Responses to RFI from Previous Solicitation.pdf
PDF 212 KB Posted
- Attached to
- Y1DA--526-13-109 – Replace Public Address (PA) System Federal contract opportunity
- Solicitation number
- 36C24221B0074
About this file
This document contains a federal contract opportunity and responses to a previous solicitation's request for information. The federal contract opportunity is for solicitation number 36C24221B0074 to replace the public address system at the James J. Peters VA Medical Center. The project has a cost estimate between $2-5 million and is set aside for Veteran Owned Small Businesses. The scope of work involves replacing the existing PA system as specified in the drawings and specifications. The response period will be included in the solicitation, which is to be released on October 8, 2021. The responses to the previous solicitation's request for information confirm that all cabling must be installed in conduit and that building-to-building paging is required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24221B0074 0005.docx | DOCX document | |
| 36C24221B0074 0004.docx | DOCX document | |
| 36C24221B0074 0003.docx | DOCX document | |
| RESPONSE TO REQUEST FOR INFORMATION.pdf | ||
| 36C24221B0074 0002.docx | DOCX document | |
| 36C24221B0074 0001.docx | DOCX document | |
| Bid Specifications.pdf | ||
| Drawings - Construction Documents.pdf | ||
| 36C24221B0074_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Response for 526-13-109 Replace Public Address System
1. Can a Telecor IP based be utilized in lieu of the Bogen system. See attached brochure. We can also provide the specification for it as well.
Response:
Drawings specify a Bogen system, we need to maintain this system to prevent the use of multiple systems and complicate our PA system.
2. During the walk-through it was stated that all cabling will need to be in conduit. The specification states that we can use j hooks etc. Please confirm if any low voltage cabling needs to be in conduit.
Response:
Spec 27 05 33 - table under 3.1.A specifies that “Public Address and Mass Notification Systems” Specification 27 51 16 shall be installed completely in conduit, therefore all cabling whether visible or not shall be in conduit.
3. Please confirm in building to building paging is required.
Response:
Yes, building-to-building paging is required and can be accomplished through Bogen network.