RFB937200-02 - MPCF Bldg 20 Plumbing Replacement - Drawings.pdf
PDF 19 MB Posted
- Solicitation number
- RFB937200-02
- Issued by
- Story County, Iowa
About this file
This document comprises the construction drawings and specifications for the Mount Pleasant Correctional Facility Building 20 Plumbing Replacement project issued by the Iowa Department of Administrative Services in response to Request for Bid (RFB937200-02). The project involves the comprehensive removal and replacement of existing waste, vent, and water piping systems serving Building 20 at the Mount Pleasant Correctional Facility located at 1200 E. Washington Street, Mount Pleasant, Iowa 52641. The scope encompasses work across basement, first, second, and third floors, organized into three construction phases to minimize facility disruption. Construction is scheduled to occur from August 22 through August 26, 2025. The project requires bidders to submit sealed electronic proposals through the IMPACS Electronic Procurement System by July 31, 2025, at 2:00 PM CDT. An optional pre-bid meeting is scheduled for July 15, 2025, at 1:00 PM at the facility. Bidding documents are available from Rapids Reproduction beginning July 7, 2025. All work must comply with the 2015 International Existing Building Code, International Building Code, International Fire Code, applicable state mechanical and plumbing codes, and ADA accessibility standards.
Bidders must submit a 5% bid security bond with their proposals. The project emphasizes small business participation opportunities for Targeted Small Businesses as defined under Iowa Code Chapter 73, with contractors encouraged to engage certified State of Iowa Targeted Small Businesses as subcontractors. All contractors must demonstrate compliance with affirmative action and equal employment opportunity provisions under state and federal law. The project is exempt from Iowa Sales Tax and Davis-Bacon Wage requirements. The procurement documents include detailed plumbing specifications, fixture schedules, isometric drawings for multiple riser systems, and architectural coordination requirements. Specific contract pricing has not been disclosed in the available documentation. The Iowa Department of Administrative Services reserves the right to reject any or all bids and waive any irregularities in the bidding process. Contractors must verify existing conditions prior to bidding and coordinate all work with an abatement contractor handling asbestos-containing materials removal under a separate contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. WASHINGTON ST
LI
LA
C D
R
S G
R
AN
D A
VE
HOSPITAL AVE
H O
SP
IT
AL
A
VE
PROJECT LOCATION
Applicable Codes:
2015 International Existing Building Code 2015 International Building Code 2015 International Fire Code 2010 Americans with Disabilities Act State Mechanical Code State Plumbing Code State Electrical Code ASME A17.1 Safety Code for Elevators and Escalators State of Iowa Elevator Safety Rules
Project Description:
Removal and replacement of existing waste, vent, and water piping plumbing systems and plumbing fixtures that serve Building 20 at Mount Pleasant Correctional Facility.
International Existing Building Code Chapter 5 Classification of Work
503.1 Scope
Level 1 alterations include the removal and replacement or the covering of existing materials, elements, equipment, or fixtures using new materials, elements, equipment, or fixtures that serve the same purpose.
503.2 Application
Level 1 alterations shall comply with the provisions of Chapter 7.
Chapter 7 Alterations - Level 1 701 General
Alterations shall not make an existing building less safe than its existing condition.
702 Building Elements and Materials
New finishes shall comply with Chapter 8 of the IBC.
703 Fire Protection
Alterations will maintain the level of fire protection provided.
704 Means of Egress
Alterations will maintain the level of protection provided for means of egress.
705 Accessibility
Alterations shall not reduce or have the effect of reducing accessibility of a facility or portion of a facility.
International Building Code Chapter 3 – Use and Occupancy Classification
The use and occupancy classification of the existing building will remain unchanged.
Chapter 5 – General Building Heights and Areas
Existing building height and area to remain unchanged.
Chapter 6 – Types of Construction
The type of construction for the existing building will remain unchanged.
Chapter 7 – Fire and Smoke Protection Features
New construction is minimal.
Chapter 10 – Means of Egress
Means of egress will remain unchanged in the existing building.
CODE SUMMARY
BA D E
FC G
SHEET INDEX
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Io w a
Il lin oi s
In di an a
H
Pr in te d:
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
CERTIFICATIONS
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
G000
1200 E Washington St, Mt Pleasant, IA 52641
R
FB
#9
0-
C O
N
ST
R U
C
TI
O N
-0
2-
SHEET LIST
SHEET NAME
GENERAL
G000 COVER SHEET
G001 PHASING PLANS
G002 PROJECT GENERAL INFORMATION
ARCHITECTURAL
AD01 OVERAL DEMOLITION PLANS - BASEMENT AND FIRST FLOOR
AD02 OVERALL DEMOLITION PLANS - SECOND AND THIRD FLOORS
AD03 BASEMENT DEMOLITION PLAN - AREA A
AD04 BASEMENT DEMOLITION PLAN - AREA B
AD05 FIRST FLOOR DEMOLITION PLAN - AREA A
AD06 FIRST FLOOR DEMOLITION PLAN - AREA B
AD07 SECOND FLOOR DEMOLITION PLAN - AREA A
AD08 SECOND FLOOR DEMOLITION PLAN - AREA B
AD09 THIRD FLOOR DEMOLITION PLAN - AREA A
AD10 THIRD FLOOR DEMOLITION PLAN - AREA B
AD20 OVERALL REFLECTED CEILING DEMOLITION PLANS -
BASEMENT AND FIRST FLOOR
AD21 OVERALL REFLECTED CEILING DEMOLITION PLANS - SECOND
AND THIRD FLOORS
A101 FLOOR PLANS - BASEMENT AND FIRST FLOOR
A102 FLOOR PLANS - SECOND AND THIRD FLOORS
A103 BASEMENT FLOOR PLAN - AREA A
A104 BASEMENT FLOOR PLAN - AREA B
A105 FIRST FLOOR PLAN - AREA A
A106 FIRST FLOOR PLAN - AREA B
A107 SECOND FLOOR PLAN - AREA A
A108 SECOND FLOOR PLAN - AREA B
A109 THIRD FLOOR PLAN - AREA A
A110 THIRD FLOOR PLAN - AREA B
A131 OVERALL REFLECTED CEILING PLAN - BASEMENT AND FIRST
FLOOR
A132 OVERALL REFLECTED CEILING PLAN - SECOND AND THIRD
FLOORS
A210 INTERIOR ELEVATIONS PHOTOS
A211 INTERIOR ELEVATIONS PHOTOS
A212 INTERIOR ELEVATIONS PHOTOS
A320 DETAILS, INTERIOR PARTITION AND FINISH INFORMATION
PLUMBING
P000 PLUMBING GENERAL INFORMATION
PD100A BELOW FLOOR SANITARY AND STORM - AREA A
PD100B BELOW FLOOR SANITARY AND STORM - AREA B
PD110A BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA A
PD110B BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA B
PD111A FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A
PD111B FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B
PD112A SECOND FLOOR PLUMBING DEMOLITON PLAN - AREA A
PD112B SECOND FLOOR PLUMBING DEMOLITON PLAN - AREA B
PD113A THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA A
PD113B THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA B
PD114 ROOF PLUMBING DEMOLITION PLAN
P100A BELOW FLOOR SANITARY AND STORM - AREA A
P100B BELOW FLOOR SANITARY AND STORM - AREA B
P110A BASEMENT FLOOR SANITARY AND VENT PLAN - AREA A
P110B BASEMENT FLOOR SANITARY AND VENT PLAN - AREA B
P111A FIRST FLOOR SANITARY AND VENT PLAN - AREA A
P111B FIRST FLOOR SANITARY AND VENT PLAN - AREA B
P112A SECOND FLOOR SANITARY AND VENT PLAN - AREA A
P112B SECOND FLOOR SANITARY AND VENT PLAN - AREA B
P113A THIRD FLOOR SANITARY AND VENT PLAN - AREA A
P113B THIRD FLOOR SANITARY AND VENT PLAN - AREA B
P114 ROOF SANITARY AND VENT PLAN
P210A BASEMENT LEVEL DOMESTIC WATER PLAN - AREA A
P210B BASEMENT FLOOR DOMETSIC WATER PLAN - AREA B
P211A FIRST FLOOR DOMESTIC WATER PLAN - AREA A
P211B FIRST FLOOR DOMESTIC WATER PLAN - AREA B
P212A SECOND FLOOR DOMESTIC WATER PLAN - AREA A
P212B SECOND FLOOR DOMESTIC WATER PLAN - AREA B
P213A THIRD FLOOR DOMESTIC WATER PLAN - AREA A
P213B THIRD FLOOR DOMESTIC WATER PLAN - AREA B
P500 PLUMBING DETAILS
P501 PLUMBING DETAILS
P600 PLUMBING SCHEDULES
P700 PLUMBING 3D VIEWS
P701 PLUMBING 3D VIEWS
P702 PLUMBING 3D VIEWS
P703 PLUMBING 3D VIEWS
P704 PLUMBING 3D VIEWS
P705 PLUMBING 3D VIEWS
P706 PLUMBING 3D VIEWS
P707 PLUMBING 3D VIEWS
NOT TO SCALEA6 SITE LOCATION
N
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL
SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY
LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
PRINTED OR TYPED NAME
SIGNATURE
MY LICENSE RENEWAL DATE IS JUNE 30,
DATE
ARCHITECT
LICENSE NUMBER
Cameron L. Manley
G000, G002, A-SERIES
06716
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Austin L. Hilton
G001, P-SERIES
23780
MECHANICAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Christopher R. Marvin
A4/A320, A6/A320, C6/A320
P27417
STRUCTURAL ENGINEER
07/07/2025
07/07/2025
07/07/2025
PHASE 2 WORK
PHASE 3 WORK
PHASE 1 WORK
PHASING LEGEND
BA D E
FC G
Io w a
I lli n o is
I n d ia n
D R
A W
N
A P
P R
O V
E D
IS
S
U E
D F
O R
D A
T E
F
IE
L D
B O
O K
P R
O J E
C T
N O
C L
IE
N T
N O
H
P ri n te d
W e s to w n P k w y S u it e
W e s t D e s M o in e s
IA
.2
.8 w w w
.s h iv e -h a tt e ry
.c o m
BA D E FC G H
Autodesk Revit 2019
A
B
KEYPLAN
NOT TO SCALE
IA
D
A S
P R
O J E
C T
.0
M P
C F
B L D
G
P
L U
M B
IN
G
R E
P L A
C E
M E
N T
E
W
A S
H
IN
G T
O N
S T
M O
U N
T P
L E
A S
A N
T
IA
G001
P H
A S
IN
G
P L A
N S
C O
N S
T R
U C
T
IO
N
F ie ld B o o k
R F
B -0
M S
J
B C
-0
-2
NORTH
1/32" = 1'-0"1
BASEMENT PHASING PLAN
48'
NORTH
1/32" = 1'-0"2
LEVEL 1 PHASING PLAN
48'
NORTH
1/32" = 1'-0"3
LEVEL 2 PHASING PLAN
48' 0
NORTH
1/32" = 1'-0"4
LEVEL 3 PHASING PLAN
48'
SYMBOLS
& AND
@ AT
# NUMBER or POUND
A
A/E ARCHITECT / ENGINEER
ACP ACOUSTICAL CEILING PANEL
ADA AMERICANS WITH DISABILITIES ACT
ADAAG AMERICANS WITH DISABILITIES ACT
ACCESSIBILITY GUIDELINES
ADD ADDENDUM
ADJ ADJUSTABLE or ADJACENT
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AL or ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATE (LY)
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AUTO AUTOMATIC (DOOR OPERATOR)
AVE AVENUE
AVG AVERAGE
B
B/O BOTTOM OF
BLDG BUILDING
BLVD BOULEVARD
BRG BEARING
C
CCTV CLOSED CIRCUIT TELEVISION
CG CORNER GUARD
CFCI CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CJ CONSTRUCTION/CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR (ANCE)
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONST CONSTRUCTION
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTRL CONTROL
CF CUBIC FEET
CW COLD WATER
D
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION/ DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DISP DISPENSER
DIV DIVISION
DN DOWN
DTL DETAIL
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWGS DRAWINGS
E
EA EACH
EF EPOXY FLOORING or EXHAUST FAN
EJ EXPANSION JOINT
ELEC ELECTRIC / ELECTRICAL
ELEV ELEVATION
EL ELEVATOR
ENGR ENGINEER
EP EPOXY PAINT
EPXY EPOXY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
F FDN or FNDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISH (ED) FLOOR ELEVATION
FHC FIRE HOSE CABINET
FL FLOOR
FLR FLOOR (ING)
FM FM GLOBAL
FRP FIBERGLASS REINFORCED PANEL
FT FOOT (FEET)
FTG FOOTING
FURN FURNITURE
G GA GAGE or GAUGE
GAL GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GWB GYPSUM WALLBOARD
H
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION, AIR CONDITIONING
HW HOT WATER
I
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
ID IDENTIFICATION or INSIDE DIAMETER
IN INCHES
INCL INCLUDE
INFO INFORMATION
J
JAN JANITOR
JC JANITOR'S CLOSET
JST JOIST (S)
JT JOINT
ABBREVIATIONS
K
KO KNOCKOUT
L
LAV LAVATORY
LF LINEAR FOOT
LH LEFT HAND
LHR LEFT HAND REVERSE
LLV LONG LEG VERTICAL
LVL LAMINATED VENEER LUMBER
LVT LUXURY VINYL TILE
M
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFRG MANUFACTURING
MFR MANUFACTURER
MIC MICROPHONE
MIN MINIMUM or MINUTE
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
N
N/A NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NIC NOT IN CONTRACT
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS
ASSOCIATION
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OPP OPPOSITE
OHD OVERHEAD DOOR
P
P PAINT
PERP PERPENDICULAR
PKWY PARKWAY
PL PLATE or PLASTIC LAMINATE
PLAM PLASTIC LAMINATE
PLWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PREP PREPARE (ATION)
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
R R RAD or RADIUS
RCI ROOF CONSULTANTS INSTITUTE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
RESIL RESILIENT
RF RADIO FREQUENCY
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RM ROOM
RO ROUGH OPENING
VTR VENT THROUGH ROOF
S
SAN SANITARY
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT
SHT SHEET REFERRING TO PAGES
SIM SIMILAR
SH SHIVE-HATTERY
SOG SLAB ON GRADE
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SQ IN SQUARE INCH
SS SOLID SURFACE or STAINLESS STEEL ST STREET or STONE
STAG STAGGERED
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STRUC STRUCTURE (AL)
SYM SYMMETRICAL
T
T/O TOP OF
T&G TONGUE AND GROOVE
TAN TANGENT
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPORARY
THRU THROUGH
TV TELEVISION
TYP TYPICAL
U
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
V
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VT VINYL TILE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WIDTH
W/ WITH
W/O WITHOUT
WC WATER CLOSET or WALL COVERING WT WALL TILE or WEIGHT
WTR WATER
1. COLOR HAS BEEN USED ON THESE DRAWINGS TO ENHANCE
UNDERSTANDING. PRINTING IN COLOR IS RECOMMENDED TO
ENSURE CLARITY.
2. ANY DAMAGE TO AREAS INSIDE OR OUTSIDE OF THE PROJECT
AREA SHALL BE REPAIRED TO THE STATUS PRIOR TO
CONSTRUCTION AT NO COST TO OWNER.
3. THE PRIME CONTRACTOR SHALL BE ULTIMATELY RESPONSIBLE
FOR ALL CUTTING, SUPPORTING, AND PATCHING IF NOT
COVERED BY A SPECIFIC TRADE.
4. PROVIDE FOR PROTECTION OF ANY ROOF SURFACES USED
DURING CONSTRUCTION. PROTECTION IS REQUIRED OVER
FULL EXTENT OF THE WORK AREAS. MINIMUM PROTECTION
CONSISTS OF 1/2” PLYWOOD OVER 1” EPS INSULATION.
5. EACH TRADE SHALL PROVIDE TESTED FIRESTOPPING
ASSEMBLIES FOR PENETRATIONS OF THEIR WORK THROUGH
FIRE-RATED WALLS AND FLOOR/CEILING
ASSEMBLIES. FIRESTOPPING ASSEMBLIES ARE TO BE OF
DESIGNS THAT PROVIDE THE SCHEDULED FIRE RATINGS WHEN
TESTED IN ACCORDANCE WITH ASTM E119, ASTM E814, OR UL
1479, AND ARE TO BE INSTALLED BY INDIVIDUALS TRAINED AND
EXPERIENCED WITH INSTALLATION OF SUCH ASSEMBLIES.
PROVIDE SUBMITTALS TO LOCAL AUTHORITIES AS REQUESTED
6. IF COMPLIANCE WITH TWO OR MORE STANDARDS IS SPECIFIED
AND THE STANDARDS ESTABLISH DIFFERENT OR CONFLICTING
REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY
LEVELS, COMPLY WITH THE MOST STRINGENT
REQUIREMENT. REFER UNCERTAINTIES AND REQUIREMENTS
THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO
ARCHITECT FOR A DECISION BEFORE PROCEEDING.
7. ABATEMENT WORK WILL BE UNDER SEPARATE CONTRACT.
OBTAIN AND MAINTAIN ON SITE A COMPLETE SET OF
ABATEMENT DOCUMENTS, INCLUDING ADDENDA AND CHANGES
AFTER START OF CONSTRUCTION, FOR REFERENCE AND
COORDINATION BY ALL TRADES. COORDINATE ALL DEMOLITION
AND CONSTRUCTION WORK WITH THE ABATEMENT
CONTRACTOR.
8. THE INDICATION OF TYPE AND LOCATION OF EXISTING
CONDITIONS AND MATERIALS IN THE DRAWINGS IS NOT
INTENDED AS EXACT DOCUMENTATION OF IN-PLACE
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING EXISTING CONDITIONS BEFORE SUBMISSION OF
BIDS. EXISTING CONDITIONS VARYING FROM THOSE SHOWN IN
THE DRAWINGS WILL NOT BE JUSTIFICATION FOR ADDITIONAL
ALLOWANCE TO THE CONTRACTOR. NOTIFY THE ARCHITECT
IMMEDIATELY IF ANY CONDITIONS CONFLICT WITH THE
DRAWINGS.
9. PROTECT ALL BUILDING SYSTEMS, NEW AND EXISTING. COVER
SUPPLY, RETURN, AND EXHAUST AIR GRILLES, AND PROTECT
OTHER SENSITIVE EQUIPMENT FROM ALL ACTIVITIES RELATED
TO THIS CONTRACT. REMOVE PROTECTION AT END OF
CONSTRUCTION.
10. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH
OTHER EVEN IF NOT SPECIFICALLY IDENTIFIED IN THE
CONTRACT DOCUMENTS.
11. ALL CODE-REQUIRED LABELS SUCH AS "UL", “FACTORY
MUTUAL”, OR ANY EQUIPMENT IDENTIFICATION, PERFORMANCE
RATING, NAME, OR NOMENCLATURE PLATES SHALL REMAIN
READABLE AND NOT PAINTED OR COVERED BY OTHER
CONSTRUCTION.
12. STRUCTURAL INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY.
13. ARCHITECTURAL DIMENSIONS AND DESIGN INTENT ARE
INDICATED ON ARCHITECTURAL DRAWINGS. IF THE
INSTALLATION OF EQUIPMENT FROM OTHER TRADES
INTERFERES WITH COMPLIANCE OF THE DESIGN INTENT,
NOTIFY THE ARCHITECT BEFORE PROCEEDING.
14. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN LOCATION
OF BUILDING ELEMENTS. IF DIMENSIONS ARE NOT AVAILABLE,
CONTACT THE ARCHITECT.
15. WHEN DIMENSIONS ON SMALL SCALE DRAWINGS CONFLICT
WITH THOSE ON LARGE SCALE DRAWINGS, THE LARGE SCALE
DRAWINGS GOVERN.
PROJECT GENERAL INFORMATION
VIEW NUMBER
GENERAL SYMBOLS LEGEND
A1 VIEW NAME
100'-0"
12" = 1'-0" 12"
VIEW SCALE
NORTH ARROW
VIEW NUMBER
SHEET NUMBER
BUILDING SECTION MARK
VIEW NUMBER
SHEET NUMBER
WALL SECTION MARK
VIEW NUMBER
SHEET NUMBER
DETAIL SECTION MARK
VIEW NUMBER
SHEET NUMBER
EXTERIOR ELEVATION MARK
VIEW NUMBER
SHEET NUMBER
INTERIOR ELEVATION MARK
ENLARGED DETAIL MARK
VIEW NUMBER
SHEET NUMBER
KEYNOTE VALUEA00
REVISION NUMBER
REVISION TYPE
EXISTING GRID ID MARK
NEW GRID ID MARK
IDENTIFIED LEVEL NAME
ELEVATION MARK
SPOT ELEVATION MARK
ROOM NAME
101 ROOM NUMBER
A4/A104
VIEW NUMBER / SHEET NUMBER OF
CONTINUING VIEW
MATCHLINE
A1 A101
A1 A101
A1 A101
A1 A101
A1 A101
A1
A1A1
A1
A100
A1 A101
RFI
FIRST FLOOR
100'-0"
N
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
G002
PR
O
JE
C
T G
EN
ER
AL
IN
FO
R
M
AT
IO
N
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF
DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
FW026-2
FW004
FW025-2
FW001
FW028
FW031
FW030
FW016 FW010
FW004
FW002-2
FW003
FW009AA
FW008
FW007
FW009
FC003 FC006
FC005
FC002
AFC001
FW013
FW014
B
FW104ABFW104ACFW104ADFW104AE
FW104AA
FW104AGFW104AF
FW104BB
FW026-1
FW025-1
FW107
J
FW106
FW103
FC116 FC117
FC305
FC127
FC123
FC106-1
FC120
FC122 FC121
FC118
FC101-1
FC103
FC107 FC106
FN117
FC105
FN109 FN111
G
FN107
FN105
FN104-1
FN103
FN116
FN115
FN114
FN113
FN112
FN120
FN100
FN126
FC128
S126
S127
S125
FN131FN132
B
S122-1
S121
S114
S113
S112
S111
S106
S105
S103 S102
S101
S107
S108
S109
S116
S117
S118
S120 S119
S123 S124
FR101
FR102
FR106 FR107
FR104
FR105 FR109
FR110
FR100
S104
FC119
FN108
FN106-1
HATCH LEGEND
PHASE 1
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 2
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 3
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD01
O
VE
R
AL
D
EM
O
LI
TI
O
N
PL
AN
S
BA
SE
M
EN
T
AN
D
FI
R
ST
F
LO
O
R
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
N
01/16" = 1'-0"A6 BASEMENT - DEMOLITION PLAN
24'
N
01/16" = 1'-0"D6 FIRST FLOOR - DEMOLITION PLAN
24'
B
FW204
FW206
FW207FW208FW209-1FW210FW211
FW104AC-2
FW227FW228FW229FW230FW231FW232
FW218
FW221
FW222FW223FW224FW225
FW213
FW214FW215FW216
FW217
FW212
FW205-1
FW203
FW201
FC306-2
FC204
FC101-2
FN233
FC201
FN232FN230
FN214
FN215
FN216
FN217
FN218
FN219
FN220 FN221
H
FN222
FN223
FN224
FN225
FN226
FN227FN228
FN201
FN202
FN203
FN204
FN205
FN206
FN208
FN209
FN210
FN211
FN212
FN213
S227 S228
S214
S215
S217
S218
S219
S220
S221
S222
S223
S225
S226
S122-2
S200
S201
S202
S203
S204
S205
S206
S207
S208
S209
S210
S211 S212
S213
FW321FW322FW323FW324FW325FW326
FW334
FW328FW329FW330FW331FW332FW333
FW304
FW305
FW306
S
FW308
FW309
FW310
FW311FW312
FW315
FW316
FW317FW318FW319FW320
FW209-2
R
FW314
FW313
FW305-2
FW301
FW303
FC303
Q
FN335
FC301
FC302
S327 S328
FN330
FN332
FN333
FN334
O
FN321
FN322
FN323
FN324
FN325
FN326
FN327
FN328
FN329
FN301
FN302
FN303
FN304
FN305
FN306
FN307
FN308
FN309
FN310
FN311
FN312
FN313FN314
FN315
FN316
FN317
FN318
FN319
S300
S301
S302
S303
S304
S305
S306
S307
S308
S309
S310
S311
S312
S313
S314
S315
S317
S318
S319
S320
S321
S322
S323
L
S325
S326
1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF
DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD02
O
VE
R
AL
L D
EM
O
LI
TI
O N
PL
AN
S -S
EC
O
N D
AN
D
T H
IR
D
FL
O
O R
S
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
N
01/16" = 1'-0"A6 SECOND FLOOR - DEMOLITION PLAN
24'
N
01/16" = 1'-0"D6 THIRD FLOOR - DEMOLITION PLAN
ELEVATOR
B
COMPRESSOR ROOM-2
FW026-2
WALK IN COOLER
FW004
WALK IN COOLER-2
FW025-2
DINING HALL
FW001
STORAGE
FW028
Room
FW031 -
FOOD STORAGE
FW030
KITCHEN OFFICE
FW016
DIETARY STORAGE
FW010
LAUNDRY
FW004
BOILER ROOM-2
FW002-2
STORAGE
FW003
MEN'S RESTROOM
FW009AA
RESTROOM
FW008
ELECTRICIAL STORAGE
FW007
TELEPHONE ROOM
FW009
TUNNEL
ENTRANCE
FC003
WATER SERVICE
FC006
LAUNDRY SORTING
FC005
STORAGE
FC002
ELEVATOR
A
CORRIDOR
FC001
WALK IN FREEZER
FW013
A02.03
A02.03
A02.03
A02.03
A02.03
A02.03
A02.03
A02.03
A02.03
A02.03
A02.03
A01.08
A01.03
A02.03
A02.03
A02.03
A02.03
A02.03
A01.08
A01.08
A01.02
A01.08
A01.02 A01.02A01.02 A01.02A01.02A01.02
A01.02
A01.02A01.02 A01.02 A01.02
A01.02
A01.02
1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF
DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
HATCH LEGEND
PHASE 1
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 2
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 3
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
A
B
KEYPLAN
NOT TO SCALE
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD03
BA
SE
M
EN
T D
EM
O
LI
TI
O N
PL
AN
AR
EA
A
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
N
01/8" = 1'-0"A6 BASEMENT - DEMOLITION PLAN - AREA A
12'
KEYNOTES
KEY NOTE
A01.02 BRACE BASEMENT FOUNDATION WALLS. PROVIDE
SHORING PLAN FOR EOR REVIEW PRIOR TO
CONSTRUCTION.
A01.03 LOCATION OF FIRST FLOOR SLAB REMOVAL ABOVE
A01.08 TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR
TO SLAB REMOVAL. PROVIDE SHORING PLAN FOR EOR
REVIEW PRIOR TO CONSTRUCTION.
A02.03 EXISTING WALLS AND DOORS TO REMAIN
1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF
DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
ELEVATOR
B
DINING HALL
FW001
STORAGE
FW028
Room
FW031 -
FOOD STORAGE
FW030
KITCHEN OFFICE
FW016
DIETARY STORAGE
FW010
MEN'S RESTROOM
FW009AA
RESTROOM
FW008
ELECTRICIAL STORAGE
FW007
TELEPHONE ROOM
FW009
TUNNEL
ENTRANCE
FC003
WATER SERVICE
FC006
WALK IN FREEZER
FW013
EQUIPMENT ROOM
FW014
A01.03
A01.08
A02.03
A02.03 A02.03A02.03
A01.08
A01.08
HATCH LEGEND
PHASE 1
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 2
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 3
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
A
B
KEYPLAN
NOT TO SCALE
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD04
BA
SE
M
EN
T D
EM
O
LI
TI
O N
PL
AN
AR
EA
B
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
KEYNOTES
KEY NOTE
A01.03 LOCATION OF FIRST FLOOR SLAB REMOVAL ABOVE
A01.08 TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR
TO SLAB REMOVAL. PROVIDE SHORING PLAN FOR EOR
REVIEW PRIOR TO CONSTRUCTION.
A02.03 EXISTING WALLS AND DOORS TO REMAIN
N
01/8" = 1'-0"A6 BASEMENT DEMOLITION PLAN - AREA B
12'
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
OFFICE
FW104AB
OFFICE-1
FW104AC
OFFICE
FW104AD
OFFICE
FW104AE
WAITING AREA
FW104AA
OFFICE
FW104AG
MEDICAL RECORDS
FW104AF
FW104BB
COMPRESSOR ROOM-1
FW026-1
WALK IN COOLER-1
FW025-1
HEATING & A/C UNITS
FW107
FREIGHT ELEV.
J
LOADING DOCK
FW106
LOADING DOCK
FW103
NURSING
SUPERVISOR
FC116
DEPT. OFFICE
FC117
MWU STORAGE
FC305
RESTROOM
FC127
RESTROOM
FC123
PIPE CHASE-1
FC106-1
NURSING SERVICES
FC120
CLOSET
FC122
RR
FC121
EXAM OFFICE
FC118
ICN ROOM-1
FC101-1
CLINICAL DIRECTORS
OFFICE
FC103
RESTROOM
FC107 RESTROOM
FC106
CORRIDOR
FN117
JC
FC105
MEN'S BATHROOM
FN109
RESTROOM
FN111
RR
G
BREAK ROOM
FN107
OFFICE
FN105
OFFICE
FN104-1
OFFICE
FN103
MAIL ROOM
FN116
CLOSET
FN115
OFFICE
FN114
OFFICE
FN113
KITCHEN
FN112
LIBRARIAN OFFICE
FN120
MHI LIBRARY
FN100
PROFESSIONAL
LIBRARY
FN126
STORAGE
FC128
EQUIPMENT ROOM
S126
RESTROOM
S127
CONTROL ROOM
S125
FN131 FN132
ELEVATOR
B
CHEMICAL
STORAGE
FC119
STORAGE
FN108
BREAK ROOM-1
FN106-1
AD.08
A210
A2
3' -6
A02.03A01.08
A210G2
HATCH LEGEND
PHASE 1
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 2
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 3
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
A
B
KEYPLAN
NOT TO SCALE
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD05
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
PL
AN
AR
EA
A
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
KEYNOTES
KEY NOTE
A01.08 TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR
TO SLAB REMOVAL. PROVIDE SHORING PLAN FOR EOR
REVIEW PRIOR TO CONSTRUCTION.
A02.03 EXISTING WALLS AND DOORS TO REMAIN
AD.08 REMOVE CASEWORK
N
01/8" = 1'-0"A6 FIRST FLOOR - DEMOLITION PLAN - AREA A
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
OFFICE
FW104AG
MEDICAL RECORDS
FW104AF
LOADING DOCK
FW106
LOADING DOCK
FW103
NURSING
SUPERVISOR
FC116 DEPT. OFFICE
FC117
MWU STORAGE
FC305
STORAGE
FC128
EQUIPMENT ROOM
S126
CONTROL ROOM
S125
FN131 FN132
ROOM
S122-1
RESTROOM
S121
PASSTHROUGH
RESTROOM
S114
OFFICER BREAK RM
S113
COUNSELOR OFFICE
S112
RECORDS
S111
EXAM ROOM
S106
HEALTH SERVICES
S105
RESTROOM
S103
PILL LINE
S102
PSYCHOLOGIST OFFICE
S101
SCHOOL
S107
LIBRARY
S108
Room S109
PIPE CHASE
S116
TREATMENT MANAGER
S117
SHIFT SUPERVISOR
S118
RESTROOM
S120
WAITING AREA
S119
CORRIDOR
S123
VESTIBULE
S124
GYMNASIUM
FR101
CHILLER CONTROL
ROOM (MECHANICAL
ROOM)
FR102
WOMEN'S
FR106
MEN'S
FR107
STORAGE ROOM
FR104
REC DEPT OFFICE
FR105
VENDING AREA
FR109
GAME ROOM
FR110
CORRIDOR
FR100
CLOSET
S104
A210
C2
AD.09
A02.03
A210C4
A210E4
A210
A4
HATCH LEGEND
PHASE 1
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 2
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
PHASE 3
CONCRETE REMOVAL AND REPLACEMENT
TILE REMOVAL AND REPLACEMENT
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
A
B
KEYPLAN
NOT TO SCALE
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD06
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
PL
AN
AR
EA
B
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
KEYNOTES
KEY NOTE
A02.03 EXISTING WALLS AND DOORS TO REMAIN
AD.09 REMOVE CASEWORK, SALVAGE FOR REINSTALLATION
N
01/8" = 1'-0"6A FIRST FLOOR DEMOLITION PLAN - AREA B
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR
DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES
ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,
ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE
SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.
8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING
REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.
9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN
GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS
NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING
CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD
VERIFICATION AND COORDINATION WITH THE ARCHITECT
PRIOR TO COMMENCING WITH STATED WORK.
10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY
DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND
FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR
REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,
MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO
LIKE NEW CONDITION.
11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,
INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,
MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER
AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.
DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND
APPROVAL.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE
WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.
13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE
PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM
AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS
REQUIRED PER THE BUILDING.
14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR
DEMOLITION AND PATCHING REQUIRED OF EXISTING
MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.
MATCH EXISTING FINISHES.
15. IN PROJECT WORK AREAS ALL NEW AND EXISTING
PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING
DECKS SHALL BE THE RESPONSIBILITY OF THE
ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL
AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH
RATING REQUIREMENT OF AREA BEING PENETRATED.
16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS
FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR
FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.
17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB
REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR
TO CONSTRUCTION.
ARCHITECTURAL DEMOLITION NOTES
EXISTING WALL PARTITIONS
DEMOLITION PLAN SYMBOLS LEGEND
TEMPORARY WALL PARTITIONS
DEMOLISHED WALL PARTITIONS
EXISTING DOOR
DEMOLISHED DOOR
ELEVATOR
B
TUB ROOM
FW204
RESTROOM
FW206
FW207
OFFICE
FW208
UNIT
BEDROOM
FW209-1
UNIT
BEDROOM
FW210
UNIT BEDROOM
FW211
OFFICE-2
FW104AC-2
UNIT BEDROOM
FW227
UNIT BEDROOM
FW228
UNIT BEDROOM
FW229
UNIT BEDROOM
FW230
UNIT BEDROOM
FW231
UNIT BEDROOM
FW232
STAFF RESTROOM
FW218
NURSES STATION
FW221UNIT BEDROOM
FW222
UNIT BEDROOM
FW223
UNIT BEDROOM
FW224
UNIT BEDROOM
FW225
JC
FW213
STORAGE
FW214
UNIT
BEDROOM
FW215
UNIT
BEDROOM
FW216
LAUNDRY UTILITY
ROOM
FW217FW212
SHOWER ROOM-1
FW205-1
RESTROOM
FW203
KITCHEN
FW201
PIPE CHASE-2
FC306-2
STORAGE
FC204
ICN ROOM-2
FC101-2
EMPLOYEE LOCKER
AREA & STORAGE
FN233
NURSING SERVICE
FC201
DAY ROM
FN232
KITCHEN AREA
FN230
OFFICE & MEDICINE
FN214
STAFF RR
FN215
SECLUSION ROOM
FN216
SECLUSION ROOM
FN217
TREATMENT ROOM
FN218
UNIT BEDROOM
FN219
BATHROOM
FN220 TUB ROOM
FN221
CHASE
H
BATHROOM
FN222
JC
FN223
PATIENT STORAGE
LAUNDRY
FN224
CONFERENCE ROOM
FN225
CONFERENCE ROOM
FN226
LAUNDRY ROOM
FN227
FN228
STORAGE
FN201
UNIT BEDROOM
FN202
UNIT BEDROOM
FN203
UNIT BEDROOM
FN204
UNIT BEDROOM
FN205
UNIT BEDROOM
FN206
UNIT BEDROOM
FN208
UNIT BEDROOM
FN209
UNIT BEDROOM
FN210
UNIT BEDROOM
FN211
UNIT BEDROOM
FN212
UNIT BEDROOM
FN213
DAYROOM
S2272 SOUTH KITCHEN REC
ROOM
S228
AD.10
A210
G4
A02.01
A211
A2
AD.03
AD.03
AD.12
AD.13
AD.09
4'-0"
AD.16
AD.01
A210
A6
A210
C6
A210 E6
G6
ELEVATOR
A
A211C2
BA D E
FC G
Io w a
Il lin oi s
In di
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
H
Pr in
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, IA
5.
3.
w w w
.s hi ve -h at te ry .c om
BA D E FC G H
Autodesk Revit 2019
A
B
KEYPLAN
NOT TO SCALE
IA
D
AS
P
R O
JE
C
T #9
2.
M
PC
F
BL
D G
PL
U
M
BI
N G
R
EP
LA
C
EM
EN
T
Io w a D ep ar tm en t o f A dm in is tra tiv e
Se rv ic es
E W as hi ng to n St
, M t P le as an t, IA
AD07
SE
C
O N
D F
LO
O
R D
EM
O
LI
TI
O N
PL
AN
AR
EA
A
C O
N
ST
R U
C
TI
O N
Fi el d Bo ok
R
FB
#9
0-
C
LM
R C
B
-0
2-
KEYNOTES
KEY NOTE
A02.01 EXISTING CASEWORK TO REMAIN
AD.01 REMOVE TUB, PATCH AND PREPARE FLOOR BENEATH
TUB FOR NEW WORK
AD.03 REMOVE CASEWORK AND SINK, PATCH AND PREPARE
WALL AND FLOOR FOR NEW WORK
AD.09 REMOVE CASEWORK, SALVAGE FOR REINSTALLATION
AD.10 REMOVE RAISED FLOOR
AD.12 REMOVE SINK, PATCH AND PREPARE WALL FOR NEW
WORK
AD.13 REMOVE ACCESS PANEL, SALVAGE FOR
REINSTALLATION
AD.16 REMOVE WALL AS INDICATED ON PLAN UP TO 7'-0"
N
01/8" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN - AREA A
DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS
AND FIELD CONDITIONS ENCOUNTERED.
2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION
MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING
CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND
CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON
PHOTOGRAPHIC DOCUMENTATION.
3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF
EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION
FROM THE OWNER.
4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND
EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START
OF CONSTRUCTION UNLESS NOTED OTHERWISE.
6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT
PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE
COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT
WEATHER IS POSSIBLE.
7. REMOVE FLOOR MATERIALS TO THE EXTENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .