RFP Ryan Park Additional Ballfields Design Consulting_Final.pdf
PDF 11 MB Posted
- Solicitation number
- 25-15
- Issued by
- San Diego County, California
About this file
This document is a Request for Proposals (RFP) No. 25-15 issued by the City of Escondido's Development Services Department for design consulting services related to Ryan Park. The City seeks a qualified consultant to provide comprehensive design services for additional ballfields, including up to four adult softball fields, ballfield storage, a concession stand with restrooms and office space, lighting, and a parking lot at Ryan Park located at 390 Hidden Trails Road. The project involves developing a state-of-the-art facility meeting athletic field standards, incorporating Crime Prevention through Environmental Design (CPTED) principles, and engaging the local community through public outreach. Proposals are due by 5 p.m. on May 23, 2025, with questions accepted until May 8, 2025. The City anticipates awarding the contract on June 26, 2025, with a contract term extending 12 months from the agreement's execution.
The project has a comprehensive scope requiring multiple deliverables, including survey services, geotechnical studies, stormwater management plans, community outreach plans, design development drawings, lighting design with photometric analysis, and environmental review. The consultant will be responsible for coordinating with various city departments and conducting community meetings. While a specific budget is not explicitly stated, the RFP indicates that the total contract price will be determined based on the selected consultant's proposal, with monthly invoicing and a 30-day payment term. The project is funded through the City's capital improvement program, with the ultimate goal of addressing the community's need for additional active park space, as identified in the City's Master Plan for Parks, Trails, and Open Space.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Development Services Department Engineering-Capital Projects 201 N. Broadway, Escondido, CA 92025
NOTICE OF REQUEST FOR PROPOSALS
April 18, 2025
Re: Notice of Request for Proposals (“RFP”) No. 25-15 – Ryan Park Additional Ballfields, Lighting, and Parking Lot Design Consulting Services
Notice is hereby given that the City of Escondido, a California municipal corporation (“City”), is soliciting proposals from qualified professionals for the design of additional ballfields, along with several amenities to be located at Ryan Park (“Project”). Services shall include, but not be limited to public outreach, ballfield design (including landscaping, lighting, storage, concession stand with restrooms and office space, and parking lot), as well as a cost estimate. Please see Section E of this RFP for a schedule of deadlines.
Applicants shall submit email copies only to the City of Escondido to Michael Tully-Project Manager in Development Services no later than 5 p.m. on May 23, 2025 (“Submission Deadline”).
All proposals shall be submitted via email to:
michael.tully@escondido.gov and shall include the following in the subject line:
“RFP No. 25-15 Ryan Park Additional Ballfields, Lighting, and Parking Lot Design”
Proposals received after the Submission Deadline will not be accepted regardless of the reason for the untimely submission. Questions or comments concerning this RFP may be submitted via e-mail only to Michael Tully at michael.tully@escondido.gov no later than 5 p.m. on May 8, 2025 (“Questions Deadline”). Any questions or comments regarding this RFP received after the Questions Deadline will be disregarded. Emails concerning this RFP should state the following in the subject line: “RFP No. 25-15 – Additional Ballfields, Lighting, and Parking Lot Design”. Any communication regarding or relating to this RFP prior to the Submission Deadline with any City employee or official other than Michael Tully is strictly prohibited. A summary of questions from prospective Consultants and City responses will be posted on BidNetDirect by 5 p.m. on May 16, 2025.
Each proposal shall be in accordance with specifications, instructions, and information contained in this RFP. The City reserves the right to reject any or all proposals for any reason it deems necessary, to waive defects or irregularities in any proposal, and to accept the proposal deemed the most advantageous to the City. This RFP does not commit the City to award a contract or to pay any costs incurred in the preparation of a response to this request.
Sincerely, Michael Tully, Project Manager-Capital Projects City of Escondido mailto:michael.tully@escondido.gov
RFP No. 25-15–Ryan Park Additional Ballfields, Lighting and Parking Lot Design Consulting Services
- 2 -
A. General
Currently, the City of Escondido (“City”) is exploring options to relocate the existing Adult Softball Fields located in Kit Carson Park 3333 Bear Valley Parkway, Escondido, CA 92024 to Ryan Park 390 Hidden Valley Road, Escondido, CA 92027 and provide ballfields as well as supporting amenities such as design of ballfields, landscaping, lighting, storage, concession stand with restrooms and office space, and parking lot at the new Ryan Park location. The proposed facility addressed in this RFP would be to serve the local and regional community surrounding Ryan Park.
The City is interested in a design process that includes working with the local community, various stakeholders and other community members to ensure a design that is desired by the users and attractive to the community at large.
The consultant awarded the contract (“Consultant”) will provide the City with design services for new adult softball fields at Ryan Park. The design shall also include landscaping, lighting, storage, concession stand with restrooms and office space, and parking lot. Within 10 calendar days of the City’s notice of award of the Project, the Consultant shall enter into a Consulting Services Agreement in substantially the same form as the City’s standard Consulting Service Agreement (“Agreement”), which is attached to this RFP as Exhibit 1 and incorporated herein by this reference.
B. Project Description
Ryan Park is located at 390 Hidden Trails Road, Escondido, CA 92027 and currently includes eight athletic fields, seven with lights and one without; restrooms, concession facilities, parking and landscaping.
The proposed Project area is approximately 19 acres and will provide additional ballfields that that meet The American Society of Testing and Materials for athletic fields that follows standards for various athletic services and tournaments of ballfield leagues. It will be a state-of-the-art facility based on the latest athletic field design principles and constructed with high-quality materials to ensure durability and longevity. The design should feature up to four adult softball fields, including ballfield storage, concession stand with restrooms and office space, lighting, and parking lot, with elements designed for various age groups and ability levels. The design should meet the ultimate needs of the community while incorporating Crime Prevention through Environmental Design (“CPTED”) principles, including as needed irrigation, sod installation, tree removal, and tree replacement.
The Project design shall be based on input from various stakeholders, including staff from the City’s Community Services, Police, Planning, Stormwater Division, Public Works and Engineering Departments as well as input received from park users and the community. The public outreach will consist of the following meetings: an initial meeting consisting during conceptual design phase, and a second meeting with a design at 30%.
C. Scope of Services and Deliverables
- 3 -
Project tasks shall include, but are not necessarily limited to, components described in this Section C. The Project consists of furnishing all services necessary to complete the tasks outlined below.
1. A design concept that is focused on providing an engaging and aesthetically pleasing design, environmentally sustainable design, and a cohesive sense of place.
2. Prepare Project specifications, incorporating the City’s General Provisions with consultant prepared special provisions and technical specifications, using the Greenbook (Standard Specifications for Public Works Construction and related amendments) format. The City will provide project specific General Provisions to the awarded consultant/contractor.
3. Provide survey services for the Project and provide base map data needed to advance design and develop construction drawings. All city benchmarks for elevation and vertical control are based on the National Geodetic Vertical Datum of 1929. Horizontal control surveying we request that nearby survey boundary and Right of Way monuments be searched for and be used for control before any ties are made to the California Coordinate System of 1983 (CCS-83). Please see link to Vertical Control Benchmarks below:
https://www.escondido.org/DocumentCenter/View/1500/City-Benchmarks-PDF
4. Provide geotechnical survey and studies along with a final geotechnical report of the findings of the project site.
5. Prepare a storm water quality management plan (SWQMP) for a priority development project. Please see link to Priority Development Project (PDP) SWQMP below:
https://www.escondido.gov/DocumentCenter/View/2832/PDP-SWQMP-Template- PDF?bidId=
6. Prepare a construction phase storm water pollution prevention plan (SWPPP) and erosion and sediment control plan.
7. Develop a community outreach plan with corresponding materials and facilitate a minimum of four community meetings. (e.g. potentially Risk, Safety, and Appearance Committee, City Council, and 2 design workshops with the community). The community outreach plan must include types and numbers of meetings and work products that will be generated to engage community members. Respondents must also identify approach to facilitation of, and participation, in all community meetings.
8. Review and evaluate all aspects, content, and comments from various engagement activities and City staff. Update and revise conceptual designs based on local and City Appearance Committee input, and produce clear and scaled design development drawings for City review and approval.
9. The design shall include and coordinate with City of Escondido Public Works on irrigation, sod installation around project site footprint, tree removal, and tree replacement as needed.
10. Design consultant shall include a lighting design with photometric analysis study of the proposed lights as part of the overall design plan set which will include proper design installation of shielding based off of study. In addition, they will also need to conduct utility coordination between San Diego Gas and Electric for power hook up prior to installation of the lights. All outdoor lighting shall conform to Article 35 of the Escondido Zoning Code.
Please see link below.
City of Escondido, CA OUTDOOR LIGHTING
11. The Project design shall take into consideration all existing utility locations, please reference Utility Reference Map Exhibit 2, which is attached hereto and incorporated by this reference.
12. Design consultant will fill out Plot Plan Application which can be found on City of Escondido’s website please see link below at 60% Design: A meeting prior to submittal https://www.escondido.org/DocumentCenter/View/1500/City-Benchmarks-PDF https://www.escondido.gov/DocumentCenter/View/2832/PDP-SWQMP-Template-%20%20PDF?bidId= https://www.escondido.gov/DocumentCenter/View/2832/PDP-SWQMP-Template-%20%20PDF?bidId= https://ecode360.com/43266390
- 4 -will be necessary to understand project scope and properly fill out application in accordance with Planning Department standards.
https://escondido.org/DocumentCenter/View/581/Plot-Plan-Application-PDF
a. The Design Consultant shall be responsible for achieving a complete submittal under the Plot Plan process through the City’s Planning Division, including an necessary supplemental checklist items. A responsive request to this proposal shall take into consideration those items listed on the below checklist as part of their estimate of costs for this project. Please see link below.
Plot Plan Application: https://escondido.gov/DocumentCenter/View/581/Plot-Plan- Application-PDF
13. Please review Appendix A Scoping Agreement Form as part of the City of Escondido Transportation Impact Analysis Guidelines and work with a Traffic Engineer to determine appropriate traffic analysis. Please see link below:
Traffic-Impact-Analysis-Guidelines-PDF
14. A noise memo study will need to be conducted showing decibel levels from the proposed park improvement location and what those decibel levels will be at the residential homes that abut the park.
