SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
0009910038 CODE 16. ADMINISTERED BYCODE
X
X
X
811310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR60
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
02/26/2021 1700 MT
01/26/2021
928-681-4000Senthia Bruns (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R6021Q0009
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 700040518032OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
Billings MT 59107
TELEPHONE NO.
17a. CONTRACTOR/
Loveland CO 80537
11056 W. CR 18E
Eastern Colorado Area Office Bureau of Reclamation-GP-ECAO
15. DELIVER TO
Billings MT 59107 PO Box 36900 Regional Office Great Plains Region
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$8.00
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
SMALL BUSINESS SET-ASIDE.
Complete Quote package must include:
___Standard Form 1449 - enter business name, DUNS or Cage Code, address, telephone number and email address in block 17 and complete block 30 ___Company Experience Reference List, (Attachment 1) ___Acknowledgement of all associated amendments, if any
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Senthia Bruns
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
U. S. Department of the Treasury's Invoice Processing Platform System (IPP) at https:// www.ipp.gov
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010
All offerors are required to have an active registration in System for Acquisition
Management, (www.sam.gov) by the solicitation close date.
Requests for information shall be submitted in writing to Senthia Bruns,Contracting Officer via email at sbruns@usbr.gov, NO LATER THAN Friday, February 12, 2021 12:00 PM MST. Answers to all questions received will be included in an amendment to the solicitation.
Award shall be made based on the lowest price technically acceptable offer. The contract will be a lump sum, firm-fixed price contract. Please submit your proposal electronically to:
sbruns@usbr.gov. Do not submit your proposal via
FedConnect. If you have any questions, please contact Senthia Bruns via email at sbruns@usbr.gov.
Mount Elbert Station Service Breaker Rehab
Period of Performance: 03/01/2021 to 06/30/2023
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
702 of
1 AU $___________ $____________________
COMPANY EXPERIENCE REFERENCE LIST
CONTRACTOR NAME: ______________________________________________________
Note: The Government may not evaluate references with incorrect or missing phone numbers and contact names.
1. Agency/Company: ________________________________________________________ Contract Number, Type, Date, and Name of Project: ________________________________ Description of the Work: ______________________________________________________ Contract Value (Initial and Final): _______________________________________________ Attn: (Name/Title) __________________________________________________________ Telephone No. _____________________________________________________________ E-mail (if known) ____________________________________________________________
2. Agency/Company: ________________________________________________________ Contract Number, Type, Date, and Name of Project: ________________________________ Description of the Work: ______________________________________________________ Contract Value (Initial and Final): _______________________________________________ Attn: (Name/Title) __________________________________________________________ Telephone No. _____________________________________________________________ E-mail (if known) ____________________________________________________________
3. Agency/Company: ________________________________________________________ Contract Number, Type, Date, and Name of Project: ________________________________ Description of the Work: ______________________________________________________ Contract Value (Initial and Final): _______________________________________________ Attn: (Name/Title) __________________________________________________________ Telephone No. _____________________________________________________________ E-mail (if known) ____________________________________________________________
4. Agency/Company: ________________________________________________________ Contract Number, Type, Date, and Name of Project: ________________________________ Description of the Work: ______________________________________________________ Contract Value (Initial and Final): _______________________________________________ Attn: (Name/Title) __________________________________________________________ Telephone No. _____________________________________________________________ E-mail (if known) ____________________________________________________________
5. Agency/Company: ________________________________________________________ Contract Number, Type, Date, and Name of Project: ________________________________ Description of the Work: ______________________________________________________ Contract Value (Initial and Final): _______________________________________________ Attn: (Name/Title) __________________________________________________________ Telephone No. _____________________________________________________________ E-mail (if known) ____________________________________________________________
Performance Work Statement 600 Volt Breaker and Structure Service
Mt. Elbert Pumped Storage and Power Plant January 14, 2021
1. BACKGROUND
The Bureau of Reclamation anticipates award of a contract to perform services for 600V power circuit breakers and the associated switchgear structure for the Mt. Elbert Pumped Storage and Power Plant. The lineup is an ITE with K-Line breakers. The facility is located at Twin Lakes, Colorado, 81251. The work will consist of rebuilding the power circuit breakers at the Contractor’s shop. During the period of performance of the contract, Reclamation will ship circuit breakers, one or two at a time, to the Contractor’s shop for rebuilding. In conjunction with the rebuild, the Contractor shall replace the breakers’ existing trip units with new AC- PRO trip units. There are four (4) 1600A breakers and seventeen (17) 600A breakers.
Additional work performed under this contract shall include, at a time to be determined by the facility within the period of performance, having the Contractor mobilize at the facility to clean and inspect the switchgear structure, and perform testing and maintenance as required (six (6) vertical sections); this work shall include testing the panel-mounted devices. The contractor shall furnish detailed logs for the individual breakers and structure describing the work performed, parts refurbished or replaced, and electrical and mechanical test results.
2. SITE VISIT
No pre-bid site visit will be conducted for this contract.
3. CONTRACTOR AND PERSONNEL
The Contractor’s technicians must be NETA certified and have a minimum five (5) years experience testing, servicing and rebuilding power circuit breakers.
Individuals performing onsite work may be required to show a driver’s license before being granted access to the site. In the absence of a driver’s license, the employee shall provide an alternate source of official identification that includes: First, Middle, Last Name; date and place of birth; and place of residence. All Contractor employees must be U.S. citizens or have a valid Immigrant Visa Number, Permanent Resident Card, or Resident Alien card authorizing them to work in the United States.
Only authorized Contractor employees shall be permitted in the facilities. A list of all employees, vehicles, and equipment to be utilized on-site, in accordance with GP-7, “Site Security,” will need to be submitted at least 10 days prior to arriving at the worksite. The contractor will be escorted at all times while on government property.
The Contractor shall be liable for any loss or damage to government property while in his/her possession and shall be responsible for any damage to government buildings or equipment occurring as a result of performance of the contract. It is understood that in the performance of the contract, the Contractor is an independent contractor, and not an agent or employee of the
United States. The Contractor shall indemnify, save, and keep harmless the government against any or all loss, cost, damage, claim, expense, or liability whatsoever, because of accident or injury to persons or property of others occurring in connection with operations under the contract.
The Contractor shall furnish qualified, experienced, drug-free, and safety-oriented personnel to perform the services under this contract. Employees shall promptly correct unsafe working conditions or report them to either the Contracting Officer’s Representative (COR) or other proper authority. Employees shall report all accidents or injuries. Fire prevention shall be exercised at all times by the Contractor and their employees. All combustible material shall be used and stored in a safe manner. The Contractor shall report any fire hazards and, if possible, correct them. In the event of a fire, the Contractor shall call 911 to report the fire and notify Reclamation personnel.
Personnel shall be licensed, insured and certified as required by the appropriate governing agencies.
4. PERIOD OF PERFORMANCE
After contract award, work will be completed within 24 months unless arranged in advance and agreed upon by both Reclamation and the Contractor. The on-site work, i.e. work performed on the switchgear structure, will take place at a time to be determined by Reclamation. All effort will be made by Reclamation to provide the Contractor sixty (60) days advance notice for the on-site work.
Hours - On-site work shall be performed between the hours of 7:00 a.m. and 4:00 p.m. on weekdays, Federal holidays excluded. However, the above hours may be flexible at the discretion of the COR or the site representative.
5. GOVERNMENT FURNISHED PROPERTY
Reclamation is not furnishing any material or equipment to support executing the work necessary in this contract. The Contractor is responsible for providing all equipment, materials, labor, programs, and supplies to meet the requirements of the contract. The equipment must operate at full-rated performance levels using existing building circuits.
All tools and equipment shall be properly calibrated, in good working order, and meet all applicable safety requirements.
When the work is performed on the switchgear structure, the facility will need to take a total outage to de-energize the lineup. No AC power will be available for the Contractor’s use, and only emergency lighting will be operational. DC control power will remain available. The Contractor will need to furnish a generator and lighting as required to execute the work.
6. SAFETY AND HEALTH
• Contractor personnel shall be trained and equipped to work within and comply with OSHA and Reclamation Safety and Health Standards (RSHS). RSHS may be accessed at http://www.usbr.gov/ssle/safety/RSHS/rshs.html.
• The Contractor shall provide a written safety plan on request. At a minimum, the general safety plan shall describe in detail how the RSHS will be complied with.
• The Contractor shall provide personal protective equipment (PPE) for workers and shall utilize a personal protective equipment program consistent with OSHA and the RSHS.
• The Contractor shall not require or permit any employee conducting performance under the anticipated contract to engage in work under conditions which are unsanitary, hazardous, or dangerous to the employee’s health or safety.
• The Contractor shall keep the premises free from debris and accumulated waste when performing onsite work.
• Reclamation personnel shall place an electrical clearance on the equipment. The Contractor’s personnel shall walk the clearance with Reclamation and place their own personal lock(s) on the clearance box.
7. CONSTRAINTS
• Site work area:
o The Contractor work site shall consist of the switchgear bay and avenues of ingress/egress.
o Any items or materials brought on site will be the Contractor’s responsibility. There is no storage available. The Contractor is responsible for all trash or debris and its proper disposal off-site. The Contractor is responsible for all damages to government facility, government or personally owned vehicles and property. The Contractor shall restore to their original condition any areas disturbed by their work or negligence including walls, ceilings, and floors. This shall include wall patching, painting, carpentry, metal work, and general cleaning. This restoration shall be done to the satisfaction of the
COR.
o Any damage must immediately be reported.
8. TASKS
• Contractor is responsible for all shipping or pick/delivery charges. Contractor is also responsible for any damages during the shipping or pick/up delivery.
• 600 Volt Power Circuit Breaker Rebuild & Testing:
o Visual and Mechanical Inspect physical and mechanical condition.
Prior to cleaning the unit, perform as-found tests, if required.
Clean the unit.
Inspect arc chutes.
Inspect moving and stationary contacts for condition, wear, and alignment.
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
Inspect bolted electrical connections for high resistance using one or more of the following methods:
• Use of a low-resistance ohmmeter in accordance with NETA MTS Section
7.6.1.2.B.1.
• Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer’s published data or NETA MTS Table 100.12.
Replace worn or damaged parts as required.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
Perform post-rebuild tests.
Record pre-rebuild and post-rebuild operation counter readings.
o Electrical Testing Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-to-ground with the circuit breaker closed, and across each open pole. Apply voltage in accordance with manufacturer's published data. In the absence of manufacturer's published data, use NETA MTS Table 100.1.
Perform a contact/pole-resistance test. - Determine long-time pickup and delay by primary current injection.
Determine short-time pickup and delay by primary current injection.
Determine ground-fault pickup and delay by primary current injection.
Determine instantaneous pickup value by primary current injection.
Perform minimum pickup voltage test on shunt trip and close coils in accordance with NETA MTS Table 100.20.
Verify operation of charging mechanism.
• Switchgear Structure Inspection and Testing o Visual and Mechanical Inspect physical, electrical, and mechanical condition including evidence of moisture or corona.
Prior to cleaning the unit, perform as-found tests, if required.
Clean the unit.
Inspect bolted electrical connections for high resistance using one or more of the following methods:
• Use of a low-resistance ohmmeter in accordance with NETA MTS Section
7.1.B.1.
• Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer’s published data or NETA MTS Table 100.12.
Use appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
Verify correct barrier and shutter installation and operation.
Exercise all active components.
Inspect mechanical indicating devices for correct operation.
Replace worn or damaged parts as required.
Verify that filters are in place and/or vents are clear.
Perform visual and mechanical inspection of instrument transformers in accordance with NETA MTS Section 7.10.
Perform as-left tests.
Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.
Verify that primary and secondary fuse ratings or circuit breakers match drawings.
Verify correct functioning of drawout disconnecting and grounding contacts and interlocks.
o Electrical Testing Perform insulation-resistance tests on each bus section, phase-to-phase and phase-to-ground, for one minute in accordance with manufacturer's published data. In the absence of manufacturer’s published data, use NETA MTS Table 100.1.
Verify operation of switchgear/switchboard heaters and their controller, if applicable.
• Protective Relays - Electromechanical and Solid-State o Visual and Mechanical Inspect relays and cases for physical damage.
Prior to cleaning the unit, perform as-found tests, if required.
Clean and inspect the unit.
Tighten case connections.
Inspect cover for correct gasket seal.
Clean cover glass. Inspect shorting hardware, connection paddles, and knife switches.
Remove any foreign material from the case.
Verify target reset.
Inspect relay for foreign material, particularly in disk slots of the damping and electromagnets.
Verify disk clearance. Verify contact clearance and spring bias.
Inspect spiral spring convolutions.
Inspect disk and contacts for freedom of movement and correct travel. Verify tightness of mounting hardware and connections. Burnish contacts. Inspect bearings and/or pivots.
o Electrical Testing Perform insulation-resistance test on each circuit-to-frame. Procedures for performing insulation-resistance tests on solid-state relays should be determined from the relay manufacturer’s published data
Test targets and indicators Determine pickup and dropout of electromechanical targets Verify operation of all light-emitting diode indicators Set contrast for liquid-crystal display readouts.
25 Sync Check Relay
• Determine closing zone at rated voltage
• Determine maximum voltage differential that permits closing at zero degrees
• Determine live line, live bus, dead line, and dead bus set points
• Determine time delay
• Determine advanced closing angle
• Verify dead bus/live line, dead line/live bus and dead bus/dead line control functions 27 Undervoltage Relay
• Determine dropout voltage
• Determine time delay
• Determine time delay at a second point on the timing curve for inverse time relays
• Determine minimum pickup at maximum torque angle
60 Voltage Balance Relay
• Determine voltage difference to close the contacts with one source at rated voltage
• Plot the operating curve for the relay
• Additional Requirements o The contract shall include specifically listed equipment and any ancillary materials and supplies not otherwise listed but necessary to complete the work such that all systems are completely functional and operate as intended.
o Any case of error, omission, discrepancy, inconsistency, or lack of clarity in the statement or drawings shall be promptly identified to the facility.
o Throughout the life of this contract, the Contractor is encouraged to continuously seek ways to incorporate innovative and emerging technologies that in the most economic and efficient manner improve mission performance. The Contractor is responsible for ensuring that each employee observes all health and safety regulations and compliance with instructions issued to them by the facility.
o The Contractor shall return work areas to their as-found condition.
o The Contractor must give notice at least one business day prior to arriving on site.
9. SUBMITTALS
• The Contractor shall make submittals per Section 15.
10. REFERENCES
• ANSI/NETA MTS, Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems
11. DELIVERABLES
• Rebuilt power circuit breakers with AC-PRO trip units.
• Power circuit breaker rebuild documentation and test reports.
• Switchgear structure inspection and test report.
12. QUALITY ASSURANCE
• All materials and equipment supplied shall be new, first quality, and the manufacturer’s best type and latest model for use in the maintenance and rebuilding of the power circuit breakers.
13. WARRANTY
• Furnish Statement of Warranty (RSN-2) with solicitation response documents.
• At a minimum, the contractor shall warrant the rebuilt power circuit breakers to be free from inherent mechanical and electrical defects for a period of one (1) year from the date of first energization, up to a maximum of eighteen (18) months.
14. RECLAMATION DOCUMENTS
• One-line diagram, at arrival on site
15. CONTRACTOR DELIVERABLES AND SUBMITTALS
RSN
# Submittals Required Due date or delivery time
No. of sets to be sent to:
CO COR
1 Qualifications With response to solicitation 1 0
2 Statement of Warranty With response to solicitation 1 0
3 Acceptable certificate of liability insurance
Within ten (10) calendar days after contract award 1 0
1) List of all contract and subcontract employees
Prior to arrival on site 1 1
2) List of all vehicles and equipment to be on site
Prior to arrival on site 1 1
5 Breaker documentation Return with breaker 0 1
Structure inspection and testing documentation
After site visit 0 1
16. CONTRACTOR QUALITY CONTROL PLAN
• Quality Control Plan (QCP). The Contractor, not Reclamation, is responsible for the management and quality control actions necessary to meet the quality standards set forth by the contract. As such, the contractor shall establish and maintain a QCP to ensure they achieve the requirements of the contract.
17. PERFORMANCE REQUIREMENTS TABLE (PRT)
Task Description
Performance Standard
Method of Monitoring Disincentive Incentive
Rebuild circuit breaker
Circuit breaker rebuilt to new functional condition
Breaker returned w/ documenta-tion, fully functional
Payment not authorized
Performance documented, satisfy contract requirement
Structure inspected and tested
Structure is inspected, cleaned and tested
Structure is clean and fully functional, documenta-tion
Payment not authorized
Performance documented, satisfy contract requirement
18. GOVERNMENT REMEDIES
Government evaluation
• All work shall be subject to inspection, approval, and acceptance by the Government. The Government will compare the Contractor’s performance to industry standards and will not exclude common sense considerations as applied by the COR. The CO will follow the requirements of FAR Clause 52.212-4(a) for the Contractor’s failure to correct nonconforming services. The Government will consider work incomplete when the following condition exists:
o The power circuit breakers are either not returned to Reclamation or not in rebuilt condition.
o The switchgear structure work is not executed as described.
• If the performance of any required service is unsatisfactory, and poor performance is clearly the fault of the Contractor, the Government may reduce the contract price to reflect the reduced value of defective services, if the Government notifies the Contractor in writing prior to executing such payments.
• The CO will determine the payment deduction amount by calculating the percentage of acceptable services performed by the Contractor. The Government will use the total number of deficiencies found to determine the percentage found unacceptable. The percentage found unacceptable subtracted from 100 percent will determine the percentage acceptable.
19. PAYMENT
Invoices must be submitted to the Contracting Officer first, then after approval, electronically through the U.S. Department of the Treasury’s Invoice Processing Platform (IPP) system located at www.ipp.gov. The Contractor shall be registered in the IPP system before any payment is made to the Contractor. The IPP system is FREE to register and use.
20. PHOTOGRAPHS
Switchgear Lineup http://www.ipp.gov/
Spare 600A Breaker
1200A Breaker Nameplate
21. GOVERNMENT POINTS OF CONTACT
Contracting Officer (CO): Bureau of Reclamation – Contracting Officer (CO):
Bureau of Reclamation Senthia Bruns PO Box 36900
Billings, MT 59101 Ph: 928-681-4000 sbruns@usbr.gov
Bureau of Reclamation Technical Point of Contact and Quality Assurance Evaluator (QAE)
Chris Longaker Reclamation POC Bureau of Reclamation 5583 Hwy 82 Twin Lakes, Colorado 719-486-2325, ext 244 clongaker@usbr.gov mailto:sbruns@usbr.gov mailto:clongaker@usbr.gov
CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE - (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): FAR Clauses – https://www.acquisition.gov/far/.
WBR 1452.222-81 Employment Verification 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-18 Commercial and Government Entity Code Maintenance - (Aug 2020) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019) 52.212-3 Offeror Representations and Certifications-Commercial Items. (Jun 2020) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items. (Jun 2020) 52.232-1 Payments (Apr 1984) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors - (Dec 2013) 52.233-1 Disputes (May 2014) 52.233-4 Applicable Law for Breach of Contract (Oct 2004) 52.243-1 Changes Fixed-Price (Aug 1987)
(End of clause)
GP-7 SITE SECURITY (FEB 2004)
(a) At least 10 days prior to arriving at the worksite, the contractor shall submit a list to Reclamation’s technical representative (Representative) listed in section 8 of the Statement of Work, the names of all contractor employees that will be on-site. Additional employee names must be provided to the Representative prior to additional employees arriving on-site. The list(s) must include a legible photocopy of each employee's driver's license. In the absence of a driver's license, provide an alternate source of official identification that includes: First, Middle, Last Name; date and place of birth; and place of residence. All contractor employees must be U.S. citizens or have a valid Immigrant Visa Number, Permanent Resident Card, or Resident Alien Card authorizing them to work in the U.S.
(b) At least 10 days prior to arriving at the worksite, the contractor shall submit an initial list to the Representative of all contractor vehicles to be brought to the worksite. For each vehicle the list shall include the year, make, model, and color;
and license plate numbers and state of issuance when applicable.
(c) All firearms and dangerous weapons are prohibited in Federal facilities for all persons not specifically authorized by Title 18, United States Code, Section 930. A license to carry a concealed firearm issued under state law is not an exception to this prohibition. This prohibition shall apply to all areas within the construction worksite and contractor use area.
(d) Reclamation reserves the right to change or modify security requirements as mandated by the Office of Homeland Security and/or as deemed necessary by Reclamation security staff.
(e) Any violations of Reclamation security requirements and/or restrictions may result in Reclamation denying the contractor personnel access to the worksite.
(f) Contractor shall notify Representative at least 24 hours in advance of any material delivery to worksite.
(End of clause)
WBR 1452.209-82 PROHIBITION ON RELEASE OF INFORMATION -- BUREAU OF RECLAMATION (JUL 1997)
(a) The Contractor shall not disclose information pertaining to the services performed under this contract to anyone other http://www.acquisition.gov/far/ than Government or other personnel authorized by the Contracting Officer. The Contractor agrees that it will protect any information obtained from other companies during the performance of this contract from unauthorized use or disclosure for as long as the information remains proprietary and shall refrain from using such information for any purpose other than that for which it was furnished.
(b) In the event that the Contractor intends to employ individuals other than its own staff or other firms in the performance of the contract, each individual or firm shall be required to furnish the same written certification.
(c) The contractor shall insert, in any subcontract that requires the performance of work similar to that being performed by the Contractor, terms that shall conform substantially to the language of this clause, including this paragraph (c).
(End of clause)
WBR 1452.228-70 Liability Insurance -- Department of the Interior Jul 1996
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY
$100,000 minimum coverage
GENERAL LIABILITY
$500,000 per occurrence
AUTOMOBILE LIABILITY
$200,000 each person $500,000 each occurrence $20,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The Contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
(End of clause)
WBR 1452.237-80 Security Requirements. BUREAU OF RECLAMATION (February 2017)
(a) General Security Requirements:
(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements. Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.
(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the CO. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the CO will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.
(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas.
The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.
(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.
(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.)
During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.
(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated.
(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities. Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site.
Cards that have been lost, damaged, or stolen must be reported to the COR and DOI Access Sponsor within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.
(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government.
The Contractor may be charged up to $500 for each occurrence for any required replacement of Government-issued access control or identification cards due to loss or misuse. At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the COR.
(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S. citizens or foreign individuals legally residing in, or legally admitted to, the U.S. For all non-U.S. citizens working under this contract, irrespective of length of time working on the contract, the Contractor shall provide to the COR, legible and valid copies of the individual’s passport and visa (unless individual is on the Visa Waiver Program) a minimum of 14 calendar days prior to beginning work or arriving at the facility. A driver’s license is not acceptable identification. In addition, a completed form I- 94 shall be submitted to the COR upon the individual’s arrival at the work facility and prior to beginning work.
(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the Contracting Officer (CO). The Contractor shall report any information raising a doubt as to whether an individual’s eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public Trust.
(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor (or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, inappropriate release of sensitive information, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from Reclamation buildings and/or facilities at no cost to the Government.
(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.
(13) These security requirements apply to all sections of this Contract including Contract Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including FAR clauses by reference or as amended by related documents.
(b) Information Security Requirements.
(1) Sensitive Information. The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and 552a of Title 5, United States Code: the Freedom of Information Act and the Privacy Act.
Sensitive information is generally categorized as FOR OFFICIAL USE ONLY (FOUO) information or CONTROLLED UNCLASSIFIED INFORMATION (CUI), but in some cases may include other unclassified information. (The protection of National Security information is beyond the scope of this clause. If any work on National Security information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors. Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation directives and standards for identifying and safeguarding sensitive information (SLE 02-01), which is available from the COR or at http://www.usbr.gov/recman/DandS.html#sle.
(i) Any Government-furnished information or material does not become the property of the Contractor and may be withdrawn at any time. Upon expiration or termination of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Government-furnished information residing on any electronic systems (laptops, servers, desktops, media) shall be deleted from those systems using a COR-approved data erasure solution. Only with prior authorization from the CO may the Contractor retain the material.
The Contractor or subcontractor shall not disclose or release the materials provided to the Contractor to any individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the CO.
Prohibited dissemination or disclosure includes, but is not limited to: permitting access to such information by foreign nationals or by immigrant aliens who may be employed by the Contractor, publication of technical or scientific papers, advertising, disclosure to Contractor staff not investigated and deemed acceptable at the appropriate information sensitivity level, and any other public release. The Contractor shall maintain, and furnish upon request of the CO, records of the names of individuals who have access to sensitive material in its custody. All questions regarding information security, access, and control shall be referred to the COR.
(ii) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained (for example, film, tape, document, electronic), pertaining to any part of this contract or any Reclamation program or activity, unless the CO has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, social media posts, and any other media releases. Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the CO ten business days before the proposed date for release. Subcontractors shall submit requests for authorization to release through the prime Contractor to the CO.
(iii) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.
(2) Classified Information.
(i) The disclosure of U.S. Government documents by third parties can result in damage to our national security. While this contract may not deal directly with classified information, each contractor is obligated to protect classified information pursuant to all applicable laws and to use Government information technology systems in accordance with agency procedures so that the integrity of such systems is not compromised.
(ii) Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites, or other electronic or non-electronic media) do not alter the documents' classified status or automatically result in declassification of the documents. To the contrary, Uclassified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by Federal employees and contractors, until it is declassified by an appropriate U.S. Government authorityU. Executive Order 13526, Classified National Security Information (December 29, 2009), Section 1.1.(c) states, "Classified Information shall not be declassified automatically as a result of any unauthorized disclosure of identical or similar information." Although the Department has taken steps to prevent access to publicly disclosed classified materials from Departmental computers, it is important to understand our continuing duties and responsibilities in this regard.
(iii) Contractors (which include all employees of the contractor, as well as subcontractors and its employees performing work for the contractor) are reminded of the following obligations with respect to the treatment of classified information and the use of unclassified government information technology systems:
(iv)The contractor shall not, while using unclassified Government computers or other devices (such as phones or tablets) access documents that are marked classified (including classified documents made publicly available by a third party), as doing so risks that material still classified will be placed onto unclassified systems. This requirement does not restrict contractor access to unclassified, publicly available news reports (and other unclassified material) that may in turn discuss classified material, as distinguished from access to underlying documents that themselves are marked classified (including if the underlying classified documents are available on public web sites or otherwise in the public domain).
(v) For contracts that require access to classified information, the contractor is responsible for obtaining the required national security clearance through the Department of the Defense National Industrial Security Program Operating Manual (NISPOM). Any classified contracts will be coordinated through the Reclamation Chief Security Officer, or for IT requirements, the Bureau Chief Information Security Officer. No contractor shall access classified information unless proper clearances have been obtained and transmitted to Reclamation. For further information, refer to 443 DM 1 or DOD NISPOM 5220.22-M dated February 28, 2006 (incorporating change 2 dated May 18, 2016). \
(vi) Classified information shall not be removed from official premises.
(vii) Classified information shall not be disclosed without proper authorization.
(c) Contractor Employee Suitability and Issuance of Government Identification Cards:
USee Clause GP-7 located on Page 1 of Clauses
(d) Reserved
(e) Site Security Requirements
(1) General Description. This section provides provisions to ensure the full security integrity of the facility and personnel working at the facility. The work of this section may involve interfaces with a number of Government security personnel, normally coordinated through the designated COR. The Contractor is responsible for ensuring that activities are accomplished in a manner that complies fully with applicable security statutes, regulations, policies, directives, and standards.
(2) Government Security Personnel. When and where applicable, personnel may be assigned to control access, secure materials or activities at the work site, or escort Contractor personnel in sensitive areas. Personnel may include: security managers, security guards, security contractors acting as agents of the Government, law enforcement personnel, or other contractors or employees. These individuals may be used to ensure the overall security and integrity of the site or building and provide controlled access. These individuals may conduct inspections of all workers, vehicles, equipment, or materials entering, or re-entering the work site. The inspection may be done visually, with walk-through and/or hand-held metal detectors, or by other means as may be deemed necessary by Reclamation.
(3) Contractor Guard Force. At the Contractor’s sole discretion, and at the Contractor’s own expense, with prior written Government approval, a Contractor may be authorized to hire its own guards to secure Contractor-owned equipment and/or to protect Contractor employees or subcontractors. If such a relationship is permitted, the Contractor shall be exclusively liable for all guard activities to include action or inaction of Contractor’s guard personnel. The Government will not offer nor provide any indemnification. Contractor shall be solely responsible for guards at all times to include any supervision, oversight, and for the development of local guard orders and/or procedures. The Contractor shall be responsible for coordinating all guard activities with the COR and shall develop and submit to the COR, for advance approval, any guard orders and/or guard procedures.
(4) Additional Security-Related Submittals
(i) Visitor List. The Contractor shall furnish to the COR, in advance, notification of visit of any…