Request for Subcontractor Qualifications - IDOT Albia_V2.pdf
PDF 358 KB Posted
- Solicitation number
- 645-RFQW-2749-2026
- Issued by
- Marshall County, Iowa
About this file
This is a Request for Subcontractor Qualifications (RFQ) issued by Woodruff Construction, serving as Construction Manager at Risk (CMaR) on behalf of the Iowa Department of Transportation for the Albia Salt Structure project. The project involves construction of a new salt storage building and maintenance facility (approximately 17,000 square feet) at 1501 South C Street, Albia, Iowa 52531, on an existing, fully operational DOT site. Woodruff Construction is soliciting qualifications for 13 distinct bid packages including precast supply and installation, foundations, concrete flatwork, masonry, steel supply, post-frame building supply and installation, membrane roofing, overhead doors, painting, fire sprinkler systems, plumbing, mechanical, electrical and low-voltage work, and earthwork. Qualifications statements were due by 5:00 p.m. CST on May 26, 2026, with an evaluation period of May 27 through June 2, 2026. Contract documents for bid proposals were issued on June 3, 2026, followed by subcontractor bid letting on June 24, 2026, and contract approval and award scheduled for July 17 through July 30, 2026. Notification of prequalification results was to be provided no less than fifteen days prior to the bid letting date.
The RFQ does not disclose contract values, pricing terms, or funding amounts. No set-aside designations, incumbent contractors, or disadvantaged enterprise requirements are specified in the documentation. Responding firms bear all costs associated with preparation and delivery of their qualification statements. Firms are required to submit a completed two-page Statement of Qualifications form addressing firm profile and background, technical competence, personnel capacity, relevant project experience, insurance and bonding capability, legal history, safety compliance, and project location familiarity. All qualified firms meeting objective prequalification criteria established under Iowa Public Bidding Law Chapter 26A are permitted to submit bid proposals. Woodruff Construction and the Iowa DOT reserve extensive rights including the ability to cancel the RFQ process, reject all proposals, modify criteria, waive irregularities, and appoint evaluation committees. Project-specific inquiries should be directed to Will McAllister at Woodruff Construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1388704-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Subcontractor Qualifications
From: Woodruff Construction, Construction Manager at Risk (CMaR)
Project: IADOT Albia Salt Structure
Release Date: Tuesday, May 5th, 2026
Woodruff Construction is soliciting subcontractor statements of qualifications “SOQs” on behalf of Iowa
Department of Transportation for its project described in this RFQ (the “Project”). This request invites firms to submit SOQ for accomplishment of the items of work described below under the Project
Description and Scope of Work. SOQs shall be prepared and submitted in accordance with the requirements described in this RFQ.
Project Description and Scope of Services
Woodruff Construction invites you to submit your firm’s qualifications for subcontracted work for the below-described project(s):
• Project – Albia Salt Storage Building & Maintenance Building, 1501 S C St, Albia, IA 52531 o The project will be a new structure on the existing DOT site. The maintenance facility site where these buildings will be constructed will be a fully operational site and owner occupied during construction. The project consists of site work and construction of a new salt storage building on the existing Albia DOT complex, and a new Maintenance facility of approximately 17,000 SF to support the DOT's ongoing operations.
o The Construction Manager intends to issue the following scopes of work as individual subcontractor bid packages:
Bid Package No. Description
A03.0 Precast Supply
A03.1 Salt Storage Precast Supply & Install
A03.2 Footings & Foundations
A03.3 Concrete Flatwork
A04.0 Masonry
A05.0 Steel Supply
A0.60 Post Frame Building Supply & Install inc. Footings
A07.0 Membrane Roof & Coping Supply & Install
A08.0 OH Door Supply & Install
A09.0 Paint
A21.0 Fire Sprinkler System
A22.0 Plumbing
A23.0 Mechanical
A26.0 Electric & Low Voltage
A31.0 Earthwork
Iowa DOT Background Info
The Iowa DOT has facilities across the state of Iowa and works to make Iowa lives better through transportation. The IDOT and Woodruff Construction are seeking sub-contractors for the above bid packages to submit qualifications.
Subcontractor Solicitation Schedule
Subcontractor RFQ Issued May 5th, 2026
Qualification Statements Due May 26th, 2026
Qualification Statements Evaluation Period May 27th – June 2nd, 2026
Notification will be given no less than fifteen days prior to the subcontractor bids being due.
Issuance of Contract Documents for Bid
Proposals
June 3rd, 2026
Subcontractor Bid Letting June 24th, 2026
Subcontractor Approval/Award July 17th – July 30th
Response Format:
• Please fill out the attached two-page Statement of Qualifications (SoQ) Form
• Incomplete or illegible forms may be grounds for disqualification
• Sections included in the SoQ Form are as follows:
o Firm Profile & Background o Technical Competence o Capacity of Personnel o List of Key Personnel o Capability to Perform o List of Relevant Projects o Insurance & Bonding
Information o Legal History o Safety History o Availability To and Familiarity with the Location of the Project o Certification by an officer of the company
Contact and Due Date
Please submit an electronic PDF copy through email or digital file share.
Date Qualifications Due: Before 5:00p.m. CST on May 26th, 2026
Qualifications Statements to: Woodruff Construction
Precon@Woodruff.Build
Subject: “IDOT ALBIA [SUBCONTRACTOR_NAME] SOQ”.
RFQ responses that are incomplete or are received after 5:00 p.m. local time on May 26th, 2026, will not be considered and will be returned unopened. Email subject and electronic file shall be clearly marked
“IDOT ALBIA (Company Name) SOQ”.
Woodruff Construction reserves the right to waive any deficiencies or irregularities in any RFQ responses and to determine if qualified firms are allowed to submit a proposal in the best interest and value of the
Owner.
Please direct all project-specific questions to the Woodruff Construction Project Manager:
Attn: Will McAllister
501 Greenfield Dr.
Tiffin, IA 52340
Cell: (319) 493-9788
Email: WILLM@Woodruff.Build
Evaluation Criteria
As the Construction Manager at Risk (CMaR), Woodruff Construction will collect Subcontractor
Qualification Statements and, following Chapter 26A of Iowa Public Bidding Law on Guaranteed
Maximum Price Contracts, apply objective prequalification criteria to evaluate them.
• All firms who meet the objective prequalification criteria as a qualified firm shall be allowed to submit a bid for the relevant trade contract work and materials package
• Upon determining which firms meet the prequalification criteria, Woodruff Construction will notify all firms who responded to the request for qualifications whether they successfully meet the prequalification criteria and will include a list of all firms who were deemed to have successfully met the prequalification criteria.
• Notification will be given no less than fifteen days prior to the subcontractor bids being due.
• Subcontractors who failed to meet the prequalification standards shall also be provided with information regarding which prequalification criteria were not met.
Following evaluation, Woodruff Construction will notify all respondents of the results. All qualified firms will be asked to submit a bid proposal.
OTHER INFORMATION
Responding firms will bear all costs for preparation & delivery of the response to this RFQ.
The Owner and Construction Manager reserve certain rights, including, but not limited to, the following:
1. Cancel the entire RFQ
2. Reject all proposals
3. Cancel the entire RFQ process and restart with modified criteria
4. Remedy technical errors in the RFQ process
5. Appoint evaluation committees to review qualifications and proposals
6. Seek assistance of outside technical experts in evaluation
7. Issue subsequent requests for proposals
8. Waive informalities and irregularities in the RFQ or subsequent RFP process
Subcontractor Statement of Qualification Form
Project: Date:
Response Format:
• Please fill out the Subcontractor Statement of Qualifications Form that follows this section in its entirety.
• Incomplete or illegible forms may be grounds for disqualification.
Seeking Prequalification for the following work:
Please list which bid packages/trades your firm anticipates submitting a proposal bid for:
Note: Combined bids for multiple packages may be allowed for this project. Note that individual bids will still be required for any and all packages that are bid as a combined package to avoid gaps and/or overlap in bid coverage.
Do you anticipate bidding two or more packages as a combined bid package (Yes/No):
Firm Profile and Background:
Company Name:
Address 1 Address 2 Website:
Contact Person/Title:
Contact Email:
Contact Phone #:
Type of Organization
(LLC, Sole Proprietor, Corporation, etc.)
Number of Years in Business:
State of Iowa Contractor #:
Est. Value of Contract Work Completed in Previous 3 Years:
Year :
Year :
Year :
Qualifications:
Technical Competence
Does your company have an orientation program for new employees? (Yes/No):
Does your company have a training program or provide continuing education to your employees? (Yes/No):
Does your company have a written quality control plan that provides guidelines, best practices, and checklists (Yes/No):
used on all projects?
Does your company employ Building Information Model (BIM model personnel) or subcontract this service? (Yes/No):
Capacity of Personnel
Does your company have the resources (personnel, financial, or other) to successfully complete this project? (Yes/No):
Do your trade workers have the capability and technical competence to successfully complete this project (Yes/No):
Does your company have the experience to successfully complete this project? (Yes/No):
List of Key Personnel (Add additional pages and resumes if possible)
Employee Name Title/Position Years in
Trade
Special Qualifications or Trade Certifications
Capability to Perform
1. How many full-time employees does your company have? Part Time?
2. What is your firm’s average project contract value over the past 3 years?
3. What is your firm’s largest single contract value over the past 3 years?
4. What is your firm’s backlog for the next 12 months?
(Attach Backlog Report if Available)
Subcontractor Statement of Qualification Form (Continued)
List five relevant projects similar in size and scope to this project your company has recently completed
Project Name Owner, Architect, or Engineer Reference (Name, Title, and Contact Info)
Contract
Amount
Year
Completed
Insurance and Bonding:
Can your company secure the level of insurance typically required for a public project such as this? (Yes/No):
Can your company secure a bid bond or a performance & payment bond for this project, if required? (Yes/No):
What is the name of your bonding company?
What is your single project bonding capacity?
What is your aggregate bonding capacity?
If possible, add a letter from your bonding company as an attachment to this document assuring your company’s ability to bond the project
Legal:
In the past five years, has your company failed to complete any contracted work? (Yes/No):
In the past five years, has your company filed for bankruptcy or insolvency? (Yes/No):
In the past five years, has any company officer, partner, or principal been convicted of a crime? (Yes/No):
In the past ten years, has your company operated under any other names or tax identification numbers? (Yes/No):
In the past ten years, has there been any judgements, claims, arbitrations, proceedings against your company? (Yes/No):
If yes, please describe the nature and outcome. Attach a separate document if necessary:
Safety:
Does your company comply with State and Federal Safety Regulations? (Yes/No):
Does your company have an internal safety program/manual? (Yes/No): If yes, please attach copy
Does your company have a Safety Officer? (Yes/No): If Yes, Full or Part Time?
In the past three years, has your company had any OSHA citations? (Yes/No): Attach 3 Year OSHA 300A Forms
If yes, please describe the nature of the citation(s):
What is your EMR Rating for the most recent three years?
Year Year Year
Availability To and Familiarity With the Location of the Project:
Approximately what percentage of your company’s work has been performed within a 60 mile radius of the project site: %
What is the distance (in miles) between the contact office that will be serving this project and the project site? miles
Certification:
The undersigned states that they have carefully examined all the information provided and representations made in this Statement of
Qualifications and certifies, to the best of their knowledge, that this State of Qualifications is entirely complete, true, and accurate.
Submitted by (Signature)
Printed Name & Title
Company Name
Date
| Project: |
| Bid Packages: |
| Combined Bid Packages?: |
| Years in Business: |
| Address 1: |
| Address 2: |
| State of Iowa Contract #: |
| Website: |
| Contact Person/Title: |
| Contact Email: |
| Contact Phone: |
| Est. Revenue Value 1: |
| Organization Type: |
| Est. Revenue Value 2: |
| Est. Revenue Value 3: |
| Orientation Program?: |
| Training Program?: |
| Q/C Program?: |
| BIM Personnel?: |
| Resources?: |
| Capability and Technical Competence: |
| Experience?: |
| Employee Title 1: |
| Years in Trade 1: |
| Special Quals 1: |
| Employee Title 2: |
| Years in Trade 2: |
| Special Quals 2: |
| Employee Name 3: |
| Employee Title 3: |
| Years in Trade 3: |
| Special Quals 3: |
| Employee Name 4: |
| Employee Title 4: |
| Years in Trade 4: |
| Special Quals 4: |
| Employee Name 5: |
| Employee Title 5: |
| Years in Trade 5: |
| Special Quals 5: |
| Full Time Employees: |
| Part Time? (1): |
| Part Time? (2): |
| Part Time? (3): |
| 12 month Backlog: |
| Project Name 1: |
| Project Reference 1: |
| Project Amount 1: |
| Project Comp 1: |
| Project Name 2: |
| Project Reference 2: |
| Project Amount 2: |
| Project Comp 2: |
| Project Name 3: |
| Project Reference 3: |
| Project Amount 3: |
| Project Comp 3: |
| Project Name 4: |
| Project Reference 4: |
| Project Amount 4: |
| Project Comp 4: |
| Project Name 5: |
| Project Reference 5: |
| Project Amount 5: |
| Project Comp 5: |
| Insurance?: |
| Bond?: |
| Bond Company?: |
| Single Project Bonding Capacity: |
| Aggregate Bonding Capacity: |
| Failure to complete work?: |
| Bankruptcy?: |
| Crime Conviction?: |
| Other Names/Tax ID: |
| Litigation: |
| Litigation Line 1: |
| Litigation Line 2: |
| Litigation Line 3: |
| State/Federal Regulations?: |
| Internal Safety Program: |
| Safety Officer?: |
| Safety Full/Part Time?: |
| OSHA Citations?: |
| OSHA Line 1: |
| OSHA Line 2: |
| OSHA Line 3: |
| EMR Rating 1: |
| EMR Rating 2: |
| EMR Rating 3: |
| Certification: Printed Name & Title: |
| EMR Rating 1 Year: |
| EMR Rating 2 Year: |
| EMR Rating 3 Year: |
| % Work within 60 Miles: |
| Distance to Site: |
| Revenue Year 1: |
| Revenue Year 2: |
| Revenue Year 3: |
| Company Name: |
| Employee Name 1: |
| Date: |
| Certification: Company Name: |
| Certification: Date: |
| Employee Name 2: |
File details come from the government source that posted it. Updated .