RFQ No 1205M620Q0020.pdf
PDF 8 MB Posted
- Solicitation number
- 1205M620Q0020
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
1205M620Q0020 03-25-2020 994060 (Commit) UNDER BDSA REG. 2 � AND/OR DMS REG. 1 Not Rated
5a. ISSUED BY 6. DELIVER BY (Date)
USDA Forest Service Mt. Baker-Snoqualmie National Forest 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067
Refer to Section F
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION
NAME TELEPHONE NUMBER OTHER (See Schedule)
Brian A. Johnson, CO E-mail: brian.johnson3@usda.gov
AREA CODE NUMBER 9. DESTINATION
425 783-6056 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.
This request does not commit the Government to pay any costs incurred in the preparation of the
May 4 @ 1400 PM (Pacific) submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
Baker Lake Visitor Information Station Parking Area
Redevelopment
E-mail Quote to:
Technical
POC:
Brian.johnson3@usda.gov
Thomas Warter, Tel: (360) 783-6082, E-mail: thomas.warter@usda.gov
IMPORTANT: See Section L, Para. L.7 for the documents to submit with your quote.
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT � NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 1 of 121
Stand-Alone Contract Mt. Baker-Snoqualmie National Forest Firm-Fixed-Price (FFP)
FAR 36.204 Disclosure of the Magnitude of Construction Projects:
The estimated price range of this project is: Between $100,000 and $250,000
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
BAKER LAKE VISITOR INFORMATION STATION PARKING
AREA REDEVELOPMENT
Mt. Baker-Snoqualmie National Forest Mt. Baker Ranger District
Concrete, Washington (Whatcom County)
B.1 SCHEDULE OF ITEMS
Base Items:
ITEM EST PAY UNIT TOTAL
NO. DESCRIPTION QTY UNIT PRICE PRICE
15101 Mobilization 01 LS $__________ $__________
15201 Construction Survey and Staking 01 LS $__________ $__________
20102 Clearing and Grubbing, Disposal 0.2 AC $__________ $__________
25101 Placed Riprap, Class 3, Acceptance 01 CY $__________ $__________ Method A (Rounded Boulder)
30201A Aggregate Base, 5/8” minus 140 CY $__________ $__________ WSDOT, Method 1 (Commercial
Source)
30201B Aggregate Sub-Base, 4” minus 340 CY $__________ $__________ WSDOT, Method 1 (Commercial
Source)
40304 Asphalt Concrete HMA CI ½” 285 TN $__________ $__________ PG 64-22 WSDOT, Type 2
60101 Minor Concrete Structures 160 LF $__________ $__________ (Concrete Unit Masonry Wall)
60201 18” inch Pipe Culvert, Corrugated 100 LF $__________ $__________
HDPE
61504 Sidewalk and Concrete Pad 80 CY $__________ $__________
61507 Accessibility Ramp, Parallel 02 EA $__________ $__________ Sidewalk Curb Ramp
Base Items Subtotal: $______________
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 2 of 121
Stand-Alone Contract Mt. Baker-Snoqualmie National Forest Firm-Fixed-Price (FFP)
B.1 SCHEDULE OF ITEMS (Cont’d)
Option Items:
ITEM EST PAY UNIT TOTAL
NO. DESCRIPTION QTY UNIT PRICE PRICE
25104 Boulders, Class 10 10 EA $__________ $__________
62005 Stone Masonry, Rock Stone 160 LF $__________ $__________ (Only Rock Stone)
Option Items Subtotal: $______________
Subtotal Price (Base Items): $__________________
Subtotal Price (Option Items): $__________________
Total Price: $__________________
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 3 of 121
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
This project consists of the renovation of an existing parking area that provides visitor services and information for the Baker Lake area near the town of Concrete, Washington. Work includes, but is not limited to: surveying, staking, clearing & grubbing, removal and disposal of waste, culvert removal/installation, excavation, subgrade construction, crushed aggregate, parking asphalt resurfacing, construction of concrete sidewalk, rock walls, mobilization and miscellaneous site work.
