Requirements Document.pdf
PDF 101 KB Posted
- Attached to
- Automatic Condom Airburst Machine
- Solicitation number
- 75F401-24-Q-1274346
About this file
This document is a Request for Quote (RFQ) for an Automated Condom Air Burst Machine for the U.S. FDA Winchester Engineering and Analytical Center (WEAC).
The key details are:
- The FDA requires one (1) automated condom air burst machine to improve the efficiency and productivity of condom testing at WEAC. The machine must meet specific technical requirements including the ability to test at least 2 condoms simultaneously, an accurate inflation system, and a displacement calibration instrument.
- Responses are due by 4:30 PM EDT on 12 August 2024, submitted via email to the contracting officer. The contract will be awarded to the lowest priced, technically acceptable offer.
- The instrument must be newly manufactured, with a 1-year warranty including parts, labor, and technical support. The vendor must provide onsite training on operations, maintenance, and troubleshooting.
- The machine will be delivered to the WEAC facility in Winchester, MA no later than 60 days after contract award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Automated Condom Air Burst Machine
Background
WEAC has participated in annual interlab round robin studies for condom air burst testing based on the ASTM D-3492 standard. WEAC is the only FDA lab that participates in the robin round studies. CDRH relies on WEAC’s work with air burst condom testing. WEAC has also performed air burst condom testing on suspected counterfeit condoms, which is very important for public health and safety. WEAC is also involved in the reviews and revisions for the ASTM and ISO-4074 condom standards.
Our feedback is based on our results from condom air burst testing.
The current air burst machine WEAC uses is manual, was purchased in 1990, and can only test 1 condom at a time. A new and modern automatic condom air burst machine that can test multiple condoms at the same time would be more efficient and increase productivity for the laboratory.
Objectives
The objectives of the requirement are for the Contractor to:
• Purchase one (1) Automated Condom Air Burst Machines for WEAC.
• Demonstrate system functionalities and acceptable performance per manufacturer’s specifications after installation.
• Provide onsite training on basic operation, routine maintenance, and system troubleshooting.
Scope
• The requested automated condom air burst machines shall be a product with all the software, hardware, and accessories, necessary to properly conduct condom air burst round robin studies and sample analysis.
Salient Characteristics
At a minimum, the automated condom air burst machine shall meet the following specifications:
• Accurate Inflation System (AIS) for determining bursting volume and pressure of male condoms (with adapters available for female condoms).
• Shall Include PC with MS Excel and application software for data acquisition and analysis.
• Shall be installed in soundproof chambers
• Shall have the ability to test at least 2 condoms at the same time.
• Shall have an automatic push button operation control.
• Shall have a pressurized air regulator with fine filters.
• Shall have spare parts including O-rings, fuses, spare fine filters, pneumatic connectors.
• Displacement Calibration Instrument (DCI) which would allow in-house calibrations and eliminate the cost of external calibration services.
• Shall include a length mandrel for male condoms.
• Shall have approximate footprint requirements for each individual cabinet:
Length: 2’, Width: 2’, Height: 5’. (Each cabinet would contain 1 condom.)
• Performance Specifications. Volume, and Pressure Accuracy: Within ± 1.0% of the Measured Value.
A. Delivery and Installation Requirements:
• The instrument will be assembled and setup by the manufacturer.
• FDA POC
o WEAC: Dan David
• Shall enter the building from the loading dock
Security and Privacy Requirements
N/A
Trade and Service Specifications
The components and/or equipment shall be a newly manufactured, not used, refurbished, or previously used for demonstration.
1. FOB Point destination to include inside delivery and clean-up of area after installation.
2. The entire system shall be warranted for parts and labor for a minimum of 1 year from date of formal government acceptance. The warranty must include unlimited telephone/e-mail support for questions regarding operation.
3. Lifetime technical assistance shall be included.
4. Offered systems shall be a turn-key solution, (i.e. the contractor shall be responsible for providing all software, hardware, components, and accessories.) The products shall be fit for its intended purpose.
5. The systems shall be delivered with all necessary supplies and accessories required for installation and start-up.
6. The vendor shall demonstrate upon installation that the system meets or exceeds all performance specifications which have been included in the vendor’s response and/or used are evaluation criteria for award. The instrument shall not be accepted until those performance specifications have been met.
7. No subcontractors or other personnel not employed by the offeror shall be utilized for instrument service.
8. Onsite training on basic operations and familiarization of the installed automated condom air burst tester shall be provided to at least one operator.
9. All service costs, (i.e., software, accessories, labor, freight, and travel) must be included.
10. Shall have included support for the lifetime of the automated condom air burst machine.
Deliverables
Delivera ble
Description Quantity Date Completed
Installation of automated condom air burst machine
At time of service
2 Onsite training on basic operation 1 At time of service
Security
Check in with Security at front entrance.
Delivery Location/Place of Performance Delivery must be coordinated with each laboratory at least 48 hours in advance:
Shipping locations:
o U. S. FDA Winchester Engineering and Analytical Center
109 Holton Street Winchester, MA 01890 Attn: Dan David
Period of Performance:
The Period of Performance begins the date of contract award execution and continues for one year (or longer depending on how long the OEM offered warranty period is) from the date of formal government acceptance. Instrument to be delivered no later than 60 days after award is made.
| Statement of Work |
| Objectives |
| Scope |
| Salient Characteristics |
| Trade and Service Specifications |
| Deliverables |
File details come from the government source that posted it. Updated .