About this file
This is a Request for Bid (RFB) and associated bid set plans for paving improvements at the A-33 Repair Tank Park located at Camp Dodge in Johnston, Iowa, issued by the Iowa Department of Public Defense. The project requires contractors to provide all labor, materials, and equipment necessary to complete comprehensive paving improvements at the facility. The scope of work includes demolition of existing pavement and sidewalks (approximately 6 inches thick), installation of 10-inch Portland cement concrete (PCC) pavement, 6-inch PCC sidewalks, pavement markings with 4-inch wide painted parking stall lines and 45-degree striping at 3-foot center spacing, and site grading with erosion control measures. The project generates approximately 156 cubic yards of waste material that must be disposed of at an approved site on the Camp Dodge campus. The bid set includes detailed plans covering the title sheet, project information, traffic control plan, demolition plan, dimension plan, grading and erosion control plan, and jointing plan. The bid opening is scheduled for July 9, 2024, at 10:00 AM CDT, with electronic submissions required through the IMPACS Electronic Procurement System.
Bid security equal to 5% of the total bid amount is required, payable as a bid bond, cashier's check, or certified check to the Iowa Department of Public Defense. Payment terms are structured as 0% 0, Net 60. The project is identified by contract number 442SI273 and project number 19083761 (also referenced as 124.0191), with award contingent upon receiving requested Federal and/or State funding. The procurement provides opportunities for Targeted Small Businesses in accordance with Chapter 73 of the Code of Iowa. Contractors must comply with affirmative action and equal employment opportunity provisions, as well as Chapter 91C of Iowa Code for construction contractors. The project is exempt from Iowa Sales Tax, and Davis-Bacon Wages do not apply. Contractors are responsible for compliance with NPDES General Permit No. 2 for storm water discharges, pollution prevention measures, and all local, state, and federal grading and erosion control requirements. The plans were prepared by Snyder and Associates, Inc., and are dated June 3, 2024, with survey data current as of February 8, 2024.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 1241112-event.pdf | ||
| RFB 061424-02_Form of Bid.pdf | ||
| RFB 061424-02_DIV 02-11 - SUDAS.pdf | ||
| RFB 061424-02_Supplement A - Bid Bond.pdf | ||
| RFB 061424-02_Tank Park_Specs_Bid Set_06-03-24.pdf | ||
| RFB 061424-02_CD A-33 Repair Tank Park advertisement.pdf | ||
| RFB 061424-02_Supplement D - TSB Form.pdf | ||
| RFB 061424-02_DIV 01 - SUDAS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NW 78TH AVE
NW BEAVER DR
N W
3R
D C
T
ENCLAVE CIR
ENCLAVE LN
N W
BEAVER
D
R
NW
BEAVER DR
OAKWOOD HILLS DR
W
ILD
FLO
W
ER
C
T
WILDFLOWER PL
COUNTY RIDGE LN
CAMP DODGE
1A
1B
NW 78TH AVE
N W
BEAVER
D
R
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P1 _1
_T
IT
LE
.d w g
JU
ST
IN
S
TR
O M
, T
IT
LE
S
H
EE
T, 4/
/0
3, 0:
A M
, A N
SI
F
U
LL
B
LE
ED
D
(3 4.
X
2.
IN
C H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
0'
4.
C
124.0191
C100
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
TI
TL
E
SH
EE
T
JO
H
N
ST
O N
, I O
W A
TT
N
-R R
W -S
S
SITE PLAN
FOR
A-33 TANK HILL PARK PAVING IMPROVEMENTS
CAMP DODGE
CITY OF JOHNSTON, POLK COUNTY, IOWA
CONTRACT NO.: PROJECT NO.:
VICINITY MAP
PROJECT LOCATION
SCALE: 1" = 500'
OWNER / DEVELOPER
CAMP DODGE
7105 NW 70TH AVE
JOHNSTON, IA 50131
ENGINEER
SNYDER AND ASSOCIATES, INC
2727 SW SNYDER BLVD
ANKENY, IA 50023
PHONE: 515-964-2020
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
Justin F. Strom, P.E. Date
License Number P24140 My License Renewal Date is December 31, 2024
Pages or sheets covered by this seal:
JUSTIN F.
STROM
P24140
D
PROFE
L
NS
E
IC
E
IONAL ENGINEER
AIOW
SS
Sheet List Table Sheet Number Sheet Title
C100 TITLE SHEET
C101 PROJECT INFORMATION
C102 TRAFFIC CONTROL PLAN
C200 DEMOLITION PLAN
C300 DIMENSION PLAN
C400 GRADING AND EROSION CONTROL PLAN
C500 JOINTING PLAN
Sheets C100 thru C500
06/03/2024
NW
BEAVER DR
OAKWOOD HILLS DR
W
ILD
FLO
W
ER
C
T
WILDFLOWER PL
COUNTY RIDGE LN
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P1 _1
_T
IT
LE
.d w g
JU
ST
IN
S
TR
O M
, P R
O
JE
C T
IN
FO
R M
AT
IO
N , 2
4/
/0
3, 0:
A M
, A N
SI
F
U
LL
B
LE
ED
D
(3 4.
X
2.
IN
C H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
N O
N E
4.
C
124.0191
C101
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
PR
O
JE
C
T
IN
FO
R
M A
TI
O
N
JO
H N
ST
O
N , I
O
-R R
W -S
S
NOTES
1. BUILDING LINES AND CORNERS ARE FOR USE IN PREPARING CIVIL SITE
PLAN DOCUMENTS. BUILDING CORNERS AND BUILDING LINES SHOULD
BE SPECIFICALLY VERIFIED, AS NECESSARY, PRIOR TO DESIGN FOR
CONSTRUCTION OF ANY PROPOSED EXPANSION OR CONNECTION OF
BUILDING COMPONENTS.
