Rio Hondo HVAC Replacement Project
This is a Scope of Work document for the Rio Hondo HVAC Replacement Project in California. The project involves the complete removal of an existing variable refrigerant flow (VRF) heating and cooling system and installation of new owner-furnished individual split-system heat pump units. The scope encompasses ten buildings designated as A, B, C, D, E, F, G, H, K, and T. The existing VRF system will be replaced with dedicated 5-ton air source split heat pump units to address operational and performance deficiencies while improving system reliability, maintainability, and thermal control capabilities.
The project represents a comprehensive HVAC system modernization undertaken to resolve persistent issues with the current VRF infrastructure. The specification requires installation of owner-supplied equipment, indicating that the contractor's responsibilities focus on demolition of existing systems and installation of the replacement heat pump units. This retrofit approach allows for improved individual building zone control and simplified maintenance procedures compared to the integrated VRF system being replaced.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
El Monte City School District
Opportunity Detail
RIO HONDO HVAC REPLACEMENT PROJECT 2026-6
Title RIO HONDO HVAC REPLACEMENT PROJECT Invitation # 2026-6
Posting Date 09/23/2026 9:00 AM (PDT) Project Stage Bidding Bid Due Date 10/27/2026 4:00 PM (PDT)
Response Format Electronic
Type Bid Response Types Line Items
Subcontractor Bid Bond Non-Collusion Declaration (required) Off-Road Diesel-Fueled Fleet Certification (required) Federal Debarment Certification (required) Federal Byrd Anti-Lobbying Certification (required) Iran Contracting Act Certification (required) Reference List (Note: Provide your own document.) (required)
General Liability and Property Insurance (Note: Provide your own document.) (required) Site Visit Certification (required)
Type of Award Lump Sum Categories 238190 - Other Foundation, Structure, and Building Exterior Contractors
238210 - Electrical Contractors and Other Wiring Installation Contractors 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Restriction eBidding Restricted To Must meet one of the following restrictions:
CADIR - Registered DIR Public Works Contractor
Department Purchasing Address 3540 Lexington Ave
El Monte, California 91731
County Los Angeles
Offer Valid
9/23/26, 5:01 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/70921/bo/bo-detail/141640#bidInformation 1/4
Bid Bond
Pre-Bid Meeting Information
Online Q&A
Contact Information
Description
Liquidated Damages 1000 Estimated Bid Value Start/Delivery Date
Project Duration
Bid Bond 10.00% Payment Bond 100.00%
Performance Bond 100.00%
Pre-Bid Meeting Yes Meeting Type Onsite
Date & Time 10/08/2026 10:00 AM (PDT) Address Rio Hondo School - 11425 Wildflower Rd. Arcadia, CA 91006
Attendance Required Yes
Online Q&A Yes Q&A Deadline 10/19/2026 4:00 PM (PDT)
Contact Info Matthew Law purchasing@emcsd.org
Bids to Owner's Agent
Scope of Services
THIS IS HVAC REPLACEMENT PROJECT SERVING BUILDING (A, B, C, D, E, F,
G, K, AND T). THIS BUILDING IS LOCATED AT 11425 WILDFLOWER RD,
ARCADIA, CA 91006.
1. SCOPE OF WORK CONSISTS OF COMPLETE REMOVAL OF THE EXISTING
VARIABLE REFRIGERANT FLOW (VRF) HEATING AND COOLING SYSTEM
AND THE INSTALLATION OF NEW OWNER FURNISHED INDIVIDUAL SPLIT-
SYSTEM HEAT PUMP UNITS SERVING BUILDING (A, B, C, D, E, F, G, H, K, AND
https://vendors.planetbids.com/portal/70921/bo/bo-detail/141640#bidInformation 2/4
T). THE EXISTING VRF SYSTEM HAS DEMONSTRATED OPERATIONAL AND
PERFORMANCE DEFICIENCIES AND WILL BE REPLACED WITH DEDICATED
5-TON AIR-SOURCE SPLIT HEAT PUMP SYSTEMS TO IMPROVE RELIABILITY,
MAINTAINABILITY, AND THERMAL COMFORT.
2. EACH OCCUPIED SPACE (CLASSROOM OR OFFICE) WILL BE SERVED BY
ITS OWN INDEPENDENT HEAT PUMP SYSTEM, CONSISTING OF A CEILING-
MOUNTED FAN COIL UNIT (FCU) AND A GROUND-MOUNTED OUTDOOR
CONDENSING UNIT. THE TOTAL SCOPE INCLUDES THIRTY-THREE (33) NEW
5-TON SPLIT HEAT PUMP SYSTEMS ACROSS MULTIPLE CAMPUS BUILDINGS.
Other Details
MECHANICAL:
1. REMOVE THE EXISTING VRF HVAC SYSTEM
2. INSTALL NEW OWNER FURNISHED HVAC SYSTEM
3. BUILDING-BY-BUILDING SYSTEM DISTRIBUTION
4. INDOOR FAN COIL UNIT INSTALLATION
5. DUCTWORK AND AIR DISTRIBUTION
6. CONTROLS AND THERMOSTATS
PROJECTS EXEMPT FROM PATH OF TRAVEL IMPROVEMENTS:
· THE SCOPE OF WORK DOES NOT TRIGGER PATH OF TRAVEL
IMPROVEMENTS IN COMPLIANCE WITH CBC 11B-202.4 EXCEPTION 7.
Notes HVAC equipment will be furnished by the District. All other components, equipment, and materials are to be supplied by the awarded bidder.
Final Addendum 10/22/2026
Bids Due 10/27/2026
Special Notices The District will only receive bids submitted electronically. The Planetbids Electronic Bid System will close exactly at the time outlined in the Notice Inviting Bid. Any bid that is submitted after this time shall be nonresponsive and returned to the bidder. Each bidder is solely responsible for timely submission of its bid; the District is not responsible for any technological issues in a bidder’s ability to timely submit its bid or portion thereof.
A mandatory pre-bid conference and site visit will be held. All participants are required to sign-in. Failure to attend or tardiness will render bid ineligible. The Site Visit Certification will be provided at the end of the Site Visit and must be submitted with the Bid.
A Bid Bond by an admitted surety insurer on the form provided by the District in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid.
The Board reserves the right to reject any and all bids and/or waive any https://vendors.planetbids.com/portal/70921/bo/bo-detail/141640#bidInformation 3/4
Search & Bid on Thousands of Contracts irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.
A Bidder and its subcontractors must possess the appropriate State of California contractors’ license and must maintain the license throughout the duration of the project. Bidders must also be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. Bids submitted by a contractor who is not properly licensed or registered shall be deemed nonresponsive and will not be considered.