1. THIS CONTRACT IS A RATED ORDER

RATING

PAGE OF

PAGES

UNDER DPAS (15 CFR 700)

2. CONTRACT NUMBER

3. SOLICITATION NUMBER

4. TYPE OF SOLICITATION

5. DATE ISSUED

6. REQUISITION/PURCHASE NUMBER

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

(If other than Item 7) NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

9. Sealed offers in original and _____________________________ copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in until local time _______________________ (Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All Offers are subject to all terms and conditions contained in this solicitation.

A. NAME

B. TELEPHONE (NO COLLECT CALLS)

C. E-MAIL ADDRESS

AREA CODE

NUMBER

EXT.

(X)

SEC.

DESCRIPTION

PAGE(S)

(X)

SEC.

DESCRIPTION

PAGE(S)

PART I - THE SCHEDULE

PART II - CONTRACT CLAUSES

A

SOLICITATION/CONTRACT FORM

I

CONTRACT CLAUSES

B

SUPPLIES OR SERVICES AND PRICES/COSTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

C

DESCRIPTION/SPECS./WORK STATEMENT

J

LIST OF ATTACHMENTS

D

PACKAGING AND MARKING

PART IV - REPRESENTATIONS AND INSTRUCTIONS

E

INSPECTION AND ACCEPTANCE

F

DELIVERIES OR PERFORMANCE

G

CONTRACT ADMINISTRATION DATA

L

INSTR., CONDS., AND NOTICES TO OFFERORS

H

SPECIAL CONTRACT REQUIREMENTS

M

EVALUATION FACTORS FOR AWARD

K

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ________ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

10 CALENDAR DAYS (%)

20 CALENDAR DAYS (%)

30 CALENDAR DAYS (%)

CALENDAR DAYS (%)

(See Section I, Clause No. 52-232-8)

14. ACKNOWLEDGEMENT OF AMENDMENTS

AMENDMENT NO.

DATE

AMENDMENT NO.

DATE

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:

CODE

FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

15A. NAME AND

ADDRESS

OF OFFEROR

(Type or print)

15B. TELEPHONE NUMBER

17. SIGNATURE

18. OFFER DATE

AREA CODE

NUMBER

EXT.

15C. CHECK IF REMITTANCE ADDRESS IS DIFFERENT FROM

ABOVE - ENTER SUCH ADDRESS IN SCHEDULE

19. ACCEPTED AS TO ITEMS NUMBERED

20. AMOUNT

21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

(4 copies unless otherwise specified) 10 U.S.C. 2304(a) ( ) 41 U.S.C. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7)

25. PAYMENT WILL BE MADE BY

CODE

CODE

26. NAME OF CONTRACTING OFFICER (Type or print)

27. UNITED STATES OF AMERICA

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

(Signature of Contracting Officer)

(REV. 9-97)

10. FOR INFORMATION CALL:

11. TABLE OF CONTENTS

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 33

Previous edition is unusable Prescribed by GSA-FAR (48 CFR) 53.214(c)

SOLICITATION, OFFER AND AWARD

SOLICITATION

OFFER (Must be fully completed by offeror) AWARD (To be completed by Government) N/A 42

RFP-NRC-38-10-704

X U.S. Nuclear Regulatory Commission Div. of Contracts Attn: Jeffrey R. Mitchell, 301-492-3639 Mail Stop: TWB-01-B10M Washington, DC 20555 MS: TWB-01-B10M, 11555 Rockville Pike, Rockville MD 20852 4:00 PM EST April 30, 2010 Jeffrey R. Mitchell 301-492-3639 Jeffrey.Mitchell@NRC.GOV See Attached Table of Contents U.S. Nuclear Regulatory Commission Div. of Contracts Mail Stop: TWB-01-B10M Washington, DC 20555 Department of Interior / NBC NRCPayments@nbc.gov Attn: Fiscal Services Branch - D2770 7301 W. Mansfield Avenue Denver CO 80235-2230 Jeffrey R. Mitchell /S/ On Agency Contract File Contracting Officer

Table of Contents
PART I - THE SCHEDULEA-1
SECTION A - SOLICITATION/CONTRACT FORMA-1
SF 33 SOLICITATION, OFFER AND AWARDA-1
PART I - THE SCHEDULEB-1
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTSB-1
B.1 PRICE/COST SCHEDULEB-1
B.2 PROJECT TITLEB-1
B.3 BRIEF DESCRIPTION OF WORK (MAR 1987)B-1
B.4 CONSIDERATION AND OBLIGATION--FIRM FIXED PRICE (JUN 1988)B-1
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORKC-1
C.1 STATEMENT OF WORKC-1
SECTION D - PACKAGING AND MARKINGD-1
D.1 PACKAGING AND MARKING (MAR 1987)D-1
SECTION E - INSPECTION AND ACCEPTANCEE-1
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCEE-1
E.2 PLACE OF INSPECTION AND ACCEPTANCE (MAR 1987)E-1
SECTION F - DELIVERIES OR PERFORMANCEF-1
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCEF-1
F.2 2052.211-70 PREPARATION OF TECHNICAL REPORTS (JAN 1993)F-1
F.3 DELIVERY SCHEDULEF-1
F.4 PLACE OF DELIVERY--REPORTS (JUN 1988)F-1
F.5 DURATION OF CONTRACT PERIOD (MAR 1987)F-1
SECTION G - CONTRACT ADMINISTRATION DATAG-1
G.1 PROJECT OFFICER AUTHORITY ALTERNATE 2 (FEBRUARY 2004)G-1
SECTION H - SPECIAL CONTRACT REQUIREMENTSH-1
H.1 2052.209-72 CONTRACTOR ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 1993)H-1
H.2 2052.215-70 KEY PERSONNEL (JAN 1993)H-1
H.3 GOVERNMENT FURNISHED EQUIPMENT/PROPERTY)H-1
H.4 SEAT BELTSH-1
H.5 Annual and Final Contractor Performance EvaluationsH-1
H.6 APPROPRIATE USE OF GOVERNMENT FURNISHED INFORMATION TECHNOLOGY (IT) EQUIPMENT AND/ OR IT SERVICES/ ACCESS (MARCH 2002)H-1
H.7 Compliance with U.S. Immigration Laws and RegulationsH-1
H.8 Safety of On-Site Contractor PersonnelH-1
H.9 2052.204.70 SECURITY (MAR 2004)H-1
H.10 2052.204-71 BADGE REQUIREMENTS FOR UNESCORTED BUILDING ACCESS TO NRC FACILITIES (MAR 2006)H-1
H.11SECURITY REQUIREMENTS FOR INFORMATION TECHNOLOGY LEVEL I OR LEVEL II ACCESS APPROVAL (JUL 2007)H-1
H.12 NRC INFORMATION TECHNOLOGY SECURITY TRAINING (AUG 2003)H-1
H.13 SECURITY REQUIREMENTS RELATING TO THE PRODUCTION OF REPORT(S) OR THE PUBLICATION OF RESULTS UNDER CONTRACTS, AGREEMENTS, AND GRANTSH-1
H.14 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND SUBCONTRACTOR EMPLOYEES (JULY 2006)H-1
PART II - CONTRACT CLAUSESI-1
SECTION I - CONTRACT CLAUSESI-1
I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCEI-1
I.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)I-1
I.3 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)I-1
I.4 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)I-1
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTSJ-1
SECTION J - LIST OF ATTACHMENTSJ-1
PART IV - REPRESENTATIONS AND INSTRUCTIONSK-1
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORSK-1
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)K-1
K.2 2052.209-70 CURRENT/FORMER AGENCY EMPLOYEE INVOLVEMENT (OCT 1999)K-1
K.3 2052.209-71 CONTRACTOR ORGANIZATIONAL CONFLICTS OF INTEREST (REPRESENTATION) (OCT 1999)K-1
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORSL-1
L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCEL-1
L.2 52.216-1 TYPE OF CONTRACT (APR 1984)L-1
L.3 52.233-2 SERVICE OF PROTEST (SEP 2006)L-1
L.4 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)L-1
L.5 2052.215-72 TIMELY RECEIPT OF PROPOSALS (OCT 1999)L-1
L.6 2052.215-73 AWARD NOTIFICATION AND COMMITMENT OF PUBLIC FUNDS (OCT 1999)L-1
L.7 2052.215-74 DISPOSITION OF PROPOSALS (JAN 1993)L-1
L.8 2052.215-75 PROPOSAL PRESENTATION AND FORMAT-ALTERNATE 2 (OCT 1999)L-1
L.9 2052.222-70 NONDISCRIMINATION BECAUSE OF AGE (JAN 1993)L-1
L.10 ESTIMATED DURATION (JUN 1988)L-1
L.11 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC PAYMENT/REMITTANCE ADDRESSL-1
L.12 2052.216-70 LEVEL OF EFFORT (JAN 1993)………………………………………………L-
SECTION M - EVALUATION FACTORS FOR AWARDM-1
M.1 2052.215-79 CONTRACT AWARD AND EVALUATION OF PROPOSALS (OCT 1999)M-1
M.2EVALUATION CRITERIA……………………………………………………………………M-2
RFP-NRC-38-10-704Section B
B-1

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE/COST SCHEDULE

CLIN

DESCRIPTION

QTY

UNIT

PRICE

Boiling Water Reactor Technology Training Course Development (Includes Task 1, Task 2 and Task 3)

EACH

B.2 PROJECT TITLE

The title of this project is as follows:

Boiling Water Reactor Technology Training Course Development

B.3 BRIEF DESCRIPTION OF WORK (MAR 1987)

The project will develop a Boiling Water Reactor Technology Training Course from design control documentation and combined operating licensee application(s).

B.4 CONSIDERATION AND OBLIGATION--FIRM FIXED PRICE (JUN 1988)

The firm fixed price of this contract is TBD.

RFP-NRC-38-10-704Section C
C-3

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

BACKGROUND

The Nuclear Regulatory Commission (NRC) regulates the civilian nuclear industry to ensure adequate protection of the health and safety of the public and the environment, by establishing standards and regulations, conducting safety evaluations to issue licenses for nuclear facilities, and inspecting licensees’ facilities to ensure compliance with the regulations.

In support of this mission, specialized technical training programs are developed and maintained by the NRC training and development division of the Office of Human Resources.

PURPOSE

The Contractor shall provide training program specialist(s), graphic artist(s) and document specialist(s) to develop a Boiling Water Reactor Technology Training Course suitable for training NRC inspectors, examiners and other NRC staff responsible for design reviews and safety evaluations for nuclear power plant licensing related activities.

SCOPE OF WORK

The project will develop a Boiling Water Reactor Technology Training Course from design control documentation and combined operating licensee application(s) submitted to the NRC. Working from within the NRC Technical Training Center in Chattanooga, TN the contracted staff will use NRC reference material to produce a student reference manual and PowerPoint instructor presentations. The graphic artist work location may be remote from the NRC Technical Training Center. The training course will be written at the senior reactor operator and system engineer level of knowledge. The content of the final product will support a training program with 60 hours of contact instruction. Some of the NRC reference material may only be available in either electronic or hardcopy formats.

KEY PERSONNEL

The training program specialist(s), at a minimum, shall be certified and experienced as Senior Reactor Operator Instructors for Boiling Water Reactors (BWR), possess technical training material development skills and be capable of using Microsoft Office Software to produce the course materials. One of the training program specialists shall act as the project lead coordinating the development team activities and presenting the deliverables to the NRC.

The graphic artist shall have a working knowledge of computer graphics programs for converting and editing control logic, piping and instrumentation drawings from Adobe PDF files to computer graphic images suitable for use with Microsoft Office Software. The graphic artist shall also be capable of developing control logic, piping and instrumentation drawings using the computer graphics programs. Additionally, the converted graphics shall be capable of future adaptation to 3-D modeling software.

The document specialist shall have a working knowledge of Microsoft compatible word processing software to convert hard copy documents into electronic form and to compile the developed course materials into the Student Reference Manual (Task 1).

TASK 1 STUDENT REFERENCE MANUAL

REQUIREMENT: The manual will include chapters on individual system design and operation, normal plant operations, startup and shutdown, technical specification requirements and bases, anticipated plant transients and accidents, normal/abnormal/emergency operating procedures, and risk assessment insights. The manual will be developed to the requirements of the training center Operation Procedure 0408; HRTD Training Course Manual Style Guide

DELIVERABLE: One hardcopy Student Reference Manual consisting of an estimated volume of 5-7 2.5 inch binders. One electronic copy of the Student Reference Manual consisting of individual chapter files and a completed compiled manual file. Project work shall commence within sixty (60) days of contact award. The project shall be completed within eight (8) months of contract award. All materials developed are considered works-for-hire and become NRC property.

* Total period of performance is eight (8) months with the understanding of taking two (2) months for the security clearance review and six (6) months to start and complete the effort.

TASK 2 INSTRUCTOR PRESENTATION MATERIALS

REQUIREMENT: The instructor presentation materials will include PowerPoint presentations with instructor guidance in the notes section to ensure repeatability of lesson presentation. The instructor notes section will indicate references used for the development.

DELIVERABLE: One hard copy and one electronic file PowerPoint presentation for each chapter of the Student Reference Manual. Project work shall commence within sixty (60) days of contact award. The project shall be completed within eight (8) months of contract award. All materials developed are considered works-for-hire and become NRC property.

* Total period of performance is eight (8) months with the understanding of taking two (2) months for the security clearance review and six (6) months to start and complete the effort.

TASK 3 GRAPHICS CONVERSION

REQUIREMENT: Graphic images will be converted/modified from existing reference material or developed for inclusion to the student reference manual and PowerPoint presentations. The final images shall be suitable for use with Microsoft Word and Microsoft PowerPoint software and capable of future conversion to 3-D modeling software.

DELIVERABLE: Supporting graphic images provided for each chapter of the Student Reference Manual. One electronic file for each of the finalized graphics included in the Student Reference Manual and PowerPoints. Project work shall commence within sixty (60) of contact award. The project shall be completed within eight (8) months of contract award. All materials developed are considered works-for-hire and become NRC property.

* Total period of performance is eight (8) months with the understanding of taking two (2) months for the security clearance review and six (6) months to start and complete the effort.

PLACE OF PERFORMANCE

U.S. Nuclear Regulatory Technical Training Center 5746 Marlin Rd., Suite 200 Chattanooga, TN 37411-5677

MEETINGS

Within ten (10) days of contract award, a teleconference meeting between the NRC Project Officer and the Contractor shall be held to coordinate project details and the start date.

TRAVEL

The Contractor shall be responsible for all temporary living expenses (lodging and per-diem) and travel expenses to/from Chattanooga through the contract period.

GOVERNMENT FURNISHED MATERIALS

The NRC will provide a work place, access to reference materials, office materials and computer hardware and software for development of the training materials at the NRC Technical Training Center in Chattanooga, TN.

