This is a Statement of Work issued by the Los Angeles County Metropolitan Transportation Authority (Metro) for the procurement of fifty stainless steel dividers for benches at the Willowbrook/Rosa Parks Bus Transit Center station. Metro seeks to acquire these dividers to deter loitering activity and match the bench divider design used at other Metro transit facilities, such as the 37th St/USC J Line station. Each of the fifty dividers must measure 17¾" x 5" x ¼" with three ⅜" all-thread rods, 10" long, welded to the side, and be fabricated from stainless steel with smooth rounded edges to prevent patron injuries. All dividers shall include a lifetime structural warranty and must be fabricated at the manufacturer's facility using hi-def plasma, waterjet, flatbed laser, or tube laser cutting methods. Quotes must be submitted via email to ortizdelgadoj@metro.net no later than 4:00 p.m. PDT on September 8, 2026, with delivery scheduled to occur in a single shipment no later than four weeks after contract execution to Metro A Line Division at 4350 E 208th St, Long Beach, California 90810. Delivery must be scheduled between 8:00 a.m. and 4:00 p.m., Monday through Friday.
Metro will select the quote offering the best value based on price, tax, freight, lead time, and past performance. All taxes, delivery charges, freight, tariffs, and applicable fees must be included in the quote, or the submission will be deemed non-responsive. Installation of the dividers will be completed by Metro staff, with the manufacturer providing only installation instructions and requirements. Questions or requests for approved equals must be submitted at least three business days prior to the solicitation close date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
50 STEELS DIVIDERS FOR BENCHES
RQ144376(2)
1.0 Project Overview
Metro is looking to acquire new stainless-steel dividers for Willowbrook/Rosa Parks Bus Transit Center station. The metal dividers will help deter loitering activity that has been a concern raised by many frontline personnel who service this station.
2.0 Parts Requirements
Metro has sixteen (16) existing benches at the Willowbrook/Rosa Parks Bus Transit Center station and is seeking to match the bench divider design of other Metro bus transit facilities, such as the 37th St/USC J Line station. Metro needs fifty (50) stainless steel dividers. All dividers shall have a lifetime structural warranty.
All structural steel could be fabricated through hi-def plasma, waterjet, flatbed laser, or tube laser cutting. The manufacturer should be able to fabricate stainless steel dividers with the following requirements: exact measurements of 17 3/4" x 5" x 1/4" all-thread rods, 10” long, welded to side, With standard shear-cutting capabilities, all dividers must have smooth rounded edges to avoid any potential injuries to patrons who sit or stand near the benches.
All fabrication of units shall be completed at the manufacturer’s facility prior to being received by Metro. Below are the divider size, quantity, and exhibits.
Fifty (50) - - - 17 3/4" x 5" x 1/4" Bench Barriers In stainless steel w/ 3 -3/8” all thread rods 10” long welded to side
Exhibit A
Exhibit B
Exhibit C
3.0 Delivery
Units are to be delivered to Metro Division 11 at the following address:
Metro A Line Division 4350 E 208th St Long Beach, CA 90810 Attn: David Salas
Delivery is to be scheduled between the hours of 8:00AM – 4:00PM, Monday through Friday. Delivery is expected to occur in one shipment no later than 4 weeks after the signed contract/purchase order.
All Taxes, Delivery charges, Freight, Tariffs, and any applicable fees shall be included in the quote, or the quote will be deemed non-responsive.
4.0 Installation
Installation of the metal BARRIER/DIVIDERS will be completed by Metro staff. The manufacturer will only provide installation instructions and requirements.