2. FOR CLARITY PURPOSES, SURVEY SPOT ELEVATIONS ARE NOT SHOWN
ON THIS SURVEY, BUT ARE CONTAINED WITHIN THE DIGITAL CADD FILES.
3. FOR THE PURPOSE OF THIS SURVEY, STORM SEWER, SANITARY SEWER
AND WATER MAIN LINES ARE ASSUMED TO FOLLOW A STRAIGHT LINE
FROM STRUCTURE TO STRUCTURE.
4. UTILITY SERVICE LINES TO BUILDINGS ARE APPROXIMATE ONLY. AN
INTERNAL BUILDING INVESTIGATION, EXCAVATION AND/OR
SUBSURFACE LOCATING/DESIGNATING WOULD NEED TO BE
PERFORMED TO DETERMINE THE LOCATION OF SERVICES ENTERING
THE BUILDING.
5. UNDERGROUND PIPE MATERIALS AND SIZES ARE BASED UPON VISIBLE
EVIDENCE VIEWED FROM ACCESS MANHOLES/STRUCTURES. DUE TO
THE CONFIGURATION AND/OR CONSTRUCTION OF THE STRUCTURE, IT
MAY BE DIFFICULT TO ACCURATELY DETERMINE THE PIPE MATERIAL
AND/OR SIZE. THE SURVEYOR WILL USE THEIR JUDGMENT AND
EXPERIENCE TO ATTEMPT TO DETERMINE, BUT COMPLETE ACCURACY
CANNOT BE GUARANTEED.
6. BOUNDARY LINES SHOWN ON THE EXISTING SITE SURVEY ARE TO
FACILITATE DESIGN OR CONCEPT NEEDS AND ENABLE CREATION OF
SAID CONSTRUCTION DOCUMENTS. THESE LINES DO NOT CONSTITUTE
A CERTIFIED BOUNDARY SURVEY AND MISSING MONUMENTS WILL NOT
BE SET.
UTILITY QUALITY SERVICE LEVELS
QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY
TYPE AND WHEN APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI /
ASCE 38-02 STANDARD.
QUALITY LEVEL (D) INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR
ORAL RECOLLECTIONS.
QUALITY LEVEL (C) INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING
VISIBLE ABOVE-GROUND UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT
IN CORRELATING THIS INFORMATION WITH
QUALITY D INFORMATION.
QUALITY LEVEL (B) INFORMATION IS OBTAINED THROUGH THE APPLICATION OF
APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE
AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES.
QUALITY LEVEL (A) IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND
UTILITIES OBTAINED BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY
EXPOSED SUBSURFACE UTILITIES, AS WELL AS THE TYPE, SIZE, CONDITION,
MATERIAL, AND OTHER CHARACTERISTICS.
UTILITY WARNING
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO
GUARANTEE THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN
COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN SERVICE OR ABANDONED.
THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES OR
SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED
EXCEPT WHERE NOTED AS QUALITY LEVEL A.
FEATURES EXISTING PROPOSED
Spot Elevation Contour Elevation Fence (Barbed, Field, Hog) Fence (Chain Link) Fence (Wood) Fence (Silt) Tree Line Tree Stump
Deciduous Tree \\ Shrub
Coniferous Tree \\ Shrub
Communication Overhead Communication Fiber Optic Underground Electric Overhead Electric Gas Main with Size High Pressure Gas Main with Size Water Main with Size Sanitary Sewer with Size Duct Bank Test Hole Location for SUE w/ID
(*) Denotes the survey quality service level for utilities
Sanitary Manhole
Storm Sewer with Size Storm Manhole Single Storm Sewer Intake Double Storm Sewer Intake Fire Hydrant Fire Hydrant on Building Water Main Valve Water Service Valve Well Utility Pole Guy Anchor Utility Pole with Light Utility Pole with Transformer Street Light Yard Light Electric Box Electric Transformer Traffic Sign Communication Pedestal Communication Manhole Communication Handhole Fiber Optic Manhole Fiber Optic Handhole Gas Valve Gas Manhole Gas Apparatus Fence Post or Guard Post Underground Storage Tank Above Ground Storage Tank Sign Satellite Dish Mailbox Sprinkler Head Irrigation Control Valve
LEGEND
X 1225.25
X1225 1225.25
FEATURES FOUND SET
Section Corner 1/2" Rebar, Cap # 11579
(Unless Otherwise Noted) ROW Marker ROW Rail Control Point Bench Mark Platted Distance P Measured Bearing & Distance M Recorded As R Deed Distance D Calculated Distance C Minimum Protection Elevation MPE Centerline Section Line 1/4 Section Line 1/4 1/4 Section Line Easement Line
PROJECT LOCATION
PROJECT LOCATION
SCALE: 1"= 200'
WASTE MATERIAL LOCATION
SCALE: 1"= 2000'
POLLUTION PREVENTION NOTES
A. POLLUTION PREVENTION AND EROSION PROTECTION
1. CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR
COMPLIANCE WITH ALL POTENTIAL POLLUTION AND SOIL EROSION
CONTROL REQUIREMENTS OF THE IOWA CODE, THE IOWA DEPARTMENT
OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN WATER
ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL
NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION
FROM THIS PROJECT SITE AND ALL OFF-SITE BORROW OR DEPOSIT
AREAS DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE.
2. DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND
ARCHITECT / ENGINEER HARMLESS FROM ANY AND ALL CLAIMS OF ANY
TYPE WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC
OR PRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY FEES
INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE
NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR
DEBRIS WHICH COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY,
THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT
THE COST THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR.
B. STORM WATER DISCHARGE PERMIT
1. THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL
PERMIT NO. 2 FOR STORM WATER DISCHARGES ASSOCIATED WITH
CONSTRUCTION ACTIVITIES FROM THE IDNR, AS REQUIRED BY THE
ENVIRONMENTAL PROTECTION AGENCY (EPA). THE GENERAL
CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR
COMPLIANCE WITH AND FULFILLMENT OF ALL REQUIREMENTS OF THE
NPDES GENERAL PERMIT NO. 2 AS SPECIFIED IN THE CONTRACT
DOCUMENTS.
2. ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT,
INCLUDING, BUT NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF
PUBLICATIONS, DISCHARGE AUTHORIZATION LETTER, CURRENT SWPPP,
SITE INSPECTION LOG, AND OTHER ITEMS, SHALL BE THE
RESPONSIBILITY OF THE IOWA ARMY NATIONAL GUARD.
C. POLLUTION PREVENTION PLAN
1. THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A
SEPARATE DOCUMENT IN ADDITION TO THESE PLAN DRAWINGS. THE
CONTRACTOR SHOULD REFER TO THE SWPPP FOR ADDITIONAL
REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION PREVENTION
PLAN MADE DURING CONSTRUCTION.
2. THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT
PRACTICES (BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT
COVERAGE. ALL BMP'S AND EROSION CONTROL MEASURES REQUIRED
AS A RESULT OF CONSTRUCTION ACTIVITIES ARE THE RESPONSIBILITY
OF THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL
BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED.
3. THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO
REFLECT CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT
SITE.
4. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL
REQUIREMENTS OF THE GENERAL PERMIT AND SWPPP, INCLUDING, BUT
NOT LIMITED TO, THE FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT
APPLICABLE:
a. UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE
SURFACE WHEN DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN
NATURAL BUFFERS AROUND SURFACE WATERS, DIRECT STORM
WATER TO VEGETATED AREAS TO INCREASE SEDIMENT REMOVAL
AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL
COMPACTION.
b. INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH
AS SILT BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR
SEDIMENTATION BASINS DOWNSTREAM OF SOIL DISTURBING
ACTIVITIES PRIOR TO SITE CLEARING AND GRADING OPERATIONS.
c. PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR
CONSTRUCTION AND LIMIT TO A MINIMUM THE TOTAL AREA
DISTURBED BY CONSTRUCTION OPERATIONS AT ANY TIME.
d. MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL
MEASURES IN WORKING ORDER, INCLUDING CLEANING, REPAIRING,
REPLACEMENT, AND SEDIMENT REMOVAL THROUGHOUT THE PERMIT
PERIOD. CLEAN OR REPLACE SILT CONTROL DEVICES WHEN THE
MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY.
e. PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM
CONSTRUCTION ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE
PROPERTIES, INCLUDING STREETS, DRIVEWAYS, SIDEWALKS,
DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY
ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE
REMEDIAL ACTIONS FOR FUTURE PREVENTION.
f. INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS
SOON AS AREAS REACH THEIR FINAL GRADES AND AS CONSTRUCTION
OPERATIONS PROGRESS TO ENSURE CONTINUOUS RUNOFF
CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS
SOON AS STORM SEWERS ARE INSTALLED.
g. RESPREAD A MINIMUM OF 8 INCHES OF TOPSOIL (INCLUDING TOPSOIL
FOUND IN SOD) ON ALL DISTURBED AREAS, EXCEPT WHERE
PAVEMENT, BUILDINGS OR OTHER IMPROVEMENTS ARE LOCATED.
h. STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, PERMANENT SEED MIX, SOD, OR PAVEMENT
IMMEDIATELY AS SOON AS POSSIBLE UPON COMPLETION OR DELAY
OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES
IMMEDIATELY AFTER CONSTRUCTION ACTIVITY IS FINALLY
COMPLETED OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE
AND WHICH WILL NOT RESUME FOR A PERIOD EXCEEDING 14
CALENDAR DAYS.
i. COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND
RECORD IN THE SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS
SHOULD CONTAIN THE FOLLOWING: JOB TRAILERS, FUELING / VEHICLE
MAINTENANCE AREA, TEMPORARY SANITARY FACILITIES, MATERIALS
STORAGE, AND CONCRETE WASHOUT FACILITY. CONTROL RUNOFF
FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT
BARRIERS AND DIRECT TO A SEDIMENT BASIN OR OTHER CONTROL
DEVICE WHERE POSSIBLE. CONCRETE WASHOUT MUST BE
CONTAINED ONSITE.
j. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE
WASTE PRIOR TO COORDINATING WITH THE IOWA ARMY NATIONAL
GUARD WHO IS RESPONSIBLE FOR FILING OF THE "NOTICE OF
DISCONTINUATION".
GENERAL NOTES
THESE GENERAL NOTES APPLY TO ALL PLAN DRAWINGS FOR THIS PROJECT.
A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION
ACTIVITIES AND COORDINATE WITH OWNER & UTILITY PROVIDERS AS
NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE
FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH OF ALL
UTILITIES. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS AND
MAINTAIN MINIMUM 18" VERTICAL AND HORIZONTAL CLEARANCE
BETWEEN UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES
NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES DO TO
CONTRACTOR'S CARELESSNESS SHALL BE CORRECTED TO THE
UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
B. CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING
FEATURES ON SITE NOT DESIGNATED FOR DEMOLITION DURING
CONSTRUCTION; SUCH AS, SIGNS, DRIVES, CURBS, SIDEWALKS, PLANT
MATERIAL, LIGHTS, BUILDINGS, ETC. ANY FEATURES DAMAGED SHALL
BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE OWNERS
SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
C. WHERE CONFLICTS ARE DISCOVERED WITH UTILITIES SHOWN AS
EXISTING ON THE PLANS OR ARE ENCOUNTERED WITHIN THE
CONSTRUCTION AREA, IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO NOTIFY THE OWNERS OF THOSE UTILITIES PRIOR TO
THE BEGINNING OF ANY FURTHER CONSTRUCTION. THE CONTRACTOR
SHALL AFFORD ACCESS TO THESE FACILITIES FOR NECESSARY
MODIFICATION OF SERVICES. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THEIR EXISTENCE AND EXACT
LOCATION AND TO AVOID DAMAGE THERETO. NO CLAIMS FOR
ADDITIONAL COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR
FOR ANY INTERFERENCE OR DELAY OR DAMAGE CAUSED BY SUCH
WORK. ANY DAMAGES DO TO CONTRACTOR'S CARELESSNESS SHALL
BE CORRECTED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE
CONTRACTOR'S EXPENSE.
D. THE CONTRACTOR IS RESPONSIBLE FOR INSPECTING THE SITE OF THE
PROPOSED WORK PRIOR TO BIDDING TO UNDERSTAND THE EXISTING
CONDITIONS AND ALL WORK NECESSARY FOR THE PROPOSED
CONSTRUCTION.
E. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO
FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK.
F. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE
RECONNECTED AND NOTED ACCORDINGLY ON THE AS-BUILT
DOCUMENTS.
G. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE
FINISHED GRADES AND/OR TOP OF PAVING SLAB OR GRANULAR
SURFACING, UNLESS OTHERWISE NOTED.
H. DIMENSIONS, PAVEMENT LOCATIONS, UTILITIES AND GRADING OF THIS
SITE ARE BASED ON AVAILABLE INFORMATION. DEVIATIONS MAY BE
NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS
BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO
THE ENGINEER PRIOR TO STARTING CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF
ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION.
I. CONSTRUCTION OF ALL SITE IMPROVEMENTS SHALL CONFORM TO THE
PROJECT SPECIFICATIONS.
J. CONTRACTOR TO COORDINATE WITH THE OWNER CONSTRUCTION
SECURITY ACCESS, STAGING AND STORAGE OF MATERIALS ON THE
PROJECT SITE AND EQUIPMENT DURING NON-WORKING HOURS.
K. ALL WASTE MATERIAL REMOVALS SHALL BE DISPOSED OF TO AN
APPROVED SITE. THE CONTRACTOR SHALL LOAD AND TRANSPORT
ALL MATERIALS CONSIDERED TO BE UNDESIRABLE AND DESIGNATED
TO BE REMOVED FROM THE PROJECT TO AN APPROVED WASTE SITE
OUTSIDE OF CAMP DODGE UNLESS OTHERWISE NOTED. DISPOSE OF IN
ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. AN
ON-SITE PAVEMENT REMOVAL AREA HAS BEEN IDENTIFIED ON THIS
SHEET AND MAY BE UTILIZED FOR DISPOSING OF THE PAVEMENT
REMOVALS. COORDINATE WITH CAMP DODGE PERSONNEL FOR
ACCESS AND HAUL ROUTES.
L. CONTRACTOR TO LOAD, HAUL AND PLACE EXCESS SOILS FROM WORK
ACTIVITY TO SPOILS SITE ON CAMP DODGE. COORDINATE SPOIL AREA
WITH OWNER. CONTRACTOR TO COORDINATE LOCATION OF SPOIL
AREA WITH OWNER PRIOR TO COMMENCEMENT OF PROJECT.
STABILIZE DISTURBED SPOIL AREA WITH TYPE '6' STABILIZING CROP
SEED MIX.
M. CONTRACTOR SHALL LOAD, TRANSPORT AND PLACE SUITABLE
SUBGRADE OR FILL MATERIAL FROM ON-SITE LOCATION AS NEEDED
FOR THE PROJECT.
N. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS,
DRIVEWAYS, AND TRAILS CLEANED OF DIRT AND DEBRIS CAUSED BY
CONSTRUCTION ACTIVITIES IN A TIMELY MANNER.
O. LOCAL, STATE AND FEDERAL GRADING AND SOIL EROSION CONTROL
CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. THE
CONTRACTOR IS RESPONSIBLE FOR ALL GRADING OPERATIONS
INCLUDING PROVIDING AND MAINTAINING STORM WATER EROSION
CONTROL MEASURES FOR COMPLIANCE OF ALL NPDES PERMIT
REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
INSTALLING EROSION CONTROL MEASURES AS NECESSARY TO
PROTECT AGAINST SILTATION, EROSION AND DUST POLLUTION ON
PROJECT SITE AND ANY OFF-SITE DEPOSIT AREA USED FOR THIS
PROJECT. INSTALL SILTATION DEVICES TO PREVENT SEDIMENT FROM
ENTERING DRAINAGE STRUCTURES AND/OR FACILITIES. CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING
EROSION CONTROL MEASURES ON SITE AT THE TIME OF
CONSTRUCTION.
P. DO NOT RESTRICT DRAINAGE CHANNELS AND PROTECT ALL EXISTING
DRAINAGE STRUCTURES UNLESS OTHERWISE NOTED. CONTRACTOR IS
FULLY LIABLE FOR ALL DAMAGES TO PUBLIC OR PRIVATE PROPERTY
CAUSED BY THEIR ACTION OR INACTION IN PROVIDING FOR THE
HANDLING OF STORM WATER FLOW DURING CONSTRUCTION.
Q. ALL HOLES RESULTING FROM OPERATIONS OF THE CONTRACTOR,
INCLUDING REMOVAL OF VEGETATION, POSTS, UTILITY POLES OR
FOUNDATION STRUCTURES SHALL BE FILLED AND CONSOLIDATED TO
FINISHED GRADE AS APPROVED BY THE ENGINEER TO PREVENT
FUTURE SETTLEMENT. THE VOIDS SHALL BE FILLED AS SOON AS
PRACTICAL, PREFERABLE THE DAY CREATED AND NO LATER THAN
THE FOLLOWING DAY. THIS WORK SHALL BE CONSIDERED INCIDENTAL
TO THE PROJECT.
R. CONTRACTOR SHALL SUPPLY ALL CONSTRUCTION STAKING FOR THIS
PROJECT.
S. THE CONTRACTOR SHALL SUBMIT TO THE OWNER A SCHEDULE FOR
PERFORMANCE OF WORK. NO WORK SHALL BEGIN UNTIL A SCHEDULE
HAS BEEN SUBMITTED AND ACCEPTED BY THE OWNER. THE
CONTRACTOR SHALL THEN PERFORM THE WORK AS TO CONFORM TO
THE ACCEPTED SCHEDULE IN COORDINATION WITH THE OWNER.
UTILITY CONTACT INFORMATION
UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS RECEIVED FROM THE IOWA
ONE CALL DESIGN REQUEST SYSTEM, TICKET NUMBER 552400728.
G1-GAS MAIN MIDAMER-GAS
Jaime Neer (515)-252-6972
MECDSMDESIGNLOCATES@MIDAMERICAN.COM
FO1-FIBER OPTIC CENTURYLINK
SADIE HULL
(918)-547-0147
SADIE.HULL@LUMEN.COM
E4-UNDERGROUND ELECTRIC CAMP DODGE
FO19-FIBER OPTIC Philip McMeins
(515)-252-4955
PHILIP.A.MCMEINS.NFG@ARMY.MIL
FO5-FIBER OPTIC IOWA COMMUNICATIONS NETWORK
BRANDON HAINES
(800)-572-3940
ICNOUTSIDEPLANTIOWAONECALL@IOWA.GOV
FO6-FIBER OPTIC JOHNSTON PUBLIC WORKS, CITY OF
W1-WATER MAIN Tyler Danielson
(515)-664-5563
TDANIELSON@CITYOFJOHNSTON.COM
OE1-OVERHEAD ELECTRIC MIDAMER-ELEC
Jaime Neer (515)-252-6972
MECDSMDESIGNLOCATES@MIDAMERICAN.COM
NO RESPONSE MEDIACOM
JERRY BROUGHTON
(845)-587-2521
JBROUGHTON@MEDIACOMCC.COM
FO8-FIBER OPTIC UNITE PRIVATE NETWORKS, LLC
Joe Kilzer (816)-425-3556
UPNGIS@UPNFIBER.COM
CONTROL POINTS
IOWA SOUTH STATE PLANE COORDINATE SYSTEM
NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET
CP1 N=618781.43 E=1583684.50 Z=983.93
CUT 'X' SE CORNER TANK PAD, +/-80' WEST OF PARK SIGN, +/-125' WEST
OF BEAVER AVE, +/-100' SOUTH OF JET
CP2 N=618889.86 E=1583715.37 Z=983.22
CUT 'X' SW CORNER JET PAD, +/-100' WEST OF BEAVER AVE, +/-100'
NORTH OF PARK SIGN
CP3 N=618999.29 E=1583853.22 Z=983.48
CUT 'X' TOP OF CURB SOUTH SIDE COUNTY RIDGE LANE, +/-25' EAST OF
BEAVER AVE, +/-25' NORTH OF POWER POLE
CP4 N=618669.05 E=1583865.30 Z=986.45
CUT 'X' ON TRAIL, +/-10' WEST OF POWER POLE, +/-25' EAST OF BEAVER
AVE, +/-100' SOUTH OF PARK ENTRANCE
BENCHMARKS
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A)
IARTN DERIVED - US SURVEY FEET
BM500 N=618980.-- E=1583849.-- ELEV=986.13
BURY BOLT ON HYDRANT, +/-25' EAST OF BEAVER AVE, +/-25'
SOUTH OF COUNTRY RIDGE LANE
DATE OF SURVEY
FEBRUARY 08, 2024
PAVEMENT REMOVAL
WASTE AREA
PROJECT LOCATION
NW 90TH AVE
NW
NW 78TH AVE
NW
OAKWOOD HILLS DR
W
ILD
FLO
W
ER
C
T
WILDFLOWER PL
COUNTY RIDGE LN
CAMP DODGE
1A
1B
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P1 _1
_T
IT
LE
.d w g
JU
ST
IN
S
TR
O M
, T R
AF
FI
C C
O N
TR
O
L
PL
AN
, 2
4/
/0
3, 0:
A M
, A N
SI
F
U
LL
B
LE
ED
D
(3 4.
X
2.
IN
C H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
4.
C
124.0191
C102
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
TR
A
FF
IC
C O
N
TR
O L
PL
A
N
JO
H N
ST
O
N , I
O
-R R
W -S
STRAFFIC CONTROL NOTES
1. PROVIDE THE FOLLOWING:
A. CONSTRUCTION CONES FOR CLOSURE OF SITE TO PUBLIC.
B. CONTRACTOR TO DETERMINE STAGING/STOCK PILING SPACE
NEEDED. EXISTING FENCE CONSISTS OF 6' TALL BLACK CHAIN
LINK FENCE WITH NO TOP OR BOTTOM RAIL. REMOVE AND
REPLACE AS NEEDED FOR CONSTRUCTION OPERATIONS.
TRAFFIC CONTROL LEGEND
PARKING LOT
CONE / SIGN
FEET
0 100
Jet Display Pad Concrete
Tank Display Pad Concrete
Cannon Display Pad Concrete
Concrete Pad
Tank Display Pad Concrete
Stone Column
Stone Column
Stone Column
Asphalt Area
Sign With Curb
N W
B ea ve r D riv e
1D
1A
1A
1F
1B1C
2B
2A
2CTYP
2CTYP
2C TYP
2C TYP
2C TYP
1D
1D
1D
1B
1I
1B1C
1E
1B
1E
1B 1G
1G
1H
7"5"
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P2 _1
_D
EM
O
.d w g
JU
ST
IN
S
TR
O M
, D
EM
O
LI
TI
O
N P
LA
N
, 2
4/
/0 3, 0:
A
M , A
N
SI
F U
LL
B
LE
ED
D (3
4.
X
2.
IN
C
H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
4.
C
124.0191
C200
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
D
EM
O
LI
TI
O
N P
LA
N
JO
H
N
ST
O N
, I O
-R R
W -S
S
FEET
0 20
DEMOLITION PLAN CONSTRUCTION NOTES
1. EXISTING FEATURES, PROTECT THE FOLLOWING:
A. PAVEMENTS TO REMAIN. SAW-CUT ALL PAVEMENTS TO FULL DEPTH AT REMOVAL LIMIT.
AVOID DAMAGE TO ADJACENT PAVEMENTS.
B. UTILITIES. VERIFY LOCATION PRIOR TO CONSTRUCTION. ANY DAMAGE TO UTILITIES DUE TO
CONSTRUCTION SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE. ADJUST EXISTING
UTILITIES WHEN REQUIRED TO MATCH PROPOSED GRADE.
C. LIGHT POLES.
D. WOOD FENCE WITH DECORATIVE STONE COLUMNS.
E. 6' TALL BLACK CHAIN LINK FENCE WITH NO TOP OR BOTTOM RAIL. REMOVE AND REPLACE
AS NEEDED FOR CONSTRUCTION OPERATIONS.
F. JET DISPLAY. VISIT SITE OR LOOK AT GOOGLE STREET VIEW TO UNDERSTAND EXISTING
VEHICLE STRUCTURES THAT WILL REMAIN IN PLACE DURING CONSTRUCTION.
STRUCTURES SHALL BE PROTECTED FROM ANY AND ALL DAMAGE AND SHALL BE
PROTECTED FROM ANY CONCRETE SPLASH BACK, HYDROSEEDING OVERSPRAY AND OTHER
MATERIALS. STRUCTURES SIT ON A CONCRETE PAD THAT SHALL REMAIN WITH PAVEMENT
REMOVALS AND REPLACEMENTS TO OCCUR AROUND THE EXISTING CONCRETE DISPLAY
PADS. CONTRACTOR TO SUBMIT A PROTECTION PLAN FOR REVIEW PRIOR TO
CONSTRUCTION.
G. TANK DISPLAY. VISIT SITE OR LOOK AT GOOGLE STREET VIEW TO UNDERSTAND EXISTING
VEHICLE STRUCTURES THAT WILL REMAIN IN PLACE DURING CONSTRUCTION.
STRUCTURES SHALL BE PROTECTED FROM ANY AND ALL DAMAGE AND SHALL BE
PROTECTED FROM ANY CONCRETE SPLASH BACK, HYDROSEEDING OVERSPRAY AND OTHER
MATERIALS. STRUCTURES SIT ON A CONCRETE PAD THAT SHALL REMAIN WITH PAVEMENT
REMOVALS AND REPLACEMENTS TO OCCUR AROUND THE EXISTING CONCRETE DISPLAY
PADS. CONTRACTOR TO SUBMIT A PROTECTION PLAN FOR REVIEW PRIOR TO
CONSTRUCTION.
H. CANNON DISPLAY. CANNON DISPLAY SITES ON A PRIMARY PAD, WITH ARMS THAT EXTEND
TO TWO SMALLER PADS. THE CANNON DISPLAY ARMS SPAN OVER PAVEMENT THAT WILL
BE REMOVED AND REPLACED. VISIT SITE OR LOOK AT GOOGLE STREET VIEW TO
UNDERSTAND EXISTING STRUCTURES THAT WILL REMAIN IN PLACE DURING
CONSTRUCTION. STRUCTURES SHALL BE PROTECTED FROM ANY AND ALL DAMAGE AND
SHALL BE PROTECTED FROM ANY CONCRETE SPLASH BACK, HYDROSEEDING OVERSPRAY
AND OTHER MATERIALS. STRUCTURES SIT ON A CONCRETE PAD THAT SHALL REMAIN WITH
PAVEMENT REMOVALS AND REPLACEMENTS TO OCCUR AROUND THE EXISTING CONCRETE
DISPLAY PADS. CONTRACTOR TO SUBMIT A PROTECTION PLAN FOR REVIEW PRIOR TO
CONSTRUCTION.
I. ELECTRONIC BOARD SIGN AND DECORATIVE STONE ENCASEMENT. VISIT SITE OR LOOK AT
GOOGLE STREET VIEW TO UNDERSTAND EXISTING STRUCTURES THAT WILL REMAIN IN
PLACE DURING CONSTRUCTION. STRUCTURES SHALL BE PROTECTED FROM ANY AND ALL
DAMAGE AND SHALL BE PROTECTED FROM ANY CONCRETE SPLASH BACK, HYDROSEEDING
OVERSPRAY AND OTHER MATERIALS. STRUCTURES SIT ON A CONCRETE PAD THAT SHALL
REMAIN WITH PAVEMENT REMOVALS AND REPLACEMENTS TO OCCUR AROUND THE
EXISTING CONCRETE DISPLAY PADS. CONTRACTOR TO SUBMIT A PROTECTION PLAN FOR
REVIEW PRIOR TO CONSTRUCTION.
2. DEMOLITION, REMOVE THE FOLLOWING:
A. EXISTING PAVEMENT. SAW-CUT TO FULL DEPTH TO CREATE UNIFORM EDGE AT LIMITS.
EXISTING PARKING LOT PAVEMENT THICKNESS ARE APPROXIMATELY 6.0". PAVEMENT
CORES WERE UTILIZED TO DETERMINE EXISTING THICKNESS, WITH THE LOCATION
AND THICKNESS OF THE THREE CORES IN THE DRIVE AISLE AND THE THREE CORES IN
THE PARKING AREA SHOWN WITH ASSOCIATED THICKNESS RESULTS.
B. EXISTING SIDEWALK.
C. REMOVE, SALVAGE AND PROTECT EXSITING CONCRETE CURB STOPS AT PERIMETER OF
PARKING LOT. REPLACE AT END OF CONSTRUCTION.
DEMOLITION LEGEND
PAVEMENT REMOVAL
CONTRACT LIMITS
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X
X X
X X
X X
X X
X
FO
U
FO
U
FO
U
FO
U
FOU
FOUFOUFOUFOU
FOU
FOU
FOU
FOU
FOU
FOU
FOU
FOU
FOU
FOU
FOU
FOUFOUFOUFOUFOUFOUFOUFOUFOUFOUFOUFOUFOUFOUFOUFOU
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
UGE
UG
E
UGE
UGE
UGE
UGE
U G
E U
G E
UGE
U G
E U
G E
UGEUGEUGE
UGE
UGE
UGE
UGE
UGE
UG
E
U G
E
UGE
UGE UGE UGE UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
O P
O P
O P
O P
O P
O P
H
Jet Display Pad Concrete
Stone Column
Stone Column
Stone Column
N W
B ea ve r D riv e
10.5'8'
18'
10'
TYP8'
18'
10'
TYP
124'
25' 28'
7'
R50'
R60'
R1
.8
1A
2A TYP
2A TYP
2B
1B
116'
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P3 _1
_D
IM
N
.d w g
JU
ST
IN
S
TR
O M
, D
IM
EN
SI
O N
P
LA
N , 2
4/
/0
3, 0:
A M
, A N
SI
F
U
LL
B
LE
ED
D
(3 4.
X
2.
IN
C H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
4.
C
124.0191
C300
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
D
IM
EN
SI
O N
P
LA
N
JO
H N
ST
O
N , I
O
-R R
W -S
S
C300
TYPICAL PAVEMENT CROSS SECTIONS
NO SCALE
PCC PAVEMENT SECTION PCC SIDEWALK SECTION
PCC PAVEMENT,
SEE PLANS
FOR THICKNESS &
LOCATIONS
PREPARED SUBGRADE
PER SPECIFICATIONS
DIMENSION PLAN CONSTRUCTION NOTES
1. PAVEMENTS. PROVIDE THE FOLLOWING:
A. 10" DEPTH PCC. SEE DETAIL. ANY FILL OR WASTE MATERIAL NEEDED/GENERATED FOR PAVEMENT IMPROVEMENTS SHALL HAVE A SOURCE OR WASTE SITE PROVIDED BY THE OWNER ON CAMP DODGE CAMPUS. CONTRACTOR WOULD BE RESPONSIBLE FOR LOADING
TRANSPORTING AND PLACING ANY MATERIAL.
B. SIDEWALK, 6" DEPTH PCC.
2. PAVEMENT MARKINGS. PROVIDE THE FOLLOWING:
A. 4" WIDE PAINTED PARKING STALL LINES.
B. 45 DEGREE STRIPING AT 3' ON CENTER SPACING.
3. WHEN ANALYZING THE EXISTING SURFACE VS THE PROPOSED SURFACE AND CONSIDERING THE EXISTING PAVEMENT THICKNESS OF 7" AND PROPOSED PAVEMENT THICKNESS OF 10", THE PROJECT IS ANTICIPATED TO GENERATE 156 CY OF WASTE. WASTE DIRT SHALL BE
HAULED TO A LOCATION ON THE CAMP DODGE CAMPUS AT NO ADDITIONAL COST.
PAVEMENT LEGEND
FEET
0 20
6" PCC SIDEWALK
10" PCC PAVEMENT
Stone Column
Stone Column
Stone Column
N W
B ea ve r D riv e
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXXXX
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X
FO
U
FO
U
FO
U
FO
U
FO
U
FO
U
FO
U
FO
U
FOU
FOU
FOU
FOUFOUFOUFOUFOUFOU
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
UGE
UGE
UGE
U G
E
UGEUGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
U G
E U
G E
U G
E
UGE
UGE
UGE
U G
E U
G E
U G
E U
G E
UGE
UGEUGEUGEUGEUGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
U G
E
UG
E
UGE
UGE
UGE
UGE
UGE
UG
E
U G
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
H
5.0
5.6
5.5
(98 5.8
0)
(98 5.9
1)
(98 5.8
9)
(98 5.9
3)
5.7
5.6
5.6
5.7
5.6
5.3
4.3
4.6
4.7
3.7
3.2
3.5
(98 3.3
0)
(98 3.2
3)
3.3
3.1
2.3
2.7
1.6
2.3
4.6
3.6
5.1
5.4
2.7
1.8
1.5
1.8
3.6
3.4
2.9
FILTER SOCK
FILTER SOCK
FILTER SOCK
E 9.8'
E 10.5'
E 9.6'
E 11.3'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 8.9'
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
E E
E
EE
E
E
E
E
E E
EE
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
EE
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P4 _1
_G
R D
G .d w g
JU
ST
IN
S
TR
O
M , G
R
AD
IN
G
A N
D E
R O
SI
O
N C
O N
TR
O
L
PL
AN
, 2
4/
/0
3, 0:
A M
, A N
SI
F
U
LL
B
LE
ED
D
(3 4.
X
2.
IN
C H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
4.
C
124.0191
C400
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
G R
A D
IN
G
A N
D E
R O
SI
O
N C
O N
TR
O
L
PL
A N
JO
H
N
ST
O N
, I O
-R R
W -S
SGRADING NOTES
1. UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM SURVEY INFORMATION AND/OR RECORDS
OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, WITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE
UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED.
2. PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT OCCURS SHALL BE REPAIRED
BY THE CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL COMPENSATION.
3. GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLABE (GUTTER), INLESS OTHERWISE NOTED.
4. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL ON ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM
8" DEPTH TO FINISH GRADES.
5. ALL DRAINAGE SWALES AND SLOPES 5 TO 1 OR GREATER TO BE SEEDED USING COMMERCIALLY AVAILABLE
EROSION CONTROL SEED. MIXTURE APPLIED AT RATE RECOMMENDED BY SUPPLIER.
6. EROSION CONTROL: SEED THE SITE AFTER ROUGH GRADING HAS BEEN COMPLETED. PLACE SILT FENCE OR FILTER SOCK AND MAINTAIN IN PROBLEM AREAS AFTER GROUND COVER HAS BEEN ESTABLISHED. COMPLY
WITH EROSION CONTROL LAW.
7. CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS
AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES.
8. HYDRAULICALLY SEED ALL AREAS DISTURBED BY CONSTRUCTION BY USING BONDED FIBER MATRIX WITH TYPE 1
PERMANENT LAWN SEED MIX.
BENCHMARKS
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A)
IARTN DERIVED - US SURVEY FEET
BM500 N=618980.-- E=1583849.-- ELEV=986.13
BURY BOLT ON HYDRANT, +/-25' EAST OF BEAVER AVE, +/-25' SOUTH OF COUNTRY RIDGE LANE
DISTURBED AREA
DIRECTION OF FLOW
'-0
" M
AX
0'-
0" M
AX
L
EN
G
TH
P
ER
S
EC
TI
O N
(6
'-0 " I
F
SL
O
PE
IS
F
LA
TT
ER
T
HA
N
5%
3'
MIN
OVERLA
P
PLAN VIEW OF SLOPE
(for sediment and slope control)
CONSTRUCT "J-HOOK" AT EACH
END ON AN INDIVIDUAL SECTION
OF SOCK OR BERM
PLACE BERM ON SOCK
PERPENDICULAR TO SLOPE
STAKES (TYP)
AREA TO
BE PROTECTED
TYPICAL PLACEMENT OF BERM OR SOCK
FILTER SOCK
WATER FLOW
STAKE
FILL MATERIAL
C400
FILTER SOCK DETAIL
NO SCALE
FEET
0 10
Stone Column
Stone Column
Stone Column
N W
B ea ve r D riv e
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXXXX
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X
H
E 9.8'
E 10.5'
E 9.6'
E 11.3'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 10.5'
E 8.9'
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
.5
E
E E
E
EE
E
E
E
E
E E
EE
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
EE
V:
\P ro je ct s\
\1
.0
1.
\C
AD
D \S
P4 _1
_G
R D
G .d w g
JU
ST
IN
S
TR
O
M , J
O
IN
TI
N
G P
LA
N
, 2
4/
/0 3, 0:
A
M , A
N
SI
F U
LL
B
LE
ED
D (3
4.
X
2.
IN
C
H
ES
BY
DA
TE
R
EV
IS
IO
N
M
AR
K Sc al e:
Te ch ni ci an
T- R
-S
SN
YD
ER
AS
SO
CIA
TE
S, INC
C he ck ed
B y:
En gi ne er
D at e:
1"
Pr oj ec t N o:
Sh ee t
Project No:
Sheet
S .W
. S N
YD
ER
B
LV
D
AN
KE
N
Y, IO
W A
5-
4-w w w .s ny de r-a ss oc ia te s.
co m
JF
S
TE
C
H
JF
S
-0
3-
4.
C
124.0191
C500
A -3
TA
N K
H
IL
L
PA
R K
P A
VI
N
G
IM
PR
O
VE
M
EN
TS
JO
IN
TI
N
G P
LA
N
JO
H
N
ST
O N
, I O
-R R
W -S
S
FEET
0 10
PAVEMENT JOINTING NOTES
A. CONTRACTOR TO PROVIDE JOINTING PLAN IDENTIFYING JOINT TYPES AND DIMENSIONS FOR ENGINEER REVIEW PRIOR TO
CONSTRUCTION.
B. VERIFY LAYOUT OF EXISTING PAVEMENT JOINTS TO ENSURE ALIGNMENT WITH PROPOSED JOINTS.
C. JOINTING SHALL BE IN ACCORDANCE WITH CURRENT SUDAS STANDARDS.
D. CONTRACTOR TO PROVIDE "B"/"BT" JOINT WHERE PAVEMENT ABUTS EXISTING PAVEMENTS, UNLESS OTHERWISE NOTED.
E. PROVIDE A MINIMUM 12"D x 12"W THICKENED EDGE WHERE PAVEMENTS ABUT.
F. PROVIDE EXPANSION JOINT WHERE PAVEMENTS ABUT FOUNDATIONS AND FOOTINGS.
File details come from the government source that posted it. Updated .