15. Produce schematic designs that identify sections of terrain, access, circulation and elevations.
16. Prepare a detailed breakdown of estimated construction costs based on quantities and unit pricing to construct all park features.
17. Submit the pdf sets at 30%, 60%, 90%, and 100% final construction complete plans and specifications with cost estimates. Design shall include grading, lighting, landscaping, irrigation and security plans including coordination of service points and securing service orders. 60% and 90% and 100% submittals shall include technical specifications, cost estimate and special provisions. Specifications and bid documents shall be prepared considering City’s general conditions, Greenbook (Standard Specifications for Public Works Construction) and using City’s standard bid forms. Final Plans, Specifications and Estimates are due in 12 months from execution of the Agreement resulting from this RFP.
18. Provide bid and construction support, respond to bidder questions, review submittals and assure all work is completed in accordance with approved design and specifications.
19. Final deliverables expected: Final specifications shall be in Microsoft Word, and the final design shall be submitted in PDF format. All studies, charts, graphs, and materials used in preliminary and public review processes shall become the property of the City of Escondido. In addition, the consultant team shall provide the final textual documents in a format consistent with the word processing program in use by the City at the time of final document delivery.
20. Identify if a Cultural Resources Report is needed for the project if needed conduct a cultural resources survey with a final report that is applicable to the CEQA process. Please see link below:
Cultural-and-Paleontological-Resources-PDF
21. Please review Climate Action Plan and determine necessary analysis in regards to greenhouse gas emissions for this project. Please see link below.
Climate Action Plan (2021) | Escondido, CA
22. This RFP includes the following requirement:
a. Provide, as an optional task the City may opt in to as part of their final decision, environmental review of the Ryan Park Additional Ballfields, Lighting and Parking Lot Design Project. Responsive proposals shall include a recommended CEQA compliant pathway, and an estimate of cost for comprehensive environmental https://escondido.org/DocumentCenter/View/581/Plot-Plan-Application-PDF https://escondido.gov/DocumentCenter/View/581/Plot-Plan-Application-PDF https://escondido.gov/DocumentCenter/View/581/Plot-Plan-Application-PDF https://www.escondido.gov/DocumentCenter/View/2114/Traffic-Impact-Analysis-Guidelines-PDF https://escondido.gov/DocumentCenter/View/6210/Cultural-and-Paleontological-Resources-PDF https://www.escondido.gov/364/Climate-Action-Plan-2021
- 5 -review of the Project pursuant to CEQA Guidelines and Public Resources Code 21000 et seq. Please see Exhibit 3 for existing MND for Ryan Park.
D. Right to Submitted Material
This RFP does not commit the City of Escondido to award a contract, to pay any costs incurred in the preparation of a proposal or contract, or to procure or contract for, any services. The City reserves the right to accept or reject any or all proposals received as a result of this RFP, or to amend, cancel (in part or in whole) this RFP if it is in the City’s best interest to do so. All proposals, reports and data submitted to the City shall become the property of the City of Escondido and may not be returned.
E. Proposal Deadlines and Schedule
The following is an estimated schedule relating to this Project:
Activity Date Questions Deadline 5 p.m. May 8, 2025
Response to Questions Released May 16, 2025 Proposal Submission Deadline 5 p.m. May 23, 2025
Staff Review of Proposals May 26-June 5, 2025 Award of Contract June 26, 2025
Note: The City reserves the right to make modifications to the estimated schedule outlined above.
F. Proposal Content
Prospective consultants are responsible for preparing and timely submitting an effective, clear, and concise proposal. Proposals must be limited to 25 pages letter size (8 ½” X 11”) in pdf format. Each proposal shall demonstrate the qualifications, competence, and capacity of the prospective consultant to perform the services described within the timeframe in the table above, and in conformity with the requirements of this RFP.
By submitting a proposal in response to this RFP, prospective consultants certify that they take no exceptions to the terms and requirements of this RFP, including the terms of the City’s form Consulting Agreement (Exhibit 1).
To be considered responsive, proposals must contain the following information in the order listed:
1. Cover Letter: A cover letter introducing the company and the individual who act as the company’s project manager.
2. Qualifications and Experience:
a. A list of personnel who will be assigned by the prospective consultant or sub-consultant to work on the Project, including their qualifications and experience on projects similar in nature and complexity to the proposed Project. Provide each personnel’s existing commitments, their role on those commitments, and their percentage of time to be spent on this Project.
At a minimum, identify the following:
- 6 -
i. Project Manager who will be the sole responsible person for the performance of design services for the duration of the Project.
ii. Individual or team that will facilitate public meetings and presentations
iii. Lead designer and draftsman.
iv. Landscape architect and/or Civil Engineer.
v. The qualifications of the Consultant’s personnel to be assigned to this
Project.
vi. Subcontractors, sub-consultants, and/or suppliers and a brief history of their background and experience.
vii. Geotechnical Consultants
viii. Environmental and Cultural Resources Consultants
ix. Electrical Engineering Consultants
x. Traffic Engineering Consultants
b. A list of at least three different projects previously completed by the prospective consultant and/or sub-consultant that are similar in size and scope to the Project.
3. Rate Sheet and Total Fee for Project: Rate sheets shall include, but not be limited to:
a. Hourly wages for all staff that will be assigned by the prospective consultant and sub-consultant to work on the Project; Total fee spreadsheet can be on 11” X 17”.
b. Estimate of the total number of hours to complete the Project; and
c. Total Not-to-Exceed fee of the prospective consultant’s proposal, which shall be calculated based the hourly rates of staff assigned to the Project, sub-consultant fees, and the estimated number of hours to complete the Project. Any incidental costs and reimbursable costs shall be included in the total fee.
4. Proposed Project Schedule for completion of all work meeting the city’s deadlines above, including the task and milestones that will be used to administer the Project. Project schedule can be on 11” X 17”.
The successful consultant’s proposal submitted in response to this RFP may become part of the resulting Consulting Agreement (Exhibit 1). Any proposed waiver, or change to the resulting Consulting Agreement (Exhibit 1) must be clearly identified in Prospective consultant’s proposal. All contracts, and any addenda thereto, shall be subject to the City’s sole discretion and approval. The requirements and service standards of this RFP and the responses of the successful consultant will be incorporated by reference into the resulting agreement regarding the Project. The successful consultant shall enter into a contract within 20 calendar days of the City’s notice of award in substantially the same form as the Agreement (Exhibit 1).
G. Selection Process
Proposals will be evaluated using the criteria listed below. Interviews of top-rated firm(s) may or may not be conducted. The City will act as the sole judge of information submitted in response to this RFP. The City reserves the right to: (i) request additional information or clarification of any submitted information, (ii) cancel or amend this RFP, including the proposal evaluation process, at any time, and (iii) not enter into any contract resulting from this RFP and issue similar solicitations in the future.
Evaluation Criteria will be based on the following:
- 7 -
1. Qualification/experience of consultant with development of similar ballfield design park projects and park projects
35 Points
2. Project Design and approach 30 Points
3. Community Outreach Approach 25 points
4. Adherence to RFP Requirements 10 Points
Total 100 Points
H. General Conditions
PLEASE READ CAREFULLY. THE FOLLOWING GENERAL TERMS AND CONDITIONS ARE
A PART OF ALL PROPOSALS SUBMITTED IN RESPONSE TO THIS RFP AND THE
RESULTING CONTRACT.
This RFP as advertised, the specification requirements detailed in this RFP (including the following General Provisions), and documents on file with the City pertaining to projects included in the City’s Capital Improvement Program are subject to all provisions of the Ordinances of the City of Escondido. Each prospective consultant submitting a response to this RFP warrants that the submitted proposal is genuine and non-collusive, or made in the interest of any person, firm, or corporation. A non-collusion declaration shall be properly completed and returned with the proposal documents. The non-collusion declaration will not count against the 25-page limit stated herein.
In submitting a proposal in response to this RFP, each prospective consultant agrees to the following general terms and conditions:
1. Public Information: The City reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether that proposal is selected. Submission of a proposal in response to this RFP indicates the prospective consultant’s acceptance of all terms and conditions contained in this RFP, including all exhibits and attachments hereto, unless clearly and specifically stated otherwise.
2. Confidential Information: Any information deemed confidential or proprietary should be clearly identified by the prospective consultant as such. Information identified as confidential or proprietary will be protected and treated with confidentiality to the extent permitted by applicable local, state, and federal law.
3. Addendums: The City reserves the right to amend, alter, or revoke this RFP at any time.
Any modifications, clarification, or additions will be distributed via email as an addendum.
4. Proposal Preparation Cost: The City is not obligated to reimburse any prospective consultant for expenses incurred in preparing proposals in response to this RFP. All Prospective consultants shall bear their own costs, fees, and expenses incurred in preparing proposals in response to this RFP.
5. Withdrawal of Proposal: A prospective consultant may modify or withdraw their proposal, either personally or by written request via email, at any time prior to the Submission Deadline. Such requests should be directed to the City’s Project Manager.
6. Inaccuracies or Misinterpretations: Subject to the City’s sole discretion, the City may terminate a prospective consultant from the RFP process or terminate any agreement with
- 8 -the Prospective consultant if the City determines that said Prospective consultant has: (i) made a material misstatement, (ii) made a material misrepresentation, or (iii) provided materially inaccurate information.
7. Optional Items: Prospective consultants may elect to provide recommendations and pricing for optional items. Pricing for optional items shall not be included in the minimum requirements pricing.
8. Business License: The successful consultant shall be required to obtain a City of Escondido Business License pursuant to the terms of Exhibit 1.
9. Signature: All proposals shall be signed in the name of the prospective consultant and shall bear the original signature in longhand of the persons duly authorized to sign the proposal.
Obligations assumed by such signature shall be fulfilled.
10. Right to Reject Proposal: The City reserves the right to reject any or all proposals, to waive any non-material irregularities or information in any proposal, and to accept or reject any items or combination of items. The City is not obligated to explain or justify its selection or rejection of any Prospective consultant. All proposals submitted in response to this RFP shall immediately become property of the City.
11. Right to Conduct Personal Interviews: The City reserves the right to conduct personal interviews or require oral presentations of any or all prospective consultants prior to selection.
12. Right to Request Additional Information: Prospective consultants shall furnish additional information as the City may reasonably require. The City reserves the right to investigate the qualifications of prospective consultants as it deems appropriate.
13. Right to Determine Financial Responsibility and Viability: The City reserves the right to request information pertaining to the financial stability of a prospective consultant to allow an appraisal of a prospective consultant’s current financial condition.
14. Understanding the Services to be Performed: By submitting a proposal in response to this RFP, each prospective consultant certifies that they have fully read and understand this RFP and have full knowledge of the scope, nature, quantity, and quality of services to be performed. Each prospective consultant understands that, if successful, they will be required to enter into a written contract in substantially the same form as Exhibit 1.
15. Award of Contract: Proposals submitted in response to this RFP will be analyzed and the contract awarded to the responsible prospective consultant whose proposal conforms to this RFP and is considered to be the most advantageous to the City, taking into consideration not just the proposal price, but also the evaluation criteria set forth in this RFP. If the prospective consultant does not execute a contract in substantially the same form as Exhibit 1 within 20 days after notification of award, the City may, subject to its sole discretion, (i) give notice to the Prospective consultant of the City's intent to select from the remaining Prospective consultants or (ii) issue a new RFP for the services.
16. Contract Funding: The City’s funding of any agreement resulting from this RFP shall be on a fiscal year basis and is subject to annual appropriations. Prospective consultant
- 9 -acknowledges that the City is a municipal corporation, is precluded by the State Constitution and other laws from entering into obligations that financially bind future governing bodies, and that, therefore, nothing in this RFP shall constitute an obligation of future legislative bodies of the City or State to appropriate funds for any agreement resulting from this RFP.
Accordingly, prospective consultants acknowledge and agree that the funding for any agreement resulting from this RFP shall be contingent upon appropriation of funds.
17. City Provisions to Prevail: The terms of this RFP and the terms of any agreement resulting from this RFP shall govern the services. Any standard terms and conditions of the successful consultant shall not be acceptable to the City unless expressly agreed to by the City by separate document. The City reserves the right to reject a proposal containing unacceptable conditions as non-responsive as a condition of evaluation or award of the proposal.
18. Equal Employment Opportunity: The consultant awarded the Project shall comply with all equal employment opportunity provisions of federal, state, and local non-discrimination laws, orders, regulations and guidelines as may be applicable to the consultant and be in effect during the performance of any agreement resulting from this RFP.
19. Consulting Agreement: Consultants submitting a proposal in response to this RFP shall be prepared to use the City’s standard contract form (Exhibit 1) rather than its own contract form. Services may not commence until Agreement for services is executed.
20. Prospective Consultant’s Invoices: Invoices shall be prepared and submitted to the Development Services Department, ATTN: Michael Tully via email to michael.tully@escondido.gov. Invoices shall be submitted on a monthly basis and contain the following information: Purchase Order number, description of services rendered, rates, quantities, extended totals, percentage of work completed under each task and remaining balances. Invoices should include all applicable sales or other taxes, and shall be remitted to appropriate agencies on the City’s behalf. All payments made pursuant to this contract are not assignable and shall only be made payable to the seller.
21. Payment Terms: The City’s payment terms are Net 30 days from date of invoice. No pre-payment or partial up front down payment will be made for any services or equipment. The time period allowed for payment, as indicated on the face hereof or offered by quote, bid, or proposal shall commence upon receipt of Prospective consultant’s invoice or upon receipt of the goods or services, whichever is later.
22. Insurance Requirements: The successful consultant must have insurance in accordance with the requirements listed in Exhibit 1.
23. Executive Order N-6-22 – Russia Sanctions: On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a proposal, Consultant represents that it is not a target of Economic Sanctions. Should the State determine Consultant is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Consultant’s proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for
- 10 -termination by the State.
24. Public Agency Clause: It is intended that other public agencies (e.g., city districts, public authorities, municipal utilities, public school districts and other political subdivisions or public corporations of California) shall have the option to participate in any award made as a result of this solicitation. The City shall incur no financial responsibility for their order placement and payments to the successful consultant. This option shall not be considered in proposal evaluation. State whether said option is granted:
YES NO
- 11 -
NONCOLLUSION DECLARATION
TO BE EXECUTED BY PROSPECTIVE CONSULTANT AND SUBMITTED WITH PROPOSAL
The undersigned declares:
The foregoing proposal submitted in response to the City of Escondido’s Request for Proposals No.25-15– Ryan Park Additional Ballfields, Lighting and Parking Lot Design Consulting Services Consulting is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The proposal is genuine and not collusive or sham. The prospective consultant has not directly or indirectly induced or solicited any other prospective consultant to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with any prospective consultant or anyone else to put in a sham proposal, or to refrain from submitting a proposal. The prospective consultant has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the prospective consultant or any other prospective consultant, or to fix any overhead, profit, or cost element of proposal price, or of that of any other prospective consultant. All statements contained in the proposal are true. The prospective consultant has not, directly or indirectly, submitted their proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal, and has not paid, and will not pay, any person or entity for such purpose.
Each individual executing this declaration on behalf of a prospective consultant that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that they have full power to execute, and does execute, this declaration on behalf of the prospective consultant.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ______________________.
Date
Signature Signature
Title Title
Of Of
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
MICHAEL R. MCGUINNESS, City Attorney
By: ___________________________
RFP 25-15– Ryan Park Additional Ballfields, Lighting and Parking Lot Design Consulting Services
- 12 - CAO:04/23/2024
Consulting Agreement (v2)
EXHIBIT 1
SAMPLE CONSULTING AGREEMENT
CITY OF ESCONDIDO
CONSULTING AGREEMENT
This Consulting Agreement (“Agreement”) is made and entered into as of the last signature date set forth below (“Effective Date”), Between: CITY OF ESCONDIDO a California municipal corporation 201 N. Broadway Escondido, CA 92025 Attn: Michael Tully (760)839-4011
("CITY")
And: [Name] [Entity Type: e.g., “a California corporation”] [Street address] [City, state, zip code] Attn: [name of contact] [Telephone number]
("CONSULTANT").
(The CITY and CONSULTANT each may be referred to herein as a “Party” and collectively as the “Parties.”)
WHEREAS, the CITY has determined that it is in the CITY’s best interest to retain the professional services of a consultant to provide expert level research, planning, and design of up to four adult softball fields, ballfield storage, concession stand with restrooms and office space, lighting, and parking lot design at Ryan Park located at 370 Hidden Trails Road, Escondido, CA 92027;
WHEREAS, CONSULTANT is considered competent to perform the necessary professional services for the CITY; and
WHEREAS, the CITY and CONSULTANT desire to enter into this Agreement for the per-formance of the Services described herein.
NOW, THEREFORE, in consideration of the mutual covenants, promises, terms, and conditions set forth herein, and the mutual benefits derived therefrom, the Parties hereby agree as follows:
1. Description of Services. CONSULTANT shall furnish all of the Services described in the Scope of
- 13 - CAO:04/23/2024
Work, which is attached to this Agreement as Attachment “A” and incorporated herein by this reference (“Services”).
2. Compensation. In exchange for CONSULTANT’s completion of the Services, the CITY shall pay, and CONSULTANT shall accept in full, an amount not to exceed the sum of [$Dollar Amount].
CONSULTANT shall be compensated only for performance of the Services described in this Agreement. No compensation shall be provided for any other work or services without the CITY’s prior written consent. If this Agreement is amended at any time, additional compensation of CONSULTANT contained in any subsequent amendments shall not exceed a cumulative total of 25% of the maximum payment provided for in this Section 2, unless approved by resolution of the City Council.
3. Performance. CONSULTANT shall faithfully perform the Services in a proficient manner, to the satisfaction of the CITY, and in accord with the terms of this Agreement. CONSULTANT shall be responsible for the professional quality, technical accuracy, timely completion, and coordination of all reports and other information furnished by CONSULTANT pursuant to this Agreement, except that CONSULTANT shall not be responsible for the accuracy of information supplied by the CITY.
4. Personnel. The performance of the Services by certain professionals is significant to the CITY. As such, CONSULTANT shall only assign the persons listed on Attachment “B”, attached to this Agreement and incorporated herein by this reference (“Personnel List”), to perform the Services.
CONSULTANT shall not add or remove persons from the Personnel List without the City’s prior written consent. If CONSULTANT has not designated a person to perform a component of the Services, CONSULTANT shall not assign such component of the Services to a person without obtaining the City’s prior written consent. CONSULTANT shall not subcontract any component of the Services without obtaining the City’s prior written consent.
5. Termination. The Parties may mutually terminate this Agreement through a writing signed by both Parties. The CITY may terminate this Agreement for any reason upon providing CONSULTANT with 10 days’ advance written notice. CONSULTANT agrees to cease all work under this Agreement on or before the effective date of any notice of termination. If the CITY terminates this Agreement due to no fault or failure of performance by CONSULTANT, then CONSULTANT shall be compensated based on the work satisfactorily performed at the time of such termination. In no event shall CONSULTANT be entitled to receive more than the amount that would be paid to CONSULTANT for the full performance of the Services.
6. City Property. All original documents, drawings, electronic media, and other materials prepared by CONSULTANT pursuant to this Agreement immediately become the exclusive property of the CITY, and shall not be used by CONSULTANT for any other purpose without the CITY’s prior written consent.
7. Insurance Requirements.
a. CONSULTANT shall procure and maintain, at its own cost, during the entire term of this
Agreement, insurance against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the Services, and the results of such work, by CONSULTANT, its agents, representatives, employees, or subcontractors. Insurance coverage shall be at least as broad as the following:
(1) Commercial General Liability. Insurance Services Office (“ISO”) Form CG 00 01 covering
Commercial General Liability on an “occurrence” basis, including products and completed
- 14 - CAO:04/23/2024
operations, property damage, bodily injury, and personal & advertising injury, with limits no less than $2,000,000 per occurrence and $4,000,000 general aggregate.
(2) Automobile Liability. ISO Form CA 00 01 covering any auto (Code 1), or if CONSULTANT has no owned autos, hired (Code 8) and non-owned autos (Code 9), with limits no less than $1,000,000 per accident for bodily injury and property damage, unless waived by the CITY and approved in writing by the CITY’s Risk and Safety Division.
(3) Workers’ Compensation. Worker’s Compensation as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limits of no less than $1,000,000 per accident for bodily injury or disease.
(4) Professional Liability (Errors and Omissions). Professional Liability (Errors and Omissions) appropriate to CONSULTANT’s profession, with limits no less than $2,000,000 per occurrence or claim and $2,000,000 aggregate.
(5) If CONSULTANT maintains broader coverage and/or higher limits than the minimums otherwise required by this Agreement, the CITY requires and shall be entitled to the broader coverage and/or the higher limits maintained by CONSULTANT.
b. Each insurance policy required by this Agreement must be acceptable to the City Attorney and shall meet the following requirements:
(1) Acceptability of Insurers. Insurance coverage must be provided by an insurer authorized to conduct business in the state of California with a current A.M. Best’s rating of no less than A-: FSC VII, or as approved by the CITY.
(2) Additional Insured Status. Both the Commercial General Liability and the Automobile Liability policies must name the CITY (including its officials, officers, agents, employees, and volunteers) specifically as an additional insured under the policy on a separate endorsement page. The Commercial General Liability additional insured endorsement shall be at least as broad as ISO Form CG 20 10 11 85, or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38, and CG 20 37 if a later edition is used. The Automobile Liability endorsement shall be at least as broad as ISO Form CA 20 01.
(3) Primary Coverage. CONSULTANT’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 with respect to the CITY, its officials, officers, agents, employees, and volunteers. Any insurance or self-insurance maintained by the CITY, its officials, officers, agents, employees, or volunteers shall be in excess of CONSULTANT’s insurance and shall not contribute with it.
(4) Notice of Cancellation. Each insurance policy shall provide that coverage shall not be canceled, except with prior written notice to the CITY.
(5) Subcontractors. If applicable, CONSULTANT shall require and verify that all subcontractors maintain insurance meeting all the requirements stated within this Agreement, and CONSULTANT shall ensure that the CITY (including its officials, officers, agents, employees, and volunteers) is an additional insured on any insurance required from a subcontractor.
(6) Waiver of Subrogation. CONSULTANT hereby grants to the CITY a waiver of any right to subrogation that any insurer of CONSULTANT may acquire against the CITY by virtue of the payment of any loss under such insurance. CONSULTANT agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this subsection shall apply regardless of whether or not the CITY has received a waiver of
- 15 - CAO:04/23/2024
subrogation endorsement from the insurer. Any Workers’ Compensation policy required by this Agreement shall be endorsed with a waiver of subrogation in favor of the CITY for all work performed by the CONSULTANT, its agents, representatives, employees, and subcontractors.
(7) Self-Insurance. CONSULTANT may, with the CITY’s prior written consent, fulfill some or all of the insurance requirements contained in this Agreement under a plan of self-insurance. CONSULTANT shall only be permitted to utilize such self-insurance if, in the opinion of the CITY, CONSULTANT’s (i) net worth and (ii) reserves for payment of claims of liability against CONSULTANT are sufficient to adequately compensate for the lack of other insurance coverage required by this Agreement. CONSULTANT’s utilization of self-insurance shall not in any way limit the liabilities assumed by CONSULTANT pursuant to this Agreement.
(8) Self-Insured Retentions. Self-insured retentions must be declared to and approved by the
CITY.
c. Verification of Coverage. At the time CONSULTANT executes this Agreement, CONSULTANT shall provide the CITY with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting the insurance coverage required by this Agreement), which shall meet all requirements under this Agreement. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by this Agreement, at any time.
d. Special Risks or Circumstances. The CITY reserves the right, at any point during the term of this Agreement, to modify the insurance requirements in this Agreement, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
e. No Limitation of Obligations. The insurance requirements in this Agreement, including the types and limits of insurance coverage CONSULTANT must maintain, and any approval of such insurance by the CITY, are not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including but not limited to any provisions in this Agreement concerning indemnification.
f. Failure to comply with any of the insurance requirements in this Agreement, including, but not limited to, a lapse in any required insurance coverage during the term of this Agreement, shall be a material breach of this Agreement. In the event that CONSULTANT fails to comply with any such insurance requirements in this Agreement, in addition to any other remedies the CITY may have, the CITY may, at its sole option, (i) immediately terminate this Agreement; or (ii) order CONSULTANT to stop work under this Agreement and/or withhold any payment that becomes due to CONSULTANT until CONSULTANT demonstrates compliance with the insurance requirements in this Agreement.
8. Indemnification, Duty to Defend, and Hold Harmless.
a. CONSULTANT (including CONSULTANT’s agents, employees, and subcontractors, if any) shall indemnify, defend, and hold harmless the CITY, its officials, officers, agents, employees, and volunteers from and against any and all claims, demands, actions, causes of action, proceedings (including but not limited to legal and administrative proceedings of any kind), suits, fines, penalties, judgments, orders, levies, costs, expenses, liabilities, losses, damages, or injuries, in law or equity, including without limitation the payment of all consequential damages and attorney’s fees and other related litigation costs and expenses (collectively, “Claims”), of every nature caused by, arising out of, or in connection with CONSULTANT’s performance of the Services or its failure to comply with any of its obligations contained in this Agreement, except
- 16 - CAO:04/23/2024
where caused by the active negligence, sole negligence, or willful misconduct of the CITY, and only to the extent such Claims arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. Further, in no event shall the cost to defend charged to the CONSULTANT exceed the CONSULTANT’s proportionate percentage of fault.
b. CONSULTANT (including CONSULTANT’s agents, employees, and subcontractors, if any) shall indemnify, defend, and hold harmless the CITY, its officials, officers, agents, employees, and volunteers from and against any and all Claims caused by, arising under, or resulting from any violation, or claim of violation, of the San Diego Municipal Storm Water Permit (Order No. R9- 2013-0001, as amended) of the California Regional Water Quality Control Board, Region 9, San Diego, that the CITY might suffer, incur, or become subject to by reason of, or occurring as a result of, or allegedly caused by, any work performed pursuant to this Agreement.
c. All terms and provisions within this Section 8 shall survive the termination of this Agreement.
9. Anti-Assignment Clause. Because the CITY has relied on the particular skills of CONSULTANT in entering into this Agreement, CONSULTANT shall not assign, delegate, subcontract, or otherwise transfer any duty or right under this Agreement, including as to any portion of the Services, without the CITY’s prior written consent. Any purported assignment, delegation, subcontract, or other transfer made without the CITY’s consent shall be void and ineffective. Unless CONSULTANT assigns this entire Agreement, including all rights and duties herein, to a third party with the CITY’s prior written consent, CONSULTANT shall be the sole payee under this Agreement. Any and all payments made pursuant to the terms of this Agreement are otherwise not assignable.
10. Attorney's Fees and Costs. In any action to enforce the terms and conditions of this Agreement, the prevailing Party shall be entitled to reasonable attorney’s fees and costs.
11. Independent Contractor. CONSULTANT is an independent contractor, and no agency or employment relationship is created by the execution of this Agreement.
12. Amendment. This Agreement shall not be amended except in a writing signed by the CITY and
CONSULTANT.
13. Merger Clause. This Agreement, together with its attachments or other documents described or incorporated herein, if any, constitutes the entire agreement and understanding of the CITY and CONSULTANT concerning the subject of this Agreement and supersedes and replaces all prior negotiations, understandings, or proposed agreements, written or oral, except as otherwise provided herein. In the event of any conflict between the provisions of this Agreement and any of its attachments or related documents, if any, the provisions of this Agreement shall prevail.
14. Anti-Waiver Clause. None of the provisions of this Agreement shall be waived by the CITY because of previous failure to insist upon strict performance, nor shall any provision be waived because any other provision has been waived by the CITY, in whole or in part.
15. Severability. This Agreement shall be performed and shall be enforceable to the full extent allowed by applicable law, and the illegality, invalidity, waiver, or unenforceability of any provision of this Agreement shall not affect the legality, validity, applicability, or enforceability of the remaining provisions of this Agreement.
16. Governing Law. This Agreement and all rights and obligations arising out of it shall be construed in accordance with the laws of the State of California. Venue for any action arising from this Agreement shall be conducted only in the state or federal courts of San Diego County, California.
- 17 - CAO:04/23/2024
17. Counterparts. This Agreement may be executed on separate counterparts, each of which shall be an original and all of which taken together shall constitute one and the same instrument. Delivery of an executed signature page of this Agreement by electronic means, including an attachment to an email, shall be effective as delivery of an executed original. The Agreement on file with the City is the copy of the Agreement that shall take precedence if any differences exist between or among copies or counterparts of the Agreement.
18. Provisions Cumulative. The foregoing provisions are cumulative to, in addition to, and not in limitation of any other rights or remedies available to the CITY.
19. Notice. Any statements, communications, or notices to be provided pursuant to this Agreement shall be sent to the attention of the persons indicated herein, and the CITY and CONSULTANT shall promptly provide the other Party with notice of any changes to such contact information.
20. Business License. CONSULTANT shall obtain a City of Escondido Business License prior to execution of this Agreement and shall maintain such Business License throughout the term of this Agreement.
21. Compliance with Laws, Permits, and Licenses. CONSULTANT shall keep itself informed of and comply with all applicable federal, state, and local laws, statutes, codes, ordinances, regulations, rules, and other legal requirements in effect during the term of this Agreement. CONSULTANT shall obtain any and all permits, licenses, and other authorizations necessary to perform the Services.
Neither the CITY, nor any elected or appointed boards, officers, officials, employees, or agents of the CITY, shall be liable, at law or in equity, as a result of any failure of CONSULTANT to comply with this section.
22. Prevailing Wages. If applicable, pursuant to California Labor Code section 1770 et seq., CONSULTANT agrees that a…