C.2 PROJECT LOCATION
This project is located at the Baker Lake Road next to Koma Kulshan Guard Station on the Mt. Baker Ranger District of the Mt. Baker-Snoqualmie National Forest, Section 25, Township 37 North, Range 08 East, Whatcom County, Washington. Project may be reached from Sedro-Woolley, Washington by traveling east on Highway 20 follow the road for 16 miles then turn left onto County Road #68, Baker Lake Forest Service Road #11 by following county road approximately 14 miles Koma Kulshan Guard Station in the right.
C.3 SPECIFICATIONS
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf
Washington State Department of Transportation, Standard Specification for Road, Bridge, and
Municipal Construction 2020; M 41-10, https://www.wsdot.wa.gov/publications/manuals/fulltext/M41-10/SS.pdf o Division 4, Section 3-04 Acceptance of Aggregate o Division 5 - Surface Treatment and Pavements, Section 5-04 Hot Mix Asphalt
C.4 CONSTRUCTION WORK DAYS AND HOURS
Monday thru Friday from 7:00AM to 7:00 PM
C.5 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.6 BIOBASED PRODUCTS
In the performance of contract, the Contractor shall make maximum use of biobased products as stated in clause FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts. Sample biobased products that may apply to this project are:
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 4 of 121
Operations and Maintenance Construction Penetrating Lubricants Dust Suppressants Greases Concrete/Asphalt Release Fluids Gear Lubricants Asphalt Restorers Pneumatic Equipment Lubricants Asphalt/Tar Removers Fuel Conditioners Traffic/Zone Marking Paints Gasoline Fuel Additives Erosion Control Hydraulic Fluids Safety Equipment (Protective Helmets)
USDA BioPreferred Program Catalog: https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 5 of 121
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 6 of 121
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 7 of 121
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than December 30, 2020. The time stated for completion shall include final cleanup of the premises.
Note: The estimated start date for this project is between May 18-29, 2020.
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 8 of 121
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
G.2 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No. Description Quantity Source Location
None
G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
1. Approve Change Orders and Modifications
2. Take Action to terminate the contract for default or Government convenience.
3. Make contract adjustments under the Different Site Conditions clause.
4. Grant extensions of contract time.
5. Approve assignment of claims.
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 9 of 121
6. Make final decisions under the Disputes clause.
7. Make final acceptance under the contract.
8. Make final decisions under the Suspension of Work clause.
9. Make equitable adjustments.
10. Authorize change in amount of Payment Retention.
11. Approve subcontractors.
12. Approve payment with deductions or final payment.
13. Approve use and possession prior to completion.
14. Enforce the warranty provisions.
G.4 NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The Contractor and subcontractor shall fill out the SF 1413, Statement and Acknowledgement and submit to the Contracting Officer. Other written notification shall include as a minimum:
a. The name, address and telephone number of the subcontractor.
b. The date upon which the subcontract was entered into and its duration.
c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
d. Documentation of the subcontractor's representative authority. Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
G.5 INVOICE PROCESSING PLATFORM (IPP)
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP).
Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted. The Contractor must also attach a detailed invoice in IPP.
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 10 of 121
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 FAR / AGAR CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE
This contract incorporates one or more clauses/provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar
H.2 SUBMITTALS
The following submittals are required for this project:
Submittal Title Referenced By
Specification No.
Submittal Date
Schedule of Work Paragraph F.2 Submit with Quote and Update as Needed
Job-Specific Safety Plan Paragraph H.3 Prior to Work Starting
Biobased Products Paragraphs C.6 and M.3 Submit with Quote
Copy of Required Insurance Coverage
Submit to CO Prior to Work Starting
Notification of Subcontracting Paragraph G.4 Prior to Subcontractor Starting Work
Fire Plan Refer to Section J. Prior to Work Starting
Camping Permit Refer to Section J. Prior to Camping
Release of Claims Form Request from CO Prior to Final Payment
Hazardous Spill Plan FP-14 Section 107 Prior to Work Starting
Quality Control Plan FP-14 Section 153 Prior to Work Starting
Traffic Control Plan FP-14 Section 156 Prior to Work Starting
Other Submittals FP-14 & FSSS As required by Specifications
H.3 JOB-SPECIFIC SAFETY PLAN
Prior to allowing any work to commence on the project, the Contractor shall submit a project-specific Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations.
Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective Equipment (PPE) that the Contractor provides for its employees at no cost to them. It shall include how often the PPE is inspected to insure that it is not defective or damaged. It shall include steps the Contractor takes
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 11 of 121 to insure that its workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE. The Contractor shall include any safety training he/she provides to his/her employees.
H.4 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9) (APR 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
H.5 USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless provided otherwise, the Contractor shall: (i) provide and maintain sanitation facilities for the workforce at the site and (ii) dispose of solid waste in accordance with applicable Federal, State, and local regulations.
H.6 ARCHAEOLOGICAL OR HISTORIC SITES (USDA 452.236-73) (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
H.7 CONTROL OF EROSION, SEDIMENTATION AND POLLUTION (USDA 452.236-74)
(FEB 1988)
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged on the ground; into or near rivers, streams, and impoundments; or into natural or manmade channels. Wash water or waste from concrete or aggregate operations shall not be
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 12 of 121 allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(c) Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H.8 RIGHTS IN AND USE OF MATERIALS
(a) The Contractors, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of work which was originally contemplated to be constructed with such material.
(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the Contractor for the cost of their production.
H.9 STORAGE AND STOCKPILING OF MATERIALS
Material shall be stored to assure the preservation of quantity and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by Forest Service shall be restored at Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered land.
H.10 EMERGENCY RESPONSE (USDA 452.236-77) (NOV 1996)
(a) Contractor's Responsibility for Fighting Fire. (1) The Contractor, under the provision of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish, all fires on the work site other than those fires in use as a part of the work. (2) The contractor may be held liable for all damages and for all costs incurred by the Government for labor subsistence, equipment, supplies, and transportation deemed necessary to suppress a fire set or caused by the Contractor or the Contractor's agent or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergency. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to restricted to fire fighting).
An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
H.11 LANDSCAPE PRESERVATION
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents and prevent the depositing of rocks, excavated materials, RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 13 of 121 stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products onsite, appropriate preventive measures shall be taken to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states.
Servicing of all equipment shall be done only in the area approved by the Contracting Officer.
If the total oil or oil products storage exceeds 6,000 litters or if any single container exceeds a capacity of shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
The Contractor will be required to make reasonable attempts to preserve the scenic and natural environment along this construction project.
(c) Trash and Refuse - Contractor shall remove all of his own trash and refuse from the contract area. Material to be removed includes, but is not limited to; used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper, garbage, etc. This material must be removed to a State, County, or Municipality-designated solid waste disposal area.
H.12 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT (MAR 2004)
To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary to ensure compliance with the terms of this provision and shall notify the Forest Service prior to moving each piece of equipment onto National Forestland, unless otherwise agreed in writing.
Notification will include identifying the location of the equipment's most recent operations.
The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.
H.13 PHYSICAL DATA
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Forest Personnel.
Weather Conditions: Weather conditions should be typical of the North Cascades, snow may be expected after October.
Elevation of this project: ~800’.
Transportation facilities: Double-lane paved highways Other Physical Data: None
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 14 of 121
H.14 FIRE PROTECTION REQUIREMENTS
The following fire requirements are attached in Section J and are applicable:
Fire Protection and Suppression, R6-FS-6300-52 (5/97) including “Additional Fire Precautionary Measure 1 - Tank Truck” and “Additional Fire Precautionary Measure 2 – Communications”
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 15 of 121
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
(Updated FAC 2020-04 Dated 01-15-2020)
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.203-19 Prohibition of Requiring Certain Internal Confidentiality Agreement or Statements (JAN 2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-22 Alternative Line Item Proposal (JAN 2017)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) (Deviation 2019-O0003) 52.219-28 Post-Award Small Business Program Representation (JUL 2013) 52.222-3 Convict Labor (JUN2003) 52.222-6 Construction Wage Rates Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Construction Wage Rates Requirements and Related Regulations (MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
(MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-50 Combating Trafficking in Persons (JAN 2019) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017)
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 16 of 121
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
(AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (AUG 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)
52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds – Construction (Oct 2010)
52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (JAN 2019) 52.245-9 Use and Charges (APR 2012) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)
(APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $35,000)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 17 of 121
452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
I.2 FAR 52.215-8 ORDER OF PRECEDENCE—CONSTRUCTION (OCT 1997)
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications);
(2) Representations and Other Instructions;
(3) Contract Clauses;
(4) Other Documents, Exhibits, and Attachments;
(5) The Specifications; then
(6) Drawings.
I.3 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 18 of 121
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 19 of 121 material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______
Foreign construction material _______ _______ _______
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I.4 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 20 of 121
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 LIST OF ATTACHMENTS
No. Attachment Description Pages
1. Project Maps and Drawings 9
2. Supplemental Specifications 27
3. Fire Protection and Suppression (R6-FS-6300-52) 6
4. Fire Plan (R6-FS-6300-55) 3
5. Wage Determination (Davis-Bacon Act) 39
6. Bid Bond (SF 24) 2
7. Camping Permit 1
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 21 of 121
Attachment 1 - Project Maps and Drawings
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 22 of 121
M
I L
E
P
I T
W
A S
T E
S
I T
E
F S
R
M
P
M
I L
F
R O
M
P
R O
J E
C T
P R
O J E
C
T
E
O
H
W Y
M
I L
E S
B
A
K
E
R
L
A
K
E
H
W
Y
F O
R E
R
V I C
E
P
R I M
A R
Y
R O
U T
E
F O
R E
R
V I C
E
S
E C
O N
D A
R Y
R O
U T
E
R O
A D
L E
G E
N D
K O
M A
K
U L
S H
A N
G U
A R
D
S
T A
T I O
N
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 23 of 121
Stand-Alone Contract Mt. Baker-Snoqualmie National Forest Firm-Fixed-Price (FFP)
AutoCAD SHX Text
BAKER LAKE INFORMATION STATION LOCATION MAP
AutoCAD SHX Text R-6
AutoCAD SHX Text
PACIFIC NORTHWEST REGION
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text
FOREST SERVICE
AutoCAD SHX Text
U.S. DEPARTMENT OF AGRICULTURE
AutoCAD SHX Text
MT. BAKER-SNOQUALMIE NATIONAL FOREST
AutoCAD SHX Text Reviewed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Design
AutoCAD SHX Text Checked
AutoCAD SHX Text Project Name
AutoCAD SHX Text Forest
AutoCAD SHX Text of
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Sheet
AutoCAD SHX Text
T. WARTER
AutoCAD SHX Text
T. WARTER
AutoCAD SHX Text
N. FERREL
AutoCAD SHX Text
MT. BAKER RANGER DISTRICT
AutoCAD SHX Text
BAKER LAKE INFORMATION STATION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BAKER LAKE INFORMATION STATION
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
F. NISHIDA
G
N E
R
L
N
T E
S
1.
C
O N
S T
R U
C T
IO
N
T R
O
O
U
D
R K
IN
ILL
B
N T
R O
L P
O
E P
R O
P O
S
P
R K
X
P A
N S
IO
N
C
O N
C R
E
ID
E W
A
LK
A
N
C R
E
LE
H E
R W
IS
P
R O
V
N
T R
A C
T
F
IC
(C
T
R
E V
IE
N
T R
A C
T
N S
T R
U C
T
A K
N
S T
R U
C T
IO
N
M A
C H
LA
C
U
LD
E R
S
R O
M
E
Q U
IR
E
M E
N
D
A
N D
A
E C
IF
IC
A T
C
T
1.0
U
LD
E
T
A
IN
M M
E R
C
IA
L S
O U
R
A
LL
P
R O
V
N
T R
A C
T
IN
G O
F F
IC
E
R
P
LA
U
LD
LO
A T
IR
E
C T
R
C R
U S
H
G R
E G
A
(5
M
IN
M
IN
U
S
S H
A
LL
T
A
IN
M M
E R
C
IA
L S
O U
R C
E
Q U
A N
T
IT
LU
R
K
E A
S
S
ID
E W
LK
N
C R
E
D
C
LE
A R
U
B B
C
A V
A
G A
IC
Y
E R
A L
S O
IL
A
M
O V
T E
R
IA
L
S
IG
N A
T E
D W
A S
IT
O
E
D E
P O
S
S
E
C T
G
O V
E R
N M
E
S
P R
O X
.5
ILE
N
S T
R U
C T
E
W
A S
T
E D
U
N T
R A
C T
R
N
S T
R U
C T
IO
N
E X
C A
V A
T
LL
W O
O
B
LE
A
R
IN
G
T O
P S
LIM
B S
R
O
U
M P
S W
ILL
P O
S
U
LIN
S
IG
N
A T
E C
T
C O
N T
R A
C T
A
LL
S P
O N
S
IB
A F
N
T R
C
E S
S A
IG
N
R
C O
N S
T R
U C
T
A C
T
IC
LIC
F E
T Y
A
LL
T
R A
C F
N
T R
O L
A
N
O
LD
T
A
N D
A R
D
C O
N C
R E
E
W
LK
N S
T R
U C
T
LU
D
A R
U
B B
IN
G
P
LA
C
E M
E
G
R E
G A
S
E , S
U R
F A
U
R
M P
A
U S
H
M P
A C
T
M P
A C
T
IO
N S
T A
N D
A
N C
R E
T E
LE
V E
LIN
E A
L K
W A
C E
E D
1 %
A
D E
R O
LL
S T
O
D
IU
(8
(18
IM
E
N S
IO
N
A
N G
U L
E
G U
IF
O R
M
C O
LO
B R
O
P R
O V
N
S T
R O
N
T R
A C
T
C O
N T
R A
C T
A
LL
C
O N
S T
R U
N
C R
E
LK
W
E W
A
LK
T
R A
N
S
T R
O
ILD
IN
G
'T Sheet Ti tle tT rawn
T. WARlE
,r Forest
.S.
DE
PA
RTM
E
N T
O F A
G
RICU
LTU
RE
M T
B
A K
E R
S
N O
Q U
A L
T
IO
N
R
E
T WARlE
G E
N E
R
T
� m·,-.u�_ .
FO
RE
R ST_
SE
6 RVICE
Design
MT. BAKER RANGER DISTR
ICT
11--
----1
Checked � N. = F
E R= R
E
LL�
Project Nam e Scale
Sheet
� Reviewed � F. =NISH=ID
A �
B A
K
O
R M
A T
A
T
T
A
PACIFI
C N ORTlllfE
ST RE
GION
L, of k==
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 24 of 121
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
BAKER LAKE INFORMATION STATION
AutoCAD SHX Text
MT. BAKER RANGER DISTRICT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text %%uGENERAL NOTES:
AutoCAD SHX Text
1. CONSTRUCTION CONTROL - THE ON GROUND MARKING WILL BE USED AS THE CONTROL POINT FOR THE
AutoCAD SHX Text PROPOSED PARKING AREA EXPANSION, CONCRETE SIDEWALK, AND CONCRETE PAD UNLESS OTHERWISE APPROVED BY THE
AutoCAD SHX Text CONTRACTING OFFICER (CO). THE CO WILL REVIEW CONTRACTOR CONSTRUCTION STAKING PRIOR TO CONSTRUCTION.
AutoCAD SHX Text
2. MACHINE PLACED ROCK BOULDERS, ROCK WILL MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION SECTION 251.04
AutoCAD SHX Text ROCK BOULDERS CAN BE OBTAINED FROM COMMERCIAL SOURCE AND SHALL BE APPROVAL BY CONTRACTING
AutoCAD SHX Text
OFFICER. PLACE BOULDER LOCATION TO BE DIRECTED BY COR.
AutoCAD SHX Text
3. CRUSHED AGGREGATE (5/8" MINUS AND 4" MINUS) SHALL BE OBTAINED FROM A COMMERCIAL SOURCE.
AutoCAD SHX Text
QUANTITIES INCLUDE NEW PARKING AREAS, SIDEWALK AND CONCRETE PAD.
AutoCAD SHX Text
4. CLEARING AND GRUBBING - EXCAVATE TOP ORGANIC LAYER TO MINERAL SOIL AND REMOVE MATERIAL TO DESIGNATED
AutoCAD SHX Text
5. EXCAVATION - ALL WOODY DEBRIS FROM CLEARING, TOPS, LIMBS, ROOT WADS AND STUMPS
AutoCAD SHX Text
WILL BE DISPOSED OF BY HAULING TO DESIGNATED SITE AS DIRECTED BY THE CO.
AutoCAD SHX Text
6. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL AND ANY NECESSARY SIGNING FOR
AutoCAD SHX Text CONSTRUCTION PRACTICES AND PUBLIC SAFETY. ALL TRACFFIC CONTROL AND SIGNING SHOULD MEET MUTCD STANDARD.
AutoCAD SHX Text
7. CONCRETE SIDEWALK CONSTRUCTION - WORK INCLUDES CLEARING AND GRUBBING, PLACEMENT OF AGGREGATE BASE, AutoCAD SHX Text SURFACE COURSE AND COMPACT THE CRUSHED ROCK WITH A PLATE COMPACTOR TO A TIGHT COMPACTION
AutoCAD SHX Text R-6
AutoCAD SHX Text
PACIFIC NORTHWEST REGION
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text
FOREST SERVICE
AutoCAD SHX Text
U.S. DEPARTMENT OF AGRICULTURE
AutoCAD SHX Text
MT. BAKER-SNOQUALMIE NATIONAL FOREST
AutoCAD SHX Text Reviewed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Design
AutoCAD SHX Text Checked
AutoCAD SHX Text Project Name
AutoCAD SHX Text Forest
AutoCAD SHX Text of
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Sheet
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text STANDARD THEN PLACE CONCRETE. LEVELING TO CREATE FLAT WALKWAYS NOT TO EXCEEDING A 1%%% GRADE.
AutoCAD SHX Text
9. NEW CXT RESTROOM IS NOT IN CONTRACT. CONTRACTOR SHALL CONSTRUCT CONCRETE WALKWAY FROM SIDEWALK
AutoCAD SHX Text
TO ENTRANCE OF CXT RESTROOM BUILDING.
AutoCAD SHX Text
8. ROCK WALL STONE TO BE ANGULAR WITH A FLAT FACE AND IRREGULAR AND NOT UNIFORM. COLOR TO BE
AutoCAD SHX Text
BROWN OR GREY AND APPROVED BY CO.
AutoCAD SHX Text WASTE SITE SHOWN ON SHEET 2, DEPOSITE WASTE AS DIRECTED BY CO. GOVERNMENT WASTE SITE APPROX. 3.5 MILES FROM
AutoCAD SHX Text
T. WARTER
AutoCAD SHX Text
T. WARTER
AutoCAD SHX Text
N. FERRELL
AutoCAD SHX Text
F. NISHIDA
CONSTRUCTION SITE. WASTE SITE IS GATED, FS KEY WILL BE ISSUE TO CONTRACTOR BY CO DURING CONSTRUCTION.
O
R T H
M A G
N E T I C
D
E C L I N
A T I O
N
A
G
H W
K
K
E
RFQ No. 1205M620Q0020 Baker Lake Visitor Information Station Parking Area Redevelopment Page 25 of 121
Stand-Alone Contract Mt. Baker-Snoqualmie National Forest Firm-Fixed-Price (FFP)
AutoCAD SHX Text
FIRE WAREHOUSE
AutoCAD SHX Text
FIRE OFFICE
AutoCAD SHX Text
WOOD SHED
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
TALL GRASS AREA
AutoCAD SHX Text
DRAINAGE SWALE
AutoCAD SHX Text
THICK TREE AREA
AutoCAD SHX Text R-6
AutoCAD SHX Text
PACIFIC NORTHWEST REGION
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text
FOREST SERVICE
AutoCAD SHX Text
U.S. DEPARTMENT OF AGRICULTURE
AutoCAD SHX Text
MT. BAKER-SNOQUALMIE NATIONAL FOREST
AutoCAD SHX Text Reviewed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Design
AutoCAD SHX Text Checked
AutoCAD SHX Text Project Name
AutoCAD SHX Text Forest
AutoCAD SHX Text of
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Sheet
AutoCAD SHX Text
MT. BAKER RANGER DISTRICT
AutoCAD SHX Text
EXISTING SITE PLAN
AutoCAD SHX Text
BAKER LAKE INFORMATION STATION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
THICK TREE AREA
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .