The document is a bid tabulation spreadsheet for the City of Boulder's 2025 Open Space and Mountain Parks (OSMP) Trailhead Improvement Projects, covering four distinct trailhead locations: Flatirons Vista, Foothills, North Teller, and Lefthand. The project involves comprehensive trailhead upgrades including mobilization, survey, erosion control, earthwork, infrastructure installation, and amenity improvements such as parking areas, fencing, gates, restrooms, trash enclosures, bike racks, and native landscaping. The bid solicitation requires contractors to provide unit pricing for multiple line items across four separate project schedules, with quantities varying by location and scope of work.

The bid tabulation includes a total project contingency of $100,000, with contractors required to submit pricing for all bid schedules using only the highlighted yellow cells on the spreadsheet. The document indicates that the City will select the lowest responsible and best bid, reserving the right to reject any or all bids and waive informalities. While specific pricing is not filled in, the bid tab provides detailed quantities for each trailhead, including items like sandstone boulders, concrete work, base course installation, native seeding, bike amenities, and various infrastructure elements. The project appears to be funded through the City of Boulder's Open Space and Mountain Parks department, focusing on enhancing public outdoor recreation access and infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to 2025 OSMP Trailhead Improvement Projects, newest first.
File Type Posted
RFB 36-2025 OSMP Trailhead Improvement Projects.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID PROPOSAL - BID NO. 36-2025
CITY OF BOULDER – 2025 OSMP Trailhead Improvement Projects
CONTRACTOR:
(enter contractor name here)
All proposals shall be submitted on this form. The lowest responsible and best bid will be accepted; provided, however that the City shall have the right to reject any and all bids and to waive any informalities or irregularities contained in said bid. The following quantities are an estimate only and may be altered to meet actual City of Boulder requirements.
CONTRACTORS SHALL USE THIS FORM TO SUBMIT THEIR BID
Submit firm unit prices for the type of construction listed below. Overhead shall not be priced and bid separately, but shall be included in each bid item as required. All prices are for furnishing and installing the described item unless noted otherwise. Bidders must provide pricing for all bid schedules.
ONLY THOSE CELLS HIGHLIGHTED IN YELLOW SHALL BE FILLED IN. ALL OTHER CELLS SHALL NOT BE ALTERED.
UNITQUANTITYUNIT COSTSUBTOTAL
SCHEDULE A: FLATIRONS VISTA TRAILHEAD
A-009-1MobilizationLS1$ - 0
A-090-1RemovalsLS1$ - 0
A-011-1SurveyLS1$ - 0
A-014-1Remove existing restroomLS1$ - 0
A-014-2Remove and reset HD equipmentLS1$ - 0
A-106-1Erosion ControlLS1$ - 0
A-202-1Strip, stockpile, and respread topsoil on siteCY30$ - 0
A-203-1Earthwork and permittingCY40$ - 0
A-400-1Gray/tan stabilized crusher fines (6" depth)SF4,750$ - 0
A-408-1Sandstone boulders (18-30" dia)EA20$ - 0
A-408-2Memorial Bench/ Buff sandstone blocks (18" x 18" x 4')EA2$ - 0
A-501-1Trailhead Agricultural FenceLF150$ - 0
B-502-113' Swing gateEA2$ - 0
A-704-1Native Seeding and mulch (OSMP provided seed)SF9,000$ - 0
A-900-1Class 6 Base course (6" depth) (new material)SF33,500$ - 0
A-900-2Cast in Place Concrete Flatwork (6" depth)SY78$ - 0
A-900-3Asphalt PavingSY210$ - 0
A-1000-1Double trash enclosureEA2$ - 0
A-1000-2Dog station/ bag dispenserEA1$ - 0
A-1000-3Wheelstop: recycled plasticEA67$ - 0
A-1000-4Bench: powdercoated steel/ recycled plasticEA1$ - 0
A-1000-5Bike rack-powder coated steel inverted UEA4$ - 0
A-1000-6Bike Repair StationEA1$ - 0
A-1000-7Double vault concrete restroom and permittingEA1$ - 0
A-1000-8Brown highway signs and permittingEA2$ - 0
A-1000-9Stop signEA3$ - 0
SCHEDULE B: FOOTHILLS TRAILHEAD
B-009-1MobilizationLS1$ - 0
B-011-1SurveyLS1$ - 0
B-090-1RemovalsLS1$ - 0
B-106-1Erosion ControlLS1$ - 0
B-202-1Strip, stockpile, and respread topsoil on siteCY80$ - 0
B-203-1Earthwork and permittingCY450$ - 0
B-301-118" culvertLF45$ - 0
B-400-1Gray/tan stabilized crusher fines (6" depth)SF1,800$ - 0
B-408-1Sandstone boulders (18-30" dia)EA5$ - 0
B-408-2Memorial Bench/ Buff sandstone blocks (18" x 18" x 4')EA1$ - 0
B-501-1Trailhead Non-Agricultural FenceLF160$ - 0
B-502-113' Swing gateEA2$ - 0
B-704-1Native Seeding and mulch (OSMP provided seed)SF8,000$ - 0
B-900-1Class 6 Base course (6" depth) (new material)SF8,200$ - 0
B-900-2Cast in Place Concrete Flatwork (6" depth)SY50$ - 0
B-900-3Cast in Place Concrete CurbLF45$ - 0
B-1000-1Double trash enclosureEA1$ - 0
B-1000-2Wheelstop: recycled plasticEA23$ - 0
B-1000-3Bench: powdercoated steel/ recycled plasticEA1$ - 0
B-1000-4Bike rack-powder coated steel inverted UEA3$ - 0
B-1000-5Bike Repair StationEA1$ - 0
B-1000-6Stop signEA1$ - 0
SCHEDULE C: NORTH TELLER TRAILHEAD
C-009-1MobilizationLS1$ - 0
C-090-1RemovalsLS1$ - 0
C-011-1SurveyLS1$ - 0
C-106-1Erosion ControlLS1$ - 0
C-202-1Strip, stockpile, and respread topsoil on siteCY85$ - 0
C-203-1Earthwork and permittingCY200$ - 0
C-400-1Gray/tan stabilized crusher fines (6" depth)SF4,400$ - 0
C-408-1Sandstone boulders (18-30" dia)EA20$ - 0
C-408-2Memorial Bench/ Buff sandstone blocks (18" x 18" x 4')EA2$ - 0
C-501-1Wire FenceLF425$ - 0
C-502-113' Swing gateEA4$ - 0
C-704-1Native Seeding and mulch (OSMP provided seed)SF4,000$ - 0
C-900-1Class 6 Base course (6" depth) (new material)SF23,300$ - 0
C-900-2Cast in Place Concrete Flatwork (6" depth)SY40$ - 0
C-900-3Asphalt PavingSY55$ - 0
C-1000-1Double trash enclosureEA1$ - 0
C-1000-2Wheelstop: recycled plasticEA31$ - 0
C-1000-3Bench: powdercoated steel/ recycled plasticEA2$ - 0
C-1000-4Bike rack-powder coated steel inverted UEA4$ - 0
C-1000-5Bike Repair StationEA1$ - 0
C-1000-6Double vault concrete restroom and permittingEA1$ - 0
SCHEDULE D: LEFTHAND TRAILHEAD
D-009-1MobilizationLS1$ - 0
D-090-1RemovalsLS1$ - 0
D-011-1SurveyLS1$ - 0
D-106-1Erosion ControlLS1$ - 0
D-408-1Sandstone boulders (18-30" dia)EA6$ - 0
D-408-2Memorial Bench/ Buff sandstone blocks (18" x 18" x 4')EA1$ - 0
D-704-1Native Seeding and mulch (OSMP provided seed)SF250$ - 0
D-1000-1Double trash enclosureEA1$ - 0
D-1000-2Bench: powdercoated steel/ recycled plasticEA1$ - 0
D-1000-3Single vault concrete restroom and permittingEA1$ - 0

FORCE ACCOUNT: CONTINGENCY $ 100,000

PROJECT TOTAL $ 100,000