This Statement of Work (SOW) details the roof replacement project for A-frame Quarters 5 at Fort Raleigh National Historic Site in Manteo, North Carolina. The project involves completely removing the existing asphalt shingle roof on the 1995-built, wood-framed single-story housing unit and installing a new high-wind rated architectural asphalt shingle roofing system. The total roof area is approximately 2,100 square feet and includes replacing fascia boards, plumbing vents, ridge vents, and installing new rubber boots and drip edges.

The contract requires a 15-year material warranty and 5-year workmanship warranty with no exclusions for wind ratings or hurricane-related issues. The project must be completed within 120 days of contract award, with work performed during normal business hours (M-F, 7:00-5:00 PM). The roofing system must meet International Building Code requirements, FEMA technical guidelines, and EPA green considerations, with careful attention to protecting the historic site's environment and minimizing disruption to park operations and visitors.

View the file

Other files for this federal contract opportunity

Other files attached to Cape Hatteras - REPLACE ROOF ON FORA A-FRAME QTRS., newest first.
File Type Posted
Additional_Questions_and_Answers_0002.pdf PDF
Sol_140P5325Q0027_Amd_0002.pdf PDF
Sol_140P5325Q0027_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
site_visit_sign_in_0001.pdf PDF
Construction_Contract_Administration.docx DOCX document
Sol_140P5325Q0027.pdf PDF
DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPE HATTERAS NATIONAL SEASHORE

Fort Raleigh

North Carolina

STATEMENT OF WORK:

Replace Roof on A-frame Quarters 5 at Fort Raleigh

NATIONAL PARK SERVICE

Region II

2 | P a g e Replace Roofs on A-frame Quarters 5 at Fort Raleigh

TABLE OF CONTENTS

TABLE OF CONTENTS

1.0 BACKGROUND/EXISTING CONDITIONS…………………………..……………………………3

2.0 OBJECTIVES

3.0 PLACE OF PERFORMANCE

4.0 PERIOD OF PERFORANCE………………………………………………………………………..5

5.0 TASKS/SPECIFICATIONS (BASE BID AND OPTIONS)……………………………..………….5

6.0 WARRANTIES

7.0 DELIVERARY

8.0 GOVERNMENT FRINISHED EQUIPMENT

9.0 SECURITY

10.0 OTHER UNIQUE REQUIREMENTS…...…………………………………………...……….……8

11.0 QUALITY ASSURANCE …………………………………….…………………………….….……9

12.0 SUBMITTALS ……………………………………………………………………………………….9

13.0 BARRIERS & RESOURCE PROTECTION MEASURES…………………………….…..…… 9

14.0 GREEN CONSIDERATIONS……………………………………………………………………. .9

3 | P a g e

1.0 BACKGROUND AND EXISTING CONDITIONS:

Fort Raleigh Quarters 5 (A Frame) provide lodging for permanent and seasonal employees. Park service maintenance staff, residents, and family members utilize the driveway and yard for parking and other normal activities.

Q5 (A Frame) was built in 1995 and is wood framed, single story, with asphalt shingles. The roof is approximately 2,100 square feet with three 2” and one 4” plumbing vents. The roof has a ridge vent that is approximately 42 feet in length. Attic access is not limited.

2.0 OBJECTIVES:

Replace existing asphalt shingle roof with new asphalt roofing systems.

3.0 PLACE OF PERFORMANCE:

The housing unit at Fort Raleigh National Historic Site are located on 1441 Pear Pad Rd., Manteo, NC

27954.

4.0 PERIOD OF PERFORMANCE:

Upon award of contract, completion of project will be accomplished in 120 days.

5.0 TASKS/SPECIFICATIONS:

BASE BID:

Replace Asphalt Shingle Roof at 1441 Pear Pad Rd with new Asphalt Shingle Roof. Work must follow the attached Specification Section 07 31 13.01 10 High Wind Architectural Asphalt Shingle Roofing

4 | P a g e

5.1 Demolish and dispose of approximately 2,100 sq ft of existing roof system down to existing roof deck to include satellite dishes and posts, nails, attic vents, boots.

5.1.1 Throughout the demolition and construction period, use tarps or other materials to catch roofing debris. Do not allow nails, shingles, or other demolition debris to spread around the yard, property, driveway, etc. Walk daily with high powered magnet, visual inspection, and other appropriate tools to remove debris from the ground level. Document in the daily reports the cleaning of the ground level site.

5.1.2 Provide fence or other barrier at ground level to alert residents and staff of areas where debris may fall from the roof to the ground. Maintain the barriers during the demolition and construction period so that barriers are visible, sturdy, and straight.

5.2 Repair roof deck, 250 sf at roof ventilation penetrations and damaged areas.

5.2.1 Remove rotten or damaged roof deck and repair deck, if needed. At locations of rotten or damaged wood, cut the roof deck to remove damaged areas back to the nearest truss rafter. Ensure cuts to remove old deck are straight and do not penetrate or cut the truss rafters. Replace the removed wood with new ½ inch thick plywood. Ensure new plywood has straight cut lines that fit in the removed area with gaps no larger than ½ inch. Fasten existing deck and new plywood at the repair.

5.3 Install new architectural asphalt shingle roof system. New roof system must meet the attached high wind specification and be rated for 150 mph or greater.

5.3.1 Install new Roof system according to approved products. New roof system must meet the attached high wind specification and be rated as 150 mph.

5.3.1.1 Color of new shingles will be selected by the CO. Submit the manufacturer’s available colors for approval.

5.3.1.2 Include drip edge. Corner pieces shall be continuous and cut to bend around the corner for at least 12 inches on both sides of the corner.

5.3.1.3 Cover entire roof with self-stick ice and snow underlayment on top of the roof deck recommended by the roofing system manufacturer.

5.3.1.4 Install new rubber boots for pipe vents sized to fit existing pipes and seal with no leaks.

5.3.1.5 Install new architectural asphalt shingles which meet or exceed a 150 mph wind rating. Installation must follow the manufacturer’s instructions and specifications and Building

Code installation requirements for the location.

5.3.1.6 On each eave and rake, install a starter row of shingles or manufacturer specific starter strip material.

5 | P a g e

5.3.1.7 Install rain diverter above the front door and back door and back garage door. Rain Diverters shall be compliant with the new roof system, acceptable for installation and cause no void in warranty.

5.3.1.8 Plumbing vents shall include new rubber boots from the same manufacturer as the roofing system. New boots must fit snug around vent pipes and be secured to roof per manufacturer’s instructions.

5.3.1.9 Provide 14 sf (1440 sq in) of ventilation for the attic space.

Provide ridge vent meeting the specs of the manufacturer’s roofing system Provide documentation of the ridge vent opening showing the total area of ventilation.

5.3.2 Replace Fascia boards.

5.3.2.1 Remove existing facia boards on eaves and rakes of the house and garage. Approximately 240 ft of fascia boards shall be replaced with new pine boards, pressure treated . New facia shall measure 1” thick and 5.5” wide, fastened to each roof rafter with minimum 2 fasteners per rafter.

5.3.3 Carpentry/Roofing/Framing/etc. work necessary to provide a complete and useable roofing system in place of the existing roof is included in this project.

5.3.4 Follow FEMA Technical Bulletins and Advisories notices for high wind and flood hazard areas.

5.3.5 New roof system must meet International Building Code/North Carolina

Building Code for the wind rating at the project site.

5.3.6 Color will be selected by the COR. Submit the manufacturer’s available colors for approval.

5.4 Temporary roofing shall maintain the project roof as watertight and able to prevent leaks and damage to the building and structure until reroofing work is completed. Contractor is to make sure that at the completion of work each day the projects roof is 100% watertight.

5.5 National Park Service (NPS) requires the existing roof decks to be walked after demolition has been completed with their onsite Contracting Officer Representative (COR) prior to installation of any new roof materials to ascertain if any water penetration has caused deterioration and corrosion of the existing decks which are to remain.

6.0 WARRANTIES

6 | P a g e

6.1 In addition to warranty required by FAR clause 52-2.6-21 warranty of construction, the following is also required:

6.1.1 New roof shingle system must have a 15-year material warranty (minimum).

Installation contractor must provide a 5-year (minimum) workmanship warranty, non-prorated. No exclusions for wind rating or workmanship due to hurricanes.

Manufacturers or roofing systems with warranties which carry exclusions for wind ratings and workmanship due to hurricanes shall not be approved. No reductions in warranty shall be approved for the slope of the roof of the existing houses.

7.0 DELIVERY:

7.1 Deliver roofing materials to the project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

7.2 Delivery of materials to the park will be brought in when needed. Items stored outside will be done at the Contractor’s own risk. Use and storage of a work trailer can be coordinated with the COR.

7.3 Materials must be stored on site according to Manufacturer’s recommendations and requirements. Damaged or improperly stored materials must be replaced at the Contractor’s expense.

8.0 GOVERNMENT-FURNISHED EQUIPMENT:

8.1 No Government equipment will be provided. Water from available hose bibs on houses and exterior electrical outlets on houses may be used during the project by the Contractor as needed. Back flow prevention and over current devices must be provided by the Contractor and utilized according to municipal codes and manufacturer’s instructions.

9.0 SECURITY:

9.1 Access to the site will be during normal business hours (M-F 7:00 to 5:00 PM) unless temporarily approved by the COR. An escort will be provided during any necessary entry into non-public or secure areas. No work will be accomplished during federal holidays, during inclement weather, in advent of an emergency or during planned park events.

10.0 OTHER UNIQUE REQUIREMENTS:

10.1 This site is part of the Fort Raleigh National Historic Site. Therefore, additional care must be taken while working around visitor areas. No obscene language on clothing will be

7 | P a g e allowed. Appropriate clothing and shoe wear must be worn inside of the park’s areas. No smoking or tobacco products in or around the buildings (within 50 feet of buildings or entrances). The COR will show the crew members where the established smoking areas are located. No inside lunch areas are available. Clean-up will be accomplished 45 minutes prior to schedule closing time. No trash or debris will remain in the work site overnight.

Dumpster and recycling are the sole responsibility of the contractor. Contractor’s vehicles will be parked be at the discretion and coordination of the COR to prevent impact on the visiting public.

10.2 Work site is in a government housing area. Parking will be designated for contractor personnel. Dumpster location will be designated by CO based on available locations.

10.3 During the demolition and construction phases of the project, work will be done to prevent the greatest impact on the housing residents. Areas that need to be closed will be coordinated with the COR.

10.4 The contractor is responsible to repair all damage caused by their personnel or equipment. Property and grounds must be brought back to original or better condition.

11.0 QUALITY ASSURANCE:

11.1 Quality Assurance will be completed through inspections by the Contracting Officer

Representative and Subject Matter Experts. Manufacturer’s instruction, Building Code

Requirements, and Industry Standards such as National Roofing Contractors Association standards will be utilized to assure quality of workmanship.

11.2 The contractor shall maintain a qualified crew of roofers throughout the duration of the project and ensure quality control. Only qualified journeypersons shall be engaged in roofing work. Apprentices may be used provided they work under the direct supervision of a qualified journeyperson. A qualified crew will consist of the project manager, journeymen and apprentices.

12.0 SUBMITTALS:

Submittals shall be submitted to the CO and approved prior to contract award.

12.1 Work schedule -- delineating the various stages of work by phase (milestones). At a minimum include: Demolition for each house, new installation of each house, expected completion date for each house.

12.2 The following submittals will-be required after work is complete and before final invoicing:

12.2.1 Warranties and Product Guarantees.

12.2.2 Manufacturers recommended care and maintenance requirements.

12.2.3 Manufacturers specifications for roofing system to include ventilated ridge vent.

12.2.4 Manufacturers specification for self-stick ice and snow roofing underlayment.

8 | P a g e

13.0 BARRIERS & RESOURCE PROTECTION MEASURES:

13.1 Protect all exterior/interior surfaces of the building and adjacent landscaping, walks, drives, walls, signage, all adjacent buildings, and Government equipment from damage by project operations. Use drop cloths, shields, masking, templates, or other suitable protective means. Protect glass windowpanes, and metal hinges and other non-painted features from breakage or other damage during project work.

13.2 Erect temporary construction barriers to protect visitors, employees and restrict pedestrian access. The contractor shall work with the CO/COR to avoid or minimize interruptions to general visitor access. Minimum is OSHA standards.

14.0 GREEN CONSIDERATIONS:

14.1 To the greatest extent possible, provide products and materials that have a lesser or reduced effect on the environment considering raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, and/or disposal of the product.

14.2 Use products meeting or exceeding EPA’s recycled content recommendations for EPA designated products.