Additional_Questions_and_Answers_0002.pdf
PDF 96 KB Posted
- Attached to
- Cape Hatteras - REPLACE ROOF ON FORA A-FRAME QTRS. Federal contract opportunity
- Solicitation number
- 140P5325Q0027
About this file
This document contains Additional Questions and Answers for federal contract opportunity 140P5325Q0027, addressing a roof replacement project for the Cape Hatteras National Seashore. The document includes two specific questions and answers: 1) A request for roof schematic details, to which the government responded with roof specifications (wood-framed, single-story structure built in 1995, approximately 2,100 square feet with asphalt shingles and multiple plumbing vents); and 2) A site address confirmation, clarifying that the mailing address is 1441 Pear Pad Rd., while Google Maps shows the location as 1415 Pear Pad Rd. in Manteo, NC.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5325Q0027_Amd_0002.pdf | ||
| Sol_140P5325Q0027_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| site_visit_sign_in_0001.pdf | ||
| Rev_1_SOW_Replace_Roofs_on_Pear_Pad_Rd_at_FORA.pdf | ||
| Sol_140P5325Q0027.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Construction_Contract_Administration.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P5325Q0027
CAHA -Replace roof on FORA A-Frame QTRS. 5
Additional Questions
1. Question: Roof Schematic or Dimensions
Would it be possible for you to provide a roof schematic, plan, or any additional measurements to help us better understand the structure and properly plan our proposal?
Answer: We do not have a schematic or blue print for the roof. but here is the description of the roof area: Q5 (A Frame) was built in 1995 and is wood framed, single story, with asphalt shingles. The roof is approximately 2,100 square feet with three 2” and one 4” plumbing vents.
The roof has a ridge vent that is approximately 42 feet in length.
2. Question: Site Address Confirmation
We’ve noticed that the address listed in the Statement of Work refers to 1441 Pear Pad Rd., Manteo, NC, but the images included in the SOW may not appear to match that location exactly.
Could you kindly confirm the exact physical address of the housing unit where the work will take place?
Answer: The mailing address is 1441, On Google Maps it shows the location as 1415 Pear Pad rd.