SOW_2_pages.docx

DOCX document 18 KB Posted

Attached to
DOGTOWN BOAT RAMP MATERIALS
Solicitation number
RFQ-AG-94TZ-S-16-0044
Issued by

About this file

STATEMENT OF WORK

View the file

Other files

File Type Posted
Amd_One_SF_30.rtf RTF text file
Amd_1_page_2.docx DOCX document
Pricing_Schedule_1_page.xls XLS spreadsheet
MAG_701_702_4_pages.pdf PDF
revetment_mat_specs_11_pages.docx DOCX document
AGG_BEDDING_2_pages.doc DOC document
SF_18.pdf PDF
Clauses.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Williams Ranger District Dogtown Lake Boat ramp materials project March 2016

1. General Description:

A. The district in cooperatrion with Arizona Game and Fish would like to purchase the materials needed to upgrade the boatramp at Dogtown lake. This project will consist the supply and delivery of an ABC to a specified gradation, an aggregregate bedding to a specified size and articulating concrete block revetment mats to the Dogtown Lake boat ramp site. The base items will consist of purchasing and delivery the necessary materials for the first 100 linear feet of the boat ramp

B. Optional work depending of funding will be purchase of the same materials for an additional 125 linear feet of the boat ramp.

2. Observations:

A. Proposed plans for the upgraded boat ramp are available for reference.

B. This work will need to take place during normal business hours and care and coordination with the public will need taken. This is a very busy recreational area and it will be important to consider the public and campground concessionaire regarding the delivery of the various materials.

3. Scope of Work:

Bidders must provide a proposal & cost for the following:

A. Bidders shall provide submittals for all materials that met the specifications. The cost shall be for supplying and delivery of all materials to the project site for future use in the boat ramp reconstruction.

Weekend work is allowed on this project but will need to be coordinated with the COR. The materials shall be stockpiled onsite at a location approved by the Contracting Officers Representative.

Work Location:

Travel west on I-40 to exit 163 for N. Grand Canyon Blvd. Turn left onto N Grand Canyon Blvd for 0.7 miles, turn right onto Historic Rte 66/W Railroad Ave for 0.1 miles, then turn left onto N 4th St for 0.4 miles. Continue from N 4th St onto S Perkinsville Rd (FSR 73) for 3.4 miles and turn left onto FSR 132 towards Dogtown Lake. Travel east on FSR 132 for approximately 2.7 miles and take a left onto FSR 132G towards Dogtown Lake campground.

Contacts:

Kaibab National Forest Engineering for information or access:

Ray Holt, Supervising Civil Engineer, 928.527.3524 Lance Haubrick, Civil Engineer, 928.527.3598

File details come from the government source that posted it. Updated .