About this file

This solicitation requests proposals for a definition-phase study of a GEO-XO Lightning Mapper (GXL) instrument. The study will define requirements for a lightning mapper to be flown on NOAA's GEO-XO series of geostationary satellites, with the first launch planned for 2032. The lightning mapper data will be used by NOAA and other agencies for severe weather forecasting and issuing public safety warnings. Proposals are due by [date redacted] and the award date is [date redacted]. The work will be performed at Goddard Space Flight Center and involve defining instrument requirements, assessing technologies, identifying risks, and developing plans for maturing critical technologies.

View the file

Other files for this federal contract opportunity

Other files attached to GeoXO Lightning Mapper (LMX) Solicitation, newest first.
File Type Posted
GeoXO Lightning Mapper Phase A Study RFP Questions and Answers 2.pdf PDF
GeoXO Lightning Mapper Phase A Study RFP Questions and Answers.pdf PDF
Attachment A-LMXSOW-0065_V_1_2.pdf PDF
RFP 80GSFC22R0005 updated Final.pdf PDF
LMX RFP Cover Letter Corrected.pdf PDF
80GSFC22R0005 SF33-14c.pdf PDF
Attachment A SOW R.pdf PDF
LMX RFP Cover Letter.pdf PDF
Enclos 1 IT Security Plan Template.pdf PDF
Attachment B PORD1.pdf PDF
Attachment D UIID1.pdf PDF
Attachment E IMAR1.pdf PDF
Attachment G IT Security Cover Sheet.pdf PDF
Attachment F Tech Dev and Risk1.pdf PDF
Attachment A LMX SOW R.pdf PDF
Attachment C GIRD1.pdf PDF
MEL - GeoXO Lightning Mapper-1.pdf PDF
Attachment H IT Security Applicable.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP #80GSFC22R0005

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988) [FOR OFFEROR FILL-IN]

The total firm fixed price of this contract is $ TO BE PROPOSED.

(End of clause)

B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP

2017)

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A.

Item Description Reference Schedule Delivery

Method/Addressee(s)

Services and

Deliverables in accordance with

Attachment A, SOW

As Defined in

Attachment A, SOW

As Defined in

Attachment A, SOW

As Defined in Attachment A, SOW/Electronic Copy

Delivered to COR/CO via

Geo-XO Flight Portal

2 Kick-off Meeting

As Defined in

Attachment A, SOW

As Defined in

Attachment A, SOW, Section 1.3 and Section 3

As Defined in Attachment A, SOW

Monthly Progress

Reviews

As Defined in

Attachment A, SOW

As Defined in

Attachment A, SOW, Section 1.3 and Section 3

As Defined in Attachment A, SOW/Electronic Copy

Delivered to COR/CO via

Geo-XO Flight Portal

4 Mid Term Review

As Defined in

Attachment A, SOW

As Defined in

Attachment A, SOW, Section 1.3 and Section 3

As Defined in Attachment A, SOW/Electronic Copy

Delivered to COR/CO via

Geo-XO Flight Portal

5 Final Study Review

As Defined in

Attachment A, SOW

As defined in

Attachment A, SOW, Section 1.3 and Section 3

As Defined in Attachment A, SOW/Electronic Copy

Delivered to COR/CO via

Geo-XO Flight Portal

6 Final Report Package

As Defined in

Attachment A, SOW

As Defined in

Attachment A, SOW, Section 1.3 and Section 3

As Defined in Attachment A, SOW/Electronic Copy

Delivered to COR/CO via

Geo-XO Flight Portal

Item Description Reference Schedule Delivery

Method/Addressee(s)

Risk Mitigation

Report &

Technology

Development Report

As Defined in

Attachment A, SOW

As Defined in

Attachment A, SOW, Section 1.3 and Section 3

As Defined in Attachment A, SOW/Electronic Copy

Delivered to COR/CO via

Geo-XO Flight Portal

Reporting of

Inventions

Section G

NFS 1852.227-70

Section G

NFS 1852.227-72

Interim Reports

Every 12 Months and Final Report within 3 Months after Contract

Completion

Electronic Copy/New

Technology Representative or Patent Representative

IT Security

Management Plan

Section I

NFS 1852.204-76

30 Days After

Contract Award &

Annual Updates as

Required

Electronic Format/CO

B.3 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE)

(NOV 2013) [FOR OFFEROR FILL-IN]

(a) Subject to other limitations and conditions specified in this contract, milestone payment shall be made to the Contractor upon delivery and acceptance of the milestone events described under paragraph (b).

(b) The payment schedule amount shall be calculated by the application of the contract percentage established per milestone event to the total fixed price amount indicated under Section B contract clause NFS 1852.216-78, Firm-Fixed Price.

Event Qty Contract

Value %

Payment Completion Criteria

Kick-off Meeting 1 10% $ To Be

Proposed (TBP)

Upon Successful completion of the meeting

Monthly Progress

Review (MPR)

#1

1 8% $ TBP Successful completion of the

Review and closed action items

MPR#2 1 8% $ TBP Successful completion of the

Review and closed action items

MPR#3 1 8% $ TBP Successful completion of the

Review and closed action items

MPR #4 1 8% $ TBP Successful completion of the

Review and closed action items

MPR #5 1 8% $TBP Successful completion of the

Review and closed action items

Mid-Term

Review

1 10% $ TBP Review conducted, all required changes to presentation package completed, and all action items closed/resolved

MPR #7 1 6% $ TBP Successful completion of the

Review and closed action items

MPR #8 1 6% $ TBP Successful completion of the

Review and closed action items

MPR #9 1 5% $ TBP Successful completion of the

Review and closed action items

MPR #10 1 5% $ TBP Successful completion of the

Review and closed action items

Final Review 1 10% $ TBP Review conducted, all required changes to presentation package completed, and all action items closed/resolved

Final Report 1 3% $ TBP Successful completion of

Final Report requirements and closed action items

Risk Mitigation

Report and

Technology

Development

Report

1 5% $ TBP Successful completion of the

Risk Mitigation Report and

Technology Development

Report.

(c) The Contractor may submit requests for payment not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the Contracting Officer, all milestone payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled.

(d) The Contractor shall not be entitled to payment of a request for milestones payment prior to successful accomplishment and acceptance by the Government of the milestone event. The Contracting Officer shall determine whether the milestone event or performance criterion for which payment is requested has been successfully accomplished and accepted by the Government in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.

(END OF SECTION B)

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with Attachment A, Statement of Work.

(END OF SECTION C)

SECTION D - PACKAGING AND MARKING

THERE ARE NO CLAUSES IN THIS SECTION

SECTION E - INSPECTION AND ACCEPTANCE

E.1 CLAUSES INCORPORATED BY REFERENCE

52.246-4 INSPECTION OF SERVICES—FIXED-PRICE (AUG 1996)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

E.2 GSFC 52.246-93 ACCEPTANCE—LOCATION(S) (SEP 2013)

The Contracting Officer or authorized representative will accomplish acceptance at the following location(s):

Deliverable Item

Numbers

Location Authorized

Representative

1-7 NASA/GSFC

Greenbelt, MD 20771

COR

1-9 NASA/GSFC

Greenbelt, MD 20771

CO

The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.

*If the Government does not approve deliverables (items 1-7 as cited in B.2, GSFC

52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED) within thirty (30) days of submission (or resubmission after addressing requests for action (RFA’s) or requests for information (RFI’s)), the deliverable shall be deemed accepted by the Government.

E.3 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (SEP 2013)

The Contractor shall maintain records evidencing inspections in accordance with the

Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

(END OF SECTION E)

SECTION F - DELIVERIES AND PERFORMANCE

F.1 CLAUSES INCORORATED BY REFERENCE

52.242-15 STOP-WORK ORDER (AUG 1989)

F.2 GSFC 52.217-92 PERIOD OF PERFORMANCE (JAN 2014)

The period of performance of this contract shall be for a period of 20 months from the contract effective date.

F.3 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING

(FEB 2016)

Shipments of the items required under this contract shall be to:

Receiving Officer

Goddard Space Flight Center

Building 35, Code 279

Greenbelt, Maryland 20771

Marked for:

*Technical Officer: Monica Todirita

Contract No.: 80GSFC22CA002

Item(s) No.: 1-7

Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.

If this is a fixed price type contract, delivery--for purposes of the Prompt Payment Act--must be through the above shipping address unless another location has been authorized by the Contracting Officer. If delivery is made to other than the Receiving Officer listed above and shipment to that other location has not been authorized by the Contracting

Officer, a delivery for the purposes of the Prompt Payment Act has not occurred and no interest penalty under the Act shall result. Shipment to other than Receiving Officer listed above will be construed as contract noncompliance.

* Instructions for uploading documents to the Geo-XO portal will be given at contract award.

(END OF SECTION F)

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 CLAUSES INCORPORATED BY REFERENCE

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014)

1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

G.2 1852.227-70 NEW TECHNOLOGY – OTHER THAN SMALL

BUSINESSFIRM OR NONPROFIT ORGANIZATION (APR 2015)

(a) Definitions. As used in this clause—

“Administrator” means the Administrator of the National Aeronautics and Space

Administration (NASA) or duly authorized representative.

“Made” means—

(1) When used in relation to any invention other than a plant variety, the conception or first actual reduction to practice of the invention; or

(2) When used in relation to a plant variety, that the Contractor has at least tentatively determined that the variety has been reproduced with recognized characteristics.

“Nonprofit organization” means a domestic university or other institution of higher education or an organization of the type described in section 501(c)(3) of the

Internal Revenue Code of 1954 (26 U.S.C. 501(c)) and exempt from taxation under section 501(a) of the Internal Revenue Code (26 U.S.C. 501(a)), or any domestic nonprofit scientific or educational organization qualified under a State nonprofit organization statute.

“Practical application” means to manufacture, in the case of a composition or product; to practice, in the case of a process or method; or to operate, in the case of a machine or system; and, in each case, under such conditions as to establish that the invention is being utilized and that its benefits are, to the extent permitted by law or

Government regulations, available to the public on reasonable terms.

“Reportable item” means any invention, discovery, improvement, or innovation of the contractor, whether or not patentable or otherwise protectable under Title 35 of the United States Code, made in the performance of any work under any NASA contract or in the performance of any work that is reimbursable under any clause in any NASA contract providing for reimbursement of costs incurred before the effective date of the contract. Reportable items include, but are not limited to, new processes, machines, manufactures, and compositions of matter, and improvements to, or new applications of, existing processes, machines, manufactures, and compositions of matter. Reportable items also include new computer programs, and improvements to, or new applications of, existing computer programs, whether or not copyrightable or otherwise protectible under Title 17 of the United States Code.

“Small business firm” means a domestic small business concern as defined at 15

U.S.C. 632 and implementing regulations of the Administrator of the Small Business

Administration. (For the purpose of this definition, the criteria and size standard adopted in the FAR Subpart 2.1 definitions for “small business concern” and for

“small business subcontractor” will be used.)

“Subject invention” means any reportable item which is or may be patentable or otherwise protectible under Title 35 of the United States Code, or any novel variety of plant that is or may be protectible under the Plant Variety Protection Act (7

U.S.C. 2321, et seq.).

(b) Allocation of principal rights—(1) Presumption of title. (i) Any reportable item that the Administrator considers to be a subject invention shall be presumed to have been made in the manner specified in paragraph (1)(A) or (1)(B) of Section

20135(b) of the National Aeronautics and Space Act (51 U.S.C. 20135(b))

(hereinafter “the Act”), and the above presumption shall be conclusive unless at the time of reporting the reportable item in accordance with paragraph (e)(2) of this clause the Contractor submits to the Contracting Officer a written statement, containing supporting details, demonstrating that the reportable item was not made in the manner specified in the Act.

(ii) Regardless of whether title to a given subject invention would otherwise be subject to an advance waiver or is the subject of a petition for waiver as described in paragraph (b)(3) of this clause, the Contractor may nevertheless file the statement described in paragraph (b)(1)(i) of this clause. The Administrator will review the information furnished by the Contractor in any such statement and any other available information relating to the circumstances surrounding the making of the subject invention and will notify the Contractor whether the Administrator has determined that the subject invention was made in the manner specified in paragraph

(1)(A) or (1)(B) of Section 20135(b) of the Act.

(2) Property rights in subject inventions. Each subject invention for which the presumption of paragraph (b)(1)(i) of this clause is conclusive or for which there has been a determination that it was made in the manner specified in paragraph (1)(A) or

(1)(B) of Section 20135(b) of the Act shall be the exclusive property of the United

States as represented by NASA unless the Administrator waives all or any part of the rights of the United States, as provided in paragraph (b)(3) of this clause.

(3) Waiver of rights. (i) Section 20135(g) of the Act provides for the promulgation of regulations by which the Administrator may waive all or any part of the rights of the United States with respect to any invention or class of inventions made or that may be made under conditions specified in paragraph (1)(A) or (1)(B) of Section

20135(b) of the Act. The promulgated NASA Patent Waiver Regulations, 14 CFR part 1245, subpart 1, provide procedures for the Contractor to submit petitions

(requests) for waiver of rights and guidance for NASA in acting on petitions for such waiver of rights.

(ii) As provided in 14 CFR part 1245, subpart 1, the Contractor may petition, either prior to execution of the contract or within 30 days after execution of the contract, for advance waiver of rights to any invention or class of inventions that may be made under a contract. If such a petition is not submitted, or if after submission it is denied, the Contractor (or an employee inventor of the Contractor) may petition for waiver of rights to an identified subject invention within eight months of first disclosure of invention in accordance with paragraph (e)(2) of this clause, or within such longer period as may be authorized in accordance with 14 CFR 1245.105.

(c) Minimum rights reserved by the Government.

(1) With respect to each subject invention for which a waiver of rights has been granted, the Government reserves—

(i) An irrevocable, nonexclusive, nontransferable, royalty-free license for the practice of such invention throughout the world by or on behalf of the United States or any foreign government in accordance with any treaty or agreement with the

United States; and

(ii) Such other rights as stated in 14 CFR 1245.107.

(2) Nothing contained in this paragraph (c) shall be considered to grant to the

Government any rights with respect to any invention other than a subject invention.

(d) Minimum rights to the Contractor.

(1) The Contractor is hereby granted a revocable, nonexclusive, royalty-free license in each patent application filed in any country on a subject invention in which the

Government has title and in any resulting patent, unless the Contractor fails to disclose the subject invention within the times specified in paragraph (e)(2) of this clause. The Contractor's license extends to its domestic subsidiaries and affiliates, if any, within the corporate structure of which the Contractor is a party and includes the right to grant sublicenses of the same scope to the extent the Contractor was legally obligated to do so at the time the contract was awarded. The license is transferable only with the approval of the Administrator except when transferred to the successor of that part of the Contractor's business to which the invention pertains.

(2) The Contractor's domestic license may be revoked or modified by the

Administrator to the extent necessary to achieve expeditious practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with 37 CFR part 404, Licensing of Government Owned Inventions. The

Contractor's license will not be revoked in that field of use or the geographical areas in which the Contractor has achieved practical application and continues to make the benefits of the invention reasonably accessible to the public. The license in any foreign country may be revoked or modified at the discretion of the Administrator to the extent the Contractor, its licensees, or its domestic subsidiaries or affiliates have failed to achieve practical application in that foreign country.

(3) Before revoking or modifying the Contractor's license, the Contractor will be provided a written notice of the Administrator's intention to revoke or modify the license, and the Contractor will be allowed 30 days (or such other time as may be authorized by the Administrator for good cause shown) after the notice to show cause why the license should not be revoked or modified. The Contractor has the right to appeal to the Administrator any decision concerning the revocation or modification of its license.

(e) Contractor's obligations.

(1) The Contractor shall establish and maintain active and effective procedures to assure that reportable items are promptly identified and disclosed to Contractor personnel responsible for the administration of this New Technology—Other Than a

Small Business Firm or Nonprofit Organization clause within six months of conception and/or first actual reduction to practice, whichever occurs first in the performance of work under this contract. These procedures shall include the maintenance of laboratory notebooks or equivalent records and other records as are reasonably necessary to document the conception and/or the first actual reduction to practice of the reportable items, and records that show that the procedures for identifying and disclosing reportable items are followed. Upon request, the

Contractor shall furnish the Contracting Officer a description of such procedures for evaluation and for determination as to their effectiveness.

(2) The Contractor shall disclose in writing each reportable item to the Contracting

Officer within two months after the inventor discloses it in writing to Contractor personnel responsible for the administration of this New Technology—Other Than a

Small Business Firm or Nonprofit Organization clause or within six months after the

Contractor becomes aware that a reportable item has been made, whichever is earlier, but in any event for subject inventions before any on sale, public use, or publication of such invention known to the Contractor. The disclosure to the agency shall identify the inventor(s) or innovator(s) and this contract under which the reportable item was made. It shall be sufficiently complete in technical detail to convey a clear understanding, to the extent known at the time of the disclosure, of the nature, purpose, operation, and physical, chemical, biological, or electrical characteristics of the reportable item. The disclosure shall also identify any publication, sale or offer for sale, or public use of any subject invention and whether a manuscript describing such invention has been submitted for publication and, if so, whether it has been accepted for publication at the time of disclosure. In addition, after disclosure to the agency, the Contractor will promptly notify the agency of the acceptance of any manuscript describing a subject invention for publication or of any sale, offer for sale, or public use planned by the Contractor for such invention.

(3) The Contractor may use whatever format is convenient to disclose reportable items required in subparagraph (e)(2). NASA prefers that the Contractor use either the electronic or paper version of NASA Form 1679, Disclosure of Invention and

New Technology (including computer software) to disclose reportable items. Both the electronic and paper versions of NASA Form 1679 may be accessed at the electronic New Technology Reporting Web site http://invention.nasa.gov.

(4) The Contractor shall furnish the Contracting Officer the following:

(i) Interim new technology summary reports every 12 months (or such longer period as may be specified by the Contracting Officer) from the date of the contract, listing reportable items during that period, and certifying that all reportable items have been disclosed (or that there are no such inventions).

(ii) A final new technology summary report, within 3 months after completion of the contracted work, listing all reportable items or certifying that there were no such reportable items, and listing all subcontracts at any tier containing a patent rights clause or certifying that there were no such subcontracts.

(5) The Contractor agrees, upon written request of the Contracting Officer, to furnish additional technical and other information available to the Contractor as is necessary for the preparation of a patent application on a subject invention and for the prosecution of the patent application, and to execute all papers necessary to file patent applications on subject inventions and to establish the Government's rights in the subject inventions.

(6) The Contractor agrees, subject to paragraph 27.302(j) of the Federal Acquisition

Regulation (FAR), that the Government may duplicate and disclose subject invention disclosures and all other reports and papers furnished or required to be furnished pursuant to this clause.

(f) Examination of records relating to inventions.

(1) The Contracting Officer or any authorized representative shall, until 3 years after final payment under this contract, have the right to examine any books (including laboratory notebooks), records, and documents of the Contractor relating to the conception or first actual reduction to practice of inventions in the same field of technology as the work under this contract to determine whether—

(i) Any such inventions are subject inventions;

(ii) The Contractor has established and maintained the procedures required by paragraph (e)(1) of this clause; and

(iii) The Contractor and its inventors have complied with the procedures.

(2) If the Contracting Officer learns of an unreported Contractor invention that the

Contracting Officer believes may be a subject invention, the Contracting Officer may require the Contractor to disclose the invention to the agency for a determination of ownership rights.

(3) Any examination of records under this paragraph will be subject to appropriate conditions to protect the confidentiality of the information involved.

(g) Withholding of payment (this paragraph does not apply to subcontracts).

(1) Any time before final payment under this contract, the Contracting Officer may, in the Government's interest, withhold payment until a reserve not exceeding

$50,000 or 5 percent of the amount of this contract, whichever is less, shall have been set aside if, in the Contracting Officer's opinion, the Contractor fails to—

(i) Establish, maintain, and follow effective procedures for identifying and disclosing reportable items pursuant to paragraph (e)(1) of this clause;

(ii) Disclose any reportable items pursuant to paragraph (e)(2) of this clause;

(iii) Deliver acceptable interim new technology summary reports pursuant to paragraph (e)(4)(i) of this clause or a final new technology summary report pursuant to paragraph (e)(4) (ii) of this clause; or

(iv) Provide the information regarding subcontracts pursuant to paragraph (h)(4) of this clause.

(2) Such reserve or balance shall be withheld until the Contracting Officer has determined that the Contractor has rectified whatever deficiencies exist and has delivered all reports, disclosures, and other information required by this clause.

(3) Final payment under this contract shall not be made before the Contractor delivers to the Contracting Officer all disclosures of reportable items required by paragraph (e)(2) of this clause, and an acceptable final new technology summary report pursuant to paragraph (e)(4)(ii) of this clause.

(4) The Contracting Officer may decrease or increase the sums withheld up to the maximum authorized above. No amount shall be withheld under this paragraph while the amount specified by this paragraph is being withheld under other provisions of the contract. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government rights.

(h) Subcontracts.

(1) Unless otherwise authorized or directed by the Contracting Officer, the

Contractor shall—

(i) Include this clause (suitably modified to identify the parties) in any subcontract hereunder (regardless of tier) with other than a small business firm or nonprofit organization for the performance of experimental, developmental, or research work;

or

(ii) Include the clause at FAR 52.227-11, as modified by 1852.227-11, (suitably modified to identify the parties) in any subcontract hereunder (regardless of tier) with a small business firm or nonprofit organization for the performance of experimental, developmental, or research work; and

(iii) Modify the applicable clause in any subcontract hereunder (regardless of tier) to identify the parties as follows: references to the Government are not changed, and in all references to the Contractor, the subcontractor is substituted for the Contractor so that the subcontractor has all rights and obligations of the Contractor in the clause.

(2) In the event of a refusal by a prospective subcontractor to accept such a clause the Contractor—

(i) Shall promptly submit a written notice to the Contracting Officer setting forth the subcontractor's reasons for such refusal and other pertinent information that may expedite disposition of the matter; and

(ii) Shall not proceed with such subcontract without the written authorization of the

Contracting Officer.

(3) In the case of subcontracts at any tier, the agency, subcontractor, and Contractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and NASA with respect to those matters covered by this clause.

(4) The Contractor shall promptly notify the Contracting Officer in writing upon the award of any subcontract hereunder (regardless of tier) by identifying the subcontractor, the applicable patent rights clause in the subcontract, the work to be performed under the subcontract, and the dates of award and estimated completion.

Upon request of the Contracting Officer, the Contractor shall furnish a copy of such subcontract, and, no more frequently than annually, a listing of the subcontracts that have been awarded.

(5) The subcontractor will retain all rights provided for the Contractor in the clause of paragraph (h)(1)(i) or (ii) of this clause, whichever is included in the subcontract, and the Contractor will not, as part of the consideration for awarding the subcontract, obtain rights in the subcontractor's subject inventions.

(i) Preference for United States industry. Unless provided otherwise, no Contractor that receives title to any subject invention and no assignee of any such Contractor shall grant to any person the exclusive right to use or sell any subject invention in the United States unless such person agrees that any products embodying the subject invention will be manufactured substantially in the United States. However, in individual cases, the requirement may be waived by the Administrator upon a showing by the Contractor or assignee that reasonable but unsuccessful efforts have been made to grant licenses on similar terms to potential licensees that would be likely to manufacture substantially in the United States or that under the circumstances domestic manufacture is not commercially feasible.

G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY

REPRESENTATIVE AND PATENT REPRESENTATIVE (APR 2015)

(a) For purposes of administration of the clause of this contract entitled “New

Technology—Other than a Small Business Firm or Nonprofit Organization” or “Patent

Rights—Ownership by the Contractor,” whichever is included, the installation New

Technology and Patent Representatives identified at http://prod.nais.nasa.gov/portals/pl/new tech pocs.html are hereby designated by the

Contracting Officer to administer such clause for the appropriate installation.

(b) Disclosures of reportable items and of subject inventions, interim new technology summary reports, final new technology summary reports, utilization reports, and other reports required by the applicable “New Technology” or “Patent Rights—Ownership by the Contractor” clause, as well as any correspondence with respect to such matters, shall be directed to the New Technology Representative unless transmitted in response to correspondence or request from the Patent Representative. Inquiries or requests regarding disposition of rights, election of rights, or related matters shall be directed to the Patent

Representative. This clause shall be included in any subcontract hereunder requiring a

“New Technology—Other than a Small Business Firm or Nonprofit Organization” clause or “Patent Rights—Ownership by the Contractor” clause, unless otherwise authorized or directed by the Contracting Officer. The respective responsibilities and authorities of the aforementioned representatives are set forth in 1827.305-270 of the NASA FAR

Supplement.

G.4 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT

(APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS

39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact

Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

(END OF SECTION G)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES INCORPORATED BY REFERENCE

1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV

2004)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002) –

ALTERNATE 1 (FEB 2006)

1852.244-70 GEOGRAPHIC PARTICIPATION IN THE AEROSPACE

PROGRAM (APR 1985)

H.2 1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-

130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at NASA/GSFC, where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

H.3 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT)

(MAR 1989)

(a) Of the total price of the total price of the basic effort, the sum of $ TO BE

DETERMINED is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said item is allotted:

SCHEDULE FOR ALLOTMENT OF FUNDS

Date Amounts

UPON AVAILABILITY OF FUNDS

(b) The Contractor agrees to perform or have performed work on the items specified in paragraph (a) above up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) if that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.

(c) (1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until TO BE DETERMINED.

(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.

(3) (i) The notice shall state the estimated date when the point referred to in subparagraph (2) above will be reached and the estimated amount of additional funds required to continue performance to the date specified in subparagraph (1) above, or an agreed date substituted for it.

(ii) The Contractor shall, 60 days in advance of the date specified in subparagraph (1) above, or an agreed date substituted for it, advise the Contracting

Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.

(4) If, after the notification referred to in subdivision (3)(ii) above, additional funds are not allotted by the date specified in subparagraph (1) above, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.

(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) above shall apply to these additional allotted funds and substituted date pertaining to them, and the contract shall be modified accordingly.

(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices

(including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery or both.

(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.

(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the Default clause of this contract.

The provisions of this Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a) above. This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.

(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract. (End of clause)

H.4 CONTRACTOR PROPOSED TECHNOLOGY DEVELOPMENT AND RISK

MITIGATION EFFORTS

The Contractor shall provide the Technology Development and Risk Mitigation efforts that are described in Attachment F, which are over and above the requirements required by the contract terms and conditions, Statement of Work and other contract attachments. These efforts were proposed by the Contractor in the proposal submitted in response to the Request for Proposal (RFP) 80GSFC21R0027 for Geostationary and

Extended Orbits (GEO-XO) Sounder Phase A Study. The incorporation of these efforts does not relieve the Contractor from their responsibilities of meeting all other contract terms and conditions and requirements in the Statement of Work and other contract attachments.

(END OF SECTION H)

SECTION I - CONTRACT CLAUSES

I.1 CLAUSES INCORPORATED BY REFERENCE

52.202-1 DEFINITIONS (JUN 2020)

52.203-3 GRATUITIES (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (JUN 2020)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (JUN 2020)

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT

(JUN 2020)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN

2017)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER

FIBER CONTENT PAPER (MAY 2011)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (JUN 2020)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT

2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (AUG 2020)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE,

SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY

KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED,

SUSPENDED, OR PROPOSED FOR DEBARMENT (JUN 2020)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (OCT 2018)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (NOV 2015)

52.210-1 MARKET RESEARCH (JUN 2020)

52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)

52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT

(OCT 1997)

52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICE DATA--MODIFICATIONS (DEVIATION 18-04) (JUN 2020)

52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—

MODIFICATIONS (DEVIATION 18-04) (JULY 2018)

52.215-14 INTEGRITY OF UNIT PRICES (JUN 2020)

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT

2010)

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR

POSTRETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS

(JUL 2005)

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA

AND DATA OTHER THAN CERTIFIED COST OR PRICING

DATA - MODIFICATIONS (JUN 2020)

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (NOV 2020)

(h) If the Contractor does not have representations and certifications in

SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it is, is not a small business concern under

NAICS Code 541330 assigned to contract number TBD.

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB

1997)

52.222-3 CONVICT LABOR (JUN 2003)

52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND

EQUIPMENT EXCEEDING $15,000 (JUN 2020)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

52.222-26 EQUAL OPPORTUNITY (SEPT 2016)

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT (DEC 2010)

52.222-50 COMBATING TRAFFICKING IN PERSONS (OCT 2020)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (JUN 2020)

52.225-1 BUY AMERICAN - SUPPLIES (JAN 2021)

52.225-8 DUTY-FREE ENTRY (OCT 2010)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB

2021)

52.227-1 AUTHORIZATION AND CONSENT (JUN 2020) - ALTERNATE I

(APR 1984)

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (JUN 2020)

52.227-16 ADDITIONAL DATA REQUIREMENTS (JUN 1987)

52.227-19 COMMERCIAL COMPUTER SOFTWARE – RESTRICTED

RIGHTS (DEC 2007) AS MODIFIED BY NFS 1852.227-19 (JUL

1997)

52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

52.232-1 PAYMENTS (APR 1984)

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

52.232-17 INTEREST (MAY 2014)

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

52.232-25 PROMPT PAYMENT (JAN 2017)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM

FOR AWARD MANAGEMENT (OCT 2018)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUN 2013)

52.233-1 DISPUTES (MAY 2014)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM

(OCT 2004)

52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

52.242-13 BANKRUPTCY (JUL 1995)

52.243-1 CHANGES—FIXED PRICE (AUG 1987) - ALT V (APR 1984)

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JULY 2021)

52.245-9 USE AND CHARGES (APR 2012)

52.246-23 LIMITATION OF LIABILITY (FEB 1997)

52.247-63 PREFERENCE FOR U.S. FLAG AIR CARRIERS (JUN 2003)

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICES) (APR 1984)

52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (AUG 2014)

1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED

INFORMATION TECHNOLOGY RESOURCES (JAN 2011) as updated by 1852.204-76 SECURITY REQUIREMENTS FOR

UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES

[DEVIATION 21-01]

(b) This clause is applicable to all NASA contractors and sub-contractors that process, manage, access, or store unclassified electronic information, to include Sensitive But

Unclassified (SBU) information [or Controlled Unclassified Information (CUI)], for

NASA in support of NASA's missions, programs, projects and/or institutional requirements. Applicable requirements, regulations, policies, and guidelines are identified in the Applicable Documents List (ADL) provided as an attachment to the contract. The documents listed in the ADL can be found at:

http://www.nasa.gov/offices/ocio/itsecurity/index.html. For policy information considered sensitive, the documents will be identified as such in the ADL and made available through the Contracting Officer.

1852.215-84 OMBUDSMAN (NOV 2011)

1852.235-70 CENTER FOR AEROSPACE INFORMATION (DEC 2006)

1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION (APR

2001)

I.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (JUN 2016)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security

Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures. (1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract

Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate…