Revised Project Schedule 09-01-2026 Final.pdf

PDF 63 KB Posted

Attached to
Water Treatment Project Request for Qualifications
Solicitation number
38843
Issued by
Tolland County, Connecticut

About this file

This is a Revised Project Schedule document for the Town of Sterling, Connecticut, detailing the timeline for a Water Filtration Project aimed at implementing a drinking water infrastructure improvement initiative. The project encompasses multiple phases beginning with an RFP for design engineers, proceeding through design engineer notice to proceed, field investigation, design phase completion, permit submissions, solicitation and receipt of construction bids, and culminating in construction activities. The schedule spans approximately two and one-half years, commencing in September 2026 and extending through approximately March 2029, with substantial construction completion targeted for the latter portion of 2028.

The project is funded through the Connecticut Drinking Water Emerging Contaminants in Small or Disadvantaged Communities (EC SDC) program and/or the State of Connecticut Drinking Water State Revolving Fund (DW SRF). The primary objective is to design and construct a new oxidation and filtration treatment system to remove iron and manganese from groundwater sources at the existing well site located at 304 Sterling Road. The Town is seeking qualified engineering, construction, and construction oversight firms to deliver these services, with the project schedule indicating sequential phases for design completion, regulatory approval, and competitive bidding prior to construction initiation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Sterling CT, Water Filtration Project Proposed Project Schedule

J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D RFP for Design Engineer

Design Engineer Notice to Proceed Field Investigation

Design Phase Permit Submissions

Solicit & Receive Construction Bids Start of Construction

Construction Substantial Construction Completion

2026 2027 2028 Estimated Project Schedule