Task Order Request for Proposal No.: NE-EB2000-22-01135

NOAA WALLOPS COMMAND AND DATA ACQUISITION STATION,

Evaluation and Repair of the WCDAS Electrical Switchgear GE – Zenith Emergency Generator Communication & Control System

This is a Request for Quote (RFQ) for a Firm-Fixed-Price (FFP) task order for The National Oceanic and Atmospheric Administration (NOAA), National Environmental Satellite, Data and Information Service (NESDIS), Office of Satellite and Products Operations (OSPO) for the following service:

Evaluation and Repair of the WCDAS Electrical Switchgear GE – Zenith Emergency Generator Communication & Control System

This is a solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.603-Streamlined Solicitation for Commercial Items under FAR Part 13, and supplemented with additional information included in this notice. This announcement constitutes the only solicitation;

quotations are being requested. The specific requirements are presented in the Statement of Need (below).

This is being procured as a small business set-aside under North American Industry Classification System (NAICS) Code 541990. Along with the quote, the Offerors shall provide a price list in reference to the items listed in the Statement of Need. This Request for Quote incorporates provisions and clauses in effect through Federal Acquisition Circulars 2022-06, dated May 26, 2022.

Vendors responding to this requirement shall provide FOB destination pricing for all the products/services listed.

Any questions related to this notice shall be submitted via email by 12:00 PM Eastern Time on August 1, 2022, to Lori Smith (Lori.Smith@noaa.gov) and Myra Rowe (Myra.Rowe@noaa.gov).

Answers to questions submitted will be provided as soon as practicable.

Responses are due via email by 4:00 PM Eastern Time on August 2, 2022 to Lori Smith, (Lori.Smith@noaa.gov) and Myra Rowe (Myra.Rowe@noaa.gov). There will be no exceptions to the time and date on which responses are due, unless determined otherwise by the Contracting Officer (CO). To verify receipt of your response, please contact the aforementioned by e-mail. Proposals must be valid for at least 60 days from date of submission.

The Contracting Officer reserves the right to make no award under this RFQ and under no circumstances shall NOAA be liable for any contractor costs responding to this RFQ.

We thank you for your continued support of the National Oceanic and Atmospheric Administration

(NOAA).

Basis for Award: NOAA anticipates awarding a Firm-Fixed Price order. Prices will be evaluated on the basis of the total price for all required deliverables, but price quotes must clearly detail/itemize the mailto:Lori.Smith@noaa.gov unit price and the total extended price (unit price x quantity) for each required item. Offerors are encouraged to provide additional discounts for required deliverables. Additionally, quotes will be evaluated for completeness and the degree to which they satisfy all RFQ requirements. Quotes shall satisfy and adhere to all requirements of this RFQ and shall clearly indicate any assumptions that are not defined in, or directly aligned with, this RFQ.

FAR SOLICITATION PROVISIONS AND CONTRACT CLAUSES

This solicitation shall incorporate the Federal Acquisition Regulations (FAR) clauses from the offerors General Services Administration (GSA) contract and the following Federal Acquisition Regulations (FAR), Commerce Acquisition Regulation (CAR), and National Oceanic Atmospheric Administration Acquisition Manual (NAM) clauses below.

52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

(End of Provision)

52.252-2 Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

(End of Provision)

Applicable

“X”

FAR Clause Number

FAR CLAUSE TITLE

X 52.212-1 Instructions to Offerors –Commercial Items

(NOV 2021)

X 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services (May 2022)

52.217-5 Evaluation of Options (July 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

52.217-8 Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

(End of clause)

52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within thirty (30) days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months.

52.237-1 Site Visit (Apr 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

(End of provision) https://www.acquisition.gov/far/17.206#FAR_17_206

COMMERCE ACQUISITION REGULATION (CAR) PROVISIONS AND CLAUSES

INCORPORATED BY REFERENCE

The resultant contract incorporates the following Commerce Acquisition Regulation clause (CAR) by reference (as indicated by an “X”) with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make the full text available.

Applicable

“X”

CAR Clause Number

CAR CLAUSE TITLE

X 1352.201-70 Contracting Officer's Authority (APR 2010)

X 1352.209-72 Restrictions against disclosure (APR 2010)

X 1352.209-73 Compliance with the laws (APR 2010)

X 1352.209-74 Organizational conflict of interest (APR 2010)

1352.233-70 Agency Protests (APR 2010)

(a) An agency protest may be filed with either: (1) The contracting officer, or (2) at a level above the contracting officer, with the appropriate agency Protest Decision Authority. See 64 FR 16,651 (April 6, 1999).

(b) Agency protests filed with the Contracting Officer shall be sent to the following address:

Lori Smith NOAA Acquisition and Grants Office SSMC 2, Room 11328 1325 East West Highway Silver Spring, MD 20910 Lori.Smith@noaa.gov

(c) Agency protests filed with the agency Protest Decision Authority shall be sent to the following address:

Sally Bockh NOAA Acquisition and Grants Office SSMC 2, Room 11328 1325 East West Highway Silver Spring, MD 20910 E-mail:

(d) A complete copy of all agency protests, including all attachments, shall be served upon the Contract Law Division of the Office of the General Counsel within one day of filing a protest with either the Contracting Officer or the Protest Decision Authority.

(e) Service upon the Contract Law Division shall be made as follows: U.S. Department of Commerce, Office of the General Counsel, Chief, Contract Law Division, Room 5099A, Herbert C. Hoover Building, 14th Street and Constitution Avenue, NW, Washington, DC 20230. FAX: (202) 482–8005.

(End of clause)

1352.233-71 GAO and Court of Federal Claims protests (APR 2010)

(a) A protest may be filed with either the Government Accountability Office (GAO) or the Court of Federal Claims unless an agency protest has been filed.

(b) A complete copy of all GAO or Court of Federal Claims protests, including all attachments, shall be served upon (i) the Contracting Officer, and (ii) the Contract Law Division of the Office of the General Counsel, within one day of filing a protest with either GAO or the Court of Federal Claims.

(c) Service upon the Contract Law Division shall be made as follows: U.S. Department of Commerce, Office of the General Counsel, Chief, Contract Law Division, Room 5099A, Herbert C. Hoover Building, 14th Street and Constitution Avenue, NW., Washington, DC 20230. FAX: (202) 482–8005.

1352.239-71 Electronic and Information Technology (APR 2010)

(a) To be considered eligible for award, offerors must propose electronic and information technology (EIT) that meet the applicable Access Board accessibility standards at 36 CFR 1194 designated below:

_X_ 1194.21 Software applications and operating systems

___ 1194.22 Web-based intranet and internet information and applications

___ 1194.23 Telecommunications products

___ 1194.24 Video and multimedia products

__ 1194.25 Self-contained, closed products

___ 1194.26 Desktop and portable computers

___ 1194.31 Functional performance criteria

___ 1194.41 Information, documentation and support

(b) The standards do not require the installation of specific accessibility-related software or the attachment of an assistive technology device, but merely require that the EIT be compatible with such software and devices so that it can be made accessible if so required by the agency in the future.

(c) Alternatively, offerors may propose products and services that provide equivalent facilitation.

Such offers will be considered to have met the provisions of the Access Board standards for the feature or components providing equivalent facilitation. If none of the offers that meet all applicable provisions of the standards could be accepted without imposing an undue burden on the agency or component, or if none of the offerors propose products or services that fully meet all of the applicable Access Board's provisions, those offerors whose products or services meet some of the applicable provisions will be considered eligible for award. Awards will not be made to an offeror meeting all or some of the applicable Access Board provisions if award would impose an undue burden upon the agency.

(d) Offerors must submit representation information concerning their products by completing the VPAT template at http://www.Section508.gov.

1352.246-70 Place of Acceptance (APR 2010)

(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.

(b) The place of acceptance will be: TBD

1352.270-70 Period of Performance (APR 2010)

(a) The base period of performance of this contract is 8/13/2022– 8/12/2023. If an option is exercised, the period of performance shall be extended through the end of that option period.

(b) The option periods that may be exercised are as follows:

Period Start Date End Date

Option I 08/13/2023 8/12/2024

Option II 08/13/2024 8/12/2025 http://www.section508.gov/

Option III 08/13/2025 8/12/2026

Option IV 08/13/2026 8/12/2027

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION ACQUISITION

MANUAL (NAM) CLAUSES INCORPORATED BY FULL TEXT

1330-52.222-70 NOAA Sexual Assault and Sexual Harassment Prevention and Response Policy

(MAY 2018)

In accordance with NOAA Administrative Order (NAO) 202-1106, NOAA Sexual Assault and Sexual Harassment Prevention and Response Policy, it is the policy of NOAA to maintain a work environment free from sexual assault and sexual harassment. NOAA prohibits sexual assault and sexual harassment by or of any employee, supervisor, manager, contractor, vendor, affiliate, or other individual with whom NOAA employees come into contact by the virtue of their work for NOAA.

(a) Definitions.

Contractor Employees - The term “contractor employees,” as used in this solicitation and contract language, refers to employees of the prime contractor or its subcontractors, affiliates, consultants, or team members.

Sexual Assault - The term sexual assault, as used in this solicitation and contract language, means any conduct proscribed by state or federal sexual abuse laws, including, but not limited to, those defined in chapter 109A of title 18 of the U.S. Code (sexual abuse), and assaults committed both by offenders who are strangers to the victim and by offenders who are known or related by blood or marriage to the victim.

Sexual Harassment - As defined by the Equal Employment Opportunity Commission, sexual harassment is a form of sex discrimination that violates Title VII of the Civil Rights Act of 1964. It includes unwelcome sexual advances, requests for sexual favors, and other verbal, non-verbal, or physical conduct of a sexual nature when any of the following are true:

• Submission to such conduct is made either explicitly or implicitly as a term or condition of an individual's employment;

• Submission to or rejection of such conduct by an individual is used as the basis for employment decisions affecting such individual;

• The conduct unreasonably interferes with an individual's work performance or creates an intimidating, hostile, or offensive working environment.

The main characteristics of sexual harassment are that the harasser's conduct is targeted against the recipient’s sex, gender identity, or sexual orientation, and is unwelcome to the recipient. It may include, but is not limited to: offensive jokes, slurs, epithets or name calling, undue attention, physical http://www.corporateservices.noaa.gov/ames/administrative_orders/chapter_202/202-1106_SASH.pdf http://www.corporateservices.noaa.gov/ames/administrative_orders/chapter_202/202-1106_SASH.pdf http://www.corporateservices.noaa.gov/ames/administrative_orders/chapter_202/202-1106_SASH.pdf assaults or threats, unwelcome touching or contact, intimidation, ridicule or mockery, insults or put-downs, constant or unwelcome questions about an individual's identity, and offensive objects or pictures.

(b) Requirements.

1. It is the responsibility of the contractor to ensure that contractor employees maintain the highest degree of conduct and standards in performance of the contract. In support of this, NOAA urges its contractors to develop and enforce comprehensive company policy addressing sexual assault and sexual harassment.

2. The contractor shall include wording substantially the same as this solicitation and contract language in every subcontract so that it is binding upon each subcontractor.

3. If a contractor employee observes or is the object of sexual assault or sexual harassment, he or she is highly encouraged to report the matter, as soon as possible, to their immediate supervisor, the Contracting Officer’s Representative (COR), subset of the COR (e.g. Task Manager or Assistant COR), or contracting officer (CO) if a COR is not assigned to the contract. The contract employee may also contact the NOAA Civil Rights Office to obtain guidance on reporting instances of sexual assault or sexual harassment. If deemed necessary, the contractor employee may also report such instances to local law enforcement. In the case where the incident occurs while performing at a remote location, such as at sea or in the field (at a field camp or other isolated location) where the above referenced individuals are unavailable, the contractor employee should follow the reporting procedure set forth in NAO 202-1106, Section 6.07, Reporting from Remote Locations.

4. Swift reporting allows NOAA and the contractor to take the appropriate measures to ensure that offensive behavior stops and the complainants’ needs are addressed.

5. The COR (if assigned), CO, and contractor, where applicable, will work together to ensure appropriate action is taken in accordance with applicable laws and regulations, contract terms and conditions, and the contractor’s written policy (where applicable).

6. The contractor shall provide all contractor employees assigned to perform under this contract with mandatory sexual assault and sexual harassment prevention and response training in compliance with the requirements of NAO 202-1106, Section 5, Prevention Training and Awareness, as part of their initial in-processing and on an annual basis thereafter. The initial training shall be completed within business days [30 unless a different number is inserted] of contract award or the date a contractor employee is assigned to perform under the contract, as applicable.

Evidence of initial training by name and date completed for each contractor employee, shall be submitted to the COR or contracting officer (if no COR assigned) within 10 business days of completion.

Evidence of annual training by name and date completed for each contractor employee shall be submitted to the COR or contracting officer (if no COR assigned) no later than March 1st of each calendar year of contract performance.

7. The mandatory sexual assault and sexual harassment training provided by the contractor shall include the required elements set forth by NOAA’s Workplace Violence Program Manager. A link to the website including the required elements of the training is provided at https://www.noaa.gov/organization/acquisition-grants/noaa-workplace-harassment-training-for-contractors-and-financial. The website will also provide training materials and resources to assist the contractor in conducting the training. The contractor may provide training that solely addresses the NOAA required elements or may supplement existing company sexual assault and sexual harassment training in a manner that ensures all of the elements are adequately addressed.

8. The required elements of the training and resources available to the contractor for the training may be updated by NOAA periodically. The contractor is responsible for monitoring the website and incorporating any changes to the NOAA required elements into the contractor provided training.

9. NOAA’s Workplace Violence Program Manager, COR, or CO may periodically review the contractor’s training outline to ensure all required elements are included and, if necessary, any appropriate adjustments are made to the training by the contractor.

10. Contractor employees performing on assignments in a remote location, such as at a field camp or other isolated locations, are subject to receiving the same briefing on the parameters of the order provided to NOAA employees as set forth in Section 6 of NAO 202-1106.

11. The contractor shall provide a copy of this solicitation and contract language and NAO 202- 1106 to contractor employees.

(c) Sexual Assault/Sexual Harassment (SASH) Helpline.

For NOAA employees, affiliates, and contractors who have experienced sexual assault or sexual harassment, NOAA has established the NOAA Sexual Assault/Sexual Harassment (SASH) helpline.

This helpline is designed to provide crisis intervention, referrals, and emotional support to those who are victims and/or survivors of sexual harassment or sexual assault within the workplace. Contractor employees may use the helpline to receive live, confidential, one-on-one support in an occurrence of sexual harassment or assault by a Federal Government employee.

All services are anonymous, secure, and available worldwide, 24 hours a day, seven days a week. The NOAA SASH helpline is accessible through a variety of channels, including:

• Phone: 1-866-288-6558

• Website & Online Chat: https://www.noaasashhelpline.org/

• Mobile App: NOAA SASH Helpline (available via iOS and Android App Stores)

• Text: (202) 335-0265

(d) Confidentiality.

https://www.noaa.gov/organization/acquisition-grants/noaa-workplace-harassment-training-for-contractors-and-financial https://www.noaa.gov/organization/acquisition-grants/noaa-workplace-harassment-training-for-contractors-and-financial https://www.noaasashhelpline.org/

Any party receiving information from the filing of a complaint alleging sexual assault or sexual harassment, or while performing an investigation into such a complaint, shall keep the information confidential. “Confidentiality” means that the information shall only be shared with others who have a need to know the information to conduct their official duties.

(e) Remedies.

In addition to other remedies available to the Government, contractor employee violations of Federal requirements (e.g., law, statutes, executive orders, code, rules, regulations) applicable to sexual assault and sexual harassment and/or failure to complete the mandatory training set forth in this solicitation and contract language, may result in:

1. Requiring the contractor to remove a contractor employee or employees from the performance of the contract;

2. Requiring the contractor to terminate a subcontract;

3. Suspension of contract payments until the Contractor has taken appropriate remedial action;

4. Termination of the contract for default or cause, in accordance with the termination clause of this contract;

5. Suspension or debarment; or

6. Other appropriate action.

(End of Solicitation and Contract language)

1330-52.242-70 Submittal of Invoices (FEB 2011)

The contractor shall prepare and submit an invoice via e-mail to the COR for approval [with a copy to the contracting officer for information]. All invoices shall be submitted by the 10th day of the subsequent month.

To constitute a proper invoice, the contractor’s invoice shall be prepared in accordance with, and contain all elements specified in, the paragraph titled, “Contractor’s Invoice,” of the applicable prompt payment provision of the contract (e.g., FAR 52.232-25, Prompt Payment; FAR 52.232-26, Prompt Payment for Fixed-Price Architect Engineer Contracts; or FAR 52.232-27, Prompt Payment for Construction Contracts). For contracts and orders for commercial items and services, paragraph (g) of FAR 52.212-4, titled, “Invoices,” applies.

If the invoice does not comply with the applicable prompt payment provision of the contract, the COR will return it to the contractor within seven days after the date the designated office received the invoice along with a statement as to the reasons why it is not a proper invoice.

1330-52.270-304 NOAA Acquisition and Grants Office Ombudsman (OCT 2016)

(a) The NOAA Acquisition and Grants Office (AGO) Ombudsman is available to organizations to promote responsible and meaningful exchanges of information. Generally, the purpose of these exchanges will be to:

1. Allow contractors to better prepare for and propose on business opportunities.

2. Advise as to technologies and solutions within the marketplace that the Government may not be aware of, or is not fully benefiting

3. Identify constraints in transparency

(b) The AGO Ombudsman will objectively, reasonably, and responsibly collaborate with parties and recommend fair, impartial, and constructive solutions to the matters presented to him/her. Further, the AGO Ombudsman will maintain the reasonable and responsible confidentiality of the source of a concern, when such a request has been formally made by an authorized officer of an organization seeking to do business with, or already doing business with NOAA.

(c) Before consulting with the AGO Ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations with the respective contracting officer for resolution.

However, direct access to the AGO Ombudsman may be sought when an interested party questions the objectivity or equity of a contracting officer’s decision, or when there is a bona fide reason to believe that reasonable, responsible, and objective consideration will not be received from an assigned contracting officer.

(d) There are several constraints to the scope of the AGO Ombudsman’s authority, for instance:

1. Consulting with the AGO Ombudsman does not alter or postpone the timelines of any formal process (e.g., protests, claims, debriefings, employee employer actions, activities involving A- 76 competition performance decisions, judicial or congressional hearings, or proposal, amendment, modification or deliverable due dates).

2. The AGO Ombudsman cannot participate in the evaluation of proposals, source selection processes, or the adjudication of protests or formal contract disputes.

3. The AGO Ombudsman is not authorized to generate or alter laws, judicial decisions, rules, policies, or formal guidance.

4. The AGO Ombudsman is not authorized to develop or alter opportunity announcements, solicitations, contracts, or their terms or conditions.

5. The AGO Ombudsman cannot overrule the authorized decisions or determinations of the contracting officer.

6. The AGO Ombudsman has no authority to render a decision that binds AGO, NOAA, the Department of Commerce, or the U.S. Government.

7. The AGO Ombudsman is not NOAA’s agent relative to the service of magistrate or judicial process and cannot be used to extend service of process to another party (whether federal, public, or a private entity)

8. (e) After review and analysis of a filed concern or recommendation, the AGO Ombudsman may refer the interested party to another more suitable Federal official for consideration.

Moreover, concerns, disagreements, and/or recommendations that cannot be resolved by the AGO Ombudsman will need to be pursued through more formal venues.

9. (f) The AGO Ombudsman is not to be contacted to request copies of forms and/or documents under the purview of a contracting officer. Such documents include Requests for Information, solicitations, amendments, contracts, modifications, or conference materials.

10. (g) Questions regarding items (a) through (f) within this language shall be directed to Rafael Roman, NOAA AGO Ombudsman, at Rafael.Roman@noaa.gov.

(End of solicitation language) mailto:Rafael.Roman@noaa.gov

WALLOPS COMMAND AND DATA ACQUISITION STATION

Evaluation and Repair of the WCDAS Electrical Switchgear GE – Zenith Emergency Generator Communication & Control System

INTRODUCTION/BACKGROUND: The National Oceanic and Atmospheric Administration (NOAA) Office of Satellite and Products Operations (OSPO) is an organizational component of the National Environmental Satellite, Data and Information Service (NESDIS). The OSPO has operational responsibility for the Satellite Operations Control Center (SOCC) at Suitland, MD and the Command and Data Acquisition Stations (CDASs) at Wallops Island, VA and Fairbanks, AK to command and control the satellites, to track the satellites, and to acquire their data. The OSPO also manages and directs the operation of the central ground facilities which ingest, process, and distribute environmental satellite data and derived products, to domestic and foreign users.

Objective:

The objective is to obtain the expertise necessary to periodically evaluate the General Electric switchgear, the switchgear control systems, perform relevant system upgrades, and correct any deficiencies within the switchgear & switchgear control system. WCDAS management also wants this individual to be on-site and provide support while preventative maintenance and software updates are installed on the electrical switchgear’s eight (8) central processing units (CPUs).

Scope:

OSPO/WCDAS management requires the services of a qualified GE Zenith/Entellysis specialist who must understand GE – Zenith Generator control system communication and control.

• Service/maintenance visits are to occur on a quarterly basis.

• To include: Communication and control of emergency generator systems that are integrated into and work collaboratively with GE Entellisys switchgear systems.

• Safely exercise the equipment to confirm system operation integrity.

• Provide general support while periodic preventative maintenance is performed on the GE electrical switchgear, circuit breakers and transformers, etc.

• Provide general support while software/firmware updates are installed on the electrical switchgear CPUs.

1. A factory trained and certified Senior Service Engineer will be scheduled to be on site & perform routine preventative maintenance on the system on a quarterly basis.

• The contractor shall coordinate with the Wallops CDA Station Facilities Management staff and schedule routine service visits at least 72 hours prior to arrival of personnel.

• Any work considered outside the scope of this agreement must be identified to the Contracting Officer (CO) and Wallops CDA Station Facilities Management, with written authorization received from the CO prior to any field engineer performing any such activity.

2. The trained Senior Service Engineer shall perform normal checks and tests on the system and perform adjustments, as needed. The technician will also be available to perform any other service as directed by WCDAS management, as time allows.

3. Preventative Maintenance – Each inspection call will be a scheduled service by the Senior Service Engineer. Following the visit to the Station the Contractor shall provide:

• The Contractor shall provide a legible written service report/record to the Wallops CDA Station Facilities Management staff within 72 hours after departure from the site. Delivered report may be in electronic format (such as “.pdf”).

• Report detailing the tasks to perform, the skill levels required, and the special tools and instrumentation required to inspect the systems for optimum system performance, both from a hardware and software perspective.

• Typical activities include:

o Inspection of hardware operator - machine interface and field panels for proper operation.

o Review/address any irregular event or alarm activity.

o Review trend logs.

4. Emergency coverage shall be provided. Response time shall be as follows:

• The contractor shall provide response/acknowledgement of request for emergency service via phone call within 4 hours.

• A fully qualified factory trained Senior Service Engineer shall be on site the following morning by 8:00 am unless other arrangements are agreed to.

• Emergency service visits shall count as (shall be in lieu of) the regular quarterly maintenance visit – so as not to increase the cost of the annual service agreement.

• Telephone number(s) where Service/technical support can be reached at any time of the day or night, weekends, or holidays shall be provided to the Contracting Officer’s Representative.

• The contractor shall provide costs for optional (additional) labor hours on an ad hoc basis (once the specialist is on site), should additional time be required to facilitate a repair.

• This contract shall also include a means for reimbursing the contractor for parts and labor needed to carry out unanticipated repairs to the system.

5. All costs for travel (including meals & accommodations) shall be included.

Security Requirements:

The contractor shall comply with all Station, NOAA, and DOC Safety, Security, and Environmental policies as provided by Facilities Supervisor or as otherwise required by law, rule, or regulation.

The WCDAS Facilities Supervisor shall be given advanced notice of all persons planning to visit the Station while engaged in work under this statement of work (SOW).

The contractor and his/her employees shall read and understand the Station’s Visitors Policy.

Physical security requirements for Wallops site access will be met to accommodate contract personnel as escorted visitors in accordance to CAR 1352.237-71 Security Processing Requirements – Low Risk contracts. Any access by contract personnel who are Foreign Nationals shall be in accordance with the requirements of CAR 1352.237-73, Foreign National Visitor and Guest Access to Departmental Resources (APR 2010).

The contractor shall provide for the safety and health of their employees and all personal protective equipment.

SCHEDULE OF SERVICE:

Provide quarterly preventative maintenance on General electric paralleling switch gears as described in the statement of work Period of Performance:

Base Year – August 13, 2022 through August 12, 2023 1 JB ___________

Provide quarterly preventative maintenance on General electric paralleling switch gears as described in the statement of work Period of Performance: Option Year 1 – August 13, 2023 through August 12, 2024. 1 JB __________ described in the statement of work Period of Performance: Option Year 2 – August 13, 2024 through August 12, 2025 1 JB _____________ described in the statement of work Period of Performance: Option Year 3 – August 13, 2025 through August 12, 2026 1 JB __________ described in the statement of work Period of Performance: Option Year 4 – August 13, 2026 through August 12, 2027 1 JB ____________________

1352.246-70 Place of Acceptance (APR 2010)
(End of clause)
1330-52.222-70 NOAA Sexual Assault and Sexual Harassment Prevention and Response Policy (MAY 2018)

File details come from the government source that posted it. Updated .