RFP-CMS-2010-8A-0014 RDIS.docx

DOCX document 155 KB Posted

Attached to
Research, Demonstration, & Information System (RDIS) Information Technology (IT) Development Federal contract opportunity
Solicitation number
RFP-CMS-2010-8A-0014
Issued by
Department of Health and Human Services Centers for Medicare and Medicaid Services

About this file

RDIS Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Research, Demonstration, & Information System (RDIS) Information Technology (IT) Development, newest first.
File Type Posted
CMS Technical Ref Arch_ v 2.0_11124009.pdf PDF
RDIS_RFP questions.xlsx XLSX spreadsheet
EHR_To Be BPM Diagrams_legal_11_18_2009_1.pdf PDF
Acronym RDIS Master 05 24 2010.docx DOCX document
SF33.pdf PDF
RDIS SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HHSM-500-2010-8A-0014

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1DESCRIPTION OF SERVICES
B.2TYPE OF CONTRACT
B.3ESTIMATED COST AND FIXED FEE
B.4WITHHOLDING OF CONTRACT PAYMENTS

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1STATEMENT OF WORK
C.2INCORPORATION OF CONTRACTOR'S PROPOSAL
C.3INCORPORATION OF REPRESENTATIONS AND

CERTIFICATIONS

SECTION D - PACKAGING AND MARKING

D.1 PACKAGING AND MARKING

SECTION E - INSPECTION AND ACCEPTANCE

E.1FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE
E.2INSPECTION AND ACCEPTANCE
E.3APPROVALS BY THE PROJECT OFFICER
E.4FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT

SECTION F - DELIVERIES OR PERFORMANCE

F.1FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE
F.2PERIOD OF PERFORMANCE
F.3ITEMS TO BE FURNISHED AND DELIVERY SCHEDULE
F.4FAR 52.242-15 STOP-WORK ORDER

SECTION G - CONTRACT ADMINISTRATION DATA

G.1ACCOUNTING AND APPROPRIATION DATA
G.2INVOICING
G.3PAYMENT
G.4PROJECT OFFICER
G.5TECHNICAL DIRECTION
G.6CONTRACTING OFFICER RESPONSIBILITY
G.7PROJECT DIRECTOR/PROJECT MANAGER
G.8HHSAR 352.270-5 KEY PERSONNEL
G.9WORKING PAPERS
G.10DATA TO BE DELIVERED
G.11INDIRECT COST - PROVISIONAL RATES
G.12SERVICE OF CONSULTANTS
G.13DISSEMINATION, PUBLICATION AND DISTRIBUTION OF
INFORMATION
G.14TRAVEL COSTS
G.15PROPERTY ADMINISTRATION
G.16AUDIT OF HOURS
G.17CORRESPONDENCE PROCEDURES
G.18FACILITIES CAPITAL COST OF MONEY
G.19SUBCONTRACT CONSENT
G.20USE OF GOVERNMENT – DATA (REPORTS/FILES/COMPUTER TAPES OR DISKETTES)
G.21ESRS REPORTING
G.22POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
G.23GOVERNMENT PRINTING OFFICE (GPO)
G.24GOVERNEMT FURNISHED PROPERTY
G.25QUALITY ASSURANCE
G.26COST ACCOUNTING STANDARDS
G.27BILLING INSTRUCTINS

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1HHSAR 352.270-7 PAPERWORK REDUCTION ACT
H.2CONDITIONS FOR PERFORMANCE
H.3HIPAA BUSINESS ASSOCIATE PROVISION II
H.4CMS IDENTITY MARK GUIDELINES
H.5SECURITY CLAUSE
H.6INDIRECT COST RATES
H.7RESTRICTIONS ON THE USES OF INFORMATION
H.8APPROVALOF CONTRACT ACQUIRED INFORMATION TECHNOLOGY (IT)
H.9ORGANIZATION CONFLICTS OF INTEREST
H.10CONFLICT OF INTEREST
H.11ELECTRONIC INFORMATION AND TECHNOLOGY ACCESSIBILITY
H.12CODE OF CONDUCT
H.13CMS INFORMATION SECURITY
H.14SECTION 508 COMPLIANCE FOR COMMUNICATIONS

SECTION I - CONTRACT CLAUSES

I.1FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE
I.2FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES
I.3FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES
I.4ORDER OF PRECEDENCE – UNIFORM CONTRACT
I.5DEPARTMENT OF HEALTH AND HUMAN SERVICES

ACQUISITION REGULATIONS (HHSAR) INCORPORATED

BY REFERENCE 352.252-20

I.6 HHSAR 352.224-7 CONFIDENTIALITY OF INFORMATION

SECTION J - LIST OF ATTACHMENTS

J.1STATEMENT OF WORK
J.2ACCOUNTING CERTIFICATION

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

K.1FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS
K.2HHSAR 352.204 CERTIFICATION OF FILING AND PAYMENT OF FEDERAL TAXES

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS

L.1Special Instructions
L-2General Instructions
L.3Section 508, Accessibility of Electronic & Information Technology (EIT) Compliance
L.4Technical Proposal Instructions
L.5Business Proposal Instructions
L.6Treatment of Data in Proposals (FOIA)
L.7Treatment of Proprietary Information in Proposals
L.852.233-2 Service of Protest (Aug 1996)
L.952.252-2 Clauses Incorporated by Reference (Feb 1998)

SECTION M – EVALUATION FACTORS FOR AWARD

M.1General Evaluation Process and Source Selection Approach
M.2Evaluation Methodology
M.3Technical Evaluation Factors
M.4Other Factors

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 DESCRIPTION OF SERVICES

The contractor shall perform services for the effort entitled “Research, Data, and Information System (RDIS) Development” in accordance with Section C, DESCRIPTION / SPECIFICATIONS/WORK STATEMENT.

