This document is a Statement of Need (SON) for a Request for Quote (RFQ) to provide commercial internet services to the U.S. Immigration and Customs Enforcement (ICE) Homeland Security Investigations (HSI) office in Chicago, Illinois.
The SON outlines the performance requirements, which include providing business internet service at various locations within the HSI office, with speeds ranging from 250 Mbps to 1.25 Gbps and static IP addresses. The period of performance is a 12-month base period with four 12-month option periods. The place of performance is the HSI Chicago office located at 47 E. 22nd Street, Suite 300, Lombard, Illinois 60148. Per the SON, Comcast and AT&T are the only two vendors capable of providing internet services to the building.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis_Solicitation Internet Services for HSI Chicago.pdf | ||
| RFQ 192124VCHSERVCS0001 Attachment 2- FAR Provisions and Clauses.pdf | ||
| 1.5_FAR 13 SSJ-Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 192124VCHSERVCS0001
Attachment 1- Statement of Need
STATEMENT OF NEED (SON)
192124VCHSERVCS0001
I. Purpose/Background/Mission:
HSI Chicago moved into a privately owned building, in which HSI was the first tenant. Due to urgent and compelling circumstances, it was critical HSI had internet services available in order to avoid a lapse in mission critical law enforcement activities. At that time, Comcast Business Service provided the fastest possible time frame to get internet and cable established (wired into building) per IT. Therefore, HSI utilized internet and cable TV services wired into the 3rd and 4th floors. Purchase Order 70CMSD23P00000007 has expired a new contract must be established. Since HSI Chicago’s move into the building, AT&T has established service in the building with other tenants. Per the Building Manager, Comcast and AT&T are the only two vendors who can provide internet services to the building.
II. Period and Place of Performance:
A 12-month base period with four (4)- 12month options.
Base Period: May 12, 2024 through May 11, 2025 Option Period 1: May 12, 2025 through May 11, 2026 Option Period 2: May 12, 2026 through May 11, 2027 Option Period 3: May 12, 2027 through May 11, 2028 Option Period 4: May 12, 2028 through May 11, 2029
Place of Performance:
HSI Chicago 47 E. 22ND Street Suite 300 Lombard, Illinois 60148
III. Performance Objectives:
Contractor shall provide commercial internet services as detailed below:
- 4th Floor Room #4124 Server Room – Business internet (coax cable) 1.25
Gbps (Static IP)
- 3rd Floor Room #3167 LAN Room – Business internet (fiber) 1 Gigabit (Static
IP)
- 3rd Floor Room #3138A Wire Server Room – Business internet (coax cable)
1.25 Gbps (Static IP)
- 3rd Floor Room #3138B Wire Server Room – Business internet (coax cable)
1.25 Gbps (Static IP)
- 3rd Floor Room #3138C Wire Server Room – Business internet (coax cable)
1.25 Gbps (Static IP)
- 3rd Floor Room #3157 Server Room – Business internet (coax cable) 1.25
Gbps (Static IP)
- 3rd Floor Room #3129 – Business internet (coax cable) 250 Mbps (Static IP)