PERFORMANCE REQUIREMENTS SUMMARY

Task/Requirement Standard Method of Surveillance Incentive/Deduction Boiling Water Reactor Technology Training Course Development (Includes Task 1, Task 2 and Task 3) The course shall be delivered on time.

100% inspection of delivered materials will be reviewed by the NRC Project Officer A 1% deduction will apply to the final invoice for each business day the contractor is late in the deliverable submission.

RFP-NRC-38-10-704Section D
D-1

SECTION D - PACKAGING AND MARKING

D.1 PACKAGING AND MARKING (MAR 1987)

The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination. Containers and closures shall comply with the Interstate Commerce Commission Regulations, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation. On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.

RFP-NRC-38-10-704Section E
E-1

SECTION E - INSPECTION AND ACCEPTANCE

E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

NUMBERTITLEDATE
FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)
52.246-4INSPECTION OF SERVICES--FIXED-PRICEAUG 1996

E.2 PLACE OF INSPECTION AND ACCEPTANCE (MAR 1987)

Inspection and acceptance of the deliverable items to be furnished hereunder shall be made by the Project Officer at the destination.

RFP-NRC-38-10-704Section F
F-1

SECTION F - DELIVERIES OR PERFORMANCE

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

NUMBERTITLEDATE
FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)
52.242-15STOP-WORK ORDERAUG 1989
52.247-34F.O.B. DESTINATIONNOV 1991
52.247-48F.O.B. DESTINATION--EVIDENCE OF SHIPMENTFEB 1999

F.2 2052.211-70 PREPARATION OF TECHNICAL REPORTS (JAN 1993)

All technical reports required by Section C and all Technical Progress Reports required by Section F are to be prepared in accordance with the attached Management Directive 3.8, "Unclassified Contractor and Grantee Publications in the NUREG Series." Management Directive 3.8 is not applicable to any Contractor Spending Plan (CSP) and any Financial Status Report that may be included in this contract. (See List of Attachments).

F.3 DELIVERY SCHEDULE

ITEM NUMBER

QUANTITY

DATE OF DELIVERY

Boiling Water Reactor Technology Training Course Development (Includes Task 1, Task 2 and Task 3) The project shall be completed within eight (8) months of contract award.

* Total period of performance is eight (8) months with the understanding of taking two (2) months for the security clearance review and six (6) months to start and complete the effort.

F.4 PLACE OF DELIVERY--REPORTS (JUN 1988)

The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:

(a) Project Officer (1 copy)

(b) Contracting Officer (electronic copy)

F.5 DURATION OF CONTRACT PERIOD (MAR 1987)

This contract shall commence on DAY OF AWARD and will expire 8 MONTHS THEREAFTER.

* Total period of performance is eight (8) months with the understanding of taking two (2) months for the security clearance review and six (6) months to start and complete the effort.

RFP-NRC-38-10-704Section G
G-1

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 PROJECT OFFICER AUTHORITY ALTERNATE 2 (FEBRUARY 2004)

(a) The contracting officer's authorized representative hereinafter referred to as the project officer for this contract is:

Name: TBD

Address:

Telephone Number:

(b) The project officer shall:

(1) Monitor contractor performance and recommend changes in requirements to the contracting officer.

(2) Inspect and accept products/services provided under the contract.

(3) Review all contractor invoices/vouchers requesting payment for products/services provided under the contract and make recommendations for approval, disapproval, or suspension.

(4) Immediately notify the Security Branch, Division of Facilities and Security (SB/DFS) (via e-mail) when a contractor emplyee no longer requires access authorization and return of any NRC issued badge to SB/DFS within three days after their termination.

(c) The project officer may not make changes to the express terms and conditions of this contract.

*To be incorporated into any resultant contract

RFP-NRC-38-10-704Section H
H-11

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 2052.209-72 CONTRACTOR ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 1993)

(a) Purpose. The primary purpose of this clause is to aid in ensuring that the contractor:

(1) Is not placed in a conflicting role because of current or planned interests (financial, contractual, organizational, or otherwise) which relate to the work under this contract; and

(2) Does not obtain an unfair competitive advantage over other parties by virtue of its performance of this contract.

(b) Scope. The restrictions described apply to performance or participation by the contractor, as defined in 48 CFR 2009.570-2 in the activities covered by this clause.

(c) Work for others.

(1) Notwithstanding any other provision of this contract, during the term of this contract, the contractor agrees to forego entering into consulting or other contractual arrangements with any firm or organization the result of which may give rise to a conflict of interest with respect to the work being performed under this contract. The contractor shall ensure that all employees under this contract abide by the provision of this clause. If the contractor has reason to believe, with respect to itself or any employee, that any proposed consultant or other contractual arrangement with any firm or organization may involve a potential conflict of interest, the contractor shall obtain the written approval of the contracting officer before the execution of such contractual arrangement.

(2) The contractor may not represent, assist, or otherwise support an NRC licensee or applicant undergoing an NRC audit, inspection, or review where the activities that are the subject of the audit, inspection, or review are the same as or substantially similar to the services within the scope of this contract (or task order as appropriate) except where the NRC licensee or applicant requires the contractor's support to explain or defend the contractor's prior work for the utility or other entity which NRC questions.

(3) When the contractor performs work for the NRC under this contract at any NRC licensee or applicant site, the contractor shall neither solicit nor perform work in the same or similar technical area for that licensee or applicant organization for a period commencing with the award of the task order or beginning of work on the site (if not a task order contract) and ending one year after completion of all work under the associated task order, or last time at the site (if not a task order contract).

(4) When the contractor performs work for the NRC under this contract at any NRC licensee or applicant site,

(i) The contractor may not solicit work at that site for that licensee or applicant during the period of performance of the task order or the contract, as appropriate.

(ii) The contractor may not perform work at that site for that licensee or applicant during the period of performance of the task order or the contract, as appropriate, and for one year thereafter.

(iii) Notwithstanding the foregoing, the contracting officer may authorize the contractor to solicit or perform this type of work (except work in the same or similar technical area) if the contracting officer determines that the situation will not pose a potential for technical bias or unfair competitive advantage.

(d) Disclosure after award.

(1) The contractor warrants that to the best of its knowledge and belief, and except as otherwise set forth in this contract, that it does not have any organizational conflicts of interest as defined in 48 CFR 2009.570-2.

(2) The contractor agrees that if, after award, it discovers organizational conflicts of interest with respect to this contract, it shall make an immediate and full disclosure in writing to the contracting officer. This statement must include a description of the action which the contractor has taken or proposes to take to avoid or mitigate such conflicts. The NRC may, however, terminate the contract if termination is in the best interest of the Government.

(3) It is recognized that the scope of work of a task-order-type contract necessarily encompasses a broad spectrum of activities. Consequently, if this is a task-order-type contract, the contractor agrees that it will disclose all proposed new work involving NRC licensees or applicants which comes within the scope of work of the underlying contract. Further, if this contract involves work at a licensee or applicant site, the contractor agrees to exercise diligence to discover and disclose any new work at that licensee or applicant site. This disclosure must be made before the submission of a bid or proposal to the utility or other regulated entity and must be received by the NRC at least 15 days before the proposed award date in any event, unless a written justification demonstrating urgency and due diligence to discover and disclose is provided by the contractor and approved by the contracting officer. The disclosure must include the statement of work, the dollar value of the proposed contract, and any other documents that are needed to fully describe the proposed work for the regulated utility or other regulated entity. NRC may deny approval of the disclosed work only when the NRC has issued a task order which includes the technical area and, if site-specific, the site, or has plans to issue a task order which includes the technical area and, if site-specific, the site, or when the work violates paragraphs (c)(2), (c)(3) or (c)(4) of this section.

(e) Access to and use of information.

(1) If in the performance of this contract, the contractor obtains access to information, such as NRC plans, policies, reports, studies, financial plans, internal data protected by the Privacy Act of 1974 (5 U.S.C. Section 552a (1988)), or the Freedom of Information Act (5 U.S.C. Section 552 (1986)), the contractor agrees not to:

(i) Use this information for any private purpose until the information has been released to the public;

(ii) Compete for work for the Commission based on the information for a period of six months after either the completion of this contract or the release of the information to the public, whichever is first;

(iii) Submit an unsolicited proposal to the Government based on the information until one year after the release of the information to the public; or

(iv) Release the information without prior written approval by the contracting officer unless the information has previously been released to the public by the NRC.

(2) In addition, the contractor agrees that, to the extent it receives or is given access to proprietary data, data protected by the Privacy Act of 1974 (5 U.S.C. Section 552a (1988)), or the Freedom of Information Act (5 U.S.C. Section 552 (1986)), or other confidential or privileged technical, business, or financial information under this contract, the contractor shall treat the information in accordance with restrictions placed on use of the information.

(3) Subject to patent and security provisions of this contract, the contractor shall have the right to use technical data it produces under this contract for private purposes provided that all requirements of this contract have been met.

(f) Subcontracts. Except as provided in 48 CFR 2009.570-2, the contractor shall include this clause, including this paragraph, in subcontracts of any tier. The terms contract, contractor, and contracting officer, must be appropriately modified to preserve the Government's rights.

(g) Remedies. For breach of any of the above restrictions, or for intentional nondisclosure or misrepresentation of any relevant interest required to be disclosed concerning this contract or for such erroneous representations that necessarily imply bad faith, the Government may terminate the contract for default, disqualify the contractor from subsequent contractual efforts, and pursue other remedies permitted by law or this contract.

(h) Waiver. A request for waiver under this clause must be directed in writing to the contracting officer in accordance with the procedures outlined in 48 CFR 2009.570-9.

(i) Follow-on effort. The contractor shall be ineligible to participate in NRC contracts, subcontracts, or proposals therefor (solicited or unsolicited), which stem directly from the contractor's performance of work under this contract. Furthermore, unless so directed in writing by the contracting officer, the contractor may not perform any technical consulting or management support services work or evaluation activities under this contract on any of its products or services or the products or services of another firm if the contractor has been substantially involved in the development or marketing of the products or services.

(1) If the contractor, under this contract, prepares a complete or essentially complete statement of work or specifications, the contractor is not eligible to perform or participate in the initial contractual effort which is based on the statement of work or specifications. The contractor may not incorporate its products or services in the statement of work or specifications unless so directed in writing by the contracting officer, in which case the restrictions in this paragraph do not apply.

(2) Nothing in this paragraph precludes the contractor from offering or selling its standard commercial items to the Government.

H.2 2052.215-70 KEY PERSONNEL (JAN 1993)

(a) The following individuals are considered to be essential to the successful performance of the work hereunder:

The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.

(b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the contracting officer and shall, subject to the con-currence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications.

(c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution. The contracting officer and the project officer shall evaluate the contractor's request and the contracting officer shall promptly notify the contractor of his or her decision in writing.

(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate. If the contracting officer finds the contractor at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.

H.3 GOVERNMENT FURNISHED EQUIPMENT/PROPERTY

The NRC will provide a work place, access to reference materials, office materials and computer hardware and software for development of the training materials at the NRC Technical Training Center in Chattanooga, TN.

H.4 SEAT BELTS

Contractors, subcontractors, and grantees, are encouraged to adopt and enforce on-the-job seat belt policies and programs for their employees when operating company-owned, rented, or personally owned vehicles.

H.5 Annual and Final Contractor Performance Evaluations

Annual and final evaluations of contractor performance under this contract will be prepared in accordance with FAR 42.15, "Contractor Performance Information," normally at the time the contractor is notified of the NRC's intent to exercise the contract option. If the multi-year contract does not have option years, then an annual evaluation will be prepared (state time for annual evaluation). Final evaluations of contractor performance will be prepared at the expiration of the contract during the contract closeout process.

The Contracting Officer will transmit the NRC Project Officer's annual and final contractor performance evaluations to the contractor's Project Manager, unless otherwise instructed by the contractor. The contractor will be permitted thirty days to review the document. The contractor may concur without comment, submit additional information, or request a meeting to discuss the performance evaluation. The Contracting Officer may request the contractor's Project Manger to attend a meeting to discuss the performance evaluation.

Where a contractor concurs with, or takes no exception to an annual performance evaluation, the Contracting Officer will consider such evaluation final and releasable for source selection purposes. Disagreements between the parties regarding a performance evaluation will be referred to an individual one level above the Contracting Officer, whose decision will be final.

The Contracting Officer will send a copy of the completed evaluation report, marked "For Official Use Only," to the contractor's Project Manager for their records as soon as practicable after it has been finalized. The completed evaluation report also will be used as a tool to improve communications between the NRC and the contractor and to improve contract performance.

The completed annual performance evaluation will be used to support future award decisions in accordance with FAR 42.1502(a) and 42.1503(c). During the period the information is being used to provide source selection information, the completed annual performance evaluation will be released to only two parties - the Federal government personnel performing the source selection evaluation and the contractor under evaluation if the contractor does not have a copy of the report already.

H.6 APPROPRIATE USE OF GOVERNMENT FURNISHED INFORMATION TECHNOLOGY (IT) EQUIPMENT AND/ OR IT SERVICES/ ACCESS (MARCH 2002)

As part of contract performance the NRC may provide the contractor with information technology (IT) equipment and IT services or IT access as identified in the solicitation or subsequently as identified in the contract or delivery order. Government furnished IT equipment, or IT services, or IT access may include but is not limited to computers, copiers, facsimile machines, printers, pagers, software, phones, Internet access and use, and email access and use. The contractor (including the contractor's employees, consultants and subcontractors) shall use the government furnished IT equipment, and / or IT provided services, and/ or IT access solely to perform the necessary efforts required under the contract. The contractor (including the contractor's employees, consultants and subcontractors) are prohibited from engaging or using the government IT equipment and government provided IT services or IT access for any personal use, misuse, abuses or any other unauthorized usage.

The contractor is responsible for monitoring its employees, consultants and subcontractors to ensure that government furnished IT equipment and/ or IT services, and/ or IT access are not being used for personal use, misused or abused. The government reserves the right to withdraw or suspend the use of its government furnished IT equipment, IT services and/ or IT access arising from contractor personal usage, or misuse or abuse; and/ or to disallow any payments associated with contractor (including the contractor's employees, consultants and subcontractors) personal usage, misuses or abuses of IT equipment, IT services and/ or IT access; and/ or to terminate for cause the contract or delivery order arising from violation of this provision.

H.7 Compliance with U.S. Immigration Laws and Regulations

NRC contractors are responsible to ensure that their alien personnel are not in violation of United States Immigration and Naturalization (INS) laws and regulations, including employment authorization documents and visa requirements. Each alien employee of the Contractor must be lawfully admitted for permanent residence as evidenced by Alien Registration Receipt Card Form 1-151 or must present other evidence from the Immigration and Naturalization Services that employment will not affect his/her immigration status. The INS Office of Business Liaison (OBL) provides information to contractors to help them understand the employment eligibility verification process for non-US citizens. This information can be found on the INS website, http://www.ins.usdoj.gov/graphics/services/employerinfo/index.htm#obl.

The NRC reserves the right to deny or withdraw Contractor use or access to NRC facilities or its equipment/services, and/or take any number of contract administrative actions (e.g., disallow costs, terminate for cause) should the Contractor violate the Contractor's responsibility under this clause.

(End of Clause)

H.8 Safety of On-Site Contractor Personnel

Ensuring the safety of occupants of Federal buildings is a responsibility shared by the professionals implementing our security and safety programs and the persons being protected. The NRC's Office of Administration (ADM) Division of Facilities and Security (DFS) has coordinated an Occupant Emergency Plan (OEP) for NRC Headquarters buildings with local authorities. The OEP has been approved by the Montgomery County Fire and Rescue Service. It is designed to improve building occupants' chances of survival, minimize damage to property, and promptly account for building occupants when necessary.

The contractor's Project Director shall ensure that all personnel working full time on-site at NRC Headquarters read the NRC's OEP, provided electronically on the NRC Intranet at http://www.internal.nrc.gov/ADM/OEP.pdf The contractor's Project Director also shall emphasize to each staff member that they are to be familiar with and guided by the OEP, as well as by instructions given by emergency response personnel in situations which pose an immediate health or safety threat to building occupants.

The NRC Project Officer shall ensure that the contractor's Project Director has communicated the requirement for on-site contractor staff to follow the guidance in the OEP. The NRC Project Officer also will assist in accounting for on-site contract persons in the event of a major emergency (e.g., explosion occurs and casualties or injuries are suspected) during which a full evacuation will be required, including the assembly and accountability of occupants. The NRC DFS will conduct drills periodically to train occupants and assess these procedures.

H.9 2052.204.70 SECURITY (MAR 2004)

(a) Contract Security and/or Classification Requirements (NRC Form 187). The policies, procedures, and criteria of the NRC Security Program, NRC Management Directive (MD) 12 (including MD 12.1, "NRC Facility Security Program;" MD 12.2, "NRC Classified Information Security Program;" MD 12.3, "NRC Personnel Security Program;" MD 12.4, "NRC Telecommunications Systems Security Program;" MD 12.5, "NRC Automated Information Systems Security Program;" and MD 12.6, "NRC Sensitive Unclassified Information Security Program"), apply to performance of this contract, subcontract or other activity. This MD is incorporated into this contract by reference as though fully set forth herein. The attached NRC Form 187 (See List of Attachments) furnishes the basis for providing security and classification requirements to prime contractors, subcontractors, or others (e.g., bidders) who have or may have an NRC contractual relationship that requires access to classified Restricted Data or National Security Information or matter, access to sensitive unclassified information (e.g., Safeguards), access to sensitive Information Technology (IT) systems or data, unescorted access to NRC controlled buildings/space, or unescorted access to protected and vital areas of nuclear power plants.

(b) It is the contractor's duty to protect National Security Information, Restricted Data, and Formerly Restricted Data. The contractor shall, in accordance with the Commission's security regulations and requirements, be responsible for protecting National Security Information, Restricted Data, and Formerly Restricted Data, and for protecting against sabotage, espionage, loss, and theft, the classified documents and material in the contractor's possession in connection with the performance of work under this contract. Except as otherwise expressly provided in this contract, the contractor shall, upon completion or termination of this contract, transmit to the Commission any classified matter in the possession of the contractor or any person under the contractor's control in connection with performance of this contract. If retention by the contractor of any classified matter is required after the completion or termination of the contract and the retention is approved by the contracting officer, the contractor shall complete a certificate of possession to be furnished to the Commission specifying the classified matter to be retained. The certification must identify the items and types or categories of matter retained, the conditions governing the retention of the matter and their period of retention, if known. If the retention is approved by the contracting officer, the security provisions of the contract continue to be applicable to the matter retained.

(c) In connection with the performance of the work under this contract, the contractor may be furnished, or may develop or acquire, safeguards information, or confidential or privileged technical, business, or financial information, including Commission plans, policies, reports, financial plans, internal data protected by the Privacy Act of 1974 (Pub. L. 93.579), or other information which has not been released to the public or has been determined by the Commission to be otherwise exempt from disclosure to the public. The contractor shall ensure that information protected from public disclosure is maintained as required by NRC regulations and policies, as cited in this contract or as otherwise provided by the NRC. The contractor will not directly or indirectly duplicate, disseminate, or disclose the information in whole or in part to any other person or organization except as may be necessary to perform the work under this contract. The contractor agrees to return the information to the Commission or otherwise dispose of it at the direction of the contracting officer. Failure to comply with this clause is grounds for termination of this contract.

(d) Regulations. The contractor agrees to conform to all security regulations and requirements of the Commission which are subject to change as directed by the NRC Division of Facilities and Security (DFS) and the Contracting Officer. These changes will be under the authority of the FAR Changes clause referenced in this document.

The contractor agrees to comply with the security requirements set forth in NRC Management Directive 12.1, NRC Facility Security Program which is incorporated into this contract by reference as though fully set forth herein. Attention is directed specifically to the section titled "Infractions and Violations," including "Administrative Actions" and "Reporting Infractions."

(e) Definition of National Security Information. The term National Security Information, as used in this clause, means information that has been determined pursuant to Executive Order 12958 or any predecessor order to require protection against unauthorized disclosure and that is so designated.

(f) Definition of Restricted Data. The term Restricted Data, as used in this clause, means all data concerning design, manufacture, or utilization of atomic weapons; the production of special nuclear material; or the use of special nuclear material in the production of energy, but does not include data declassified or removed from the Restricted Data category pursuant to Section 142 of the Atomic Energy Act of 1954, as amended.

(g) Definition of Formerly Restricted Data. The term Formerly Restricted Data, as used in this clause, means all data removed from the Restricted Data category under Section 142-d of the Atomic Energy Act of 1954, as amended.

(h) Definition of Safeguards Information. Sensitive unclassified information that specifically identifies the detailed security measures of a licensee or an applicant for the physical protection of special nuclear material; or security measures for the physical protection and location of certain plant equipment vital to the safety of production of utilization facilities. Protection of this information is required pursuant to Section 147 of the Atomic Energy Act of 1954, as amended.

(i) Security Clearance. The contractor may not permit any individual to have access to Restricted Data, Formerly Restricted Data, or other classified information, except in accordance with the Atomic Energy Act of 1954, as amended, and the Commission's regulations or requirements applicable to the particular type or category of classified information to which access is required. The contractor shall also execute a Standard Form 312, Classified Information Nondisclosure Agreement, when access to classified information is required.

(j) Criminal Liabilities. It is understood that disclosure of National Security Information, Restricted Data, and Formerly Restricted Data relating to the work or services ordered hereunder to any person not entitled to receive it, or failure to safeguard any Restricted Data, Formerly Restricted Data, or any other classified matter that may come to the contractor or any person under the contractor's control in connection with work under this contract, may subject the contractor, its agents, employees, or subcontractors to criminal liability under the laws of the United States. (See the Atomic Energy Act of 1954, as amended, 42 U.S.C. 2011 et seq.; 18 U.S.C. 793 and 794; and Executive Order 12958.)

(k) Subcontracts and Purchase Orders. Except as otherwise authorized in writing by the contracting officer, the contractor shall insert provisions similar to the foregoing in all subcontracts and purchase orders under this contract.

(l) In performing the contract work, the contractor shall classify all documents, material, and equipment originated or generated by the contractor in accordance with guidance issued by the Commission. Every subcontract and purchase order issued hereunder involving the origination or generation of classified documents, material, and equipment must provide that the subcontractor or supplier assign classification to all documents, material, and equipment in accordance with guidance furnished by the contractor.

H.10 2052.204-71 BADGE REQUIREMENTS FOR UNESCORTED BUILDING ACCESS TO NRC FACILITIES (MAR 2006)

During the life of this contract, the rights of ingress and egress for contractor personnel must be made available, as required, provided that the individual has been approved for unescorted access after a favorable adjudication from the Security Branch, Division of Facilities and Security (SB/DFS).

In this regard, all contractor personnel whose duties under this contract require their presence on site shall be clearly identifiable by a distinctive badge furnished by the NRC. The Project Officer shall assist the contractor in obtaining badges for the contractor personnel. All contractor personnel must present two forms of Identity Source Documents (I-9). One of the documents must be a valid picture ID issued by a state or by the Federal Government. Original I-9 documents must be presented in person for certification. A list of acceptable documents can be found at http://www.usdoj.gov/crt/recruit_employ/i9form.pdf. It is the sole responsibility of the contractor to ensure that each employee has a proper NRC-issued identification/badge at all times. All photo-identification badges must be immediately (no later than three days) delivered to SB/DFS for cancellation or disposition upon the termination of employment of any contractor personnel. Contractor personnel must display any NRC issued badge in clear view at all times during on site performance under this contract. It is the contractor's duty to assure that contractor personnel enter only those work areas necessary for performance of contract work, and to assure the protection of any Government records or data that contractor personnel may come into contact with.

H.11SECURITY REQUIREMENTS FOR INFORMATION TECHNOLOGY LEVEL I OR LEVEL II ACCESS APPROVAL (JUL 2007)

The proposer/Contractor must identify all individuals and propose the level of Information Technology (IT) approval for each, using the following guidance. The NRC sponsoring office shall make the final determination of the level, if any, of IT approval required for all individuals working under this contract. The Government shall have and exercise full and complete control and discretion over granting, denying, withholding, or terminating IT access approvals for individuals performing work under this contract.

The Contractor shall conduct a preliminary security interview or review for each IT level I or II access approval Contractor applicant and submit to the…

This is the start of the file's text. The full file is on GovTribe.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .