Figure B is a cost summary template for RFQP 25-005 from the City of Jackson, Michigan for the East Side Commerce Corridor Engineering project. The document is designed for a contractor to detail cost breakdowns across seven specific tasks: RAISE Grant Agreement Preparation, Railroad Permitting, Preliminary Survey, Preliminary Engineering (PE) and Construction Engineering (CE) for Lead Service Line Replacements, and PE and CE for Corridor Improvements. The template includes columns for base labor costs, overhead rates, direct labor costs, material and direct costs, transportation costs, and a total cost calculation.
The document is part of a U.S. Department of Transportation RAISE Grant-funded project administered through the Michigan Department of Transportation (MDOT), with the City of Jackson providing additional funding for water main and sanitary sewer construction. The cost summary template allows bidding firms to comprehensively itemize their proposed expenses across different project phases, enabling a detailed and transparent cost evaluation for the street reconstruction and infrastructure improvement work along Page Avenue, Elm Avenue, and Washington Avenue.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQP_25-005_East_Side_Commerce_Corridor_Engineering.pdf | ||
| Sample_PSA_Contract_Agreement.docx | DOCX document | |
| RFQP_25-005_FIGURE_A_STAFF_HOUR_DISTRIBUTION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQP NUMBER: RFQP 25‐005 TITLE: East Side Commerce Corridor Engineering
FIRM:
Authorized Signature Date
A B C D E F Task Task Description Base Labor Overhead Direct Labor Material and Transportation Total
Costs Rate Costs Direct Costs Costs Cost A x B C + D + E
I RAISE Grant Agreement Preparation
II Railroad Permitting
III Preliminary Survey
IV PE for Lead Service Line Replacements
V CE for Lead Service Line Replacements
VI PE for Corridor Improvements
VII CE for Corridor Improvements
Total NA
FIGURE B ‐ SUMMARY OF COSTS
Name of Company