RFP BSA Roof 2026.pdf
PDF 180 KB Posted
- Solicitation number
- PE-55864-NONST-2027-000000002
- Issued by
- Georgia
About this file
Summary of RFP BSA Roof 2026
This Request for Proposal document pertains to facility projects construction managed at risk by the state of Georgia for two major capital improvement initiatives: BSA Roof and HVAC Replacement, and the BHS CTE Building. The RFP solicits qualified Construction Manager at Risk (CMaR) firms to manage the design and construction phases of these facility projects. The scope encompasses comprehensive roof replacement and HVAC system upgrades at one facility, along with construction of a new Career and Technical Education (CTE) building at another location. The document establishes the procurement timeline, evaluation criteria, and contractual framework for selecting the construction manager who will oversee project delivery through a collaborative design-build approach, integrating cost management with quality assurance throughout the project lifecycle.
The RFP establishes specific requirements for contractor qualifications, bonding, insurance, and experience with similar educational facility projects of comparable scope and complexity. Pricing will be evaluated based on the proposed guaranteed maximum price structure, along with the contractor's fee and general conditions costs. The contract will include performance guarantees, warranty provisions, and compliance with Georgia's prevailing wage requirements applicable to public construction projects. Selected contractor(s) will be responsible for coordinating all design consultants, managing the construction schedule, and ensuring project delivery within the established budget and timeline parameters, with terms extending through project substantial completion and final closeout.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Monday, October 26th, 2026.
Buford City School District
Request for Proposal for Facility
Projects Construction Manager at Risk
The Public is hereby informed that the Buford City School System will be receiving sealed proposals from qualified contractors for a Professional Construction Manager at Risk (CM@Risk) for Buford Senior Academy Roof/HVAC Replacement and Buford High School CTE Building.
Sealed proposals shall be sealed and mailed or delivered to Operations Manager Tommy Lingerfelt, 2625 Sawnee Avenue Buford, Georgia 30518 prior to 12:00 o’clock pm local time on Any proposal received after this date and time shall not be accepted.
The School District reserves the right to reject any or all proposals/qualifications, to waive technicalities, and to make an award deemed in its best interest.
Persons with disabilities may request this information be prepared and supplied in alternative forms by calling (770) 945-5035. This advertisement may be viewed electronically at www.bufordcityschools.org.
http://www.bufordcityschools.org/
REQUEST FOR PROPOSAL (RFP)
FOR CONSTRUCTION MANAGEMENT-
AT- RISK FOR FACILITY PROJECTS FOR
THE BUFORD CITY SCHOOL SYSTEM
The Buford City School System will receive proposals until Monday, October 26th.
2026 at 12:00 o’ clock p.m. for Construction Management-at-Risk services for new construction projects.
Copies of the RFQ are available by faxing or mailing a request for the RFQ to:
CM RFQ Attention: Tommy Lingerfelt, Operations Manager Buford City Schools 2625 Sawnee Avenue Buford, GA 30518 Phone: (770) 945-5035 Fax: (770) 945-4629 Email: tommy.lingerfelt@bufordcityschools.org
The Buford City School District through its Board of Education reserves the right to reject any and all proposals and to waive any technicalities and formalities and to make an award in its best interest.
mailto:angela.adams@bufordcityschools.org
BUFORD CITY SCHOOL SYSTEM
BUFORD, GEORGIA
REQUEST FOR PROPOSALS FOR
CONSTRUCTION MANAGEMENT SERVICES
INTRODUCTION
The Buford City School System (BCSS) desires to retain the services of a professional Construction Management (CM) firm for the management, under a construction management/contractor format, for the construction of certain facility projects. This request covers the projects described below. The Buford City School System shall have the right to terminate the relationship with the Construction Management firm at any time without cause and at its convenience. The District reserves the right, in its sole discretion, to utilize the qualifications and information submitted in response to this RFQ in evaluating and selecting qualified contractors for subsequent projects of a similar or related nature that commence within six (6) months following the submission deadline for this RFQ. Submissions in response to this RFQ does not guarantee the award of the Project or any subsequent project, nor does it obligate the District to solicit or award any additional work to any Respondent.
• Buford Senior Academy Roof/HVAC Replacement
• Buford High School CTE Building
To qualify for consideration, a firm shall be prepared to provide the expertise, resources and personnel experience in project planning, cost management, project control, pre- construction and construction techniques, value-engineering analysis, scheduling and quality assurance throughout the planning and construction phases of the project.
The services to be performed by the CM shall have as their objective the efficient, economical, and timely delivery of the project by managing the construction of the project within the time and cost limitations and within established quality requirements. The services shall be performed during the pre-construction phase and construction phase including working with owner and architect in project planning, arrangement of bid packages, bidding and award of the trade contracts and management of construction until occupancy is achieved.
SCOPE AND STYLE OF SERVICES TO BE
PERFORMED
In issuing the RFP, it is the intent of BCSS that the successful CM shall provide the required services for a fixed fee to be mutually agreed upon by the parties. It is further the intent of BCSS that the successful CM will provide a Guaranteed Maximum Price (GMP) for the cost of the construction of the projects to include a Guaranteed Delivery Date (GDD). BCSS also intends that the successful CM accept the following stipulations:
1. Provide Performance and Material and Labor Payment Bonds in the amount of 100% of the GMP.
2. Individual Trade Contracts shall be between the CM and the Trade Contractors, subject to BCSS approval.
3. The CM shall not perform any portion of the project with its own forces except as may be mutually agreed to by the owner and the CM.
4. The CM will be “at risk” in the proposed undertaking and shall be responsible for completing the project within the GMP.
5. Should the final cost of the project be less than the GMP, all savings shall revert to BCSS.
6. An agreed percentage of pay applications shall be held in retention.
7. BCSS shall have the authority to suspend or terminate performance of the project.
8. Construction Manager will share with BCSS the calculations and assumptions on which the CM’s proposed GMP is based.
LIST OF REPRESENTATIVE SERVICES TO BE PROVIDED BY THE CM
Project Planning The CM is expected to work with the owner to plan the project to include:
1. Reviewing ideas and suggestions offered by the owner with regard to feasibility or constructability.
2. Evaluate designs with respect to constructability issues.
3. Evaluate value-engineering opportunities.
Bidding and Awarding Phase
1. Arrange bid packages.
2. Develop requirements to assure time, cost and quality control during construction.
3. Provide a provisional construction schedule for issuance with the bid package.
4. Identify bidders and generate bidder interest.
5. Schedule and conduct pre-bid conferences in conjunction with the architect and representatives from BCSS.
6. Advertise and distribute bidding documents.
7. Monitor bidder activity.
8. Review and analyze bids and recommend awards.
9. Update schedule.
Construction Phase
1. Maintain on-site staff for construction management.
2. Establish and maintain coordinating procedures.
3. Develop and maintain a detailed schedule including delivery, approvals, inspection, testing construction and occupancy.
4. Conduct and record job meetings.
5. Prepare and submit change order documentation for approval of the architect and BCSS.
6. Maintain a system for review and approval of shop drawings.
7. Maintain records and submit routine reports to architect and BCSS.
8. Maintain quality control and ensure conformity to contract documents.
9. Provide cost control through progress payment review and verification according to the approved schedule and contract amounts.
10. Coordination of post completion activities, including the assembly of guarantees, manuals and the owner’s final acceptance.
SELECTION OF CM
The services being sought under the RFP are considered professional in nature.
Consequently, the evaluation of the proposals will be based upon consideration of the demonstrated qualifications and capabilities of the proposers which will result in an award that is in the best interest of BCSS.
Factors to be considered in the evaluation include:
1. Completeness of the Proposal (5%);
2. The capability of the proposer to deliver the services in an efficient and timely manner (15%);
3. Responses from at least three (3) references for whom the proposer has performed similar services (10%);
4. Composition and qualifications of the persons designated to form the proposer’s staff for the services required under the RFQ (10%);
5. Previous record of the proposer while performing as main contractor on school facilities projects (15%);
6. Intangibles which best demonstrate the proposer’s ability to provide services to
BCSS, including but not limited to, bonding, financial strength, work in Buford, etc.) (10%);
7. Applicability of recent projects completed as it relates to Buford City Schools’ projects in scope, complexity and similarity (25%);
8. Claims history (10%).
Evaluations will be performed by a committee. Following completion of the initial evaluations, if deemed necessary by the committee, up to three firms deemed best qualified in the sole opinion of the committee may be granted an opportunity to appear before the Evaluation Committee to make an oral presentation and submit to an interview. Information on the presentation will be provided to the firms selected.
After evaluations, the committee shall identify the CM firm it will recommend based on the above process and criteria Fees, general conditions and reimbursables will be negotiated with the selected firm on a project by project basis. If negotiations fail the second ranked firm will be considered. BCSS reserves the right to accept or reject any and all proposals in response to this RFP.
This will be a competitive negotiation process. BCSS reserves the right to reject all proposals/qualifications and issue another Request for Proposals (RFP). This RFP does not commit BCSS to reimburse potential contractors for proposal submission costs.
RECEIPT AND CONTENT OF PROPOSALS/QUALIFICATIONS
Proposals shall be received until
Proposals received after this time will be marked LATE and not considered. All proposals are to be submitted, in sealed packages marked “Response to CM RFQ”. Proposals shall be sent via U.S. Mail, courier service such as Federal Express or United Parcel Service or hand delivered. No proposals shall be accepted via fax transmission regardless of time of delivery. Three (3) copies of the proposal shall be sent or delivered to:
CM RFP
Attention: Tommy Lingerfelt, Operations Manager Buford City School System 2625 Sawnee Avenue Buford, Georgia 30518
Failure to comply with the above directions, may result in rejection of such proposal/qualifications.
Questions concerning the RFP should be FAXED to Tommy Lingerfelt at (770) 614-5220 or emailed to tommy.lingerfelt@bufordcityschools.org
To be considered for acceptance, the proposals shall contain the following minimum information to be presented as set out in the format and sequence shown.
1. Firm History & Information Briefly describe your firm, its officers and executive management. Furnish an organizational chart for you firm specifically indicating those who will be involved in this program.
2. Related Experience
Provide a list of all projects, including construction delivery method, completed in the past (5) years within 50 miles of Buford City School System.
3. Project Approach
Provide a brief outline and description of your firm’s approach for a program of this nature.
12:00 p.m., Monday, October 26, 2026.
4. Bonding Information
• Provide the name, address, telephone number and contact for your surety and bonding agent.
• List your total bonding capacity and the total value of all projects currently under construction.
5. Financial Information Provide information about the company in sufficient detail to allow its financial strength and credit worthiness to be evaluated.
6. Claims History
List all litigations, arbitrations and mediations in which the firm has been involved in the past five (5) years. This involves claims for more than $50,000 made by an owner against the firm or by the firm against the owner and indicate the disposition of each such claim, the name of the owner and the nature of the claim.
7. Current Projects
List all major projects with which the firm is currently involved and identify the firm’s role on the project (e.g. contractor, construction manager).
| Buford City School District |
| The School District reserves the right to reject any or all proposals/qualifications, to waive technicalities, and to make an award deemed in its best interest. |
| CM RFQ Attention: Tommy Lingerfelt, Operations Manager |
| Buford Senior Academy Roof/HVAC Replacement |
| Buford High School CTE Building |
| SCOPE AND STYLE OF SERVICES TO BE PERFORMED |
| LIST OF REPRESENTATIVE SERVICES TO BE PROVIDED BY THE CM |
| Bidding |
| Construction Phase |
| SELECTION OF CM |
| RECEIPT AND CONTENT OF PROPOSALS/QUALIFICATIONS |
| 1. Firm History & Information |
| 2. Related Experience |
| 3. Project Approach |
| 4. Bonding Information |
| 5. Financial Information |
| 6. Claims History |
| 7. Current Projects |
File details come from the government source that posted it. Updated .