This document is a Request for Proposal (RFP) issued by the Fermi National Accelerator Laboratory (Fermilab) for a Crystal Collimation Station. Fermilab requests firm-fixed price proposals for the fabrication of a Crystal Collimation vacuum chamber and goniometer assembly to be used in the Fermilab Delivery Ring. The RFP provides detailed requirements for the vacuum chamber size, fitment, and features, as well as functional requirements for the crystal positioning and goniometer. Proposals are due by 5pm CDT on July 16, 2024, and the award will be made to the responsible offeror whose proposal conforms to the RFP requirements and represents the best value. Pricing terms are net 30 days FOB Fermilab. The resulting purchase order/subcontract will be subject to Fermilab's standard terms and conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fermi National Accelerator Laboratory Procurement Department

Finance Section 630-840-2454 rhiannon@fnal.gov

Date:

Request for Proposal #:

Proposals Due:

REQUEST FOR PROPOSAL - THIS IS NOT A PURCHASE ORDER

Fermi Research Alliance, LLC (FRA) anticipates procurement of the following assemblies for Fermi National Accelerator Laboratory (Fermilab). Fermilab Requests your firm-fixed price proposal for the following:

Pg. 1 of 2

ITEM QTY. DESCRIPTION UNIT PRICE DELIV.

Total Extended Proposal Price:

Company Name:

Address:

Terms: Net 30 FOB: Fermilab Signature & Date: Rhiannon Patterson - Procurement Specialist II

REQUEST FOR PROPOSAL

June 14, 2024

RFP 357121RLP

July 16, 2024

MATERIALS, SUPPLIES OR SERVICES RESULTING FROM

THIS QUOTE ARE FOR WORK DONE UNDER PRIME

CONTRACT NO. DE AC02 07CH11359 WITH THE UNITED

STATES DEPARTMENT OF ENERGY. ANY ITEMS COVERED

BY G.S.A. CONTRACTS SHOULD BE SO INDICATED.

Exceptions to specifications and extra charges for containers, tooling, etc. must be clearly indicated

*If foreign supplied, shipment shall have INCO terms 2020, Delivery at Place (DAP); Supplier is also required to utilize E.

Besler, FRA customs broker contact Amy Davenport

1 1 Crystal Collimation can, with the goniometer stage, motion devices and movable arms, compatible with the dimensional specifications noted in attached scope of work (titled 1A).

2 1 Goniometer, precision motion device to adjust X-position and X-angle according to specifications noted in attached scope of work

(titled 1A).

Fermi National Accelerator Laboratory / Kirk and Pine Street / P.O. Box 500 / Batavia, IL 60510 / www.fnal.gov / fermilab@fnal.gov Managed by Fermi Research Alliance, LLC for the U.S. Department of Energy Office of Science

RFP # 357121RLP Pg. 2 of 2

The 2 units will ship to: Fermilab Receiving Warehouse 2 Kirk Rd & Wilson Street Batavia, IL 60510 United States

Basis for Subcontract Award

FRA General Terms and Conditions for Commercial Products and Commercial Services (03.2024)

Offers to include F.O.B. Fermilab delivery terms. All freight charges must be included in your quotation.

The following Representations must be completed and returned with your proposal:

SARC - Subcontractor Annual Reps & Certs (Rev. 3) PUR-466 - Proposal Certifications ( Rev. 1 Dated 10/14/2021)

Proposals shall be submitted by 5pm CDT July 16, 2024 Questions shall be submitted by 5pm CDT July 2, 2024.

All contractual questions shall be directed to:

Rhiannon Patterson Procurement Specialist II rhiannon@fnal.gov 630-840-2454 (office)

The RFP response shall include a completed RFP page, SARC Form (if not completed in the last year), and a PUR- 466 Form.

This is a best value source selection. Award shall be made to the supplier who is deemed responsible by FRA, whose proposal conforms to the solicitation’s requirements, and is judged to represent best value to FRA. The best value is represented by the lowest price of technically acceptable offerors. FRA intends to award without discussions.

The following terms and conditions shall become a part of any subsequent purchase order/subcontract resulting from this solicitation.

The above referenced terms and conditions are available on the Fermilab Business Services Web Site. They are PDF Format (hard copy forms are available upon request) and can be accessed at the following URL:

https://procurement.fnal.gov/terms-conditions/

Fermi National Accelerator Laboratory / Kirk and Pine Street / P.O. Box 500 / Batavia, IL 60510 / www.fnal.gov / fermilab@fnal.gov Managed by Fermi Research Alliance, LLC for the U.S. Department of Energy Office of Science https://procurement.fnal.gov/terms-conditions/ https://procurement.fnal.gov/terms-conditions/ https://procurement.fnal.gov/terms-conditions/ https://procurement.fnal.gov/terms-conditions/ mailto:rhiannon@fnal.gov https://procurement.fnal.gov/terms-conditions/

Statement of Work for Mu2E Crystal

Goniometer Assembly

Document Approval

Signatures Required Date Approved

Co Author: Dakota Krokosz, Crystal Collimation Lead Mechanical Engineer

Co Author: Vladimir Nagaslaev, DR Slow Extraction Scientist

Approver:

Approver:

Revision History

Revision Date Section

No.

Revision Description

- 06/14/2024 ALL Initial Draft

Mu2E Crystal Goniometer Statement of Work

Table of Contents

1.INTRODUCTION

2. SCOPE

3. VACUUM CHAMBER FITMENT

5. FUNCTIONAL REQUIREMENTS

6. REFERENCES

List of Tables

Table 1: Chamber Requirements

Table 2: Goniometer Requirements

List of Figures

Figure 1. The conceptual layout of the Crystal Collimation placement in the Fermilab

Delivery Ring

Figure 2: Assembly of a curved crystal with its iron support structure

Figure 3: Length and Height allocated for goniometer vacuum chamber installation

Figure 4: Width profile of available space

Figure 5: Distance from floor to beam pipe center

Figure 6: Maximum distance chamber can extend into isle from beam pipe center

Figure 7: Goniometer and Vacuum CF Flanges

Figure 8: Collar for Quick Connect Flanges

Figure 9: Quick Connect Flanges on Chamber assembly

Figure 10. The principal crystal curvature vs auxiliary (visible) curvature

Figure 11. Isometry and top views of the crystal and fixture orientation with beam

1. Introduction

The specification describes the requirements for a Slow Extraction (SX) crystal collimation (SXCC) station in the Fermilab Delivery Ring (DR) intended to reduce the beam losses produced in the Electrostatic Septum (ESS) foil plane. In the SX, part of the beam is deliberately made unstable using excitation of the 3rd integer resonance in the DR

[1]. The motion of the unstable beam particles is carefully controlled and when they reach their maximum amplitude, they enter the field region of the electrostatic septum and get deflected into the M4 beamline. A small part of the beam is passing directly through a thin foil plane. Due to the scattering in the foil plane this part is lost downstream, in the beam line and in the ring aperture. The beam losses lead to significant radiological and hardware radiation exposure issues and need to be mitigated. One of the ways to mitigate the losses is using Crystal Collimation. The Crystal Collimation station is set up upstream of the ESS1 as show in the Figure 1 below.

Figure 1. The conceptual layout of the Crystal Collimation placement in the Fermilab

Delivery Ring.

The Crystal Collimation station is the beam line vacuum insert consisting of a vacuum can, crystal holder, curved crystal, and the precision motion device(s). The motion device(s) shall allow fine adjustment of the position and orientation of the crystal with respect to the proton beam to the specifications outlined in Table 2.

Figure 2: A typical assembly of a curved crystal with its iron support structure.

A typical geometry of the bent crystal with its encasing is shown in Figure 2 above.

Exact details of the crystal holder design (such as the support bracket positioning) and vertical alignment may be subject to adjustments, involving the crystal producer.

The motion to the goniometer can be provided from the stepper motors and actuators outside the vacuum chamber. If motion is provided by external means, it shall do so via standard CF Flange and meet vacuum requirements listed in Table 1.

2. Scope

This Statement of Work (SOW) provides detailed requirements for the fabrication vendor (hereafter referred to as “the Vendor”) as part of a Request for Quotation (RFQ) from the vendor. All specifications provided in this SOW refer to a single Prototype

Assembly unit. Additional units may be purchased upon mutual written agreement between

FNAL and the Vendor.

In this specification the following key words (in bold text) will be used:

shall: Indicates a mandatory requirement. Designers shall implement such mandatory requirements to claim conformance with this specification.

should: Indicates flexibility with a strongly preferred implementation.

Note: When not in bold text, the words in the table above are being used in the traditional sense; that is, they do not adhere to the strict meanings described above.

3. Vacuum Chamber Fitment

It’s allowable for the installed vacuum chamber to have larger dimensions than the beam pipe it’s coupled to. If the vacuum chamber has a larger diameter than the surrounding beam pipe (6” OD) it shall reduce the diameter where FNAL quick connect

(QC) flanges (F00023279-M) can be installed on either applicable end to make the chamber mate-able to the Mu2E beamline. The vendor is not required to provide a stand for the chamber assembly however the provided chamber shall have mounting features for a stand.

Should the vendor need to change any of the reference measurements in Figure 3 through

Figure 6, this can be subject to change with FNAL approval. Note that the chamber depicted in all figures is a placeholder and doesn’t dictate the shape of the vendors design.

Figure 3: Length and Height allocated for goniometer vacuum chamber installation

Figure 4: Width profile of available space

Figure 5: Distance from floor to beam pipe center

Figure 6: Maximum distance chamber can extend into isle from beam pipe center

3.1 Chamber Features

The chamber should not require any additional gauges of instruments outside of the crystal goniometer and its applicable stages/actuators required for operation. The chamber shall contain at least (1) CF Flange for mounting of a vacuum pump and (1) CF Flange for mounting of the goniometer. The chamber shall be constructed in a manner where the goniometer will mount on the aisle side of the chamber so it’s accessible.

Figure 7: Goniometer and Vacuum CF Flanges

It is optional for the vendor to provide the pump itself. Both the upstream and downstream ends of the chamber will utilize a quick connect flange to mate to the beamline, FNAL shall provide the collars to connect the flanges. The vendor shall be responsible for providing the reducer flange pre-installed on the vacuum chamber. The chamber assembly shall include bellows per FNAL drawing F10142162.

Figure 8: Collar for Quick Connect Flanges

Figure 9: Quick Connect Flanges on Chamber assembly

4. Crystal Positioning

The center line of the beam pipe coincides with the central beam orbit; the nominal horizontal location for the crystal shall be offset by 10.5mm from the center line towards the insertion port (Figure 12). The crystal is oriented with the long length vertically, and the bending curvature takes place in the direction transverse to vertical line and bends the beam away from the center line. It’s important to note that this implies the principal bend, see Figure 10. The main beam passes outside the fork of the C-shaped fixture of the crystal in Figure 11, but there will be also part of the beam on the left (inside the fork). Vertically, the center of the crystal should be at the same level as the center of the beam. To ensure that, the vendor is expected to communicate with the crystal vendor to determine the actual geometry of the crystal fixture.

Figure 10. The principal crystal curvature vs auxiliary (visible) curvature.

Figure 11 shows the orientations of the insertion motion, bending direction and the crystal offset direction. The principal curvature is quite small and hardly visible. The auxiliary curvature is obvious and runs around the beam direction. To simplify the definition of the crystal orientation, the crystal vendor will be asked to provide clear instructions for mounting the crystal fixture on the motion device (goniometer).

Figure 11. Isometry and top views of the crystal and fixture orientation with beam.

The goniometer may utilize commercially available components for its design. The goniometer may be a standalone design that will be fixed to the insertion actuator or be integrated as part of the insertion design. The controls for the motion devices are assumed to be an in-house design at Fermilab, if the vendor wants to provide a control system, they should include it in their design proposal pending Fermilab approval.

Figure 12: Position of Extracted Crystal

5. Functional Requirements

Table 1: Chamber Requirements

Parameter Unit Value

Consistent with the vacuum level of Torr 2.0e-9

No leak shall be detectable on the most sensitive scale of a helium mass spectrometer leak detector to a sensitivity of

(measured at vacuum level <1.0e-6Torr)

Atm-cc/sec

1.0e-10

Coupling to the beam pipe, Outside Diameter Inch 6

Coupling to the beam pipe, Inside Diameter Inch 5.794

Coupling flange to Extraction Septum, Quick Connect Flange Inch 6

Coupling flange to the beam pipe, Quick Connect Flange Inch 6

Coupling flange to vacuum pump, CF Flange (Non-Rotatable) Inch 6

Maximum axial installed length of chamber (Including Flanges) Inch 20.5

Maximum allowed vertical space from beam centerline Inch 16.5

Chamber Material N/A 316 SS

Flange Material N/A 316 SS

Beam Pipe Material N/A 316 SS

Table 2: Goniometer Requirements

Parameter Unit Value

Operation Temperature range °C 18-36

Angular motion precision and repeatability Rad <10

Angular motion range mRad >100*

Linear motion precision and repeatability mm <0.01

Linear motion range mm 10*

Typical proton flux per year p/cm2/year 5e20

Beam Energy deposition in the crystal at 8kW operation W 10

Encoder Resolution Rad <10

* Indicates parameter is flexible upon FNAL approval

6. References

1. Mu2e Resonant Extraction, in Mu2e TDR.

2. Mu2e Resonant Extraction Specification document.

RFP 357121RLP.pdf
Sheet1

Crystal Goniometer SOW-P 2.0.pdf

File details come from the government source that posted it. Updated .