RFQP04111200020 Cable System UpgradeQ A.docx

DOCX document 15 KB Posted

Attached to
CABLE SYSTEM UPGRADE - EQUIPMENT/INSTALLATION
Solicitation number
RFQP04111200020
Issued by

About this file

Contractor Questions

View the file

Other files

File Type Posted
ContractorQuestionsandAnswers.pdf PDF
RFQP04111200020 Cable System UpgradeQ A.docx DOCX document
RFQP04111200020amendment1.pdf PDF
pre-submissionminutesCABLE.docx DOCX document
RFQP04111200020CableUpgrade.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQP04111200020 Cable System Upgrade – Contractor Questions and Responses

1. Is the existing wiring to remain with no changes/replacements in this contract?

A: All of the cable being replaced will be provided and installed by FCI Pekin.

2. Are there drawings showing the layout of the man holes etc. available that can be sent out in addendum?

A: No drawings will be made available through FedBizOpps.