Statement of Work.doc
DOC document 26 KB Posted
- Attached to
- Prefabricated Building for Vehicle Inspections Federal contract opportunity
- Solicitation number
- RFQ20058730BW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement of Work - Post RFI Modifications.doc | DOC document | |
| RFIs for Checkpoint.doc | DOC document | |
| RFP PR20058730 PreFab Bldg for Auto Insp.doc | DOC document | |
| http //www.wdol.gov/wdol/scafiles/davisbacon/CA36.dvb | DVB file | |
| RFP PR20058730 PreFab Bldg for Auto Insp 6-14-11.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – Murrieta Agent Cover The Contractor shall furnish all labor, materials, tools, equipment, etc, to install a cover at the Murrieta, CA, Border Patrol Station Checkpoint. Location of the checkpoint is:
Customs and Border Protection
BP Checkpoint I15
47960 Interstate 15 North
Temecula, CA 92590
Technical Point of Contact is John Vaughn, 619-690-7730. Contract Specialist is Barbara B. Wilson, 317-614-4933.
Provide one 30’ wide’ x 30’ deep’ x 20’ high cover to conceal Agents while inspecting and disassembling vehicles for secondary inspection. The cover shall be placed over an existing vehicle lift.
The cover shall have one 10’ x 10’ roll-up door for vehicle access and one 3’ x7’ man door for employee access. A minimum of two windows shall be included for ventilation.
The cover shall be installed on asphalt with concrete footings.
The Contractor shall obtain CalTrans permitting prior to erecting the building.
The Contractor shall schedule his working hours to coincide with the working hours of the Customs and Border Protection personnel (normal working hours, 40-hour week, Monday through Friday, except Federal Holidays).
The procedure shall provide for safe conduct of work, careful removal of materials, and protection of property which is to remain undisturbed. Any damage resulting from the Contractor staff while performing the work shall be repaired to match the existing work at no additional cost to the Government (CBP). All work and the Contractor operations shall comply with the requirements of the National Environmental Policy Act of 1969.
File details come from the government source that posted it. Updated .