Description of Flooring Requirements Mississippi Army National Guard
Installation of Rubber roll matting at Camp Shelby, MS Designated Buildings
1.0 General:
1.1 Scope: 154th RTI Gym, BLDG 3501, Camp Shelby, MS flooring replacement. The contractor shall provide all labor, materials, supervision, equipment, methods, and devices necessary to install contractor supplied flooring as detailed in this document.
Contractor shall ensure work is completed by skilled tradesmen, fully experienced in the field of the applicable task. The contractor shall comply with all army base procedures, regulations, and local, state, and federal guidelines as applicable to the work involved.
TECHNICAL SPECIFICATIONS; MINIMUM SALIENT CHARACTERITISCS:
-COMMERCIAL GRADE RUBBER ROLL MAT FLOORING
-GLUED DOWN AND PERMENATLY AFFIXED
-MINIMUM THICKNESS OF 3/8 INCH
-NON POROUS AND ANTI SKID SURFACE
-SOLID BLACK WITH MINIMUM 10% COLOR FLECK
-INSTAL VINYL ROLLED BASEBOARDS
-INSTAL TRANSITIONS AND THRESHOLDS AS REQUIRED
1.2 Background: The 154th RTI at Camp Shelby, MS has identified the need for flooring replacement in the RTI Gym located in building 3501 Camp Shelby, MS. The project will include the removal and replacement of all existing flooring with commercial quality rubber roll matting. The contractor will be responsible for any and all permits, fees, licenses, certificates, inspections, authorizations, insurances etc. as required by any Federal, State, local or installation authorities necessary for the proper execution and completion of this work. All materials used by the contractor shall be new. The contractor shall be responsible for returning the site to original layout. RTI will provide a final clearance inspection prior to contractor completion and departure.
1.3 Performance: The Period of Performance shall be from 1-30 September 2021.
Location of project is at RTI Gym; address is Building 3501, C Ave. Camp Shelby, MS 39407. Specifically the rooms “VESTIBULE”, FITNESS AREA “A” and FITNESS AREA “B” as labeled in attached figure (see last page). The total floor area of which is approximately +/-2150 sq. ft.
a. The contractor shall provide all supervision, labor, equipment, material and supplies required to install materials meeting the above described salient characteristics.
b. The contractor shall move all existing gym equipment, furniture and other items for site preparation and installation of flooring. Upon completion of installation, contractor shall replace gym equipment, furniture and other items to original configuration. Therefore, this job will require movement and the return of gym equipment to finished work spaces.
Due to storage needs for the equipment while the work is being performed, the completed installation in some areas might be required to accommodate equipment from other areas that will re-floored as well. Nonetheless, there will be no more two moves for each piece of equipment--once out of the area for clearing the space and then the return of the equipment once the installation is complete.
c. The contractor shall demo existing flooring and properly dispose of existing flooring material and all other trash/debris related to the performance of project.
In some areas, glue residue adhesive that remains from the prior flooring surface will need to be removed to ensure a smooth surface for new flooring overlay.
d. The approximate building layout is depicted in the attached figure. Prior to bid submission potential contractors may arrange for an onsite visit to view the building in order to confirm dimensions and measurements as well as other general coordinating concerns.