B.2 TYPE OF CONTRACT

This is a Cost-Plus-Fixed-Fee contract.

B.3 ESTIMATED COST AND FIXED

The total estimate cost plus fixed fee is xxx, the reimbursable cost is xxx, the fixed fee is xxx.

B.4 WITHHOLDING OF CONTRACT PAYMENTS (APR 1984) HHSAR Clause

352.232-9 (APR 1984)

Notwithstanding any other payment provisions of this contract, failure of the Contractor to submit required reports when due or failure to perform or deliver required work, supplies, or services, will result in the withholding of payments under this contract unless such failure arises out of causes beyond the control, and without the fault or negligence of the Contractor as defined by the clause entitled "Excusable Delays" or "Default", as applicable. The Government shall promptly notify the Contractor of its intention to withhold payment of any invoice or voucher submitted.

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

See Section J, Statement of Work (SOW)

C.2 INCORPORATION OF CONTRACTOR'S PROPOSAL

The Contractor's technical proposal, entitled "xxx," dated xxx, is hereby incorporated by reference, and made a part of this contract. The portions of the Contractor's proposal identified above are declared to be "Technical Data" and notwithstanding any restrictive markings placed on or in the proposal, the identified portion is subject to the unlimited rights provisions of the "Rights in Data-General" clause of Section I of this contract. In the event of any inconsistency between the provisions of this contract and the Contractor's technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (a) Part I, The Schedule, (b) Part II, FAR Clauses incorporated under Section I, (c) Contractor's technical proposal, and (d) Other provisions of the contract, whether incorporated by reference or otherwise.

C.3 INCORPORATION OF REPRESENTATIONS AND CERTIFICATIONS

The Contractor’s Representations and Certifications have been completed in accordance with FAR 52.204-8. A copy should be provided in the business proposal to the government.

SECTION D PACKAGING AND MARKING

D.1 PACKAGING, AND MARKING

All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.

SECTION E INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.arnet.gov/far/

E.2 INSPECTION AND ACCEPTANCE

a. All work under this contract is subject to inspection and final acceptance by the Contracting Officer or the fully authorized representative of the Government.

b. The Government’s Project Officer is a duly authorized representative of the Government and is responsible for inspection and acceptance of all items to be delivered under this contract.

c. Inspection and acceptance of the Contractor’s performance shall be in accordance with the applicable FAR clauses in Section E.1 above.

E.3 APPROVALS BY THE PROJECT OFFICER

All items to be delivered to the Project Officer will be deemed to have been approved 30 calendar days after date of delivery, except as otherwise specified in this contract, if written approval or disapproval has not been given within such period. The Project Officer’s approval or revision to the items submitted shall be within the general scope of work stated in this contract.

E.4 52.246-5 INSPECTION OF SERVICES – COST - REIMBURSEMENT(APR 1984)

Incorporated by reference

SECTION F DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.arnet.gov/far/

F.2 PERIOD OF PERFORMANCE

The period of performance for completion of all work under this contract shall be five (5) months from the award date.

F.3 ITEMS TO BE FURNISHED AND DELIVERY SCHEDULE

a. All deliverables required under this contract shall be packaged, marked and shipped in accordance with U.S. Government specifications. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.~f

b. The Contractor shall submit all required deliverables and reports in accordance with the following schedule. Reports submitted under the contract shall reference and cite the contract number and identify CMS as the sponsoring agency.

c. Satisfactory performance of the final contract shall be deemed to occur upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the following schedule (reports submitted under the contract shall reference and cite the contract number and identify CMS as the sponsoring agency):

The contractor shall submit all required reports and deliverables in accordance with the following schedule. Reports and/or deliverables submitted under this contract shall be in accordance with this Statement of Work.

F.4 52.242-15 STOP-WORK ORDER (AUG 1989)

Incorporated by reference

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 ACCOUNTING AND APPROPRIATION DATA

TBD

G.2 INVOICING (COST REIMBURSEMENT)

a. Submission of Invoices and Place of Payment

(1) Once each month following the effective date of this contract, the Contractor may submit to the Government an invoice (or public voucher) for payment, in accordance with FAR Clause 52.216-7 "Allowable Cost & Payment." Invoices shall be prepared in accordance with the "Billing Instructions" attached hereto and made a part of this contract. The Government shall make provisional payments on all invoices pending the completion of a final audit of the Contractor's cost records.

(2) To expedite payment, invoices shall be sent, as follows:

(a) Monthly invoices (original and four copies) shall be sent per "Billing Instructions" directly to the address below (where applicable, the Contractor shall submit the invoice to said office via the cognizant government auditor):

Department of Health and Human Services Centers for Medicare & Medicaid Services

P.O. BOX 7520

7500 Security Boulevard Baltimore, Maryland 21207-0520

(b) Content of Invoice (If Applicable):

- Contractor's name and invoice date;

- Contract number of other authorization for delivery of property and/or services;

- Description, cost or price, and quantity of property and/or services actually delivered or rendered;

- Shipping and payment terms;

- Other substantiating documentation or information as required by the contract; and

- Name (where practicable), title, phone number, and complete mailing address of responsible official to whom payment is to be sent.

G.3 PAYMENT (COST RIEMBURSEMENT)

(1) In accordance with FAR 52.232-33, the Centers for Medicare and Medicaid Services (CMS) shall only make an electronic reimbursement/payment.

In accordance with FAR 52.204-7, the contractor must register in the Central Contractor Registration (CCR) database. Failure to register in CCR may prohibit CMS from making awards to your organization.

The contractor shall notify CMS' Division of Accounting Operations of all EFT and address changes in CCR via the following email address: CCRChanges@cms.hhs.gov

(2) The target date for payment pursuant to the provision of FAR Clause, 52.216-7 "Allowable Cost and Payment" of this contract shall be 30 calendar days after an invoice containing the information set forth in Paragraph "a" of this article is received in the payment office designated herein.

(3) Upon receipt of the Contractor's "completion invoice" in the payment office designated in Paragraph "a" of this article, payment of any remaining cost and fee determined to be allowable pursuant to the provisions of FAR Clause, 52.216-7 "Allowable Cost and Payment" of this contract shall be due 30 calendar days after the Contracting Officer approves the "completion invoice" for payment.

(4) Payment shall be authorized after the Division of Accounting has audited the invoice in accordance with Federal Regulations. This audit includes verification that the invoice contains the rates/unit prices, those indicated in the contract or purchase order. Any discrepancies determined as a result of the audit, could delay the processing of the invoice and may result in the invoice being returned to the vendor for correction. Inquiries relating to payments should be directed to

G.4 PROJECT OFFICER

TBD is hereby designated as the Project Officer. The Project Officer responsibilities shall include continuous overall monitoring of the Contractor’s compliance with all substantive project objectives. Specific duties and responsibilities are identified in G.5, Technical Direction.

G.5 TECHNICAL DIRECTION

a. Performance of the work under this contract shall be subject to the technical direction of the PO. The term "technical direction" is defined to include, without limitation, the following:

- Directions to the Contractor which redirect the contract effort, shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish the contractual statement of work.

- Provision of information to the Contractor which assists in the interpretation of drawings, specifications, or technical portions of the work description.

- Review and, where required by the contract, approval of technical reports, drawings, specifications, and technical information to be delivered by the Contractor to the Government under the contract.

b. Technical direction must be within the general Statement of Work stated in the contract. The PO does not have the authority to and may not issue any technical directions which:

(1) Constitutes an assignment of additional work outside the general Statement of Work of the contract.

(2) Constitutes a change as defined in the FAR contract clause entitled:

52.243-2 Changes - Cost-Reimbursement. (AUG 1987) - Alternate I APR 1984

(3) In any manner cause an increase or decrease in the total estimated contract cost, fixed-fee, or the time required for contract performance.

(4) Change any of the expressed terms, conditions, or specifications of the contract.

c. All technical direction shall be issued in writing by the PO or shall be confirmed by him/her in writing within 5 working days after issuance.

d. The Contractor shall proceed promptly with the performance of technical direction duly issued by the PO in the manner prescribed by this article and within his/her authority under the provisions of this article.

e. If, in the opinion of the Contractor, any instruction or direction issued by the PO is within one of the categories as defined in b(l) through b(4) above, the Contractor shall not proceed but shall notify the Contracting Officer in accordance with FAR 52.243-7, Notification of Changes.

G.6 CONTRACTING OFFICER RESPONSIBILITY

In accordance with FAR 52.201-1 Definitions, The term Contracting Officer means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority delegated by the Contracting Officer.

Notwithstanding any of the other provisions of this Contract, the Contracting Officer shall be the ONLY individual authorized to:

a. enter into and commit/bind the Government by contract for supplies or services;

b. accept nonconforming work or waive any requirement of this Contract;

c. authorize reimbursement to the Contractor for any costs incurred during the performance of the Contract, and

d. modify any term or condition of this Contract, i.e., make any changes in the Statement of Work; modify/extend the period of performance; change the delivery schedule.

G.7 PROJECT DIRECTOR/PROJECT MANAGER

TBD will serve as Contractor’s Project Director/Project Manager. It will be his responsibility to obtain the staff necessary and to direct the work for the conduct of this project. The Government reserves the right to approve any necessary successor to be designated as Contractor’s Project Director/Project Manager.

G.8 HHSAR 352.270-5 KEY PERSONNEL

The personnel specified in this contract are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification* (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the program. No diversion shall be made by the Contractor without the written consent of the Contracting Officer; provided, that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by the clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.

*All proposed substitutions shall be submitted, in writing, to CMS at least 30 days prior to the proposed substitution. Each request shall provide a detailed explanation of the circumstance necessitating the proposed substitution, a complete resume and any other information required by CMS. All proposed substitutions shall have qualifications equal to or greater than the person being replaced.

The following individuals are considered key personnel under this contract:

TBD

G.9 WORKING PAPERS

The Contractor shall provide, at the request of the Contracting Officer, all the working papers used by the participating officials and employees of the Contractor in connection with this project.

G.10 DATA TO BE DELIVERED

a. Any working papers, interim reports, data given by the Government or first produced by the Contractor under the contract or collected or otherwise obtained by the Contractor under the contract, or results obtained or developed by the Contractor (subcontractor or consultants) pursuant to the fulfillment of this contract are to be delivered, documented, and formatted as directed by the Contracting Officer.

b. In addition, information and/or data, which are held by the Contractor related to the operation of their business and/or institution and which are obtained without the use of Federal funds, shall be considered “PROPRIETARY DATA” and are not subject data to be delivered under this contract.

G.11 INDIRECT COST - PROVISIONAL RATES

a. Pursuant to the provisions of FAR 52.216-07 entitled "Allowable Cost & Payment," in Section I of this contract, the allowable Indirect Costs under this contract shall be obtained by applying the final rates or rates negotiated to the appropriate bases. The period or periods for which such rates will be established shall correspond to the Contractor's fiscal year(s). The final rate proposal is to be submitted to the Contracting Officer at:

Centers for Medicare & Medicaid Services Acquisition and Grants Group Attn: Contracting Officer C2-21-15 7500 Security Boulevard Baltimore, Maryland 21244

In the event that the final rate proposal is submitted to the cognizant audit agency, the Contractor shall advise the Contracting Officer in writing when and to whom it was submitted.

b. Pending establishment of final rates for any fiscal year period, provisional reimbursement will be made on the basis of the provisional rates shown below.

Type Cost Center Rate Ceiling Rate

TBD

G.12 SERVICE OF CONSULTANTS

a. Except as may otherwise be expressly provided elsewhere in this contract, prior written approval of the Contracting Officer for utilization of consultants shall be required. Whenever Contracting Officer approval is required, the Contractor shall furnish to the Contracting Officer information concerning the need for such consultant services and the reasonableness of the fees to be paid to any consultants.

b. For utilization of the services of any consultants under this contract, the contractor shall be reimbursed in accordance with the rate(s) set forth below. If not identified below, the contractor shall be reimbursed for utilization of consultant services at a rate determined to be reasonable and appropriate for the services, exclusive of travel costs.

Rate Number Total Cost

G.13. DISSEMINATION, PUBLICATION AND DISTRIBUTION OF INFORMATION

a. Data and information either provided to the Contractor, or to any subcontractor or generated by activities under this contract or derived from research or studies supported by this contract, shall be used only for the purposes of the contract. It shall not be duplicated, used or disclosed for any purpose other than the fulfillment of the requirements set forth in this contract. This restriction does not limit the contractor's right to use data or information obtained from a non-restrictive source. Any questions concerning "privileged information" shall be referred to the Contracting Officer.

b. Some data or information may require special consideration with regard to the timing of its disclosure so that preliminary findings which could create erroneous conclusions are not stimulated. Also, some data or information, which relate to policy matters under consideration by the Government, may also require special consideration with regard to the timing of its disclosure so that the open and vigorous debate, within the government, of possible policy options is not damaged.

c. Any questions about use or release of the data or information or handling of material under this contract, shall be referred to the Contracting Officer who must render a written determination. The Contracting Officer's determinations will reflect the results of internal coordination with appropriate program and legal officials.

d. Written advance notice of at least forty-five (45) days shall be provided to the Contracting Officer of the Contractor's desire to release findings of studies or research or data or information described above. If the Contractor disagrees with the Contracting Officer's determination, and if this disagreement cannot be settled by the Contractor and the Contracting Officer in a mutually satisfactory manner, then the issue will be settled pursuant to the "Disputes" clause.

e. Any presentation of any report, statistical or analytical material based on information obtained from this contract shall be subject to review by the Project Officer before dissemination , publication, or distribution. Presentation includes, but is not limited to, papers, articles, professional publications, speeches, testimony or interviews with public print or broadcast media. This does not apply to information that would be available under the Federal Freedom of Information Act.

f. The Project Officer review shall cover accuracy, content, manner of presentation of the information, and also the protection of the privacy of individuals. If the review finds that the Privacy Act is or may be violated, the release/use of the presentation shall be denied until the offending material is removed or until the Contracting Officer makes a formal determination, in writing, that the privacy of individuals is not being violated.

g. If the review shows that the accuracy, content, or manner of presentation is not correct or is inappropriate in the light of the purpose of the project, the Project Officer shall immediately inform the Contractor, in writing, of the nature of the problem. If the Contractor disagrees, the Project Officer may insist that the presentation contain, in a manner of equal importance, materials which show the government's problem with the presentation.

h. The Contractor agrees to acknowledge support by CMS whenever reports of projects funding, in whole or in part, by this contract are published in any medium. The Contractor shall include in any publication resulting from work under this contract, an acknowledgement substantially, as follows:

"The analyses upon which this publication is based were performed under Contract Number HHSM-500-2010- TBD, entitled, " Research, Data, and Information System (RDIS) Development."

Any deviation from the above legend shall be approved, in writing, by the Contracting Officer.

G.14 TRAVEL COSTS

Costs incurred for lodging, meals and incidental expenses shall be considered to be reasonable, allowable and allocable under this contract only to the extent that they do not exceed, on a daily basis, the maximum per diem rates in effect at the time of travel as set forth in the latest Federal Travel Regulations. The full text of the Federal Travel Regulations may be accessed electronically at this address: http://www.doi.gov/pfm/oden/toc.html.

G.15 PROPERTY ADMINISTRATION

The CMS Contract Property Administrator, Property and Distribution Management Section, Division of General Services, 7500 Security Blvd., Baltimore, Md. 21244, is hereby designated the property administration function for this contract. The Contractor agrees to furnish information regarding Government Property to the Property Administrator in the manner and to the extent required by the Property Administrator, his duly designated successors, and in accordance with FAR Part 45 and DHHS Manual entitled, Contractor's Guide for Control of Government Property, (1990).

If equipment is procured in order to provide services, CMS will retain title to the equipment. CMS must be notified as part of the itemized billing arrangement if there is an equipment acquisition, included in the cost of the contract.

All original tapes, video, CD ROM's, manual, brochures, pamphlets shall remain the property of the CMS. The contractor shall provide to CMS all final, complete and editable web-based training course files.

If equipment is procured in the performance of this contract, CMS will retain title to the equipment. CMS must be notified as part of the itemized billing arrangement if there is an equipment acquisition, included in the cost of the contract.

G.16 AUDIT OF HOURS

a. In addition to the examination of costs, as detailed in FAR Clause No. 52.215-02 entitled "Audit-Negotiation," the Contracting Officer or his representatives will have the right to examine all books, records, documents and other data of the Contractor relating to this contract for the purpose of evaluating the accuracy and completeness of the hours which the Contractor has recorded on his invoices as expended toward satisfaction of the requirements of this contract.

b. The materials described above shall be made available at the office of the Contractor, at all reasonable times, for inspection, audit or reproduction until:

(1) The expiration of three (3) years from the date of final payment under this contract,

(2) the expiration of three (3) years from the date of final settlement resulting from a termination or a partial termination of this contract.

G.17 CORRESPONDENCE PROCEDURES

To promote timely and effective administration, correspondence (except for invoices), submitted under this contact shall be subject to the following procedures:

a. Technical Correspondence - Technical correspondence (as used herein, this term excludes technical correspondence which proposes or otherwise involves waivers, deviations or modifications to the requirements, terms or conditions of this contract) shall be addressed to the PO/GTL with an informational copy of the basic correspondence to the Contracting Officer.

b. Other Correspondence - All other correspondence shall be addressed to the Contracting Officer, in duplicate, with an informational copy of the basic correspondence to the PO/GTL.

c. Subject Lines - All correspondence shall contain a subject line, commencing with the contract number as illustrated below:

EXAMPLE: Contract No. HHSM-500-2010- TBD Request for Subcontract Consent

G.18 FACILITIES CAPITAL COST OF MONEY

When facilities capital cost of money (cost of capital committed to facilities) is included as an item of cost in the contractor's proposal, a reduction in the profit objective shall be made in an amount equal to the amount of facilities capital cost of money allowed in accordance with the Facilities Capital Cost-of Money Cost Principal.

If the contractor does not propose this cost, facilities capital cost of money is not an allowable cost.

G.19 SUBCONTRACT CONSENT

To facilitate the review of proposed subcontracts, the Contractor shall include in its proposal the information required by the FAR Clause 52.244-2 entitled, "Subcontracts".

In all other instances the Contractor shall submit its request for subcontracting consent to the Contracting Officer. The Contracting Officer shall consult with the Project Officer and advise the Contractor of his/her decision to consent to or dissent from the proposed subcontract, in writing.

G.20 USE OF GOVERNMENT – DATA (REPORTS/FILES/COMPUTER TAPES OR DISKETTES)

Any data given to the Contractor by the Government shall be used only for the performance of the contract unless the Contracting Officer specifically permits another use, in writing. Should the Contracting Officer permit the Contractor the use of Government-supplied data for a purpose other than solely for performance of this contract and, if such use could result in a commercially viable product, the Contracting Officer and the Contractor must negotiate a financial benefit to the Government. This benefit should most often be in the form of a reduction in the price of the contract; however, the Contracting Officer may negotiate any other benefits he/she determines is adequate compensation for the use of these data.

Upon the request of the Contracting Officer, or the expiration date of this contract, whichever shall come first, the Contractor shall return or destroy all data given to the Contractor by the Government. However, the Contracting Officer may direct that the data be retained by the Contractor for a specific period of time, which period shall be subject to agreement by the Contractor. Whether the data are to be returned, retained, or destroyed shall be the decision of the Contracting Officer with the exception that the Contractor may refuse to retain the data. The Contractor shall retain no data, copies of data, or parts thereof, in any form, when the Contracting Officer directs that the data be returned or destroyed. If the data are to be destroyed, the Contractor shall directly furnish evidence of such destruction in a form the Contracting Officer shall determine is adequate.

G.21 ESRS REPORTING

The Contractor shall report all subcontract awards to small, small disadvantaged, women-owned, HUBZones, veteran-owned and service-disabled veteran-owned small business concerns. The reports shall be prepared using the electronic Subcontracting Reporting System (eSRS) via the internet at http://www.esrs.gov. The Individual Subcontracting Report (ISR), formerly SF 294, shall be submitted semi-annually for the periods of October 1 through March 31 and April 1 through September 30. The Summary Subcontracting Report (SSR), formerly, SF 295 shall be submitted annually for the period of October 1 through September 30.

G.22 POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE

a. Contractor Performance Evaluations

Interim annual, and final evaluations of contractor performance will be prepared on this contract in accordance with FAR 42.15. The final performance evaluation will be prepared at the time of completion of work. At the discretion of the Contracting Officer, interim evaluations should be considered. Annual evaluations shall be prepared to coincide with the anniversary date of the contract.

A copy of all evaluations should be provided to the Contractor as soon as practicable after completion of the annual and final evaluation. The Contractor will be permitted thirty (30) days to review the document and to submit additional information or a rebutting statement. Any disagreement between the parties regarding an evaluation will be referred to the Deputy Director, Acquisition and Grants Group, whose decision will be final.

Copies of the evaluation, contractor responses, and review comments, if any, will be retained as part of the contract file, and will be used to support future award decisions.

b. Electronic Access to Contractor Performance Evaluations

Contractors that have Internet capability may access evaluations through a secure Web site for review and comment by completing the registration form that can be obtained at the following address: https://cpscontractor.nih.gov.

To register, simply logon and click on the “Register Here” link. This site provides instructions on how to register and offers computer-based training for contractors through the “CPS Contractor On-Line Training” hyperlink. There is no fee for registration or use of this system. Electronic evaluations are available to registered contractors for review 30 days from the date the evaluation is sent.

The registration process requires the contractor to identify an individual that will serve as a primary contact and who will be authorized access to the evaluation for review and comment. In addition, the contractor will be required to identify an alternate contact who will be responsible for notifying the cognizant contracting official in the event the primary contact is unavailable to process the evaluation within the required 30-day time frame.

G.23 GOVERNMENT PRINTING OFFICE (GPO)

Printing will be performed in accordance with the Government Printing Office (GPO) Style Manual, 29th Edition (2000), United States Government Printing Office, Washington, DC.

Government Printing

Printing . The acquisition of printing and high volume duplicating by contract is prohibited unless it is authorized by the Joint Committee on Printing of the U.S. Congress. Procedures to be followed are contained in the "Government Printing and Binding Regulations" and the HHS Printing Management Manual and FAR subpart 8.8.

8.802 Policy.

(a) Government printing must be done by or through the Government Printing Office (GPO ) (44 U.S.C. 501), unless -

(1) The GPO cannot provide the printing service (44 U.S.C. 504);

(2) The printing is done in field printing plants operated by an executive agency (44 U.S.C. 501(2));

(3) The printing is acquired by an executive agency from allotments for contract field printing (44 U.S.C. 501(2)); or

(4) The printing is specifically authorized by statute to be done other than by the GPO .

(b) The head of each agency shall designate a central printing authority; that central printing authority may serve as the liaison with the Congressional Joint Committee on Printing (JCP) and the Public Printer on matters related to printing. Contracting officers shall obtain approval from their designated central printing authority before contracting in any manner, whether directly or through contracts for supplies or services, for the items defined in 8.801 and for composition, platemaking, presswork, binding, and micrographics (when used as a substitute for printing).

(c)(1) Further, 44 U.S.C. 1121 provides that the Public Printer may acquire and furnish paper and envelopes (excluding envelopes printed in the course of manufacture) in common use by two or more Government departments, establishments, or services within the District of Columbia, and provides for reimbursement of the Public Printer from available appropriations or funds. Paper and envelopes that are furnished by the Public Printer may not be acquired in any other manner.

(2) Paper and envelopes for use by Executive agencies outside the District of Columbia and stocked by GSA shall be requisitioned from GSA in accordance with the procedures listed in Federal Property Management Regulations (FPMR) Subpart 101-26.3.

G.24 GOVERNMENT FURNISHED PROPERTY

During performance of this contract, the contractor will be required to acquire equipment, or data; or use government furnished/owned equipment on a no-charge, non-interference basis. At such time, the provisions of FAR Clause No. 52.245-1 entitled “Government Property”, shall become applicable.

G.25 QUALITY ASSURANCE

The IT Technical Management Contractor shall ensure the timeliness and quality of the deliverables for the duration of this task. The GTL will review deliverables, provide comments for revisions, frequently monitoring IT Technical Management Contractor activities, and conduct routine status meetings. In addition, review of progress reporting will also help support the monitoring of the IT Technical Management Contractor’s work.

G.26 COST ACCOUNTING STANDARDS (FAR SUBPART 30.2)

Pursuant to the requirements of FAR Subpart 30.2 – CAS Program Requirements, it has been determined that the Contractor’s Accounting System has not been reviewed pending implementation of a new accounting system. In that regard, the contractor has agreed to implement an adequate accounting system no later than November 30, 2008. If CMS determines that the system does not meet the requirements of FAR Subpart 30.2, the Contractor must correct any inadequacies by February 28, 2009. Until such time as an adequate accounting system has been approved and indirect cost provisional rates are established, the contractor shall bill all costs on an actual incurred cost basis.

If the contractor has not implemented an adequate accounting system by February 28, 2009, CMS reserves the right to terminate this contract in the best interest of the Government and negotiate a mutually agreeable settlement amount.

G.27 BILLING INSTRUCTIONS

INVOICE/FINANCING REQUEST INSTRUCTIONS FOR COST-REIMBURSEMENT TYPE CONTRACTS

General: The Contractor shall submit claims for reimbursement in the manner and format described herein and as illustrated in the sample invoice/financing request.

Format: Standard Form 1034, Public Voucher for Purchases and Services Other Than Personal; and Standard Form 1035, Public Voucher for Purchases and Services Other Than Personal--Continuation Sheet, or reproduced copies of such forms marked ORIGINAL should be used to submit claims for reimbursement.

Number of Copies: As indicated in the Invoice Submission/Contract Financing Request clause in the contract.

Frequency: Invoices/financing requests submitted in accordance with the payment clause shall be submitted monthly unless otherwise authorized by the Contracting Officer.

Cost Incurrence Period: Costs incurred must be within the contract performance period or covered by pre-contract cost provisions.

Billing of Costs Incurred: If billed costs include: (1) Costs of a prior billing period, but not previously billed, or (2) costs incurred during the contract period and claimed after the contract period has expired, the amount and month(s) in which such costs were incurred shall be cited.

Contractor's Fiscal Year: Invoices/financing requests shall be prepared in such a manner that costs claimed can be identified with the Contractor's fiscal year.

Currency: All CMS contracts are expressed in United States dollars. Where expenditures are made in a currency other than United States dollars, billings on the contract shall be expressed, and reimbursement by the United States Government shall be made, in that other currency at amounts coincident with actual costs incurred. Currency fluctuations may not be a basis of gain or loss to the Contractor. Notwithstanding the above, the total of all invoices paid under this contract may not exceed the United States dollars authorized.

Costs Requiring Prior Approval: Costs requiring the Contracting Officer's approval which are not set forth in an advance understanding in the contract shall be so identified.

Invoice/Financing Request Identification: Each invoice/financing request shall be identified as either:

(a) Cost Reimbursable - Financing Request: These are interim payment requests submitted during the contract performance period.

(b) Completion/Final Invoice: The completion invoice is a final invoice which is submitted promptly upon completion of the work, but no later than one year from the contract completion date. The completion invoice should be submitted when all costs (except for finalization of indirect cost rates) have been assigned to the contract and all performance provisions have been completed. A revised final invoice may be required after the amounts owed have been settled between the Government and the Contractor (e.g., final indirect cost rates and resolution of all suspensions and audit exceptions).

Preparation and Itemization of the Invoice/Financing Request: The Contractor shall furnish the information set forth in the explanatory notes below. These notes are keyed to the entries of the sample invoice/financing request.

(a) Paying Office and Address: The paying office and address, identified in the Invoice Submission/Contract Financing Request clause of the contract, shall be entered on all copies of the invoice/financing request.

(b) Invoice/Financing Request Number: Insert the appropriate serial number of the invoice/financing request.

(c) Date of Invoice/Financing Request: Insert the date of the invoice/financing request is prepared.

(d) Contract Number and Date: Insert the contract number and the date of the contract.

(e) Payee's Name and Address: Show the Contractor's name (as it appears in the contract), correct address, and the title and phone number of the responsible official to whom payment is to be sent. When an approved assignment has been made by the Contractor, or a different payee has been designated, then insert the name and address of the payee instead of the Contractor.

(f) Contract Amount: Insert the total estimated cost of the contract, exclusive of fixed-fee. For incrementally funded contracts, enter the amount currently obligated and available for payment.

(g) Fixed-Fee: Insert the total fixed-fee (where applicable).

(h) Billing Period: Insert the beginning and ending dates (day, month, and year of the period in which costs were incurred and for which reimbursement is claimed.

(I) Amount Billed for Current Period: Insert the amount billed for the major cost elements, adjustment and adjusted amounts for the period.

(j) Cumulative Amount from Inception to Date of this Billing: Insert the cumulative amounts billed for the major cost elements and adjusted amounts claimed during this contract.

(k) Direct Costs: Insert the major cost elements. For each element, consider the application of the paragraph entitled Costs Requiring Prior Approval on page 1 of these instructions.

(1) Direct Labor: This consists of salaries and wages paid (or accrued for direct performance of the contract.

(2) Fringe Benefits: This represents fringe benefits applicable to direct labor and billed as a direct cost. Fringe benefits included in indirect costs should not be identified here.

(3) Nonexpendable Equipment: This category of cost includes permanent research equipment and general purpose equipment having a unit acquisition cost of $1,000 or more and having an expected service life of more than two years. Prepare and attach Form HHS-565 in accordance with the following instructions:

List each item for which reimbursement is requested. A reference shall be made to the following (as applicable):

(A) The item number for the specific piece of equipment listed in the Property Schedule;

(B) The Contracting Officer's Authorization letter and number, if the equipment is not covered by the Property Schedule, or;

(C) Be preceded by an asterisk (*) if the equipment is below the approval level.

Further itemization of invoices/financing requests shall only be required for items having specific limitations set forth in the contract.

(4) Materials and Supplies: This category includes equipment with unit costs of less than $500 or an expected service life of two years or less, and consumable material and supplies regardless of amount.

(5) Premium Pay: This is remuneration in excess of the basic hourly rate.

(6) Consultant Fee: Fees paid to consultants. Identify consultant by name or category as set forth in the contract's advance understanding , as well as the effort (i.e., number of hours, days, etc.) and rate being billed.

(7) Travel: Domestic travel is travel within the United States, its territories, possessions and Canada for Contractors located there; otherwise it is the Contractor's own country. It should be billed separately from foreign travel.

(8) Subcontract Costs: List subcontractor(s) by name and amount billed.

(9) Other: List all other direct costs in total unless exceeding $1,000 in amount. If over $1,000, list cost elements and dollar amount separately. If the contract contains restrictions on any cost element, that cost element should be listed separately.

(l) Cost of Money (COM): Cite the COM factor and base in effect during the time the cost was incurred and for which reimbursement is claimed.

(m) Indirect Costs--Overhead: Cite the formula (rate and base) in effect during the time the cost was incurred and for which reimbursement is claimed. If special rate is being used; e.g., off-site, then so specify.

(n) Fixed-Fee: If the contract provides for a fixed-fee, it must be claimed as provided for by the contract. Cite the formula or method of computation.

(o) Total Amounts Claimed: Insert the total amounts claimed for the current and cumulative periods.

(p) Adjustments: This includes amounts conceded by the Contractor, outstanding suspensions and disapprovals subject to appeal.

(q) Grand Totals

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 HHSAR 352.270-7 PAPERWORK REDUCTION ACT (JAN 2006)

(a) This contract involves a requirement to collect or record information calling either for answers to identical questions from 10 or more persons other than Federal employees, or information from Federal employees which is outside the scope of their employment, for use by the Federal government or disclosure to third parties; therefore, the Paperwork Reduction Act of 1995 (Pub. L. 104–13) shall apply to this contract. No plan, questionnaire, interview guide or other similar device for collecting information (whether repetitive or single time) may be used without first obtaining clearance from the Office of Management and Budget (OMB). Contractors and Project Officers should be guided by the provisions of 5 CFR Part 1320, Controlling Paperwork Burdens on the Public, and seek the advice of the HHS operating division or Office of the Secretary Reports Clearance Officer to determine the procedures for acquiring OMB clearance.

(b) The Contractor shall not expend any funds or begin any data collection until OMB Clearance is received. Once OMB Clearance is received from the Project Officer, the Contracting Officer shall provide the Contractor with written notification authorizing the expenditure of funds and the collection of data. The Contractor must allow at least 120 days for OMB clearance. Excessive delays caused by the Government which arise out of causes beyond the control and without the fault or negligence of the Contractor will be considered in accordance with the Excusable Delays or Default clause of this contract.

H.2 CONDITIONS FOR PERFORMANCE

In addition to the performance requirements of this contract as set forth under Section C, the Contractor may be required to comply with the requirements of any revisions in legislation or regulations which may be enacted or implemented during the period of performance of this contract, and are directly applicable to the performance requirements of this contract.

Such legislative or regulatory requirements shall become a part of this contract only through an execution of a contract modification by the Contracting Officer. The contractor will be consulted and participate in negotiations to effect an equitable adjustment to the contract.

H. 3 HIPAA BUSINESS ASSOCIATE PROVISION II

Definitions:

All terms used herein and not otherwise defined shall have the same meaning as in the Health Insurance Portability and Accountability Act of 1996 (“HIPAA,” 42 U.S.C. sec. 1320d) and the corresponding implementing regulations. Provisions governing the Contractor’s duties and obligations under the Privacy Act (including data use agreements) are covered elsewhere in the contract.

"Business Associate'' shall mean the Contractor.

"Covered Entity" shall mean CMS’ Medicare Fee for Service program and/or Medicare’s Prescription Drug Discount Care and Transitional Assistance Programs.

"Secretary" shall mean the Secretary of the Department of Health and Human Services or the Secretary’s designee.

Obligations and Activities of Business Associate

(a) Business Associate agrees to not use or disclose Protected Health Information (“PHI”), as defined in 45 C.F.R. § 160.103, created or received by Business Associate from or on behalf of Covered Entity other than as permitted or required by this Contract or as required by law.

(b) Business Associate agrees to use safeguards to prevent use or disclosure of PHI created or received by Business Associate from or on behalf of Covered Entity other than as provided for by this Contract. Furthermore, Business Associate agrees to use appropriate administrative, physical and technical safeguards that reasonably and appropriately protect the confidentiality, integrity and availability of the electronic protected health information (“EPHI”), as defined in 45 C.F.R. 160.103, it creates, receives, maintains or transmits on behalf of the Covered Entity to prevent use or disclosure of such EPHI.

(c) Business Associate agrees to mitigate, to the extent practicable, any harmful effect that is known to Business Associate of a use or disclosure of PHI by Business Associate in violation of the requirements of this Contract.

(d) Business Associate agrees to report to Covered Entity any use or disclosure involving PHI it receives/maintains from/on behalf of the Covered Entity that is not provided for by this Contract of which it becomes aware.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .