This is a Request for Bids (RFB No. 36-2025) issued by the City of Boulder's Open Space and Mountain Parks (OSMP) Department for the 2025 Trailhead Improvement Projects. The solicitation seeks a contractor to perform various trailhead improvements across multiple locations, including parking lot grading and layout, outhouse installation and demolition, fence work, and gate installations. The RFB was issued on June 30, 2025, with bids due on July 30, 2025, at 4:00 PM Mountain Time. A mandatory pre-bid meeting is scheduled for July 15, 2025, at Flatirons Vista Trailhead. Bids must be electronically submitted through the Rocky Mountain E-Purchasing System (Bidnet), and the project is expected to have a substantial completion date of August 5, 2025, with a final contractor selection date of August 7, 2025.
The contract will be awarded to the lowest responsible bidder, with evaluation based on initial cost, life-cycle cost, maintenance expenses, and energy efficiency. Bidders must submit various documents, including a bid proposal, bid bond (5% of total bid), contractor qualification form, and certificates of good standing. The City has specific requirements for bidder responsibility, including financial stability, technical expertise, ability to complete the contract, and previous performance. Preference will be given to labor, materials, and services produced in Colorado. The project aims to promote social equity, encourage participation from underserved business communities, and ensure compliance with Davis-Bacon wage standards and equal opportunity employment practices.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 2025 Trailheads bid tab.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Boulder, CO RFB No.36-2025
CITY OF BOULDER, COLORADO
Finance Department / Purchasing Division
1136 Alpine P.O. Box 791 Boulder, Colorado 80306 Telephone: 303-413-7429 Email: mccreeryc@bouldercolorado.gov
REQUEST FOR BIDS
RFB NO. 36-2025
2025 OSMP Trailhead Improvement Projects
ISSUE DATE: 06/30/2025
DUE DATE: 4:00 PM, July 30, 2025
Bids to be electronically saved to the Bidnet website PRIOR TO Proposal Due Date and Time above.
CONTACT:
Nick Devonald
Trailheads Program Manager 720-582-8326
Devon1@bouldercolorado.gov mailto:mccreeryc@bouldercolorado.gov CARISSA McCREERY Sticky Note @devon1@bouldercolorado.gov How does this look? The excel bid sheet will be uploaded as its own attachment
2025 OSMP Trailhead Improvement Projects
The City of Boulder (“City”), by and through its Open Space and Mountain Parks Department, is seeking a contractor to make a variety of improvements to multiple trailheds. Work includes parking lot grading and layout, outhouse installation and demo, fence work, and gate installations.
Bidnet – Required. Solicitation documents will be issued electronically only. A copy of this Request for Bids (RFB) must be obtained only from the Rocky Mountain E-Purchasing System (Bidnet) at:
www.bidnetdirect.com/colorado. Any modifications to this RFB or addenda pertaining to this RFB will be published to the above-mentioned website, and all bidders are responsible to periodically check the website for relevant updates prior to the submittal of a proposal.
Response to RFB. The City will only accept electronic submissions saved to the Bidnet website in response to this RFB. Electronic submissions are required to be considered for an award. To submit your RFB, please visit . Please authorize receiving notices through Bidnet relating to this procurement.
Deadline. The submission deadline is 07/30/2025, at 4:00 p.m. Mountain Time. This deadline is mandatory.
You must save your submission to the Bidnet website before the deadline. Failure to do so may result in an inability to submit a response that is automatically implemented in the software. Except as set forth herein, no exceptions will be allowed. The City specifically reserves the right to reject late submissions.
Technical Submission Issues. In extraordinary circumstances, the City may permit late submissions if the
City, in its sole discretion, determines the bidder has shown good cause due to technical issues. If you experience problems submitting your electronic response, please contact the Bidnet Direct technical support team (800-835-4603) prior to the submission deadline and document the technical errors and your efforts to resolve the same before the submission deadline. Bidders are encouraged to document that their Bidnet submission was saved in case technical issues arise or are later discovered. Your documentation may include e-mailing your submission to mccreeryc@bouldercolorado.gov provided such submission is emailed by the deadline or immediately upon discovery of the issue. An emailed submission does not substitute the requirement for an electronic submission using Bidnet. By this paragraph, the City does not guarantee it will accept submissions that experience technical issues.
Costs. Proposals shall be prepared at the bidder’s sole expense.
Public Record. Bid submissions are public records and subject disclosure under the Colorado Open Records Act (CORA).
Confidential Data. All submitted materials are presumed to be public records. However, confidential data, if unambiguously identified as such, will be held confidential upon request if: (1) it is clearly and unambiguously identified, (2) the request is made as part of the bid, and (3) if the City Attorney’s Office determines the data meets the requirements of the CORA. The City’s Access to Public Records Policy, which includes policies about release of solicitation records, can be found on the City’s Central Records web page under the heading Additional Resources.
Preference. Preference is given to labor, materials, supplies, or provisions produced, manufactured, or grown in the state of Colorado, quality and price being equal to articles or services offered by competitors
CITY OF BOULDER
NOTICE OF REQUEST FOR BIDS
RFB NO. 36-2025
http://www.bidnetdirect.com/colorado mailto:mccreeryc@bouldercolorado.gov https://bouldercolorado.gov/services/central-records outside of Colorado.
Digital Accessibility. If the work or services described herein include information technology or digital content that must be made “accessible,” the successful bidder must agree, if requested by the City, to undertake such reasonable efforts that may be needed of the successful bidder to adapt and convert work product to ensure it is accessible within the meaning of §§ 24-85-101, et seq., C.R.S., and its implementing regulations. For contracts which the provision of information technology comprises a primary or material component of the service (such as software and web services) the City anticipates requiring that the successful bidder agrees to ensure legal compliance, subject to limited exceptions.
Socially Responsible Procurement. The City is committed to socially responsible procurement and promoting social equity through its contracts. The City works to ensure open and fair procurements, competitive and fair pricing, environmentally sustainable solutions, and encourage members of the underserved business community to participate in our competitive solicitations.
Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin (Davis Bacon Wages). If the bidder anticipates hiring employees to work on this job, the bidder should contact the local manpower office for qualified candidates.
Equal Opportunity. The City does not discriminate on the grounds of race, creed, ancestry, religion, religious expression, color, sexual orientation, gender identity, gender expression, genetic characteristics, marital status, age, sex, mental or physical disability, or national origin in consideration of an award.
Disadvantaged business enterprises are afforded a full opportunity to submit proposals.
City’s Reserved Rights. For avoidance of doubt, the City reserves the following rights:
• Right to Supplement or Modify. At any time prior to award, the City reserves the right to supplement or modify its solicitation with additional or different information, questions, contract language, or any other materials the City deems prudent to include in the supplementation or modification. Such supplementation or modification includes the right to modify the bid schedule at any time.
Supplementation or modification will likely occur through Bidnet but may occur by email contact to bidders if the deadline has passed.
• Right to Reject. The City reserves the right to reject any bid that fails to meet the requirements described herein, the requirements or criteria in the City’s Purchasing Ordinance, or in the City’s Purchasing Policy Manual, as such ordinance or policy manual may be amended from time to time, or any other pertinent standard or criteria established by City. The City reserves the right to require new bids or reject any bid if the City believes it would not be in the best interest of the project or services set forth in this RFB to make an award to a given bidder. This right to reject includes the right to reject any bidder who appears on one or more lists designating the bidder as a debarred or suspended entity or individual for other public procurements.
• Right to Waive Irregularities. The City may waive, or decline to waive, any informality or irregularity contained in any bid.
https://library.municode.com/co/boulder/codes/municipal_code?nodeId=TIT2GOOR_CH8PUPR
• Right to Revoke or Cancel Award. At any time prior to the successful bidder and the City entering into a written and signed contract, the City reserves the right to revoke or cancel the award. If, for any reason, the City and a successful bidder are unable to come to terms of agreement, the City may, in its sole discretion, either award to the next highest scoring bidder or cancel this solicitation.
• Right to Negotiate Changes in Scope or Services. The City may negotiate changes to the services or work offered by the successful bidder as part of the final contracting process.
• Right to Make Partial Award. The City may award the contract by sections or in portions and reserves the right to adopt all or part of a bid.
Verbal Communications. Any verbal communications bidders may receive about this solicitation are non-binding upon the City. Vendors should rely only upon written statements issued by the authorized City representatives listed in the Instructions to Bidders and Bid Schedule section of this RFB or a member of the City’s Purchasing Division.
Unauthorized Contacts. A bidder’s unauthorized contacts with City staff about this solicitation may result in disqualification of the bidder.
Contract Terms. All awards are subject to the awarded bidder and the City successfully negotiating and entering into a written and signed contract in a form approved by the City Attorney’s Office. The City’s award to a successful bidder does not constitute consent by the City to (1) any revised terms or conditions contained in exceptions, or (2) any terms or conditions contained in the bid of the successful bidder.
In some instances, contract terms are resolved by appending this solicitation and the successful bid to the contract template attached hereto. This is common for the City’s construction and public works contracts.
However, most contracts necessitate development of a scope of work that further refines and clarifies the services. Bid language may merit modification to contract terms, even where a bidder has not made exceptions. While the City’s position is that, generally, failure to make exceptions results in a waiver of the ability to later claim those exceptions, the City reserves the right to modify the contract as the City and the successful bidder deem appropriate.
In the event of any conflict between this RFB and the contract entered into by and between the City and the successful bidder, the terms and conditions of the contract shall control.
Bidder’s Right to Withdraw. In the event the selected bidder and the City are unable to come to an agreement on final terms for the contract, and provided such inability is due to either (1) the bidder’s exceptions or the City’s required changes in response thereto, or (2) the City’s required revisions to the version of the contract posted with this solicitation (as modified by an addendum), the selected bidder shall have the right to withdraw its bid without penalty or loss of any bid bond required by this solicitation.
Waiver. All bidders agree that damage or claim shall not be brought by any bidder because of rejections, and the bidders shall not seek any recourse of any kind against the City because of such rejections. The filing of any bid in response to this RFB shall constitute a binding agreement of the bidder to these
Federal, State, or Other Third-Party Approval. Bidders should be aware that some awards may require approval (or non-objection) by one or more third parties. Common examples of this include projects that use state or federal funding and for which, accordingly, state or federal agencies must approve the award (e.g., CDOT approval required for certain transportation projects). The City specifically reserves the right to revoke awards if a state, federal, or other entity providing financing or with oversight rights/responsibilities will not approve of or object to the award, or if the selected bidder is not otherwise fully authorized to perform the services under such state, federal, or third-party entity.
Dated this 6/30/2025
City of Boulder, Colorado A Municipal Corporation
INSTRUCTIONS FOR BIDDERS AND BID SCHEDULE
1. Bidders responding to this RFB must submit their bids as specified in this solicitation.
2. One electronic copy of the bid must be submitted online through the Rocky Mountain E-Purchasing System (www.bidnetdirect.com/colorado) and must be addressed to the Project Manager listed below. Bidders are strongly encouraged to familiarize themselves with the Bidnet website in advance of the proposal deadline.
3. Bids must be dated and signed by a duly authorized partner or corporate officer, with that person’s name and title clearly identified. All bid terms, conditions, contents, fees, and charges shall be guaranteed by the bidder for a minimum of forty-five (45) days from the submission deadline. The City may, in its sole discretion, release any bid and return the bid bond prior to the end of such guarantee period.
4. Bidders who have questions concerning the scope of work or services or other requirements set forth in this RFB shall contact the following City representative:
Project Manager Name: Nick Devonald Title: Trailheads Program Manager City of Boulder Department: Open Space and Mountain Parks Phone: 262-719-5843 Email: devon1@bouldercolorado.gov
5. The above referenced individual is the only representative of the City with authority to provide any information, clarification, or interpretation regarding the plans, specifications, and any other contract documents or requirements. Contact with any other employee of the City of Boulder regarding this project is not authorized. Any information obtained from those other than an authorized City representative shall be considered invalid in the preparation of a proposal for this project.
6. Bidders who request clarification of the solicitation’s requirements may submit written questions to the project manager at the email address listed above by 5:00 PM (Mountain Time) on 07/18/2025. All questions and answers will be posted as an addendum on Bidnet. Bidders should rely only on written statements issued by the project manager.
7. Before submitting a bid, each bidder shall:
• Examine the contract documents thoroughly.
• Become familiar with federal, state, and local laws, ordinances, rules, and regulations that may in any manner affect cost, progress, or performance of the work.
• Study and carefully correlate the bidder’s observations with the contract documents.
• Notify the project manager of all conflicts, errors, omissions, ambiguities, or discrepancies in or among the contract documents.
http://www.bidnetdirect.com/colorado
8. All bids timely submitted shall become the property of the City and shall be retained in accordance with the City’s records retention schedule. The City is a Colorado governmental entity and therefore, all information included in proposals and other written information submitted by the bidder to the City is subject to the provisions of the CORA. Bidders should expect that their proposal may be viewed by the general public and competitors once submitted to the City, subject to the City’s Access to Public Records Policy. Merely marking information as “confidential,” “proprietary,” or otherwise stating a written intent to protect the information from disclosure is not necessarily sufficient to prevent disclosure under CORA.
9. Bid Schedule (all times Mountain Time)
RFB Issued Mandatory Prebid Meeting Written Questions due Responses to Written Questions Posted Bids Due Review of Bids Successful Bidder Selected*
06/30/2025 07/15/2025 at Flatirons Vista Trailhead 1:00PM 07/18/2025, at 5:00pm 07/23/2025 7/30/2025, at 4:00pm 08/05/2025 08/07/2025
*Pursuant to Section 2-8-4(a)(3) of the Boulder Revised Code 1981, the successful bidder is required to sign a contract with the City within 15 days of the successful bidder’s acceptance of the award by the City.
Failure to do so will result in the bidder’s forfeiture of its bid bond.
Interview – Optional. The City may elect to conduct interviews with one or more bidders. The City may do so to better understand the bidders, their teams, their approaches, products, and solutions, and any other information relevant to the work or project described in this solicitation. In some instances, the City may request that the interviews include a presentation by the interviewed bidders. In these instances, bidders may prepare PowerPoint or other written material that may assist the City in understanding and evaluating their bid. Bidders cannot plan on having an interview and, accordingly, are strongly encouraged to include all information necessary for the City’s evaluation in their bid documents. For the avoidance of doubt, the City reserves the right to include information provided by bidders during interviews in the contract documents.
10. Prebid Meeting - Mandatory
Bidders are responsible for ensuring their attendance is documented, including by signing any provided sign-in sheet or otherwise checking in for online meetings so that City representatives understand bidder’s representative is in attendance. This may require provision of company name, attendee name, and contact information.
11. Required Documents for Bid Submission.
To be considered, all bids shall include the following completed forms:
• City of Boulder Bid Proposal. Please include the separate excel spreadsheet with your submission.
• City of Boulder Bid Bond in the amount of 5% of the total bid (form attached).
• City of Boulder Bid Form (attached).
• City of Boulder Acceptance of Terms and Conditions (attached).
In addition, the City requests submittal of the following documents at the time of bid submission, and the
City will require such documents be completed and submitted in acceptable form to the City prior to https://documents.bouldercolorado.gov/WebLink/DocView.aspx?id=185061&dbid=0&repo=LF8PROD2&_ga=2.103231561.839680403.1721847125-955511549.1682975816&cr=1 contracting:
• City of Boulder Non-Collusion Certificate (attached).
• City of Boulder Contractor Qualification Form (attached).
• City of Boulder Schedule of Manufacturers and Suppliers (attached).
• City of Boulder Schedule of Proposed Subcontractors (attached).
• Certificate of Good Standing from the Colorado Secretary of State. If your company is not registered with the Colorado Secretary of State, include a statement addressing why it is not required to register or affirming that, prior to entering into a contract with the City, your company will register with the Colorado Secretary of State if the City awards your company the contract.
In addition to the forms attached to this RFB, all above-listed documents, except the Bid Proposal and Certificate of Good Standing, have been included as a separate PDF file in the Bidnet documents section labeled Required Bid Documents. You will also find the Microsoft Excel spreadsheet for pricing in the same documents section in Bidnet. The spreadsheet is labeled 2025 Trailhead Bid Tab for 2025 OSMP Trailhead Improvement Projects.
For avoidance of doubt, the City reserves the right to request that bidders correct minor irregularities or issues in the forms submitted, though bidders should not expect to have the opportunity to correct such irregularities or issues. With respect to the City’s contracting terms and conditions, the City reserves the right to negotiate additional or different changes to contract language that the City deems necessary or prudent to account for bidder exceptions.
EVALUATION CRITERIA
The award will be provided to the lowest bid, submitted by a responsible and qualified bidder. Bids the City determines fail to respond to a material component of this Solicitation may be rejected. The lowest bid will include consideration of initial cost and, if applicable, life-cycle cost, including, without limitation, maintenance cost, over the normal lifetime of the product and energy-efficiency in consumption of non-renewal fuels (if applicable). Bidders are only responsible and qualified if the City is satisfied it meets the below responsibility criteria:
• The bidder’s integrity and financial responsibility.
• The bidder’s skill, relevant technical expertise, and ability to complete the contract promptly and satisfactorily.
• Whether the bidder maintains a permanent place of business.
• Whether the bidder has adequate plant, equipment, and support services to perform the contract.
• Whether the bidder has previously performed similar work satisfactorily.
• Whether the bidder is likely to be engaged in work that may impair the ability to finance the work covered by the bid or provide equipment for its proper execution.
• Whether the bidder proposes a reasonable approach to achieve the objectives sought.
• Whether there have been or are any claims that raise a substantial question about the bidder’s ability to perform the contract.
The City applies the above criteria liberally, and may eliminate bidders based upon one or more of these criteria. Bidders must propose high-quality approaches, competitive and reasonable pricing, and provide adequate certainty surrounding the project or risk elimination from consideration. The City may conduct such investigations as the City deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications, and financial ability of any bidder or their proposed subcontractors and other persons and organizations to do the work in accordance with the contract to City’s satisfaction.
Further, the City may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for those portions of the work as to which the identity of subcontractors, suppliers, and other persons and organizations must be submitted. The City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the work when such data is required to be submitted prior to the contract award.
ALL AWARDS ARE SUBJECT TO CONTRACT EXECUTION. If for any reason, the negotiations with the apparent lowest bidder who satisfies all applicable requirements are unsuccessful, the City may terminate those negotiations and begin negotiations with a different bidder, or cancel and repost the solicitation in order to contract with the bidder that best meets the needs of the City.
BID BOND
Note: Complete and return this form with your bid.
RFB Title: 2025 OSMP Trailhead Improvement Projects
RFB Number: 36-2025
Witness:
, as principal, hereinafter called the “bidding contractor,” and , as “surety,” a corporation properly organized under the laws of Colorado or authorized to do business in Colorado, hereby obligate themselves to the City of Boulder, as obligee, hereinafter called the “City,” in the penal sum of dollars ($ ), which penal sum shall secure the obligation of the bidding contractor to enter into contract with the City for the work associated with
Project Number , if the bidding contractor is so selected by the City.
If the City accepts the bid of the bidding contractor, and if the bidding contractor properly executes a contract with the City to perform the work covered by the award, then this obligation shall be null and void.
In the alternative, if the bidding contractor refuses to enter into contract with the City for work described in the bid, but rather pays to the city the difference between the bidding contractor’s stated bid amount and the actual amount bid by an alternate bidding contractor, who is accepted by the City, then this obligation shall be null and void.
EXECUTED on this day of , 20 .
(Contractor)
By:
(President)
(Surety Company)
By:
(Attorney-in-Fact)
BID FORM
The undersigned bidder does hereby declare and stipulate that the Bid Proposal is made in good faith, without collusion or connection with any other person or persons bidding for the same work, and that it is made in pursuance or and subject to all the terms and conditions of the bid documents all of which have been examined by the undersigned.
Bidders shall submit prices as provided in the Bid Proposal. Should an error occur in the extension of price, the unit price shall govern.
The City of Boulder (“City”) reserves the right to make the award on the basis of the bid deemed most favorable to the City, to waive any informalities or to reject any or all bids.
The bidder shall complete the attached Contractor Qualification Form, with the bid proposal.
Failure to provide this information may be sufficient cause for rejection of the bid.
The bidder shall complete the attached Proposed Subcontractors Form, with the bid proposal.
Failure to provide this information may be sufficient cause for rejection of the bid.
The bidder shall complete the attached Schedule of Manufacturers and Suppliers Form, with the bid proposal. Failure to provide this information may be sufficient cause for rejection of the bid.
Addendum No.(s) have been received.
Attached is an unconditional letter of credit, money order, certified check, or bid bond payable to the City of Boulder in an amount not less than five percent (5%) of the total amount of the bid.
If this bid is accepted, the bidder agrees to sign the contract agreement without qualifications and to furnish the performance bond, labor and material bond and the required evidence of insurance within ten (10) calendar days after notification of award.
All proposals shall be submitted on the bid proposal. The lowest responsible bid will be accepted;
provided, however, that the City shall have the right to reject any or all bids and to waive any informalities or irregularities contained in said bid. The quantities are an estimate only and may be altered to meet actual City requirements.
Submit firm unit prices for the type of construction listed. Overhead shall not be priced and bid separately but shall be included in each bid item as required. All prices are for furnishing and installing the described item.
The bidder proposes to perform all work and provide all labor, materials, and equipment in full accordance with the bidding documents.
Confidential data, if identified as such, will be held confidential upon request, if the request is made as part of the bid and the City Attorney’s Office determines the data meets the minimum requirements of the Colorado Public Records Act.
ATTEST:
Corporation
President Date Address City State Zip Code Phone number
ATTEST: Company Name
Company Partner
Address City State Zip Code
ATTEST:
Individual
Company Name
Address City State Zip Code
Tax Identification Number It is imperative that the Business and/or vendor name (surname for an individual) and TIN number combination (Employer Identification Number for a Business or Social Security Number for an individual) match exactly.
ACCEPTANCE OF TERMS AND CONDITIONS
The undersigned, as an authorized agent of the bidder, hereby certifies that the bidder:
1. Has received addendums;
2. Is familiar with all instructions, terms and conditions, and specifications stated in this RFB;
3. Is qualified to perform the work and services outlined in this RFB; and
4. Has reviewed the form of agreement attached to this RFB.
Each bidder must indicate exceptions that it takes to any terms and conditions listed in the form of agreement attached to this RFB, as well as the RFB itself. The City reserves the right to not consider exceptions that are not identified on this form. Proposals which take exception to the specifications, terms, or conditions of this RFB or offer substitutions shall explicitly state the exception(s), reasons(s) therefore, and language substitute(s) (if any) in this section of the proposal response. Failure to take exception(s) shall mean that the bidder accepts the conditions, terms, and specifications of the RFB, including the attached form of agreement.
Check the appropriate box below and complete this section as applicable:
☐ Bidder takes no exception to the specifications, terms, and conditions of this RFB.
☐ Bidder takes exception to the following terms and conditions in this RFB:
Signed:
By: ______________________________________
Title: _____________________________________
Date: _____________________________________
For: ________________________________________________________
NON-COLLUSION CERTIFICATE
Note: Return this page with your bid.
The undersigned, being duly sworn, deposes and says that the person, firm, association, partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in the preparation and submission of a proposal to the City of Boulder for consideration in the award of the project described in this solicitation.
(Firm Name)
By: ______________________________________
(Authorized Signature)
Printed Name: ___________________________
Title: ________________________________
Email: _______________________________
CONTRACTOR QUALIFICATION FORM
I. General Information
Your Company:
Name:
Address:
How long have you been in business?
How long have you been in business under the present business name? __________________
What former name(s), if any, has your company operated under in the past five (5) years?
What is the largest contract you have been awarded in the past twelve (12) months?
II. Information: Previous Construction Contract
Provide the following information for three (3) contracts you have performed, or are currently performing, within the past five (5) years. At least two (2) contracts must be completed. If you have performed any contract with the City of Boulder, or County of Boulder, or state of Colorado, include information about at least one (1) such contract.
Contract 1
Owner
Name
Address Phone
Date Begun Date Completed Dollar Amount
Description of Work
Architect
Surety for Performance Bond: ___________
Surety for Labor and Material Bond:
Insurance Company:
Major Subcontractor:
Major Supplier:
Are there any lawsuits, claims, or disputes resulting from this project? If so, please describe:
Contract 2
Surety for Performance Bond:
Are there any lawsuits, claims, or disputes resulting from this project? If so, please describe:
Contract 3
Surety for Performance Bond:
Are there any lawsuits, claims, or disputes resulting from this project? If so, please describe:
III. Describe the work you normally perform with your own forces:
IV. Have you, or any officer or partner of your organization, when working for another organization, failed to complete any work awarded to you or such officer or partner? If so, attach a separate sheet of explanation.
V. Are there any claims or law suits against your organization, against predecessor organizations of your organization, or against any officer or partner who currently works for your organization which have been brought during the previous five years? If so, attach a separate sheet of explanation.
VI. Resumes
Provide resumes for at least two (2) persons with your company. One resume should be for an officer of the company: president, vice-president, etc. The second resume should be for an operations manager of the company who has had experience directing a job as a contractor or superintendent. An operations manager may also be an officer of the company.
Officer:
Operations Manager:
VII. Trade References:
1.
2.
3.
4.
5.
VIII. Bank References:
1.
2.
3.
4.
5.
IX. Name of Bonding Company and name and address of agent:
X. Attach a financial statement, audited if available, (consolidated if the contractor is part of an affiliated group), including contractor's latest balance sheet and income statement showing the following items:
A. Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory, and prepaid expenses):
B. Net Fixed Assets:
C. Other Assets:
D. Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries, and accrued payroll taxes):
E. Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus, and retained earnings):
Name of firm preparing financial statement and date thereof:
Is this financial statement for the identical organization named in Part I on page one?
If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent-subsidiary).
Will this organization act as guarantor of the contract for construction?
SCHEDULE OF MANUFACTURERS AND SUPPLIERS
Note: The City reserves the right to reject the use of any particular manufacturer.
Name Phone No.
City State Zip Code
PROPOSED SUBCONTRACTORS
Note: The City reserves the right to reject the use of any particular subcontractor.
PROJECT INFORMATION, SPECIFICATIONS, DRAWINGS
REMOVE EX. RESTROOM,
REINSTALL HD EQUIPMENT
ON NEW RESTROOM
HIGHWAY 93
STRIP AND
STOCKPILE
TOPSOIL ±30CY
EX. KIOSK TO REMAIN,
PROTECT IN PLACE
REMOVE EX. FENCE, ± 125 LF
REPLACE ASPHALT APRON
REMOVE AND RESET
EX. FENCE, ± 50 LF
PROTECT IN PLACE EX.
TRAILHEAD SIGN
PROTECT IN PLACE EX.
FENCE TO REMAIN, TYP.
1 FLATIRONS VISTA SITE PREPARATION
PLAN
ft0
Scale 1" = 40'-0"
80'60'20' 40'
L1
TOPSOIL, SEED ALL
DISTURBED AREAS,
TYP.
ROAD BASE
PAVING, TYP.
WHEELSTOP, TYP OF 67
SWING GATE, TYP
OF 2
IMPEDENCE
BOULDER, TYP.
FOUR (4) 55' HORSE
TRAILER SPACES
M
ATC
H
LIN
E
STABILIZED CRUSHER
FINES PAVING, TYP
NON-AGRICULTURAL
TRAILHEAD FENCE
ENTRY PLAZA SITE
FURNISHINGS, TYP.
20' X 35' CONCRETE PAD: 2
ACCESSIBLE PARKING SPACES,
AISLE AND BIKE RACK PAD.
SLOPE TRANSITION BETWEEN
CONCRETE AND AGGREGATE
PER DETAILS.
2.5%
CRUSHER FINES WALK
35'
14'
2.5%
+LP
CRUSHER FINES
AGGREGATE
CONCRETE
ASPHALT
NATIVE SEED
FURNISHINGS
WHEELSTOPS
EX. FENCE
FENCE
EX. CONTOURS
EX. INDEX CONTOURS
CONTOURS
INDEX CONTOURS
LEGEND
HIGHWAY 93
+LP
3%
35'
205 CY CUT
85 CY FILL
290 CY TOTAL EARTHWORK
GRADING CALCULATIONS
REMOVE AND RESET
EX. FENCE, ± 50 LF
PROTECT IN PLACE EX.
TRAILHEAD SIGN
FENCE TO REMAIN, TYP.
FLATIRONS VISTA LAYOUT, GRADING, AND MATERIALS
PLAN
ft0
Scale 1" = 40'-0"
L2
M
ATC
H
LIN
E
STONE BENCH
NOTE: RESTORE AREAS
DISTURBED BY CONSTRUCTION
ACTIVITY, TYP
DOUBLE VAULT RESTROOM
WASTE
CRUSHER FINES
CRUSHER FINES
AGGREGATE
CONCRETE
ASPHALT
NATIVE SEED
FURNISHINGS
WHEELSTOPS
EX. FENCE
FENCE
EX. CONTOURS
EX. INDEX CONTOURS
CONTOURS
INDEX CONTOURS
LEGEND
1 FLATIRONS VISTA RESTROOM
PLAN
ft0
Scale 1" = 40'-0"
L3
STRIP AND
STOCKPILE
TOPSOIL ±80 CY
REMOVE EX.
FENCE, TYP.
EX. KIOSK TO BE
REMOVED AND
RESET BY
OTHERS
REMOVE/
REPLACE EX.
CULVERT
PROTECT IN PLACE
EX. TRAILHEAD SIGN
BR
O
AD
W
AY
S
TR
EE
T
EX. NATURAL
SURFACE
TRAIL TO
REMAIN, TYP.
1 FOOTHILLS SITE PREPARATION PLAN
PLAN
ft0
Scale 1" = 40'-0"
L4
+LP
4:1
4%
+LP
+35.5 +35.6
+35.5
+33.1
2%
CRUSHER
FINES PAVING
BR
O
AD
W
AY
S
TR
EE
T
CONCRETE PAD FOR
ACCESSIBLE PARKING
AND AISLE. SLOPE
TRANSITIONS PER
DETAILS
3 BIKE RACKS AND
FIXIT STATION ON
CONCRETE PAD
FURNISHINGS,
TYP
TOPSOIL AND SEED ALL
DISTURBED AREAS, TYP.
TRAILHEAD
FENCE, ± 155 LF
CONCRETE CURB, ± 45
LF, TRANSITION TO
FLUSH AT 5' WALKWAY
IMPEDANCE
BOULDERS
18" CULVERT AND
END SECTIONS
SWING GATE, TYP OF 2
WHEELSTOP, TYP OF 23
2 L5
NOTE: RESTORE AREAS
DISTURBED BY CONSTRUCTION
ACTIVITY, TYP
CRUSHER FINES
AGGREGATE
CONCRETE
ASPHALT
NATIVE SEED
FURNISHINGS
WHEELSTOPS
EX. FENCE
FENCE
EX. CONTOURS
EX. INDEX CONTOURS
CONTOURS
INDEX CONTOURS
LEGEND
4:1 SLOPE AGGREGATE PARKING
EX. 2'
NATURAL
SURFACE
TRAIL
TO REMAIN
EX. DITCH
TO REMAIN
FENCE ON SOUTH
SIDE ONLY
CUTOFF DITCH
(RIPARIAN
SEED)
CUTOFF DITCH
(RIPARIAN
SEED)
60 CY CUT
325 CY FILL
385 CY TOTAL EARTHWORK
GRADING CALCULATIONS
FOOTHILLS LAYOUT, GRADING AND MATERIALS PLAN
PLAN
ft0
Scale 1" = 40'-0"
80'60'20' 40'
2 FOOTHILLS TRAILHEAD
SECTION ft0
Scale 1" = 10'-0"
20'30'10' 20'
L5
VALMONT ROAD
STRIP AND
STOCKPILE
TOPSOIL, ±85 CY
REMOVE
± 25 LF FENCE
1 NORTH TELLER SITE PREPARATION PLAN
PLAN
ft0
Scale 1" = 40'-0"
L6
VALMONT ROAD
ACCSSIBLE BENCH
CONCRETE
ACCESSIBLE PARKING
AND ACCESS AISLE.
SLOPE TRANSITION
PER DETAILS
CRUSHER FINES
PAVING
AGGREGATE PAVING
ACCSSIBLE BENCH
DOUBLE VAULT
RESTROOM
4 BIKE RACKS AND
FIXIT STATION ON
CONCRETE PAD
STONE BENCH, TYP
OF 2
DOUBLE TRASH
ENCLSOURE
WIRE FENCE
AGGREGATE PAVING
IMPEDANCE BOULDER,
TYP.
14'
ASPHALT APRON
SWING GATE, TYP OF 2
SWING GATE, TYP OF 2
CRUSHER FINES
AGGREGATE
CONCRETE
ASPHALT
NATIVE SEED
FURNISHINGS
WHEELSTOPS
LEGEND
EX. FENCE
FENCE
EX. CONTOURS
EX. INDEX CONTOURS
CONTOURS
INDEX CONTOURS
56 CY CUT
81 CY FILL
137 CY TOTAL EARTHWORK
GRADING CALCULATIONS
NORTH TELLER LAYOUT, GRADING, AND MATERIALS PLAN
PLAN
ft0
Scale 1" = 40'-0"
L7
CITY OF BOULDER
OPEN SPACE AND MOUNTAIN PARKS
TRAILHEAD CONSTRUCTION DETAILS
JULY 2024
TABLE OF CONTENTS
103-01 PROTECTION OF VEGETATION
204-03 AGGREGATE SURFACING
306/7-01 DRAINAGE AND RAINGARDEN STRUCTURES
408-01 LANDSCAPE BOULDERS
501-06 TRAILHEAD FENCES
501-07 TRAILHEAD POST & WIRE FENCE AND GATE
503-01 VEHICULAR GATES AND BOLLARDS
704-01 SEEDING DETAILS
708-01 PLANTING DETAILS
708-02 TYPICAL PLANTING SCHEDULES
812-01 PREFABRICATED STRUCTURES
902-01 CONCRETE PAVEMENT
902-02 CONCRETE PAVEMENT
902-03 CONCRETE CURBS
902-04 CONCRETE PAVEMENT JOINTS AND SEALANTS
903-01 ASPHALT PAVEMENT
904-01 WHEELSTOP
1000-01 BIKE FACILITIES
1000-02 WASTE RECEPTACLE
1000-03 PICNIC TABLE
1000-04 BENCH
¾
¾
Amelanchier sp.
Crataegus erythropoda
Catalpa speciosa
Celtis occidentalis
Gymnocladus diocia
Juniperus scopulorum
Malus sp.
Prunus americana
Populus deltoides
Picea pungens
Pinus ponderosa
Prunus virginiana
Quercus gambelii
Quercus macrocarpa
Atriplex canescens
Artemisia filifolia
Acrostaphylos x coloradoensis Panchito
Ericameria nauseosa nauseosa glabrata
Ericameria nauseosa nauseosa
Forestiera pubescens v. pubescens
Fallugia paradoxa
Juniperus communis
Krascheninnikovia lanata
Mahonia aquifolium 'Compacta'
Mahonia repens
Potentilla fruticosa
Prunus besseyi 'Pawnee Buttes'
Rhus trilobata 'Autumn Amber'
Rhus trilobata
Rosa woodsii
Yucca glauca
Bouteloua gracilis
Carex nebrascensis
Deschampsia caespitosa Iris missouriensis
Juncus arcticus
Juncus torreyi
Sporobolus heterolepsis
1.5"R
A
B
C
D
Open Space and Mountain Parks Standard Trail Specifications and
Construction Details
Final Draft December 23, 2022
Confluent Design
2 OSMP Trail Construction Documents December 23, 2022
Table of Contents 000 General Specifications
001 Organization of Specifications 002 Intent of these Standard Specifications and Construction Details 003 General Requirements
003.10 DESCRIPTION
003.20 Permits
004 Terms, Abbreviations, and Definitions
004.10 MEANING OF TERMS
004.20 ABBREVIATIONS, ACRONYMS AND NOTATIONS
004.30 DEFINITIONS
005 Control of Work
005.10 DESCRIPTION
005.20 AUTHORITY OF THE PROJECT MANAGER
005.30 CONFORMITY TO THE DRAWINGS AND SPECIFICATIONS
005.40 WORKING HOURS
005.50 CONSTRUCTION PROGRESS SCHEDULE
005.60 COORDINATION AND NOTIFICATION
005.70 SUPERVISION AT THE JOB SITE
005.80 SPECIFICATIONS AND DRAWINGS
005.90 MEASUREMENT AND PAYMENT
006 Control of Materials
006.10 DESCRIPTION
006.20 HANDLING MATERIALS
006.30 MATERIAL SOURCES
006.40 MEASUREMENT
006.50 PAYMENT
007 Quality Control and Quality Assurance
007.10 DESCRIPTION
007.20 QUALITY CONTROL
007.30 RECORDS
007.40 QUALITY ASSURANCE
007.50 CORRECTION OR REMOVAL OF DEFECTIVE WORK
007.60 MEASUREMENT
007.70 PAYMENT
008 Measurement and Payment
008.10 DESCRIPTION
008.20 UNITS OF MEASUREMENT
008.30 METHODS OF MEASUREMENT
009 Mobilization
009.10 DESCRIPTION
3 OSMP Trail Construction Documents December 23, 2022
009.20 PROJECT IDENTIFICATION
009.30 MEASUREMENT
009.40 PAYMENT
010 Trail Design and Field Staking Notes
010.10 DESCRIPTION
010.20 PRELIMINARY TRAIL DESIGN
010.30 FINAL TRAIL DESIGN
010.40 FIELD STAKING NOTES
010.50 TRAIL DESIGN REVIEW AND APPROVAL PROCESS
010.60 MEASUREMENT
010.70 PAYMENT
011 Construction Survey, Staking, and Flagging
011.10 DESCRIPTION
011.20 GENERAL REQUIREMENTS FOR CONSTRUCTION SURVEY, STAKING, AND FLAGGING
011.30 REQUIREMENTS FOR CONSTRUCTION SURVEYING OF DESIGN/BUILD TRAILS
011.40 UTILITY LOCATES
011.50 STAKING AND FLAGGING REQUIREMENTS
011.60 STAKING AND FLAGGING REMOVALS
011.70 MEASUREMENT
011.80 PAYMENT
012 Construction Zone Public Access and Traffic Control
012.10 DESCRIPTION
012.20 GENERAL REQUIREMENTS FOR CONSTRUCTION ZONE AND PUBLIC ACCESS CONTROL . 50
012.30 PUBLIC ACCESS TRAIL CLOSURE PLAN
012.40 CONTRACTOR AND PUBLIC ACCESS SHARED USE PLAN
012.50 TRAIL CLOSURE AND PUBLIC ACCESS SHARED USE PLAN(S) CONTENT
012.60 MEASUREMENT
012.70 PAYMENT
013 Construction Access
013.10 DESCRIPTION
013.20 GENERAL REQUIREMENTS FOR USE AND PROTECTION OF EXISTING SERVICE ROADS
AND TRAILS
013.30 GENERAL REQUIREMENTS FOR USE AND PROTECTION OF TEMPORARY ACCESS ROUTES
013.40 TYPES OF TRANSPORTATION CONSIDERED FOR CONSTRUCTION ACCESS
013.50 CONSTRUCTION ACCESS PLAN CONTENT
013.60 MEASUREMENT
013.70 PAYMENT
014 Limits of Disturbance
014.10 DESCRIPTION
014.20 GENERAL REQUIREMENTS FOR LIMIT OF DISTURBANCE
4 OSMP Trail Construction Documents December 23, 2022
014.30 ADJUSTMENTS TO LIMITS OF DISTURBANCE
014.40 RESTORATION OF DISTURBANCE
014.50 MEASUREMENT
014.60 PAYMENT
015 Phasing of Work
015.10 DESCRIPTION
015.20 PHASING OF WORK
015.30 OPENING OF TRAILS TO PUBLIC USE
015.40 MEASUREMENT
015.50 PAYMENT
016 Construction Management of Conservation Corps Work
016.10 DESCRIPTION
016.20 GENERAL RESPONSIBILITIES FOR CONTRACTOR OVERSIGHT OF CONSERVATION CORPS
016.30 CONSERVATION CORPS WORK PRODUCTIVITY
016.40 RESPONSIBILITY FOR CONSERVATION CORPS WORK PRODUCT
016.50 MEASUREMENT
016.60 PAYMENT
017 Use of Helicopters
017.10 INSURANCE REQUIREMENTS
017.20 FUEL
017.30 CONTROL OF PUBLIC ACCESS
017.40 HELICOPTER STAGING (PICK POINT)
017.50 REDUCTION OF NOISE IMPACT
017.60 ENVIRONMENTAL PROTECTIONS
017.70 REGULATORY COMPLIANCE
017.80 MEASUREMENT
017.90 PAYMENT
090 RESERVED FOR GENERAL SPECIFICATIONS SPECIAL PROVISIONS
100 Environmental Specifications
101 Housekeeping
101.10 GENERAL
101.20 DOGS
101.30 SANITARY SERVICE (PORTABLE TOILETS)
101.40 BURNING, FIRE PROTECTION & PREVENTION
101.50 EQUIPMENT SERVICE
101.60 MEASUREMENT & PAYMENT
102 Preservation of Natural Features
102.10 LIMITS OF DISTURBANCE
102.20 DRILLING
102.30 AESTHETIC ATTRIBUTES
5 OSMP Trail Construction Documents December 23, 2022
102.40 MEASUREMENT & PAYMENT
103 Biological Resources - Vegetation
103.10 PROTECTION OF VEGETATION
103.20 MINIMIZE ENVIRONMENTAL DAMAGE
103.30 DAMAGE BY CONTRACTOR
103.40 VEGETATION REMOVAL AND REPLACEMENT
103.50 NOXIOUS AND INVASIVE SPECIES CONTROL
103.60 MEASUREMENT
103.70 PAYMENT
104 Biological Resources - Wildlife
104.10 PROTECTION OF MIGRATORY BIRDS
104.20 PRAIRIE DOG MANAGEMENT
104.30 PREBLE’S MEADOW JUMPING MOUSE
104.40 MEASUREMENT AND PAYMENT
105 Cultural Resources
105.10 LIMITS OF DISTURBANCE
105.20 CULTURAL RESOURCES AVOIDANCE
105.30 POST-REVIEW DISCOVERY
105.40 MEASUREMENT & PAYMENT
106 Water Quality and Erosion Control
106.10 GENERAL PRACTICES
106.20 STORMWATER MANAGEMENT PLAN
106.30 MATERIALS HANDLING AND SPILL PREVENTION
106.40 PROTECTION AND MAINTENANCE OF STORMWATER SYSTEMS (WATER CONTROL)
106.50 GROUNDWATER
106.60 AIR AND WATER POLLUTION CONTROL
106.70 MEASUREMENT
106.80 PAYMENT
107 Solid Waste and Contaminated Materials Management
107.10 SPILL RESPONSE PLAN*
107.20 DISPOSAL OF WASTE MATERIALS
107.30 CONTAMINATED SOIL AND WATER
107.40 MEASUREMENT & PAYMENT
108 Air and Noise Quality
108.10 AIR POLLUTANT AND DUST CONTROL
108.20 NOISE CONTROL
108.30 MEASUREMENT & PAYMENT
190 Reserved for Environmental Special Project Specifications 200 Trailway
201 Design Standards
201.10 DESCRIPTION
6 OSMP Trail Construction Documents December 23, 2022
201.20 DESIGN FOR TRAIL USERS AND RESOURCE PRESERVATION
201.30 DESIGN OF TRAIL GRADIENTS
201.40 DESIGN OF ROLLING CONTOUR TRAILS
201.50 DESIGN OF NATURAL SURFACE TRAILS
201.60 DESIGN OF AGGREGATE SURFACE TRAILS (Crusher Fines & Road Base)
201.70 DESIGN OF DRAINAGE AND SWALE CROSSINGS
201.80 DESIGN OF RETAINING WALLS
201.90 MEASUREMENT AND PAYMENT
202 Vegetation Clearing and Grubbing
202.10 DESCRIPTION
202.20 MATERIAL TO BE CLEARED
202.30 BRUSH REMOVAL
202.40 TREE AND STUMP REMOVAL
202.50 MEASUREMENT
202.60 PAYMENT
203 Excavation and Embankment (Earthwork & Natural Surface Trails)
203.10 DESCRIPTION
203.20 SOIL EXCAVATION AND EMBANKMENT
203.30 BEDROCK EXCAVATION
203.40 USE AND DISPOSAL OF EXCAVATED MATERIAL
203.50 ROCKFALL PROTECTION
203.60 MEASUREMENT
203.70 PAYMENT
204 Tread Surfacing
204.10 DESCRIPTION
204.20 PREPARATION OF TRAILBED
204.30 AGGREGATE SURFACING AND BASE COURSE
204.40 STONE PAVING
204.50 MEASUREMENT
204.60 PAYMENT
205 Climbing Turns
205.10 DESCRIPTION
205.20 CLIMBING TURN
205.30 STEPPED CLIMBING TURN
205.40 MEASUREMENT
205.50 PAYMENT
206 Talus Slope Tread
206.10 DESCRIPTION
206.20 TALUS TREAD SUBGRADE
206.30 TALUS TREAD SURFACE
206.40 MEASUREMENT
7 OSMP Trail Construction Documents December 23, 2022
206.50 PAYMENT
207 Trailway Repair
207.10 DESCRIPTION
207.20 TREAD SURFACE REPAIR
207.30 DRAINAGE IMPROVEMENTS FOR REPAIR PROJECTS
207.40 OTHER TRAIL IMPROVEMENTS FOR REPAIR PROJECTS
207.50 MEASUREMENT
207.60 PAYMENT
208 Fords
208.10 NATURAL FORD
208.20 ARMORED FORD
208.30 MEASUREMENT
208.40 PAYMENT
290 RESERVED FOR TRAILWAY SPECIAL PROJECT SPECIFICATIONS
300 Drainage Structures
301 Culverts
301.10 DESCRIPTION
301.20 CULVERTS
301.30 HEADWALLS
301.40 MEASUREMENT
301.50 PAYMENT
302 Drain Dips & Waterbars
302.10 DESCRIPTION
302.20 DRAIN DIPS
302.30 ROCK WATERBARS
302.40 LOG WATERBARS
302.50 MEASUREMENT
302.60 PAYMENT
303 Underdrains
303.10 DESCRIPTION
303.20 ROCK UNDERDRAINS
303.30 MEASUREMENT
303.40 PAYMENT
304 Ditches
304.10 DESCRIPTION
304.20 SIDE DITCHES
304.30 LEADOFF DITCHES
304.40 MEASUREMENT
304.50 PAYMENT
305 Riprap (Slope Stabilization)
305.10 DESCRIPTION
8 OSMP Trail Construction Documents December 23, 2022
305.20 RIPRAP
305.30 MEASUREMENT
305.40 PAYMENT
390 Reserved for Drainage Structures Special Project Specifications 400 Trail Structures
401 Switchbacks
401.10 DESCRIPTION
401.20 TYPE 1 – RADIUS SWITCHBACK
401.30 TYPE 2 – CIRCULAR LANDING SWITCHBACK
401.40 MEASUREMENT
401.50 PAYMENT
402 Causeways
402.10 DESCRIPTION
402.20 CAUSEWAY WITH LOG OR TIMBER RETAINER
402.30 CAUSEWAY WITH ROCK RETAINER
402.40 MEASUREMENT
402.50 PAYMENT
403 Puncheons
403.10 DESCRIPTION
403.20 SAWN TIMBER PUNCHEON
403.30 MEASUREMENT
403.40 PAYMENT
404 Side Barriers
404.10 DESCRIPTION
404.20 STACKED ROCK BARRIERS AND PINNERS
404.30 LOG BARRIER
404.40 MEASUREMENT
404.50 PAYMENT
405 Retaining Walls
405.10 DESCRIPTION
405.20 TIMBER RETAINING WALL
405.30 STACKED ROCK RETAINING WALL
405.40 GABION RETAINING WALL
405.50 MEASUREMENT
405.60 PAYMENT
406 Steps and Staircases
406.10 DESCRIPTION
406.20 INDIVIDUAL STEPS
406.30 STAIRCASES
406.40 MEASUREMENT
406.50 PAYMENT
9 OSMP Trail Construction Documents December 23, 2022
407 Retainers
407.10 DESCRIPTION
407.20 ROCK RETAINERS
407.30 LOG AND TIMBER RETAINERS
407.40 MEASUREMENT
407.50 PAYMENT
490 Reserved for Trail Structures Special Project Specifications 500 Restriction Devices
501 Fences
501.10 DESCRIPTION
501.20 POST AND WIRE FENCE (SMOOTH, BARBED, AND HIGH TENSILE)
501.30 POST AND DOWEL FENCE
501.40 BUCK AND RAIL (JACK LEG) FENCE (TYPE 1 AND TYPE 2)
501.50 SNOW FENCE
501.60 CONSTRUCTION FENCE
501.70 MEASUREMENT
501.80 PAYMENT
502 Gates
502.10 WIRE GATE
502.20 METAL SWING GATE
502.30 MEASUREMENT
502.40 PAYMENT
590 Reserved for Restriction Devices Special Project Specifications 600 Pedestrian Trail Bridges
601 Design Standards
601.10 BRIDGE DESIGN LOADS
601.20 BRIDGE SLOPES
601.30 APPROACH SECTIONS
601.40 USER BARRIERS (CURBS AND RAILINGS)
601.50 ACCESSIBILITY
602 Log Stringer Trail Bridge (Single and Double)
602.10 DESCRIPTION
602.20 LOG STRINGER TRAIL BRIDGES
602.30 MEASUREMENT
602.40 PAYMENT
603 Sawn Timber Trail Bridge
603.10 DESCRIPTION
603.20 SAWN TIMBER TRAIL BRIDGES
603.30 MEASUREMENT
603.40 PAYMENT
604 Trail Bridge Substructures
10 OSMP Trail Construction Documents December 23, 2022
604.10 TIMBER AND LOG SILLS ON GABION BASKET FOUNDATION
604.20 TIMBER SILLS ON TIMBER CRIBBING FOUNDATION
604.30 TIMBER AND LOG SILLS ON AGGREGATE PAD
604.40 MEASUREMENT
604.50 PAYMENT
690 Reserved for Trail Bridge Special Project Specifications 700 Restoration
701 Obliteration of Abandoned Trails
701.10 GENERAL
701.20 EARTHWORK
701.30 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
701.40 NATURALIZATION
701.50 MEASUREMENT
701.60 PAYMENT
702 Check Dams
702.10 ROCK CHECK DAMS
702.20 LOG CHECK DAMS
702.30 MEASUREMENT
702.40 PAYMENT
703 Topsoil Preparation
703.10 NATIVE TOPSOIL
703.20 SOIL CONDITIONING
703.30 MEASUREMENT
703.40 PAYMENT
704 Seeding
704.10 DESCRIPTION
704.20 SEED MIXES AND SOURCE
704.30 INTERIM STABILIZATION
704.40 FINAL STABILIZATION
704.50 SEED INSTALLATION (INTERIM AND FINAL)
704.60 ACCEPTANCE, MAINTENANCE, AND WARRANTY
704.70 MEASUREMENT
704.80 PAYMENT
705 Mulching
705.10 DESCRIPTION
705.20 HYDRAULIC MULCH
705.30 WOOD STRAND MULCH
705.40 MEASUREMENT
705.50 PAYMENT
706 Erosion Control Blankets
706.10 DESCRIPTION
11 OSMP Trail Construction Documents December 23, 2022
706.20 SURFACE PREPARATION
706.30 SLOPE INSTALLATION
706.40 CHANNEL INSTALLATION
706.50 CONSTRUCTION PERIOD MAINTENANCE
706.60 MEASUREMENT
706.70 PAYMENT
707 Erosion Control Logs
707.10 DESCRIPTION
707.20 INSTALLATION AND MAINTENANCE
707.30 MEASUREMENT
707.40 PAYMENT
790 Reserved for Incidentals Special Project Specifications 800 Materials
801 Rock and Aggregate
801.10 LOCALLY SOURCED ROCK AND AGGREGATE
801.20 IMPORTED ROCK
801.30 IMPORTED AGGREGATE
802 Pipe Material
802.10 CORRUGATED STEEL PIPE
802.20 CORRUGATED PLASTIC PIPE
803 Fence Material
803.10 FENCE WIRE & HARDWARE
803.20 FENCE POSTS
803.30 TEMPORARY PLASTIC FENCE
803.40 TEMPORARY SNOW FENCE
804 Geotextiles
804.10 NON-WOVEN GEOTEXTILE
804.20 GEOTEXTILE FASTENERS
805 Material for Wood Structures
805.10 LOCALLY SOURCED MATERIAL FOR WOOD STRUCTURES
805.20 IMPORTED MATERIAL WOOD STRUCTURES
806 Fasteners and Hardware
806.10 NAILS AND SPIKES
806.20 LAG SCREWS
806.30 BOLTS AND NUTS
806.40 WASHERS
806.50 REBAR STAKES
807 Material for Gabion Baskets
807.10 GABION CAGES
807.20 GABION FASTENERS
807.30 GABION GEOTEXTILE
12 OSMP Trail Construction Documents December 23, 2022
808 Erosion Control Materials
808.10 MULCHES
808.20 EROSION CONTROL BLANKETS
808.30 EROSION CONTROL LOGS
STANDARD SPECIAL PROVISI