Appendix F - Key Personnel Requirements

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIH Building 29B Renovation Conference Room AV Installation Solicitation ID: RFQ-RML-C-1860741

RFQ Appendices Section August 25, 2017

Appendix F - Page 1 of 2

APPENDIX F:

KEY PERSONNEL REQUIREMENTS

NIH Building 29B Renovation Conference Room AV Installation Solicitation ID: RFQ-RML-C-1860741

RFQ Appendices Section August 25, 2017

Appendix F - Page 2 of 2

The following key personnel shall be part of the vendor’s team. These individuals shall be identified in the awarded vendor’s response to the solicitation and their required submittals to the Government, prior to start of work.

1. The vendor shall provide one (1) qualified project manager, who shall be the primary point of contact to the Government during the entire span of the project. Full-time, daily presence shall be required onsite, during the installation period. (Note: The project manager shall be a dedicated individual. Delegation of project management responsibilities to other project staff is not allowed.)

2. The vendor shall provide at least one (1) qualified AV and videoconferencing system designer, who shall have primary responsibility for design and engineering during the entire span of the project.

3. The vendor shall provide at least one (1) qualified Crestron control system programmer who shall have primary responsibility for control system programming during the entire span of the project.

4. The vendor shall provide at least one (1) qualified audio engineer with prior experience in the programming of Biamp Tesira DSPs, who shall have primary responsibility for audio engineering and commissioning during the entire span of the project.

5. The vendor shall provide a sufficient number of qualified AV system integration and AV system installation technicians to complete the required off-site and onsite work within the allotted schedule.

5.1. The vendor shall be responsible for assuring that the accepted schedule is conformed to and that the technical staff can perform the required work at the expected level of quality during that period.

5.2. If necessary, the vendor shall provide additional staff at their own expense, to fulfill the promised completion date.

6. Key personnel will not be replaced without notification to the COR and COR concurrence with proposed replacement personnel. See HHSAR clause 352.237-75 incorporated.