2025 Trailheads bid tab.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- 2025 OSMP Trailhead Improvement Projects State and local contract opportunity
- Solicitation number
- 36-2025
- Issued by
- Boulder County, Colorado
About this file
The document is a bid tabulation spreadsheet for the City of Boulder's 2025 Open Space and Mountain Parks (OSMP) Trailhead Improvement Projects, covering four distinct trailhead locations: Flatirons Vista, Foothills, North Teller, and Lefthand. The project involves comprehensive trailhead upgrades including mobilization, survey, erosion control, earthwork, infrastructure installation, and amenity improvements such as parking areas, fencing, gates, restrooms, trash enclosures, bike racks, and native landscaping. The bid solicitation requires contractors to provide unit pricing for multiple line items across four separate project schedules, with quantities varying by location and scope of work.
The bid tabulation includes a total project contingency of $100,000, with contractors required to submit pricing for all bid schedules using only the highlighted yellow cells on the spreadsheet. The document indicates that the City will select the lowest responsible and best bid, reserving the right to reject any or all bids and waive informalities. While specific pricing is not filled in, the bid tab provides detailed quantities for each trailhead, including items like sandstone boulders, concrete work, base course installation, native seeding, bike amenities, and various infrastructure elements. The project appears to be funded through the City of Boulder's Open Space and Mountain Parks department, focusing on enhancing public outdoor recreation access and infrastructure.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFB 36-2025 OSMP Trailhead Improvement Projects.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID PROPOSAL - BID NO. 36-2025 |
| CITY OF BOULDER – 2025 OSMP Trailhead Improvement Projects |
| CONTRACTOR: |
| (enter contractor name here) |
| All proposals shall be submitted on this form. The lowest responsible and best bid will be accepted; provided, however that the City shall have the right to reject any and all bids and to waive any informalities or irregularities contained in said bid. The following quantities are an estimate only and may be altered to meet actual City of Boulder requirements. |
| CONTRACTORS SHALL USE THIS FORM TO SUBMIT THEIR BID |
| Submit firm unit prices for the type of construction listed below. Overhead shall not be priced and bid separately, but shall be included in each bid item as required. All prices are for furnishing and installing the described item unless noted otherwise. Bidders must provide pricing for all bid schedules. |
| ONLY THOSE CELLS HIGHLIGHTED IN YELLOW SHALL BE FILLED IN. ALL OTHER CELLS SHALL NOT BE ALTERED. | ||||||
| UNIT | QUANTITY | UNIT COST | SUBTOTAL | |||
| SCHEDULE A: FLATIRONS VISTA TRAILHEAD | ||||||
| A- | 009-1 | Mobilization | LS | 1 | $ - 0 | |
| A- | 090-1 | Removals | LS | 1 | $ - 0 | |
| A- | 011-1 | Survey | LS | 1 | $ - 0 | |
| A- | 014-1 | Remove existing restroom | LS | 1 | $ - 0 | |
| A- | 014-2 | Remove and reset HD equipment | LS | 1 | $ - 0 | |
| A- | 106-1 | Erosion Control | LS | 1 | $ - 0 | |
| A- | 202-1 | Strip, stockpile, and respread topsoil on site | CY | 30 | $ - 0 | |
| A- | 203-1 | Earthwork and permitting | CY | 40 | $ - 0 | |
| A- | 400-1 | Gray/tan stabilized crusher fines (6" depth) | SF | 4,750 | $ - 0 | |
| A- | 408-1 | Sandstone boulders (18-30" dia) | EA | 20 | $ - 0 | |
| A- | 408-2 | Memorial Bench/ Buff sandstone blocks (18" x 18" x 4') | EA | 2 | $ - 0 | |
| A- | 501-1 | Trailhead Agricultural Fence | LF | 150 | $ - 0 | |
| B- | 502-1 | 13' Swing gate | EA | 2 | $ - 0 | |
| A- | 704-1 | Native Seeding and mulch (OSMP provided seed) | SF | 9,000 | $ - 0 | |
| A- | 900-1 | Class 6 Base course (6" depth) (new material) | SF | 33,500 | $ - 0 | |
| A- | 900-2 | Cast in Place Concrete Flatwork (6" depth) | SY | 78 | $ - 0 | |
| A- | 900-3 | Asphalt Paving | SY | 210 | $ - 0 | |
| A- | 1000-1 | Double trash enclosure | EA | 2 | $ - 0 | |
| A- | 1000-2 | Dog station/ bag dispenser | EA | 1 | $ - 0 | |
| A- | 1000-3 | Wheelstop: recycled plastic | EA | 67 | $ - 0 | |
| A- | 1000-4 | Bench: powdercoated steel/ recycled plastic | EA | 1 | $ - 0 | |
| A- | 1000-5 | Bike rack-powder coated steel inverted U | EA | 4 | $ - 0 | |
| A- | 1000-6 | Bike Repair Station | EA | 1 | $ - 0 | |
| A- | 1000-7 | Double vault concrete restroom and permitting | EA | 1 | $ - 0 | |
| A- | 1000-8 | Brown highway signs and permitting | EA | 2 | $ - 0 | |
| A- | 1000-9 | Stop sign | EA | 3 | $ - 0 |
| SCHEDULE B: FOOTHILLS TRAILHEAD | |||||
| B- | 009-1 | Mobilization | LS | 1 | $ - 0 |
| B- | 011-1 | Survey | LS | 1 | $ - 0 |
| B- | 090-1 | Removals | LS | 1 | $ - 0 |
| B- | 106-1 | Erosion Control | LS | 1 | $ - 0 |
| B- | 202-1 | Strip, stockpile, and respread topsoil on site | CY | 80 | $ - 0 |
| B- | 203-1 | Earthwork and permitting | CY | 450 | $ - 0 |
| B- | 301-1 | 18" culvert | LF | 45 | $ - 0 |
| B- | 400-1 | Gray/tan stabilized crusher fines (6" depth) | SF | 1,800 | $ - 0 |
| B- | 408-1 | Sandstone boulders (18-30" dia) | EA | 5 | $ - 0 |
| B- | 408-2 | Memorial Bench/ Buff sandstone blocks (18" x 18" x 4') | EA | 1 | $ - 0 |
| B- | 501-1 | Trailhead Non-Agricultural Fence | LF | 160 | $ - 0 |
| B- | 502-1 | 13' Swing gate | EA | 2 | $ - 0 |
| B- | 704-1 | Native Seeding and mulch (OSMP provided seed) | SF | 8,000 | $ - 0 |
| B- | 900-1 | Class 6 Base course (6" depth) (new material) | SF | 8,200 | $ - 0 |
| B- | 900-2 | Cast in Place Concrete Flatwork (6" depth) | SY | 50 | $ - 0 |
| B- | 900-3 | Cast in Place Concrete Curb | LF | 45 | $ - 0 |
| B- | 1000-1 | Double trash enclosure | EA | 1 | $ - 0 |
| B- | 1000-2 | Wheelstop: recycled plastic | EA | 23 | $ - 0 |
| B- | 1000-3 | Bench: powdercoated steel/ recycled plastic | EA | 1 | $ - 0 |
| B- | 1000-4 | Bike rack-powder coated steel inverted U | EA | 3 | $ - 0 |
| B- | 1000-5 | Bike Repair Station | EA | 1 | $ - 0 |
| B- | 1000-6 | Stop sign | EA | 1 | $ - 0 |
| SCHEDULE C: NORTH TELLER TRAILHEAD | |||||
| C- | 009-1 | Mobilization | LS | 1 | $ - 0 |
| C- | 090-1 | Removals | LS | 1 | $ - 0 |
| C- | 011-1 | Survey | LS | 1 | $ - 0 |
| C- | 106-1 | Erosion Control | LS | 1 | $ - 0 |
| C- | 202-1 | Strip, stockpile, and respread topsoil on site | CY | 85 | $ - 0 |
| C- | 203-1 | Earthwork and permitting | CY | 200 | $ - 0 |
| C- | 400-1 | Gray/tan stabilized crusher fines (6" depth) | SF | 4,400 | $ - 0 |
| C- | 408-1 | Sandstone boulders (18-30" dia) | EA | 20 | $ - 0 |
| C- | 408-2 | Memorial Bench/ Buff sandstone blocks (18" x 18" x 4') | EA | 2 | $ - 0 |
| C- | 501-1 | Wire Fence | LF | 425 | $ - 0 |
| C- | 502-1 | 13' Swing gate | EA | 4 | $ - 0 |
| C- | 704-1 | Native Seeding and mulch (OSMP provided seed) | SF | 4,000 | $ - 0 |
| C- | 900-1 | Class 6 Base course (6" depth) (new material) | SF | 23,300 | $ - 0 |
| C- | 900-2 | Cast in Place Concrete Flatwork (6" depth) | SY | 40 | $ - 0 |
| C- | 900-3 | Asphalt Paving | SY | 55 | $ - 0 |
| C- | 1000-1 | Double trash enclosure | EA | 1 | $ - 0 |
| C- | 1000-2 | Wheelstop: recycled plastic | EA | 31 | $ - 0 |
| C- | 1000-3 | Bench: powdercoated steel/ recycled plastic | EA | 2 | $ - 0 |
| C- | 1000-4 | Bike rack-powder coated steel inverted U | EA | 4 | $ - 0 |
| C- | 1000-5 | Bike Repair Station | EA | 1 | $ - 0 |
| C- | 1000-6 | Double vault concrete restroom and permitting | EA | 1 | $ - 0 |
| SCHEDULE D: LEFTHAND TRAILHEAD | |||||
| D- | 009-1 | Mobilization | LS | 1 | $ - 0 |
| D- | 090-1 | Removals | LS | 1 | $ - 0 |
| D- | 011-1 | Survey | LS | 1 | $ - 0 |
| D- | 106-1 | Erosion Control | LS | 1 | $ - 0 |
| D- | 408-1 | Sandstone boulders (18-30" dia) | EA | 6 | $ - 0 |
| D- | 408-2 | Memorial Bench/ Buff sandstone blocks (18" x 18" x 4') | EA | 1 | $ - 0 |
| D- | 704-1 | Native Seeding and mulch (OSMP provided seed) | SF | 250 | $ - 0 |
| D- | 1000-1 | Double trash enclosure | EA | 1 | $ - 0 |
| D- | 1000-2 | Bench: powdercoated steel/ recycled plastic | EA | 1 | $ - 0 |
| D- | 1000-3 | Single vault concrete restroom and permitting | EA | 1 | $ - 0 |
FORCE ACCOUNT: CONTINGENCY $ 100,000
PROJECT TOTAL $ 100,000