STATEMENT OF WORK/SPECIFICATIONS
FCC Pollock AFD Replacement
I. SPECIFICATIONS:
A. INTRODUCTION
The Federal Bureau of Prisons (FBOP), Federal Correctional Complex Pollock located at 1000 Airbase Rd. in Pollock, LA intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to replace existing AFD, replace grounding brushes, and change oil and oil filter on Chiller #1. Contractor will adhere to all Federal, State, Industry, and Manufacturers standards or codes in performing work.
All equipment specified in this statement must be brand name or an equal product. Should your firm choose to submit an equal product, you must submit all technical specification of the equal product to be analyzed and a technical determination issued with acceptance/non-acceptance.
B. SCOPE OF WORK
1. Replace AFD
Contractor shall recover and dispose of existing refrigerant from Chiller #1. Contractor shall disconnect and reconnect any existing electrical and refrigerant lines associated with AFD replacement. Contractor shall replace the current AFD (Trane AFD, Serial Number L04M05696) from Chiller #1 (Trane, Model Number CVHF570) with an exact replacement, OEM, or equal. Contractor shall perform a virgin charge of Chiller #1 with 1350 pounds of R123 refrigerant after AFD and grounding brush replacement. Contractor shall reconfigure CH530 panel with laptop and reconfigure new AFD with Rockwell software. Contractor shall perform startup and confirm proper operation.
2. Replace Grounding Brushes
Contractor shall replace Grounding Brushes located on compressor shaft in accordance with Manufacturer’s recommendations and confirm proper operation.
3. Replace Oil Filter Change Oil
Contractor shall drain oil, remove oil filter and replace with new manufacturer recommended materials. Contractor will dispose of oil and filter accordingly.
C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS
All installers/technicians shall be qualified and/or certified by the manufacturer to install, test, and certify the new components. Such certification must be verified in writing by the manufacturer and submitted to the Contracting Officer seven (7) days before the project starts.
All environmental compliance, Life Safety, NFPA, ADA-ABA, and Federal, State and Local codes and regulations will be considered during all phases of this project.
Services and materials provided by the contractor will adhere to and shall be consistent with the most current industry standards, the Underwriters Laboratories (UL) and the General and the National Electric Code (NEC).
It is the contractor’s responsibility to obtain permitting, should it be required. Copies of all permits must be submitted to the Contracting Officer upon receipt from local agency.
The contractor shall provide a computer laptop with the software and license to reconfigure the AFD and CH530.
D. UTILITIES
The FBOP will provide water, use of restrooms and minimal electricity service (120V) for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project.
E. TESTING AND ACCEPTANCE
The Contractor shall notify the CUP Operator prior to the final system testing and certification so that arrangements can be made to have BOP required staff available to observe testing
F. HOUSEKEEPING AND MATERIAL DISPOSAL
The contractor awarded the contract will be responsible to ensure the premises are kept clean and free from accumulations of waste materials and rubbish at all times. The contractor will remove all debris, scrap, and rubbish from the work area daily. Surplus materials and all equipment shall be promptly removed from the site upon completion of the work. The Contractor shall be responsible to remove all debris and waste materials from the job site upon conclusion and acceptance of the project. These items must be disposed of in accordance with all Federal, State, and local laws.
G. SUBMITTALS & Responsibilities
1. All security clearance paperwork/documentation shall be submitted to the Facility Manager a minimum of (14) working day prior to the start of work (see below).
2. The Contractor shall provide to the Facility Manager three (3) copies of the Safety Data Sheets (SDS) on all materials and substances that may be used during the course of the project. In the event the material is not approved by the Safety Manager, it shall be the responsibility of the Contractor to locate and procure an alternative product.
3. For security and safety purposes, forty-eight (48) hour advance notice in writing, prior to disruption to the system must be given to the Contracting Officer and Facility Manager.
4. Any deviations from this Statement Of Work will be considered an Change Order Request and must be authorized through the institution’s Contracting Officer prior to the implementation of the requested change.
5. It is the Contractor’s responsibility to repair and/or replace any Government property damaged by contractors/subcontractors employees. Damage will be corrected and restored to previous condition at no cost to the Government.
6. It shall be the Contractor’s responsibility for obtaining all measurements and data requirements to comply with manufacturer’s installation recommendations. All installations must be in accordance with product manufacture’s recommendations.
II. CONTRACTOR SECURITY/WORKING REGULATIONS
A. Work Hours:
Work Hours available for the contractor are 7:30 AM – 4:00 PM, Monday - Friday, excluding weekends and federal holidays. Any work required to be completed at any other time than noted above must be requested and approved by the Facility Manager prior to the start of the work. In the event of any equipment being replaced that would result in downtime from the normal orderly running of the institution, alternate work hours may be authorized.
Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight-hour work day. The Government assumes no responsibility to the Contractor nor to any of his subcontractors for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines.
B. Delivery of Materials:
All construction materials/equipment required for work on this project is required to be processed by the Contractor and coordinated with the institution Facility Manager for temporary storage.
Any construction related deliveries which are directly shipped to the contractor can be received between the hours of 7:00 a.m. to 12:00 p.m., Monday through Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor or his representative is not present to verify and accept the delivery.
Under no circumstances will FCC Pollock or its staff be responsible for the acceptance of any Contractor or company deliveries. The contractor shall be responsible for providing their own means of loading and unloading contractor material or equipment.
The contractor shall not use the institution entry/driveway for the loading, unloading, or storage of any materials and equipment. The contractor will not impede/block the driveway at any time during or after the work shift.
C. Storage of Materials and Equipment:
All work related materials/tools can be stored in a designated area mutually agreed upon between the Facility Manager and the contractor. The storage area will be a secure lockable gang box or similar, size to be determined by the contractor and the Facility Manager. If required, the contractor shall provide a securable, single point access storage container, such as a Job or Gang Box that will be left in the agreed upon storage area for the duration of the project. Size of the storage container will be determined by the contractor and the Facility Manager. The container will be secured using a padlock protocol with two locks to secure it. One shall be a contractor lock and the other lock provided by the institution. If necessary, a heavy duty chain provided by the contractor may be used to facilitate the locking requirement. All materials and equipment stored within the container will be maintained in a safe an orderly fashion
All tools will be inventoried prior to entering the institution and will be inventoried back in to ensure accurate accountability when exiting the institution at the end of each work day.
Materials cannot be stored at a height that would create a fall hazard. All tools will be inventoried prior to entering the Institution. At the start of each work day all tools will be inventoried out on a daily tool inventory sheet and at the end of the work day all tools will be inventoried back in to ensure accurate accountability of all tools at the end of each work day.
All contractor owned extension cords that will be used during the project, regardless of length, shall be in good condition with no broken outer Insulation. Extension cords are considered a “high risk” tool having a Federal Bureau of Prisons’ tool classification of Double A. All contractor owned extension cords used for this project will be required to exit the institution at the end of every work day for the duration of the project.
All contractor owned ladders approved for use within the institution, regardless of the size, shall be stored in a pre-determined area and secured to a stationary fixture with a heavy link chain and lock which would prevent removal.
D. Security Clearance/Contractor Badges:
If required, the contractor shall provide the Facility Manager with all the necessary security clearance documents for all contractors and subcontractor employees accessing the institution.
In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor’s responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the nature of why a contractors or subcontractor employee was not able to pass the security clearance process.
All contractors/subcontractors working at FCC Pollock may be issued and required to wear a picture ID/contractor badge provided by the institution. For security reasons, the badge will be worn in a visible manner as directed by the Facility Manager.
E. Safety and Personal Protective Equipment:
All contractors and employees shall have and wear the required personal protective equipment (PPE) prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide all PPE equipment. All extension cords regardless of length shall be in good condition with no broken outer insulation and will be secured in a locked construction gang box. Should a system require Lock-out/Tag-out, the system will be required to have both Contractor and FCC Pollock locks on the isolation point to prevent shock. All Lock-out/Tag-out procedures will be in compliance with the institution Lock-out program.
F. Additional Considerations:
1. The Facilities Department maintains a digital camera that will be utilized by BOP staff to document the project work. The Contractor may request copies of these documentation photos for record keeping.
2. Contractor will be permitted to wear jeans in the institution, however, shorts, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services that are being provided.
3. Federal smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced.