Construction RFQ 1224H820Q0027 Allegheny National Forest Gate Maintenance IDIQ
REQUEST FOR QUOTATION
PAGE OF PAGES
(THIS IS NOT AN ORDER)
THIS RFQ
IS
IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
1224H820Q0027 07/27/2020
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY
6. DELIVER BY (Date) Allegheny National Forest 4 Farrm Colony Drive Warren, PA 16365 See Section F 5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FOB DESTINATION
NAME
TELEPHONE NUMBER
OTHER (See Schedule) Carol Northrop, Contract Specialist
AREA CODE
NUMBER
9. DESTINATION
728-6242
a. NAME OF CONSIGNEE
8. TO:ALL PROSPECTIVE BIDDERS
Allegheny National Forest
a. NAME
b. COMPANY
b. STREET ADDRESS
4 Farm Colony Drive
c. STREET ADDRESS
c. CITY Warren
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
PA
16365
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the August 31, 2020 @ 4:30 p.m. EST submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a) (b) (c) (d) (e) (f) Allegheny National Forest Gate Maintenance IDIQ
CONTRACTOR MUST BE REGISTERED IN
https://www.sam.gov/" https://www.sam.gov/ in order to submit an offer on this project.
ENTER DUNS Number ________________________ Please complete this package and return by the response date to the address in box 9 or via email to carol.northrop@usda.gov" carol.northrop@usda.gov
Enter pricing on Schedule of Items in Section B, Pages 2-4
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
NUMBER
PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE
c. COUNTY
AREA CODE
d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER
NSN 7540-01-152-8084
Previous edition not usable 18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
| CONSTRUCTION RFQ | SOL NO |
| UNIT | |
| PROJ NAME | |
| PAGE 1 of 45 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
Forestwide Gate Maintenance Contract Schedule of Items
PRICING PERIOD 1 - 10/01/20 - 09/30/21
| Item | Estimated | ||||
| No. Description | Quantity | Unit | Price | Amount |
01 Fabricate Gate 5 EA $___________ $_____________
02 Gate Installation 5 EA $___________ $_____________
03 Hourly (Crew/Total) Rate 200 HR $___________ $_____________
04 Remove Gate 5 EA $___________ $_____________
05 Replace Cross Arm Assembly 5 EA $___________ $_____________
06 Replace Gate Post 5 EA $___________ $_____________
TOTAL BID PRICING PERIOD 1 $_________________
PRICING PERIOD 2 - 10/01/21 - 9/30/22
| Item | Estimated | ||||
| No. Description | Quantity | Unit | Price | Amount |
01 Fabricate Gate 5 EA $___________ $_____________
02 Gate Installation 5 EA $___________ $_____________
03 Hourly (Crew/Total) Rate 200 HR $___________ $_____________
04 Remove Gate 5 EA $___________ $_____________
05 Replace Cross Arm Assembly 5 EA $___________ $_____________
06 Replace Gate Post 5 EA $___________ $_____________
TOTAL BID PRICING PERIOD 2 $_________________
PRICING PERIOD 3 - 10/01/22 - 9/30/23
| Item | Estimated | ||||
| No. Description | Quantity | Unit | Price | Amount |
01 Fabricate Gate 5 EA $___________ $_____________
02 Gate Installation 5 EA $___________ $_____________
03 Hourly (Crew/Total) Rate 200 HR $___________ $_____________
04 Remove Gate 5 EA $___________ $_____________
05 Replace Cross Arm Assembly 5 EA $___________ $_____________
06 Replace Gate Post 5 EA $___________ $_____________
TOTAL BID PRICING PERIOD 3 $_________________
PRICING PERIOD 4 - 10/01/23 - 9/30/24
| Item | Estimated | ||||
| No. Description | Quantity | Unit | Price | Amount |
01 Fabricate Gate 5 EA $___________ $_____________
02 Gate Installation 5 EA $___________ $_____________
03 Hourly (Crew/Total) Rate 200 HR $___________ $_____________
04 Remove Gate 5 EA $___________ $_____________
05 Replace Cross Arm Assembly 5 EA $___________ $_____________
06 Replace Gate Post 5 EA $___________ $_____________
TOTAL BID PRICING PERIOD 4 $_________________
PRICING PERIOD 5 - 10/01/24 - 9/30/25
| Item | Estimated | ||||
| No. Description | Quantity | Unit | Price | Amount |
01 Fabricate Gate 5 EA $___________ $_____________
02 Gate Installation 5 EA $___________ $_____________
03 Hourly (Crew/Total) Rate 200 HR $___________ $_____________
04 Remove Gate 5 EA $___________ $_____________
05 Replace Cross Arm Assembly 5 EA $___________ $_____________
06 Replace Gate Post 5 EA $___________ $_____________
TOTAL BID PRICING PERIOD 5 $_________________
OFFEROR NAME ___________________________________________________
OFFEROR DUNS NUMBER ___________________________________________
OFFEROR PHONE NUMBER__________________________________________
OFFEROR EMAIL ADDRESS _________________________________________
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _______________________________________________________________.
NOTES:
There is a requirement for bonding and/or payment protections (Irrevocable Letter of Credit (ILC) or payment bond) for all task orders over $35,000. The payment bond or ILC will be for 100% of the award price and submitted within 10 days after award of each task order. See Section I for additional information.
Contractor must be registered www.sam.gov to be considered. THIS IS A FREE REGISTRATION.
There is no pre-bid meeting. Contractors should visit the sites independently.
There is a requirement to submit a technical proposal with your offer. See Section L & M for preparation instructions.
Award will be made to one contractor. You must submit pricing for all items, including any option items and/or option years.
Quantities expressed in the schedule, are for evaluation of bids only. Actual work performed in any given period of the contract could vary dramatically, however unit prices submitted by the contractor will be considered firm for whatever quantities that are actually performed.
g. This solicitation is for an IDIQ contract to include 5 Pricing Periods. A task orders will be issued to the sucessful quoter for work on an as needed, on-call basis. The amount of work may vary considerably from gate to gate.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
It is the intent of this contract to provide for a variety of work on road gates within the Allegheny National Forest. Work may include fabrication of gates, installation of gates, removal of gates, field repair of gates, and other tasks related to gates that will be paid for on an hourly basis. The contractor shall furnish all labor, equipment, supplies, supervision and incidentals required in the performance of the work.
Project Location
Gates upon which work is to be accomplished are located within the Allegheny National Forest in Warren, Elk, Forest and McKean Counties, Pennsylvania.
Division 100 - General Specifications
130 - Meetings
The successful vendor will be contacted prior to individual projects to discuss details of work, location, priorities, etc.
140 - Transportation
The moving of personnel and supplies to and from designated gates is incidental to the bid price.
150 - Government Furnished Items
The Forest Service will provide gate signs to be installed, and nuts and bolts for these signs. This material will be available from the COR.
All other material required for the work shall be supplied by the Contractor.
Division 200 - Technical Specifications
210 - General
All work will be in accordance with these specifications and attached drawing J3 Project Drawings - Forest Service Gate.
220 - Maintenance for Traffic
Existing roads shall be kept open to all traffic by the contractor while work is progressing. Appropriate warning signs to the public will be displayed.
230 - Project Requirements
231 - Fabrication of gates, item 1, Gates shall be in accordance with attached drawing. Fabrication with Contractor furnished materials; (new material only); Gates shall be painted as specified on the drawings. Completed gates will be delivered by the Contractor to the designated site of installation. Payment will be for each gate fabricated and accepted, all other items of work associated will be considered incidental to this pay item.
Priming and painting of gates. All newly fabricated gates will receive two (2) coats of iron oxide red primer prior to delivery.
232 - Gate installation, item 2, Contractor shall when requested by the Contracting Officer or COR install their fabricated gate at the location so chosen by the Government. Installation will be in accordance with drawing. All material needed for installation (eg. Concrete) is considered incidental to this pay item.
After installation all gates will receive touch up primer as needed, and one (1) final coat of Walnut Brown paint (Fed. Standard 595A, paint No. 20140)
233 – Hourly Crew Rate, Item 3, This item is applicable for work that is not specifically covered in another item. Examples of this type of work are the following: Resetting or realigning gates, repainting or resigning. Minimum crew size for this item, as well as, when performing other work is two (2) employees. Under no circumstances are one person crews allowed. This rate only includes hours worked at the jobsite, it does not include travel time to or from the job.
Material needed in association with doing this hourly rated job may be billed for at contractor’s cost, or a pre-agreed upon cost between the contractor and Contracting Officer.
234 – Removal of Gates, Item 4, Contractor shall, when requested to perform this item, remove the entire structure (posts, concrete, cross arms and signs). Material associated with the removal of gates becomes the property of the contractor, and must be removed and properly disposed of off Forest Service property. Any holes in the ground shall be backfilled with material approved by the COR. Ground surface shall be shaped to match adjacent terrain. An approved seed mix shall be placed according to manufacturer’s recommendations.
235 – Replacement of cross arm assembly or gate post, Items 5 or 6, Contractor shall, when requested to perform these items, remove existing structure from the gate and replace with a new part of the gate as directed. Work shall include fabricating part, painting and installation. All material needed for installation (eg. Concrete) is considered incidental to this pay item.
240 - Work Hours
All field work shall be performed during daylight hours Monday through Friday. Weekend and Holiday work may be permitted if approved in advance by the COR.
250 - Time of Performance
Work on a project shall commence within 14 calendar days of notification and be completed within the allocated time noted on each task order. Each task order will be issued with the following period of performance according to work load assigned.
| 1-3 gates = 30 days |
| 4-6 gates = 45 days |
| 7-9 gates = 60 days |
| 10 or more gates = 90 days |
The Contractor shall notify the COR when approaching completion of a unit of work so an inspection/acceptance can be made prior to acceptance in the event additional work is needed. Final acceptance shall be no later than 10 calendar days after receipt of notification of completion.
260 - Safety
Contractor is required to follow all applicable OSHA standards (CFR 29), while working on the job site. In addition, it is recommended the successful contractor utilize appropriate personal protective safety equipment, which includes, but is not limited to, hard hats, ear protection, eye protection, and hand protection while working on project items. Contractor must keep the Government representative posted as to current site work, and must be especially alert to vehicular traffic during field operations.
270 - Payment
Payment may be made at the contract unit price for each item inspected and accepted. Payment will be made under the Prompt Payment Act, with billing not more frequently than monthly, or if greater than $1,000.00. Payment will be made upon final inspection and acceptance of work and submission of proper invoice.
80 – Performance Requirement Summary
TASKS
QUALITY STANDARDS
ACCEPTABLE QUALITY LEVEL
MEANS OF MEASUREMENT
INCENTIVES / DISINCENTIVES
Performs gate fabrication, installation, removal and replacement of associated parts (as outlined in Sections 231 – 235)
Completes assigned tasks in a timely manner in accordance with Section 250 Meets all specifications related to Sections 231 – 235 Start all work within 14 calendar days of notification and complete work related to a specific task within allocated time noted on each task order.
Completion of contract year with no more than 2 defects (any combination of tasks) will be considered Satisfactory Contract Performance
Completion of contract year with 3 or more defects (any combination of tasks) will be considered Unsatisfactory Contract Performance Forest Service will conduct random inspections at project sites at the discretion of the COR Forest Service will also validate any customer complaints
Completion of contract year with no more than 2 defects (as reported in Contract Daily Diaries) will result in full payment of 100% of contract pricing
Completion of contract year with 3 or more defects (as reported in Contract Daily Diaries) will result in a 10% deduction, based on original contract price.
Work that needs to be re-performed shall be at no additional cost to the Government
C.1 Sustainable Acquisitions The Contractor shall comply with FAR Part 23 Sustainable Acquisition Policy and all associated laws, rules, regulations, and executive orders referenced therein. Contracts that include the supply of products and for the acquisition of services (including construction) that include the supply of products, require that the products provided are—
(1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP)-designated); (applicable if FAR Clause 52.223-15 is included)
(2) Water-efficient; (applicable if FAR Clause 52.223-15 is included)
(3) Biobased; (applicable if FAR Clause 52.223-2 is included)
(4) Environmentally preferable (e.g., EPEAT®-registered, or non-toxic or less toxic alternatives); (applicable if FAR Clause 52.223-13,14, or 16 are included)
(5) Non-ozone depleting; (applicable if FAR clause 52.223-11,12,20, or 21 are included), and/or
(6) Made with recovered materials (EPA-Designated products) (applicable if FAR clause 52.223-9 or 17 is included).
(b) The required products in the contract actions for services include products that are—
(1) Delivered to the Government during performance;
(2) Acquired by the contractor for use in performing services at a Federally-controlled facility; or
(3) Furnished by the contractor for use by the Government.
C1.1 Sustainable products identified for this solicitation:
The following is a list of sustainable products that that may be used in the performance of this contract. The list is not all inclusive; the Contractor shall research for available products.
C1.1.1 Energy-efficient and Water-efficient Products ENERGY STAR® at http://www.energystar.gov/; and FEMP at http://www1.eere.energy.gov/femp/procurement/eep_requirements.html www.epa.gov/watersense
NONE
C1.1.2 Biobased Products: (requires reporting at www.sam.gov by 10/31 each year)
Other files
| File | Type | Posted |
|---|---|---|
| J2 GovtProvidedTechnicalProposalForms.pdf | ||
| J3 Project Drawings.pdf | ||
| J1 Wage Rate Determination.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .