Water Intrusion Assessment and Mitigation RFP Summary
This is a Request for Proposal (RFP) issued by the Long Beach Public Utilities Department (LBPUD) for water intrusion assessment and mitigation services with full contractor design-build services across three municipal buildings. The scope of work requires contractors to conduct comprehensive facility diagnostics, identify water infiltration pathways and structural deficiencies, and engineer definitive mitigation solutions for Buildings #550, #560, and #570. Contractors must attend a mandatory pre-proposal site walk on September 3, 2026 at 9:00 AM, with RSVP required by August 27, 2026. Written inquiries are due by September 10, 2026, with responses posted by September 17, 2026. Proposals must be submitted electronically via the Long Beach Buys portal by October 1, 2026 at 11:00 AM. The contract will commence upon issuance of a Notice to Proceed and terminate upon satisfactory completion of services outlined in the scope of work, with no specified renewal options.
Pricing is performance-based with contractors submitting detailed cost proposals including all labor, materials, equipment, and overhead necessary to complete the work. Contractors must provide separate pricing for miscellaneous work performed on holidays, weekends, or outside regular business hours at the request of LBPUD. The RFP is evaluated on three criteria: Approach (40 points), Experience (30 points), and Price (30 points). Proposals must demonstrate a minimum of five consecutive years of experience in roofing mitigation measures, include three project references from the past five years, and provide sample water intrusion assessment plans. No incumbent contractor is identified. Contractors must maintain comprehensive insurance coverage including general liability ($1,000,000 per occurrence), workers' compensation, professional liability, and commercial auto liability. All work must comply with California prevailing wage requirements, Department of Industrial Relations public works standards, and CAL-OSHA safety orders. Pre-contractual proposal development expenses are not reimbursable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Doing Business with the City Webinar~6.pdf | ||
| LBB Bid Solicitation Guide~17.pdf | ||
| RFP UD-26-353 Addendum 1.pdf | ||
| LBB User Profile Guide~5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL FOR
WATER INTRUSION ASSESSMENT AND MITIGATION WITH
FULL CONTRACTOR SERVICES
UD-26-353
Company Name _________________________________________________________________
Contact Person _________________________________________________________________
Address _________________________________ City _________________ State ____________
Zip _____________ Telephone (____) _______________ Fax (____) ______________________
Federal Tax ID No. ________________________
Email Address: __________________________________________________________________
Prices contained in this proposal are subject to acceptance within __________ calendar days.
I have read, understand, and agree to all terms and conditions herein.
Date ___________________________________________________________________________
Signed _________________________________________________________________________
Print Name & Title ________________________________________________________________
For additional information, contact the Utilities Procurement Representative:
Tina Kim
CentralProcurement@lbutilities.org 562-570-2459
See Section 3 for instructions on submitting proposals.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 2 | P a g e
TABLE OF CONTENTS
1. OVERVIEW OF PROJECT
2. ACRONYMS/DEFINITIONS
3. SUBMITTAL INSTRUCTIONS
4. RESPONSE REQUIREMENTS
5. EVALUATION OF PROPOSALS
6. NEGOTIATIONS
7. BASIS OF AWARD
8. COMMENCEMENT OF SERVICES
9. CONTRACTOR ORIENTATION MEETING
10. LEGAL DISCLOSURE
11. CONFLICT OF INTEREST
12. ADDENDUM (IF APPLICABLE)
13. FUTURE AMENDMENTS
14. CONTRACTORS LICENSE AND PERMITS
15. BUSINESS LICENSE
16. WARRANTY/MAINTENANCE AND SERVICE
17. CONTRACTOR’S VEHICLES
18. HAZARDOUS MATERIALS
19. ENVIRONMENTAL REQUIREMENTS
20. HOLIDAYS AND WEEKENDS
21. COST
22. BILLING & INVOICING
23. RECORD RETENTION, INSPECTION AND AUDIT
24. OWNERSHIP OF REPORTS AND DOCUMENTS
25. CONTRACTOR’S ONSITE PERSONNEL
26. USE OF LBPUD FACILITIES
27. UNSAFE WORKING CONDITIONS
28. SAFETY
29. DAMAGE CAUSED BY CONTRACTOR/ EXISTING FACILITIES AND
STRUCTURES
30. DEFAULT BY CONTRACTOR
31. OTHER CONTRACTS
32. ATTORNEY FEES AND COST
33. WAIVER
34. TERMS, CONDITIONS AND EXCEPTIONS
EXHIBIT A: SCOPE OF WORK/ REQUIREMENTS
EXHIBIT B: PROTEST PROCEDURES
EXHIBIT C: PRO-FORMA AGREEMENT
EXHIBIT D: RFP CHECKLIST
ATTACHMENT I: CERTIFICATION OF COMPLIANCE
ATTACHMENT II: STATEMENT OF NON-COLLUSION
ATTACHMENT III: EQUAL BENEFITS ORDINANCE
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 3 | P a g e
ATTACHMENT IV: W-9 REQUEST FOR TAXPAYER IDENTIFICATION NUMBER
AND CERTIFICATION
ATTACHMENT V: SECRETARY OF STATE CERTIFICATION
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 4 | P a g e
The City of Long Beach utilizes the bid portal Long Beach Buys to promote transparency, equity, and efficiency in the City’s procurement system. We invite you to register your business for any potential bid opportunities within all departments. Registration can be completed at https://longbeachbuys.buyspeed.com/bso/.
1. OVERVIEW OF PROJECT
The Long Beach Public Utilities Department (hereafter “Department” or “LBPUD”) is soliciting proposals from qualified contractors to provide WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES. Proposals are requested from experienced, qualified, and licensed companies/organizations, as detailed in the Request for Proposals (RFP).
Exhibit A, Scope of Work/Requirements, provides complete details.
1.1. Term of Agreement
This agreement shall commence upon the issuance of a Notice to Proceed and terminate upon the satisfactory completion of the services as outlined in Exhibit A.
2. ACRONYMS/DEFINITIONS
For the purposes of this RFP, the following acronyms/definitions will be used:
Agreement/ Contract
Contract specifying the terms and conditions and defining the scope of services to be performed by the Contractor for a specific project, or on a continuing on-call basis.
City The City of Long Beach and any department or agency identified herein.
Department Long Beach Public Utilities Department
Evaluation Committee
An independent committee comprised solely of representatives of the City established to review proposals submitted in response to this RFP, score the proposals, and select a Contractor.
LBPUD Long Beach Public Utilities Department
May Indicates something that is not mandatory, but permissible.
OSHA Occupational Safety and Health Administration
Contractor/Proposer Organization/individual submitting a proposal in response to this
RFP.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 5 | P a g e
Public Utilities A government agency that provides energy, sewer, or water services to the public.
RFP Request for Proposal
Shall/Must A mandatory requirement. Failure to meet a mandatory requirement may result in the rejection of a proposal as non-responsive.
Should
Something that is recommended, but not mandatory. If the Contractor fails to provide recommended information, the Department may, at its sole option, ask the Contractor to provide the information or evaluate the proposal without the information.
Subcontractor A third party not directly employed by the Contractor, who will provide services identified in this RFP.
3. SUBMITTAL INSTRUCTIONS
Contractors must RSVP no later than one week prior to the scheduled site walk.
Failure to RSVP by the deadline will result in disqualification and the Contractor will not be permitted to attend the mandatory pre‑proposal meeting or submit a proposal.
Upon RSVP, Contractors will receive the Department’s internal assessment in advance for review prior to the site walk.
3.1. RFP Timeline (times indicated are Pacific Time)
TASK DATE/TIME
RSVP for pre-proposal site walk (MANDATORY) August 27, 2026 @ 9:00 AM
Pre-proposal site walk (MANDATORY) September 3, 2026 @ 9:00 AM
Deadline for submitting questions September 10, 2026 @ 11:00 AM
Answers to all questions submitted available September 17, 2026 @ 3:00 PM
Deadline for submission of proposals October 1, 2026 @ 11:00 AM
NOTE: The Long Beach Public Utilities Department reserves the right to modify these dates at any time, with appropriate notice to prospective Contractors.
3.2. All inquiries regarding this RFP must be submitted in writing via email to the
Utilities Procurement Representative listed on the cover page, by the due date listed in Section 3.1. Responses to the questions will be posted on Long Beach Buys under the RFP title. All Contractors are recommended to visit the abovementioned
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 6 | P a g e website on a regular basis as the responses may be posted earlier than the deadline posted in the timeline above.
3.3. The Department will not be responsible for or bound by (1) any oral communication or
(2) any other information or contact that occurs outside the official communication process specified herein, unless confirmed in writing by the Utilities Procurement Representative listed on the cover page.
3.4. Electronic Submittal Instructions
Proposals shall only be submitted electronically via the City’s secure online bidding system Long Beach Buys portal, available at https://longbeachbuys.buyspeed.com/bso/. All required sections of the Proposal must be submitted via the Long Beach Buys portal. Contractors must be registered with Long Beach Buys in order to submit a proposal. Registration can be complete at https://longbeachbuys.buyspeed.com/bso/. Registration is free for all Contractors and is required in order to respond to opportunities with the Long Beach Public Utilities Department.
For customer support accessing Long Beach Buys, please contact the Long Beach Purchasing team Monday through Friday, 8am to 5pm.
Technical support for Long Beach Buys is available by email at LBPurchasing@longbeach.gov, or by phone at (562) 570-6200 during normal business hours (8am-5pm PT Monday through Friday) or by submitting an Issue Reporting Form which can be completed at the following link:
https://forms.office.com/Pages/ResponsePage.aspx?id=wxE_MWhCak-NO8fmUBg-eJhZqE0zY4JHucmtLMnWlxRUMzlJTVpROTNONUpZQ0tPMzVIQU5WQkk2Uy4u&w dLOR=c713C83D7-4896-4449-9834-FB4A3401C10C
Electronic proposals are not accessible and cannot be viewed by LBPUD until the deadline date and time. If a proposer needs to withdraw their proposal, the proposer may do so any time before the proposal deadline, by going into the City’s Long Beach Buys portal and selecting “withdraw”.
3.5. Mandatory Pre-Proposal Meeting and Site Walk
Contractors must RSVP no later than one week prior to the scheduled site walk.
Failure to RSVP by the deadline will result in disqualification and the Contractor will not be permitted to attend the mandatory pre‑proposal meeting or submit a proposal.
Upon RSVP, Contractors will receive the Department’s internal assessment in advance for review prior to the site walk.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 7 | P a g e
The mandatory RSVP deadline and the date of the mandatory pre-proposal meeting and site walk are listed in Section 3.1.
Mandatory RSVP must be submitted in writing via email to the Utilities Procurement Representative listed on the cover page, by the due date listed in Section 3.1.
Location(s) of meeting: Long Beach Gas Department, 2400 E Spring St, Long Beach 90806.
The mandatory pre-proposal meeting shall allow all interested proposers to have a clear understanding of the project scope, objectives, and requirements for the WATER
INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR
SERVICES RFP. It is recommended that Contractors bring a copy of the RFP document to this meeting. Attendance is mandatory, no exceptions. Contractors must attend the meeting and sign-in to be able to submit a proposal. Proposals from Contractors who do not attend the meeting will not be considered.
This meeting will provide an opportunity to address questions, clarify expectations, and outline critical project details to ensure alignment with our utility’s goals and compliance standards. Attendance is essential for submitting a proposal and fostering a consistent baseline of knowledge among all participants.
Contractors shall be responsible for thoroughly understanding the requirements for the development of the WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES as outlined in the RFP prior to submitting a proposal.
Contractors are encouraged to review all relevant system data and operational factors that may influence or affect the performance of work. Failure to conduct due diligence shall not relieve the Contractor from fulfilling the obligations of the Contract. LBPUD will assume that Contractors have assessed and are satisfied with the scope of work and requirements of the RFP.
If Contractors find discrepancies or omissions in this solicitation or believe clarification is needed after participating in the meeting, Contractors must address the matter in email to the Utilities Procurement Representative listed on the cover page by the deadline for submitting questions listed in Section 3.1. Responses to the questions will be posted on Long Beach Buys under the bid invitation number on or by the due date listed in Section 3.1.
3.6. Proposals must be received by the due date listed in Section 3.1, Pacific Time.
Proposals that are not uploaded by the specified date and time WILL NOT BE CONSIDERED. Contractors may submit their proposal any time prior to the submittal deadline. Other means of submission will NOT be considered unless otherwise authorized.
3.7. Proposals shall be presented in a format that corresponds to, and references sections as detailed in Section 4, Response Requirements.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 8 | P a g e
3.8. Proposals must be signed by the individual(s) legally authorized to bind the Contractor.
3.9. If complete responses cannot be provided without referencing supporting documentation, such documentation must be provided with the proposal and specific references made to the tab, page, section and/or paragraph where the supplemental information can be found.
3.10. Contractors are encouraged to carefully review this RFP, particularly Section 4, Response Requirements, and the RFP Checklist in Exhibit D prior to preparation of the proposal. A proposal may be considered non-responsive if conditional, incomplete, or if it contains alterations of form, additions not called for, or other irregularities that may constitute a material change to the proposal.
3.11. LBPUD reserves the right to reject any or all proposals, or select the proposal most advantageous to the Department. LBPUD reserves the right to verify all information submitted in the proposal.
3.12. LBPUD reserves the right to amend the RFP or issue to all Contractors a Notice of
Amendment to address questions for clarification.
3.13. Contractor may modify or amend its proposal only if LBPUD receives the amendment prior to the deadline stated herein for receiving proposals. Alterations, modifications or variations to a proposal may not be considered unless authorized by this RFP or by addendum or amendment.
3.14. LBPUD reserves the right to waive informalities and minor irregularities in proposals received.
3.15. Proposals must include any and all proposed terms and conditions and the Contractor’s standard contract language. The omission of these documents may render a proposal non-responsive.
3.16. If Contractor forms a joint venture, a copy of the joint venture agreement will be requested if Contractor is selected for award. Do not submit the joint venture agreement with the proposal.
3.17. Pre-contractual expenses are not to be included in the Cost Proposal for services. Pre-contractual expenses are defined as expenses incurred by the Contractor in; a) preparing its proposal in response to this RFP; b) submitting that proposal to LBPUD;
c) negotiating with LBPUD any matter related to the Contractor’s proposal; and d) any other expenses incurred by the Contractor prior to the date of award and execution, if any, of the Contract.
3.18. Upon award of the contract, the Awarded Contractor will be required to submit insurance according to the guidelines and requirements listed below:
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 9 | P a g e
3.18.1. If at any time during the progress of the Work, Awarded Contractor shall allow any indebtedness to accrue for labor, equipment, or materials, or which may become a claim against LBPUD, Awarded Contractor shall immediately upon request from the LBPUD pay such claim or indebtedness or cause such lien to be dissolved and discharged by giving a bond or otherwise and, in case of his failure so to do, LBPUD may withhold any money due Awarded Contractor until such claim or indebtedness is paid or may apply such money toward the discharge thereof; or, in such event LBPUD may at its option declare this Contract to be terminated; take possession and control of the Work and complete the same or cause the same to be completed according to the specifications. Awarded Contractor shall pay to LBPUD the difference between the Contract price and the actual cost to LBPUD in completing or causing the Work to be completed.
3.18.2. Awarded Contractor shall carry on the Work at its own risk until the same is fully completed and accepted and shall, in case of any accident, destruction, or injury to the Work or materials before its final completion and acceptance, repair, or replace the Work or materials so injured, damaged, and destroyed, at his own expense and to the satisfaction of LBPUD. When materials and equipment are furnished by others for installation or erection by Proposer, Proposer shall receive, unload, store, and handle same at the Site and become responsible as though such materials and equipment were being furnished by the Awarded Contractor under the Contract.
3.18.3. Awarded Contractor shall procure and maintain at Awarded Contractor’s expense for the duration of the Contract the insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the Contract by Proposer, its agents, representatives, employees or Subcontractors as detailed in Exhibit C.
Awarded Contractor shall maintain at its expense, until completion of performance and acceptance by City, from an insurer:
a. Admitted (licensed) in the State of California with a current financial responsibility rating of A (Excellent) or better and a current financial size category (FSC) of V (capital surplus and conditional surplus funds of greater than $10 million) or greater rating as reported by A.M.
Best Company or equivalent, unless waived in writing by City’s Risk Manager, or
b. Non-admitted in the State of California with a current financial responsibility rating of A (Excellent) or better and a current financial size category (FSC) of VIII (capital surplus and conditional surplus funds of greater than $100 million) or greater rating as reported by A.M. Best Company or equivalent, unless waived in writing by City’s Risk Manager.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 10 | P a g e
All coverage for Subcontractors shall be subject to the requirements stated herein and shall be maintained at no expense to LBPUD.
Awarded Contractor shall furnish LBPUD with certificates of insurance and original endorsements providing coverage as required above. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf.
Before any of Awarded Contractor’s or Subcontractor’s employees shall do any Work, Awarded Contractor shall furnish LBPUD with the required certificates evidencing that such insurance is being maintained. Such certificates shall specify the date when such insurance expires. Such insurance shall be maintained until after the Work under the Contract has been completed.
Such insurance as required herein or in any other documents to be considered a part hereof shall not be deemed to limit Awarded Contractor’s liability under this Contract.
1. Awarded Contractor shall indemnify, protect and hold harmless the
Board, City, its Board, Commissions, and their officials, employees and agents (“Indemnified Parties”), from and against any and all liability, claims, demands, damage, loss, obligations, causes of action, proceedings, awards, fines, judgments, penalties, costs and expenses, including attorneys’ fees, court costs, expert and witness fees, and other costs and fees of litigation, arising or alleged to have arisen, in whole or in part, out of or in connection with (1) Contractor’s breach or failure to comply with any of its obligations contained in this Agreement, including all applicable federal and state labor requirements including, without limitation, the requirements of California Labor Code section 1770 et seq. or (2) negligent or willful acts, errors, omissions or misrepresentations committed by Contractor, its officers, employees, agents, subcontractors, or anyone under Contractor’s control, in the performance of work or services under this Agreement (collectively “Claims” or individually “Claim”).
2. Awarded Contractor shall list the name and location of the place of business of each Subcontractor who will perform work, labor or services for Awarded Contractor, or who specially fabricates and installs a portion of the Work or improvement in an amount in excess of one-half of one percent of Awarded Contractor’s total contract cost.
The Subcontractor list shall be submitted with Proposer’s Proposal.
4. RESPONSE REQUIREMENTS
By submitting a proposal, Contractor represents that it:
Has thoroughly examined and become familiar with the RFP.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 11 | P a g e
Is capable of performing in accordance with the RFP.
Acknowledges that its RFP is valid for six (6) months from the proposal submission deadline and the RFP cannot be withdrawn within that time.
Has made a personal inspection of each site and the surrounding areas and has evaluated the extent to which the physical condition thereof will affect the services to be provided.
Accepts the premises in their present physical condition, and shall not make any demands upon LBPUD for any improvements or alterations thereto.
Acknowledges that the regular completion of services hereunder will result in a gradual upgrading of the areas maintained, regardless of the present condition.
The following information requested will be used to evaluate the Contractor’s proposal based on the criteria outlined in Section 5, Evaluation of Proposals. Contractors may be deemed non-responsive, if they do not respond to all items listed in A through N, below.
Proposals must be prepared simply and economically, providing a straightforward, concise description of methodology and approach to satisfy the requirements of this RFP. Emphasis should be on completeness and clarity of content with sufficient detail to allow for accurate evaluation and comparative analysis.
Contractor’s proposal shall be clear, accurate and comprehensive. Excessive or irrelevant materials will not be favorably received.
Proposal shall be organized in separate sections tabbed with corresponding numbers and related headings in the order presented below:
A. Executive Summary Letter B. Validity of Proposal C. Certificate of Insurance D. Primary Contractor Information E. Staffing and Key Personnel F. Experience G. References H. Subcontractors I. Work Plan/Methodology J. LBPUD Supplied Items/Service K. Cost Proposal L. Financial Information
M. WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR
SERVICES Sample(s) N. RFP Checklist Attachments (Exhibit D)
A. Executive Summary Letter
This letter shall be a brief formal letter from Contractor that provides information regarding the firm and its ability to perform the requirements of this RFP. Emphasize those aspects of your organization and experiences that distinguish your firm from other firms who may
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 12 | P a g e respond to this RFP. The letter must be signed by an individual authorized to bind the proposing entity or by the two corporate officers authorized to bind the proposing entity as set forth in the California Corporations Code and shall identify all materials and enclosures being forwarded in response to this RFP. An unsigned proposal submission may be grounds for rejection.
B. Validity of Proposal
Responses to this RFP shall be valid for a minimum of six (6) months. Submissions not valid for at least six (6) months will be considered non-responsive. The Contractor shall state the length of time for which the submitted proposal shall remain valid.
C. Certificate of Insurance
Contractor shall state herein the willingness and ability to provide the required insurance coverage and Acord insurance form at the time of award. Insurance requirements are listed in Exhibit C. The Long Beach Public Utilities Department shall request the actual Acord insurance form when recommendation for award is made.
D. Primary Contractor Information
Contractor must provide a company profile. Information provided shall include:
Company ownership. If incorporated, the state in which the company is incorporated and the date of incorporation. An out-of-state Contractor must register with the State of California Secretary of State before a contract can be executed (https://bizfileonline.sos.ca.gov/search/business). See Attachment V.
Location of the company offices.
Location of the office servicing any California account(s).
Number of employees both locally and nationally. Specify the number of full-time and part-time employees residing in Long Beach.
Location(s) from which employees will be assigned.
Name, address and telephone number of the Contractor’s point of contact for a contract resulting from this RFP.
Company background/history and why Contractor is qualified to provide the services described in this RFP.
Length of time Contractor has been providing services described in this RFP to the public and/or private sector. Please provide a brief description.
Resumes for key staff to be responsible for performance of any contract resulting from this RFP
E. Staffing and Key Personnel
Provide herein qualifications, experience, technical knowledge, and any required certifications of firm and key personnel. Contractor shall provide herein, the necessary information to demonstrate that the Contractor, or its principals, has been an established and experienced in providing roofing mitigation measures for a minimum of five (5)
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 13 | P a g e consecutive years. In this section, identify the Contractor’s designated Project Manager and describe their qualifications as they relate to the requirements in this RFP, as well as any other relevant management team support members.
F. Experience
Proposer shall have a minimum of five (5) consecutive years of recent experience in performing the services described in this Request for Proposals (RFP). Proposer shall be fully qualified by ability, knowledge, and experience to satisfactorily perform the work required in this RFP and shall be engaged in the business of providing a clear understanding of the project scope, objectives, and requirements for the WATER
INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES
by the use of its own trained and qualified employees and equipment, material, and supplies, except as specified in this RFP. The Awarded Contractor shall be fully licensed to perform the services required under this Contract.
It is preferred for this experience to have involved a service area of similar size and scope as that of the LBPUD. However, experience with service areas half the size of the City, at a minimum, and with similar scope is acceptable.
Provide herein three project summaries that have been completed within the last five (5) years that emphasize those requirements outlined in the scope of work/requirements.
Include the date, client name, project title, description of work performed, contract period, and identify current or on-going projects.
G. References
Contractor shall submit a minimum of three (3) references from clients for whom Contractor has completed projects of similar size and scope within the last five (5) years.. Special consideration will be given to any and all Public Utility references provided. Contractor shall provide a brief description of the services provided to each reference and how the experience with these organizations will benefit LBPUD. Information provided for each reference shall include:
a. Client name;
b. Services provided;
c. Project timeline (starting and ending);
d. Contract Amount;
e. Staff assigned to reference engagement that will be designated for work per this
RFP;
f. Client project manager name, e-mail, and telephone number.
H. Subcontractors
Contractor shall submit herein a list of any subcontractors they intend to contract with to meet the requirements of this RFP.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 14 | P a g e
Does this proposal include the use of subcontractors?
Yes ______ No ______ Initials _______
If “Yes”, Contractor must:
1. Identify specific subcontractors and the specific requirements of this RFP for which each proposed subcontractors will perform services.
2. Provide the same information for any subcontractors as is indicated in section F.
Primary Contractor Information Section.
3. References must also be provided for any proposed subcontractors.
4. LBPUD requires that the awarded Contractor provide proof of payment of any subcontractors used for this service. Proposals shall include a plan by which LBPUD will be notified of such payments.
5. Primary Contractor shall not allow any subcontractor to commence work until all insurance required of subcontractor is obtained.
6. An official of each proposed subcontractor must sign and include as part of the proposal submitted in response to this RFP a statement to the effect that the subcontractors has read and will agree to abide by the awarded Contractor’s obligations.
I. Work Plan/Methodology
Contractor shall describe its approach to meeting the RFP’s overall requirements, including internal quality control procedures and policies to monitor performance. The Contractor will also explain in detail how it will accomplish the items specified in the Scope of Work in Exhibit A. A project schedule reflecting the project approach and identified due dates shall be made a part of the proposal.
The Contractor shall demonstrate proven experience in WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES, with a commitment to adhering to the project timeline and maintaining clear, consistent communication. Contractors are encouraged to provide concise proposals that explain the Contractor’s approach and ability to carry it out to the benefit of LBPUD. Their approach ensures the work is completed efficiently and in compliance with RFP requirements.
J. Long Beach Public Utilities Department Supplied Items/Services
Contractor shall identify herein any items, services, or requirement necessary for successful completion of this service that LBPUD must provide for Contractor.
K. Cost Proposal/Fee Schedule
Submit a Cost Proposal.
BASE COST
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 15 | P a g e
Contractor shall submit proposed costs to complete the scope of work. The proposed fee shall include all necessary costs to provide the proposed services, including but not limited to: employee costs and benefits, clerical support; overhead; profit;
supplies; materials; licensing; insurance; materials, and supplies.
Contractor shall provide a detailed cost per hour for any miscellaneous work performed on holidays, weekends, or outside of regular business hours, on an as-needed basis at the request of LBPUD.
SUPPLEMENTAL WORK COSTS
Where applicable, Contractor must provide detailed fixed prices, including all costs associated with the responsibilities and related services indicated herein. Clearly specify the nature of expenses anticipated and the amount of each category for expenses.
LBPUD will not consider payment or reimbursement for any cost/fees/expenses not included in the Contractor’s proposal. Contractor must itemize any cost/fees/expenses for which Contractor may request reimbursement or payment.
The cost proposal shall include and specify the Contractor’s labor, indirect costs, and any subcontractor costs. The cost proposal shall relate in such a way that LBPUD can understand the hours, costs, and work associated with each team member.
The City does not warrant or guarantee that the total contract amount will be reached or that any specific amount of work will be authorized during the term of the contract.
L. Financial Information
If selected, Contractor may be requested to submit a complete financial statement for the two most recent years, prepared in accordance with generally accepted accounting principles. The financial statement must include a balance sheet and income statement.
Contractor must be prepared to substantiate all information shown. Contractor must indicate herein Contractor’s willingness to provide this information.
M. WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR
SERVICES Sample(s)
As part of the proposal submission, please include a sample WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES plan. This sample should clearly illustrate the format, content, and level of detail that LBPUD can expect to receive.
N. RFP Checklist Attachments
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 16 | P a g e
Submit herein all required documents as specified in Exhibit D, RFP Checklist, and Attachments section.
5. EVALUATION OF PROPOSALS
Proposals shall be evaluated on the basis of the responses to all questions and requirements in this RFP. The evaluation of a Contractor’s ability to provide the required services will be based on the written material submitted and any interviews, presentations and proficiency testing that may be required of the Contractor. Each proposal will be competitively evaluated on its strengths and weaknesses against the following criteria listed below.
5.1 Proposals shall be consistently evaluated based upon the following criteria as outlined in Section 4, Response Requirements:
CATEGORY POINTS
1. APPROACH 40
Work Plan Operational Approach, Timeline, and Project Management Staffing Levels & Availability Related to Contract Requirements Proximity to the service area Equipment
2. EXPERIENCE 30
Performance on Like-Sized/Similarly-Scoped Contracts/References Training & Staff Expertise
3. PRICE 30
Cost Proposal Reasonableness of Cost
TOTAL POSSIBLE SCORE: 100 Points
5.2 Proposals will be evaluated by the committee to ensure compliance with submission guidelines, response criteria, and minimum requirements. Proposals that fail to meet the minimum requirements may be considered non-responsive and disqualified from further consideration. LBPUD reserves the right to request clarification on any terms or conditions from prospective Contractors.
5.3 The Department reserves the right to award contracts to multiple Contractors.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 17 | P a g e
5.4 LBPUD shall not be obligated to accept the lowest priced proposal but shall make an award in the best interests of LBPUD after all factors have been evaluated.
5.5 Proposals will become public record after a contract award is submitted to the Board of
Public Utilities Commissioners or designee for approval, unless the proposal or specific parts of the proposal can be shown to be exempt by law. Each Contractor may clearly label all or part of a proposal as "CONFIDENTIAL" provided that the Contractor thereby agrees to indemnify and defend LBPUD for honoring such a designation. The failure to label any information that is released by LBPUD shall constitute a complete waiver of any and all claims for damages caused by any release of the information.
5.6 LBPUD reserves the right to request clarification of any proposal term from prospective
Contractors.
5.7 Proposals that appear unrealistic in terms of technical commitments, lack of technical competence, or are indicative of failure to comprehend the complexity and risk of this contract may be rejected.
5.8 LBPUD may also contact the references provided; contact any Contractor to clarify any response; contact any current users of a Contractor’s services; solicit information from any available source concerning any aspect of a proposal; and seek and review any other information deemed pertinent to the evaluation process.
5.9 Selected Contractor(s) will be notified in writing. Any award is contingent upon the successful negotiation of final contract terms.
5.10 Any contract resulting from this RFP shall not be effective unless and until approved by the City of Long Beach Board of Public Utilities Commissioners or designee.
5.11 LBPUD reserves the right to negotiate final contract terms with any Contractor selected.
Negotiations regarding agreement terms, conditions, scope of work, and pricing may begin at this time. Negotiations shall be confidential and not subject to disclosure to competing Contractors unless and until an agreement is reached. If satisfactory agreement provisions cannot be reached, then negotiations may be terminated.
LBPUD reserves the right to negotiate to contract with another firm submitting an RFP or withdraw the RFP.
6. NEGOTIATIONS
Negotiations regarding agreement terms, conditions, scope of work, and pricing may begin at the time the selected Proposer(s) is notified in writing. Negotiations shall be confidential and not subject to disclosure to competing Proposers unless and until an agreement is reached. If satisfactory agreement provisions cannot be reached, then negotiations may be terminated.
LBPUD reserves the right to negotiate with another firm submitting an RFP or withdraw the RFP. This negotiation sequence continues until agreement is reached.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 18 | P a g e
7. BASIS OF AWARD
Any Agreement resulting from this RFP will be awarded to the Contractor whose proposal is most advantageous to the Department as defined by their total evaluation score, interview results (if any), and the outcome of the final negotiations.
LBPUD may award a single contract embracing all RFP services or separate contracts each embracing one or more RFP service or include or exclude RFP services from the Contract if LBPUD believes it is in their best interest.
No announcement concerning the award of a contract as a result of this RFP may be made without the prior written approval of LBPUD.
8. COMMENCEMENT OF SERVICES
The services requested in this RFP will commence upon issuance of a Notice to Proceed.
9. CONTRACTOR ORIENTATION MEETING
Awarded Contractor may be required to attend an orientation meeting prior to the commencement of the contract.
10. LEGAL DISCLOSURE
Contractor shall disclose claims made by it or any of its owners against the LBPUD, the City or any other public agency over the previous five (5) years, and may provide relevant detail regarding each claim. The Contractor shall disclose all pending claims and litigation to which it is a party, including the case number, jurisdiction, and current status of the action.
Each Contractor must include in its proposal a complete disclosure of any alleged significant prior or ongoing contract failures, any civil or criminal litigation or investigation pending that involves the Contractor or in which the Contractor has been judged guilty or liable. Failure to comply with the terms of this provision will disqualify any proposal. LBPUD reserves the right to reject any proposal based upon the Contractor’s prior history with the Department or with any other party, which documents without limitation, unsatisfactory performance, adversarial or contentious demeanor, significant failure(s) to meet contract milestones, or other contractual failures.
11. CONFLICT OF INTEREST
Contractor represents and warrants that no City employee whose position in the City enables him/her to influence the award of the Contract or any competing Contract, and no spouse or economic dependent of such employee is or shall be employed in any capacity by the Contractor herein, or does or shall have any direct or indirect financial interest in this Contract.
12. ADDENDUM (IF APPLICABLE)
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 19 | P a g e
During the advertising period an addendum may be issued, which includes changes and/or additions to the original RFP. Contractors shall acknowledge the receipt of the addendum by signing and returning with their RFP. Proposers that do not include a posted Addendum with their RFP may be deemed non-responsive and their RFP may be rejected. Addendum submittal may not be accepted after the RFP due date.
Addendums will be posted online at https://longbeachbuys.buyspeed.com/bso/ under the RFP number and via email request to Utilities Procurement Representative listed on the cover page.
13. FUTURE AMENDMENTS
The LBPUD reserves the right to change any portion of the work required, add/or delete services or amend such other terms and conditions, which may become necessary. Any such revisions shall be accomplished by an amendment to the Contract approved by LBPUD and executed by the Contractor and LBPUD.
14. CONTRACTORS LICENSE AND PERMITS
Contractor shall possess all of the following:
14.1. Contractor shall be licensed to do business within the City of Long Beach and shall meet the Labor Standards for each employee as set forth by the California Industrial Relations Department.
14.2. All permits and licenses necessary to perform the scope of work shall be obtained by the Contractor at the Contractor's expense. Contractor shall pay all taxes properly assessed against any equipment or property used or required.
14.3. Contractor shall give all notices necessary and incidental to the due and lawful performance of the Services. All cost thereof shall be deemed to be included in the prices proposed for the Services.
14.4. Each Proposer shall hold a valid state of California Contractor's License sufficient to qualify as contractor in this case, a current city of Long Beach Business License and any other required permits or licenses at the time the proposal is submitted and throughout the duration of the contract. Failure to complete license information may disqualify the Proposer.
15.5 Proposers shall provide LBPUD with proof of compliance with all applicable permitting and licensing laws, including but not limited to, copies of all permits and licenses.
Proposers shall maintain in good standing all applicable licenses and permits related to the services and shall immediately notify LBPUD of any change in the status, or the terms or conditions, of any permit or license thereof.
15.6 Awarded Contractor(s) and/or its subcontractor(s) shall maintain said license during the entire term of the Contract. A copy of the license shall be included with the RFP.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 20 | P a g e
15. BUSINESS LICENSE
The Long Beach Municipal Code (LBMC) requires all businesses operating in the City of Long Beach to pay a business license tax. In some cases the City may require a regulatory permit and/or evidence of a State or Federal license. Prior to issuing a business license, certain business types will require the business license application and/or business location to be reviewed by the Development Services, Fire, Health, and/or Police Departments. For more information, go to www.longbeach.gov/finance/business_license.
In accordance with Municipal Code (Section 3.80.210) a business license is required under the following conditions:
(a) If you are providing a service in Long Beach, CA
(b) If you are providing and delivering a product in Long Beach, CA
For more information, contact the Business License Section at 562-570-6211 or by e-mail to lbbiz@longbeach.gov.
Long Beach Business License Number:
(Only Required Upon Notification of Award)
Awarded Contractor(s) must have a valid Long Beach Business License prior to contract execution. At the time of Quote submittal, a Long Beach Business License is not mandatory;
however, if the Contractor has already filed, information may be submitted above.
The undersigned hereby declares that the Contractor has a valid State of California Contractor's License sufficient to qualify as a Contractor in this case and a current City of Long Beach Business License; and will obtain all required permits.
California Contractor's License No.:
Expires: ___________________________ Classification: ______________________
16. WARRANTY/MAINTENANCE AND SERVICE
Awarded Contractor hereby warrants that all labor furnished under this Contract shall be competent to perform the tasks undertaken; that the product of such labor shall yield only first-class results; that all materials and equipment provided shall be of high quality; that the work performed will be completed, of high quality, without defects; and that all work strictly complies with the requirements and scope of work of this RFP. Any work not strictly complying with the requirements and scope of work of this RFP shall constitute a breach of the Contractor’s warranty, which may invoke deductions.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 21 | P a g e
Awarded Contractor shall warrant/guarantee all parts, materials and labor done against failure due to defective material and/or faulty workmanship from date of acceptance of the work by LBPUD for a minimum of one (1) year.
State in Proposal warranty period for workmanship/labor _______ year(s)/month(s)/day(s) State in Proposal warranty period for parts/equipment _______ year(s); If other than the manufacturer’s standard warranty.
If the manufacturer of the material normally offers a warranty with a term in excess of the warranty specified above, the items shall also be subject to the full-term of that warranty.
When defective material or workmanship is discovered which requires repair or replacement under warranty/guarantee, the Contractor shall furnish all necessary labor, materials, and equipment to correct and make good, at no expense to LBPUD, all such defects. Repair or replacement shall commence within 24 hours after notification has been given to the Contractor by LBPUD, and shall be diligently and continuously performed until the repair or replacement is completed and accepted.
Multiple callbacks and/ or service repairs for the same issue may be considered grounds for termination of this agreement.
17. CONTRACTOR’S VEHICLES
The Awarded Contractor shall clearly identify and equip each vehicle used at an LBPUD facility with decals or magnetic signs on the exterior right and left front door panels identifying the Awarded Contractor's name and phone number. No other commercial advertising shall be allowed upon the vehicles, equipment, staff, or posted at LBPUD facility under this Contract.
These requirements shall also apply to all subcontractors. All vehicles used shall be in “good repair” and shall present a clean, professional appearance. The Awarded Contractor's vehicles and equipment shall not be allowed to deposit oil, fluids, litter, foreign substances, or other debris on LBPUD Sites. LBPUD reserves the right to require the Contractor to install “diapers” on any and all vehicles utilized or to remove vehicles from the sites until repaired to the satisfaction of LBPUD.
18. HAZARDOUS MATERIALS
Use of any chemicals or hazardous materials by the Awarded Contractor in performing services shall be subject to approval of LBPUD, and shall be used in accordance with the manufacturer's directions and specifications. The Awarded Contractor shall store and dispose of chemicals or hazardous materials in accordance with all laws, rules and regulations on the subject.
The Awarded Contractor shall not dispose of hazardous material on any LBPUD site. All hazardous materials shall be properly stored on a temporary basis, thereafter to be disposed of by the Contractor at a properly licensed disposal site.
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 22 | P a g e
The Awarded Contractor shall defend, indemnify and hold harmless LBPUD, its officials, employees and agents for all claims, demands, damage, causes of action, loss, liability, cost or expense relating to the Awarded Contractor's failure to comply with this Section.
19. ENVIRONMENTAL REQUIREMENTS
The Awarded Contractor shall conduct all aspects of its operation in compliance with all state and federal environmental laws and regulations. The Awarded Contractor shall immediately inform LBPUD of any investigation, citation or legal action by any regulatory agency related to the Awarded Contractor's obligations under this Contract and shall defend, indemnify and hold harmless LBPUD, its officials, employees and agents from any loss including, but not limited to fines, penalties and corrective measures the City may sustain by reason of the Contractor's failure to comply with any state or federal law, regulation or rule.
Stormwater Management and National Pollutant Discharge Elimination Program (NPDES) Regulations: Awarded Contractor shall conduct all aspects of the Work in accordance with all state and federal laws and regulations, including but not limited to all environmental laws and regulations, Order No. 99-060 of the California Regional Water Quality Control Board, Los Angeles Region ("Waste Discharge Requirements for Municipal Storm Water and Urban Runoff Discharges within the City of Long Beach"), and related Best Management Practices (BMPs) that the City and its contractors must adhere to. These procedures contain pollution prevention and source control techniques to minimize the impact of activities upon dry-weather urban runoff, storm water runoff, and water quality.
Order No. 99-060 is available on the City’s website and related BMPs are on file in the office of the City's Director of Public Works, which is located at 333 West Ocean Blvd. in the City of Long Beach. The Contractor hereby acknowledges that it has read, reviewed and understands the Order and the BMPs as they relate to the Work and hereby agrees to perform the Work in conformance therewith. LBPUD will deduct from the money due or to become due to the Contractor the total amount of any fines levied on LBPUD, plus legal and staff costs, as a result of the Contractor's failure to comply with these provisions. In addition, the Contractor shall defend, indemnify, and hold LBPUD harmless for any liability, loss, damage, fines, penalties, actions, costs and expenses related to the Contractor’s (or its subcontractors) failure to comply with these laws and regulations.
Noise: Every effort must be made to minimize noise during business hours. The Awarded Contractor shall not interfere with the public use of the sites and shall conduct its operations as to offer the least possible obstruction and inconvenience to LBPUD employees and the public or disruption to the peace and quiet of the area within which the Industrial Electrical services are performed.
Energy Conservation: The Awarded Contractor shall instruct all employees performing work within LBPUD facilities to utilize methods that will maximize energy conservation. This shall include the turning on of light fixtures only in areas where work is in progress.
20. HOLIDAYS AND WEEKENDS
WATER INTRUSION ASSESSMENT AND MITIGATION WITH FULL CONTRACTOR SERVICES RFP 23 | P a g e
Holidays observed by LBPUD are as follows: New Year’s Day (January 1); Martin Luther King, Jr.