Replace Main Kitchen Freezers_100 Bid Drawings.pdf

PDF 12 MB Posted

Attached to
Y1AZ--REPLACE MAIN KITCHEN FREEZERS Project 526-21-111 Federal contract opportunity
Solicitation number
36C24223B0046
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 to replace main kitchen freezers. The solicitation number is 36C24223B0046 for the Y1AZ--REPLACE MAIN KITCHEN FREEZERS Project 526-21-111. The opportunity type is a solicitation to provide replacement of main kitchen freezers. Relevant details include the federal agency involved, the project name and number, and that the opportunity is for replacement of main kitchen freezers. No other salient information is provided in the document.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--REPLACE MAIN KITCHEN FREEZERS Project 526-21-111, newest first.
File Type Posted
36C24223B0046 0002.docx DOCX document
36C24223B0046 0001.docx DOCX document
REPLACE MAIN KITCHEN FREEZERS_IFB 36C24224B0046_SITE VISIT SIGN IN SHEET_12.20.23.pdf PDF
Bronx Kitchen Freezers_100Bid Specifications.pdf PDF
P07_DBA WAGE RATES_REPLACE MAIN KITCHEN FREEZERS - Copy.docx DOCX document
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
36C24223B0046_2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE

WEBB AVENUE

SEDGWICK

AVENUE

KI

N

G

SB

R

ID

G E

R O

AD

REPLACE MAIN KITCHEN FREEZERS

TB BF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD BID DOCUMENTSCapital Assets Section/

Engineering Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

26 OCTOBER 2022Revisions: Date:

526-21-111

130 W KINGSBRIDGE RD, BRONX, NY 10468

REPLACE MAIN KITCHEN FREEZERS

Approved: Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

Approved: NAL

Approved: PCC/Service Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

MEP Consultant:

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198

SAFETY/EGRESS - GROUND FLOOR PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD BID DOCUMENTSCapital Assets Section/

Engineering Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

26 OCTOBER 2022Revisions: Date:

526-21-111

130 W KINGSBRIDGE RD, BRONX, NY 10468

REPLACE MAIN KITCHEN FREEZERS

Approved: Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

Approved: NAL

Approved: PCC/Service Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

MEP Consultant:

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

PARTITION TYPE - TEMP BARRIER

GROUND FLOOR DEMOLITION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD BID DOCUMENTSCapital Assets Section/

Engineering Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

26 OCTOBER 2022Revisions: Date:

526-21-111

130 W KINGSBRIDGE RD, BRONX, NY 10468

REPLACE MAIN KITCHEN FREEZERS

Approved: Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

Approved: NAL

Approved: PCC/Service Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

MEP Consultant:

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

GROUND FLOOR DEMOLITION PLAN

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD BID DOCUMENTSCapital Assets Section/

Engineering Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

26 OCTOBER 2022Revisions: Date:

526-21-111

130 W KINGSBRIDGE RD, BRONX, NY 10468

REPLACE MAIN KITCHEN FREEZERS

Approved: Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

Approved: NAL

Approved: PCC/Service Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

MEP Consultant:

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

GROUND FLOOR NEW CONSTRUCTION PLAN

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD BID DOCUMENTSCapital Assets Section/

Engineering Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

26 OCTOBER 2022Revisions: Date:

526-21-111

130 W KINGSBRIDGE RD, BRONX, NY 10468

REPLACE MAIN KITCHEN FREEZERS

Approved: Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

Approved: NAL

Approved: PCC/Service Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

MEP Consultant:

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

CONCRETE PAD ON GRADE DETAIL

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD BID DOCUMENTSCapital Assets Section/

Engineering Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Project Director

26 OCTOBER 2022Revisions: Date:

526-21-111

130 W KINGSBRIDGE RD, BRONX, NY 10468

REPLACE MAIN KITCHEN FREEZERS

Approved: Assoc Project Director

Approved: Chief Engineer

Approved: Safety Manager

Approved: NAL

Approved: PCC/Service Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

MEP Consultant:

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198

GROUND FLOOR NEW CONSTRUCTION PLAN

FLOOR ASSEMBLY DETAIL AT GE-01A

FLOOR ASSEMBLY DETAIL AT GE-01E, GE-05, GE-06, GE-07, GE-09

FINISH SCHEDULE DOOR ELEVATION AND SECTION SECTION @ GE-01A ONLY

CONTROLS SYMBOLS

T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT

H7

A

DRAWING SYMBOLS

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

GATE VALVE WITH GLOBE-VALVED

BYPASS

PLUG VALVE

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

HOSE CONNECTOR

VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

QUICK-COUPLE HOSE CONNECTOR

GENERAL PIPING SYMBOLS

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING

ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING PIPING

ACCESSORIES SEE DETAIL

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

AV

MANUAL AIR VENTMV

THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES

SEE DETAIL

FE

W WATTS

Wb WET-BULB (TEMPERATURE)

VHA VETERANS HEALTH ADMINISTRATION

UC UNIT COOLER

UL UNDERWRITERS LABORATORY

Db DRY-BULB TEMPERATURE

DEG DEGREE

DIA DIAMETER

DPS DIFFERENTIAL PRESSURE SENSOR

CFM CUBIC FEET PER MINUTE

BFP BACKFLOW PREVENTER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCU AIR-COOLED CONDENSING UNIT

AFF ABOVE FINISHED FLOOR

AHU AIR-HANDLING UNIT

AMP AMPERGE

APD AIR PRESSURE DROP

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

C CENTIGRADE (CELCIUS)

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EF EXHAUST FAN

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

FD FLOOR DRAIN

GA GAUGE

GAL GALLONS

GPM GALLONS PER MINUTE

HP HORSEPOWER

HZ HERTZ

FT FEET

NA NOT APPLICABLE

NTS NOT TO SCALE

MAX MAXIMUM

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MIN MINIMUM

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LWT LEAVING WATER TEMPERATURE

I/O INPUT/OUTPUT

IN INCHES

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

PD PRESSURE DROP

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE

INCH

– ABSOLUTE

PSIG POUNDS PER SQUARE INCH– GAGE

ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD BID DOCUMENTSCapital Assets

U.S. Department

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

REPLACE MAIN KITCHEN FREEZERS

130 W KINGSBRIDGE RD, BRONX, NY 10468

526-21-111

26 OCTOBER 2022 JWE MPL

Approved:

Project Director

Assoc Project Director

Section/ Engineering

Service Approved:

Approved:

Chief Engineer

Safety Manager

Approved:

Approved:

NAL

PCC/Service Director

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198 of Veterans Affairs

CONCEPT / PRELIMINARIES SUBMITTAL 18 MAR 22

35% SCHEMATIC DESIGN SUBMITTAL 2 MAY 22

65% DESIGN DEVELOPMENT SUBMITTAL 8 JUL 22

95% CONSTRUCTION DOCUMENTS SUBMITTAL 22 AUG 22

100% CONSTRUCTION DOCUMENTS SUBMITTAL 26 SEP 22

100% CD BID DOCUMENTS SUBMITTAL 26 OCT 22

G sh or tc ut

-ta rg et s-by -id

\1 Am

4f gx

Kh 1N aH Sg

M M

-W y-

Q cI

T2 U

9e tIJ z\ W at so n En gi ne er in g\ 1-

W at so n

En gi ne er in g, P C

\2

1\ Th in kf or m

\T H

-2

R ep la ce

M ai n Ki tc he n Fr ee ze rs B ro nx

V

AM

C \W at so n D ra w in gs

\R ev it\ W at so n R ev it

Pr oj ec t.r vt

/2 5/

:1

3:

P M

M-001

MECHANICAL NOTES, SYMBOLS,

AND ABBREVIATIONS

GENERAL MECHANICAL NOTES:

1. THE GENERAL MECHANICAL NOTES ON THIS SHEET APPLY TO ALL THE MECHANICAL DRAWINGS.

2. IT IS THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL ASPECTS OF THE DESIGN, TO INCLUDE THE WORK OF SUB-TRADES, PRIOR TO SUBMITTING A BID.

3. THE MECHANICAL DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT, CLEARANCE, ETC. IT IS THE MECHANICAL CONTRACTOR’S RESPONSIBILITY TO SURVEY ALL WORK AREAS AND SUBMIT FINAL, DETAILED COORDINATED SHOP DRAWINGS FOR REVIEW BY THE DESIGNER OF RECORD TO ENSURE THAT THE DESIGN INTENT WILL BE MET AND THAT ALL TRADES ARE PROPERLY COORDINATED. CHANGES REQUIRED TO FIT EQUIPMENT, PIPING, AND DUCTWORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. ANY

MAJOR DISCREPANCIES SHALL BE CLARIFIED PRIOR TO SUBMITTAL OF BID.

4. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, CLEARANCES, POSSIBLES CLASHES, AND ACCESSORIES THAT MAY BE REQUIRED.

COORDINATE ALL THE WORK OF ALL THE TRADES TO ENSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR DEVELOPING COORDINATED SHOP DRAWINGS FOR REVIEW PRIOR TO STARTING INSTALLATION.

5. MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO SUBMITTAL OF BID.

6. IF A JOB REQUIRES TYING INTO ANY EXISTING MECHANICAL SYSTEM, THE MECHANICAL CONTRACTOR SHALL CONDUCT NECESSARY PRE TEST, ADJUST, AND BALANCING (TAB) ACTIVITIES TO VERIFY BASELINE SOURCE CAPACITY FROM THE FACILITY, UNLESS THE OWNER CAN PROVIDE SUFFICIENT FACILITY MECHANICAL TREND LOGS TO ESTABLISH THAT SUFFICIENT SOURCE CAPACITY EXISTS. UPON DETERMINING INSUFFICIENT SOURCE CAPACITY, THE MECHANICAL CONTRACTOR SHALL IMMEDIATELY REPORT FINDINGS TO THE OWNER AND ENGINEER FOR RECORD FOR ADDITIONAL GUIDANCE BEFORE PROCEEDING.

7. THE WORK INCLUDES ALL ITEMS OF THE MECHANICAL SPECIFICATIONS THAT ARE EITHER WRITTEN ON THE DRAWINGS OR SEPARATELY IN A SPECIFICATIONS BOOK.

8. WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO CONSTRUCTION, MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT SHALL BE UTILIZED OR INSTALLED. THE MOST STRINGENT SHALL BE DEFINED AS THE SPECIFICATION OR REQUIREMENT THAT ALLOWS ALL SPECIFICATIONS OR REQUIREMENTS THAT ARE IN CONFLICT TO BE SATISFIED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE CONTRACTOR BECAUSE OF THIS INTERPRETATION.

9. MECHANICAL CONTRACTOR SHALL NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND COORDINATED SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND COORDINATED SHOP DRAWINGS SHALL BE AT THE MECHANICAL CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE MECHANICAL CONTRACTOR'S EXPENSE AT THE REQUEST OF THE OWNER'S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE OWNER'S REPRESENTATIVE.

10. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE INTERNATIONAL BUILDING MECHANICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC. IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE

OWNER'S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION.

11. UNLESS STATED OTHERWISE, ALL EXISTING MATERIAL AND EQUIPMENT SHALL REMAIN THE PROPERTY OF THE PROJECT OWNER.

12. THE MECHANICAL CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN AND WORK SCHEDULE WITH ALL PHASING, STAGING, AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE MECHANICAL CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS WORK SCHEDULE, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS

AND SPACES AND DETERMINE WHAT WORK MUST BE DONE DURING "OFF HOURS".

13. WITH THE EXCEPTION OF SIGNIFICANT NOISE GENERATING ACTIVITIES SUCH AS CORE DRILLING, ETC., WORK OUTSIDE OF THE OCCUPIED SPACES, SUCH AS ON THE ROOF, ETC., MAY BE PERFORMED DURING

NORMAL WORKING HOURS.

14. UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOWN IS NEW AND SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

15. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AND IS SUBJECT TO THEIR CONTINUOUS APPROVAL.

16. THE MECHANICAL CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL AND MUST FOLLOW MANUFACTURER RECOMMENDATIONS FOR PROPER INSTALLATION. IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE MECHANICAL CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, CLEARANCE, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE MECHANICAL CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT A/E AND THE OWNER'S REPRESENTATIVE.

17. BEFORE ANY DEMOLITION OR CONSTRUCTION WORK IS BEGUN, THE MECHANICAL CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SURVEY THE EXISTING BUILDING AREA TO BE MODIFIED AND/OR REPLACED TO ACCURATELY DOCUMENT EXISTING CONDITIONS. THIS SURVEY WILL BE USED BY THE OWNER'S REPRESENTATIVE AT JOB COMPLETION TO DETERMINE WHICH BUILDING/SITE COMPONENTS MUST BE

REPLACED WITH NEW.

18. UNLESS STATED OTHERWISE, REQUEST APPROVAL FROM THE OWNER'S REPRESENTATIVE SEVEN DAYS IN ADVANCE FOR THE SHUTDOWN OF ANY EXISTING SYSTEM.

19. UNLESS STATED OTHERWISE, FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE OWNER'S REPRESENTATIVE PRIOR TO THE PROPOSED SHUTDOWN OF ANY SYSTEM.

20. THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE OWNER'S REPRESENTATIVE; NOTIFY LOCAL AUTHORITIES AS REQUIRED.

21. PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE CONSTRUCTION PERIOD. COORDINATE WITH INSTALLING FIRE PROTECTION CONTRACTOR.

22. THE ENTIRE EXISTING FIRE PROTECTION SYSTEM SHALL BE RESTORED TO FULL OPERATION AT THE END OF EACH WORKING DAY. ALL EXISTING FIRE ALARMS AND FIRE EXITS AND ANY OTHER ASPECT OF THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN FULL OPERATION. THE COST OF RESPONSE TO ANY FALSE ALARM AS CHARGED BY ANY LOCAL FIRE DEPARTMENT SHALL BE PAID BY THE MECHANICAL

CONTRACTOR.

23. MECHANICAL CONTRACTOR SHALL NOT PENETRATE OR CUT ANY STRUCTURAL MEMBERS NOT SPECIFICALLY SHOWN ON THE DRAWINGS (E.G., JOISTS, BEAMS, ETC.). IF STRUCTURAL MEMBERS CONFLICT WITH ROUTING, CONTACT THE OWNER'S REPRESENTATIVE FOR DIRECTION BEFORE PROCEEDING. EXERCISE CAUTION IN CUTTING CONCRETE FLOORS AND WALLS TO AVOID EXISTING UTILITIES WHICH MAY BE LOCATED

IN AND UNDER CONCRETE SURFACES.

24. THE MECHANICAL CONTRACTOR SHALL PROVIDE NEW OPENINGS IN WALLS, FLOOR, AND ROOF, AND PATCH EXISTING OPENINGS IN CONJUNCTION WITH THE DEMOLITION AND INSTALLATION OF THE NEW BUILDING

COMPONENTS. ALL NECESSARY FRAMING, COUNTER-FLASHING, ETC. SHALL BE INCLUDED.

25. FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE EXISTING STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC.

26. ALL EXISTING DUCTWORK, PIPING, CONDUIT, AND MECHANICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE OWNER'S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT, IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE OWNER'S REPRESENTATIVE.

27. FOR EACH PHASE AND BEFORE INTERRUPTING EACH EXISTING UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE, WILL BE INTERRUPTED AND PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA. DETERMINE ALL SUCH TEMPORARY SERVICES PRIOR TO SUBMITTING BID. THERE WILL BE NO FUTURE CONSIDERATION TO THE MECHANICAL CONTRACTOR FOR ANY TEMPORARY SERVICES REQUIRED. PREPARE A DETAILED SHOP DRAWING SHOWING ALL OF THE EXISTING UTILITIES IN THEIR RELOCATED LOCATION AND ALL THE NEW HVAC SYSTEMS.

28. THE FLOOR AREAS BELOW OVERHEAD WORK, WHERE WELDING "HOT WORK" IS TO BE PERFORMED, SHALL BE CLEARED TO A MINIMUM DISTANCE OF 36 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD "HOT WORK". ALL FLAMMABLE MATERIALS SHALL BE CLEARED TO A DISTANCE 50 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD "HOT WORK".

29. EXISTING DUCTWORK, DOMESTIC COLD WATER PIPING, DOMESTIC HOT WATER PIPING, CHILLED AND HEATING HOT WATER PIPING, WASTE, VENT, FIRE SPRINKLER LINES, FIRE ALARM EQUIPMENT, ELECTRICAL CONDUIT, TELEPHONE CONDUIT, COMMUNICATION CONDUIT, PNEUMATIC TUBING, ETC., MAY HAVE TO BE RELOCATED TO FACILITATE THE INSTALLATION OF THE NEW WORK. THE CONTRACTOR SHALL DETERMINE ALL EXISTING SERVICES THAT REQUIRE RELOCATION PRIOR TO SUBMITTING HIS BID AND INCLUDE ALL COSTS IN THE BID. THERE WILL BE NO EXTRA COMPENSATION TO THE CONTRACTOR FOR THIS WORK.

30. THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS. THIS COULD INCLUDE ELECTRICAL WORK, REFRIGERANT LINE ROUTING, CONTROL MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU'S, ETC.

31. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.

32. ALL CEILING DEMOLITION WORK SHALL BE DONE AFTER NORMAL WORKING HOURS. THE INSTALLATION OF THE NEW CEILING SHALL BE DONE AFTER NORMAL WORKING HOURS. THE WORK AREA SHALL BE

CLEANED BEFORE THE START OF EACH WORKING DAY.

33. REMOVE T-BARS AND 2X4 CEILING PANELS AS REQUIRED FOR THE DEMOLITION AND THE INSTALLATION OF THE NEW WORK. REINSTALL EXISTING OR REPLACE WITH NEW AS REQUIRED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE. FOR ANY HARD CEILING AREA, CUT AND DEMOLISH ENOUGH OF THE HARD CEILING TO DO THE WORK REQUIRED. REBUILD AND PATCH THE DEMOLISHED. FINISH AND PAINT TO

MATCH EXISTING TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.

34. ANY DEVICE THAT REQUIRES ACCESS FOR ADJUSTMENT OR ROUTINE MAINTENENANCE, SUCH AS BUT NOT LIMITED TO VALVES, VOLUME DAMPERS, CONTROL DEVICES, VAVS, ETC. SHALL BE INSTALLED IN AN

ACCESSIBLE LOCATION.

35. PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO BE REUSED.

36. REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.

37. WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE MECHANICAL CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO EVERY SIMILAR CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS

REPEATED OR REFERENCED.

38. WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK DETAILED OR NOTED ELSEWHERE OR TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF

THE OWNER'S REPRESENTATIVE.

39. ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE MECHANICAL CONTRACTOR'S WORK AND WHICH REMAIN EXPOSED IN THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION. SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.

40. WHEREVER NEW WALL, FLOOR, OR CEILING FINISHES ARE INDICATED, THE MECHANICAL CONTRACTOR SHALL BRING EXISTING MECHANICAL COMPONENTS FLUSH WITH THE NEW FINISHED SURFACES IF

APPROPRIATE.

41. THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL FRAMING AND FURRING SHALL BE REPAIRED WHERE DAMAGE BY THE CONTRACTOR'S WORK.

42. PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.

43. ALL NEW FIRE ALARM DEVICES INSTALLED IN HVAC EQUIPMENT SUCH AS SMOKE DETECTORS, SMOKE DAMPERS, FIRE/SMOKE DAMPERS, ETC. SHALL BE CONNECTED TO THE MAIN FIRE ALARM PANEL.

44. ALL EQUIPMENT AND MATERIALS SUBJECT TO THE WEATHER THAT ARE NOT FACTORY PAINTED SHALL BE FIELD PAINTED AND WEATHER PROOFED WITH PRIMER, AND TWO COATS OF EXTERIOR PAINT. MATCH THE COLOR OF THE EXISTING BUILDING EXTERIOR. THE COLOR AND QUANTITY OF THE PAINT IS SUBJECT TO THE APPROVAL OF THE OWNER'S REPRESENTATIVE. SUBMITTAL REQUIRED.

45. ANY ANTICIPATED HAZARDOUS MATERIALS (HAZMAT) ARE INDICATED ON THE DRAWINGS, HOWEVER, IT IS IMPOSSIBLE TO PREDICT WHERE EXACTLY ALL HAZMAT MAY BE ENCOUNTERED. IF HAZMAT IS ENCOUNTERED OR SUSPECTED AT ANY POINT DURING CONSTRUCTION, CEASE ALL WORK IMMEDIATELY AND CONTACT THE OWNER’S REPRESENTATIVE FOR GUIDANCE.

46. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE-VERSA. IT IS THE CONTRACTOR’S RESPONSIBILITY TO DETERMINE IF THERE IS ENOUGH SPACE AND/OR COMPATABILITY EXISTS TO USE EXISTING CONTROLLERS OR OTHER ASSOCIATED EXISTING CONTROLS EQUIPMENT. IF COMPATIBILITY AND/OR SPACE DOES NOT EXIST, IT IS THE CONTROLS CONTRACTOR RESPONSIBILITY TO PROVIDE THE REQUIRED CONTROLLERS, BRIDGES, ETC. TO ALLOW FULL INTEGRATION OF REQUIRED POINTS AND TO SATISFY THE SEQUENCE OF OPERATIONS. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE

COMPLETION OF THE PROJECT.

47. UNLESS THE OWNER CHOOSES TO USE THEIR OWN THIRD-PARTY TEST, ADJUST, AND BALANCE AGENCY, THE MECHANICAL CONTRACTOR SHALL UTILIZE A THIRD PARTY TAB AGENCY FOR ALL NECESSARY FINAL TAB AND PROVIDE COORDINATION WITH EQUIPMENT MANUFACTURER FOR TYPICAL STARTUP SERVICES. FULL DOCUMENTATION, TO INCLUDE NECESSARY FACILITY STAFF TRAINING, SHALL BE COMPLETED AND

SUBMITTED TO ALLOW FOR REQUIRED CONTINUED OPERATION AND MAINTENANCE.

Revisions: Date:

WALK-IN COOLER/FREEZER CALCULATION SUMMARY

GE-01a GE-01E GE-05 GE-06 GE-07 GE-09

Refrigeration Type Refrigerator Freezer Refrigerator Refrigerator Refrigerator Refrigerator

Nominal Width (ft) 11 21 12 12 12 13

Nominal Length (ft) 20 50 21 21 21 21

Nominal Height (ft) 8 8 8 8 8 8

Volume (ft^3) 1768.2 8284.7 1980.0 2000.6 2000.6 2138.4

Surrounding Ambient Temperature (F) 85 85 85 85 85 85

Inside Refrigeration Temperature (F) 32 -10 32 32 32 32

Temperature Reduction dT=Ambient minus Inside Temp (F) 53 95 53 53 53 53

Walls Insulation Type

Walls K Factor-Thermal Conductivity (BTU/hr*SF*degF/in of thickness) 0.12 0.12 0.12 0.12 0.12 0.12

Wall Thickness (in) 4 4 4 4 4 4

Wall Heat Load (BTU/24hrs/SF) 38 68 38 38 38 38

Windows? yes yes yes yes yes yes

Window Area (SF) 1.36 2.72 1.36 1.36 1.36 1.36

Window Heat Load (BTU/24hrs/SF) 1350 2560 1350 1350 1350 1350

Floor Insulation Type Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane

Floor K Factor-Thermal Conductivity (BTU/hr*SF*degF/in of thickness) 0.12 0.12 0.12 0.12 0.12 0.12

Floor Thickness (in) 4 4 4 4 4 4

Floor Heat Load (BTU/24hrs/SF) 38 68 38 38 38 38

Ceiling Insulation Type Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane

Ceiling K Factor-Thermal Conductivity (BTU/hr*SF*degF/in of thickness) 0.12 0.12 0.12 0.12 0.12 0.12

Ceiling Thickness (in) 4 4 4 4 4 4

Ceiling Heat Load (BTU/24hrs/SF) 38 68 38 38 38 38

Walls Transmission Load (BTU/24hrs) 20670.26 83852.26 21621.78 21697.78 21697.78 22205.46

Floor Transmission Load (BTU/24hrs) 8398.79 70419.53 9405.00 9502.97 9502.97 10157.40

Ceiling Transmission Load (BTU/24hrs) 8398.79 70419.53 9405.00 9502.97 9502.97 10157.40

Total Transmission Load (BTU/24hrs) 37,468 224,691 40,432 40,704 40,704 42,520

Average Air Changes Per 24 Hours 13 6 12 12 12 12

Heat Removed in Cooling Air Storage Room Conditions (BTU/cubic ft) 2.09 3.49 2.09 2.09 2.09 2.09

Air Change Load (BTU/24hrs) 48,041 159,024 49,658 50,176 50,176 53,631

Product (Mixed Vegetables, Meat, Dairy, etc) Mixed Vegetables Beef, fresh Mixed Vegetables Beef, fresh Mixed Vegetables Milk, Pasteurized Grade A

Product Latent Heat of Fusion [NOTE IF REFRIGERATOR=0] (BTU/lb) 0 100 0 0 0 0

Specific Heat Above Freezing (BTU/lb/F) 0.90 0.76 0.90 0.84 0.90 0.93

Specific Heat Below Freezing [NOTE IF REFRIGERATOR=0] (BTU/lb/F) 0 0.41 0 0 0 0

Heat of Respiration [NOTE IF FREEZER=0] (BTU/LB/24hrs) 2 0.00 2 0 2 0

Product Load Per Day (lbs/day) 7,000 4,500 7,000 7,000 7,000 7,000

Entering Product Temp (F) 35 35 35 35 100 35

Product Freezing Temp (F) 30 29 30 29 30 31

Product Heat Load (BTU/24hrs) 45,500 543,263 45,500 35,280 455,000 26,040

Motor Horsepower (hp) 0.5 0.5 0.5 0.5 0.5 0.5

Lighting Load (Watt) 221.0 1,035.6 247.5 250.1 250.1 267.3

Equipment Heat Load (BTU/24hrs) 55,624 122,418 57,795 58,006 58,006 59,419

Design Factor of Safety 10% 10% 10% 10% 10% 10%

Hours of Operation 18 18 18 18 18 18

Total Cooling Load Requirement (BTU/hr) 11,405 64,130 11,818 11,255 36,904 11,098

Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane Foamed in Place Urethane

10/25/2022

UP

CON

C. S

TEP

S

NO.

PNE

UMA

TIC

MES

SEN

GER

STA

IR

NO.

STA

IR

SYS

TEM

EQ

UIPM

ENT

RM

SILV

ER

MAC

HINE

RM

REC

OVE

RY

RM

10111213141516171819

9.510.2 19.6

A

B

A2

A7

B3

PHASE 1 DEMOLITION

PHASE 2 DEMOLITION

GENERAL MECHANICAL DEMOLITON NOTES

A. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK.

B. ALL AREAS OF THE BUILDING AFFECTED BY MECHANICAL DEMOLITION WORK SHALL BE PATCHED AND REPAIRED TO MATCH ADJACENT FINAL FINISHES AND REQUIRED FIRE RATING. THE REPAIR WORK SHALL BE DONE TO THE

OWNER'S SATISFACTION.

C. DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT REQUIRED TO

PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

D. REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

E. DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED. PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN PROGRESS, AND TIMELY

DISCONNECTION OF UTILITY SERVICES.

F. EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH SIMILAR EXISTING WORK.

STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL

WORK.

G. UNLESS SPECIFIED OTHERWISE, ALL PIPING, WIRING, CONDUIT, AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE OWNER'S PROPERTY. THIS INCLUDES ALL CONCRETE PADS, PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN

ROOF, WALLS, FLOORS, IN AN APPROVED MANNER. STRUCTURAL

H. REMOVAL AND DISPOSAL OF ALL EXISTING REFRIGERANT SHALL BE COMPLETED IN ACCORDANCE WITH SECTION 608 OF THE CLEAN AIR ACT (CAA), AND THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS LISTED

IN 40 CFR PART 82, SUBPARTS A AND F.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD BID DOCUMENTSCapital Assets

U.S. Department

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

REPLACE MAIN KITCHEN FREEZERS

130 W KINGSBRIDGE RD, BRONX, NY 10468

526-21-111

26 OCTOBER 2022 JWE MPL

Approved:

Project Director

Assoc Project Director

Section/ Engineering

Service Approved:

Approved:

Chief Engineer

Safety Manager

Approved:

Approved:

NAL

PCC/Service Director

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198 of Veterans Affairs

CONCEPT / PRELIMINARIES SUBMITTAL 18 MAR 22

35% SCHEMATIC DESIGN SUBMITTAL 2 MAY 22

65% DESIGN DEVELOPMENT SUBMITTAL 8 JUL 22

95% CONSTRUCTION DOCUMENTS SUBMITTAL 22 AUG 22

100% CONSTRUCTION DOCUMENTS SUBMITTAL 26 SEP 22

100% CD BID DOCUMENTS SUBMITTAL 26 OCT 22

G sh or tc ut

-ta rg et s-by -id

\1 Am

4f gx

Kh 1N aH Sg

M M

-W y-

Q cI

T2 U

9e tIJ z\ W at so n En gi ne er in g\ 1-

W at so n

En gi ne er in g, P C

\2

1\ Th in kf or m

\T H

-2

R ep la ce

M ai n Ki tc he n Fr ee ze rs B ro nx

V

AM

C \W at so n D ra w in gs

\R ev it\ W at so n R ev it

Pr oj ec t.r vt

/2 5/

:0

0:

P M

MD100

SUB-BASEMENT MECHANICAL

DEMOLITION PLAN

1/8" = 1'-0"1

SUB-BASEMENT MECHANICAL

DEMOLITION PLAN

KEYED DEMOLITION NOTES

EXISTING DUCT MOUNTED EXHAUST FAN TO BE REMOVED.

EXISTING EXHAUST DUCT TO BE REMOVED IN ITS ENTIRETY.

EXISTING COOLER CONDENSING UNIT TO BE REMOVED.

EXISTING FREEZER COMPRESSOR TO BE REMOVED.

EXISTING REFRIGERANT PIPING TO BE REMOVED. REFER TO SHEET MD101 FOR CONTINUATION ON

THE GROUND LEVEL.

EXISTING CONDENSATE DRAIN PIPING TO BE REMOVED. REFER TO SHEET MD101 FOR OCNTINUATION

ON THE GROUND LEVEL.

EXISTING EQUIPMENT PAD TO BE DEMOLISHED. EXISTING FLOOR SHALL BE LEVELED AND CLEANED

TO MATCH ADJACENT FLOOR FINISH.

Revisions: Date: 10/25/2022

POT WASHING

F.E.C.

FROZEN FOODS

GE-01E

PRE-FAB VEG. FRIG.

GE-05

PRE-FAB MEAT FRIG.

GE-06

FOOD BANK

GE-07

DAIRY REFRIGERATION

GE-09

INGREDIENT ROOM

GE-08

MEAT & VEGETABLE

GE-01C

NUTRITION STORAGE

GE-10A

SUBSISTENCE STORAGE

GE-10

NONFOOD STORAGE

GE-08A

GE-04

OFFICE PROGRAM DEVELOPMENT OFICE

DELIVERY

STERILE STORAGE

DUMB WAITER

GE-11

CORRIDOR

CG-25

FOOD PROCESSING

GD-40B

HOUSEKEEPING

3A

SOILED DISHES

GE-01

CLEAN DISHES

GE-02

TRAY ASSEMBLY AREA

GE-01

DIETETIC OFFICE

DIET COMMUNICATION

GE-01

REFRIGERATOR

CORRIDOR

CG-26

TELEPHONE

EQUIPMENT

GE-13

STAIR NO. 7

ELECTRICAL

CLOSET

G-E

TRANSFORMER

CLOSET

GD-40B

MANUAL CART WASH

GD-01

UP

UP

POT WASHING

F.E.C.

FROZEN FOODS

GE-01E

PRE-FAB VEG. FRIG.

GE-05

PRE-FAB MEAT FRIG.

GE-06

FOOD BANK

GE-07

DAIRY REFRIGERATION

GE-09

INGREDIENT ROOM

GE-08

MEAT & VEGETABLE

GE-01C

NUTRITION STORAGE

GE-10A

SUBSISTENCE STORAGE

GE-10

NONFOOD STORAGE

GE-08A

GE-04

OFFICE PROGRAM DEVELOPMENT OFICE

DELIVERY

STERILE STORAGE

DUMB WAITER

GE-11

CORRIDOR

CG-25

FOOD PROCESSING

GD-40B

HOUSEKEEPING

3A

SOILED DISHES

GE-01

CLEAN DISHES

GE-02

TRAY ASSEMBLY AREA

GE-01

DIETETIC OFFICE

DIET COMMUNICATION

GE-01

REFRIGERATOR

CORRIDOR

CG-26

TELEPHONE

EQUIPMENT

GE-13

STAIR NO. 7

ELECTRICAL

CLOSET

G-E

TRANSFORMER

CLOSET

GD-40B

MANUAL CART WASH

GD-01

UP

UP

10111213141516171819

9.510.2 19.6

A

B

A2

A7

B3 1 1 1 1

2 2

6 6 6 6

PHASE 1 DEMOLITION

PHASE 2 DEMOLITION

GENERAL MECHANICAL DEMOLITON NOTES

A. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK.

B. ALL AREAS OF THE BUILDING AFFECTED BY MECHANICAL DEMOLITION WORK SHALL BE PATCHED AND REPAIRED TO MATCH ADJACENT FINAL FINISHES AND REQUIRED FIRE RATING. THE REPAIR WORK SHALL BE DONE TO THE

OWNER'S SATISFACTION.

C. DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT REQUIRED TO

PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

D. REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

E. DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED. PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN PROGRESS, AND TIMELY

DISCONNECTION OF UTILITY SERVICES.

F. EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH SIMILAR EXISTING WORK.

STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL

WORK.

G. UNLESS SPECIFIED OTHERWISE, ALL PIPING, WIRING, CONDUIT, AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE OWNER'S PROPERTY. THIS INCLUDES ALL CONCRETE PADS, PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN

ROOF, WALLS, FLOORS, IN AN APPROVED MANNER. STRUCTURAL

H. REMOVAL AND DISPOSAL OF ALL EXISTING REFRIGERANT SHALL BE COMPLETED IN ACCORDANCE WITH SECTION 608 OF THE CLEAN AIR ACT (CAA), AND THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS LISTED

IN 40 CFR PART 82, SUBPARTS A AND F.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD BID DOCUMENTSCapital Assets

U.S. Department

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

REPLACE MAIN KITCHEN FREEZERS

130 W KINGSBRIDGE RD, BRONX, NY 10468

526-21-111

26 OCTOBER 2022 JWE MPL

Approved:

Project Director

Assoc Project Director

Section/ Engineering

Service Approved:

Approved:

Chief Engineer

Safety Manager

Approved:

Approved:

NAL

PCC/Service Director

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198 of Veterans Affairs

CONCEPT / PRELIMINARIES SUBMITTAL 18 MAR 22

35% SCHEMATIC DESIGN SUBMITTAL 2 MAY 22

65% DESIGN DEVELOPMENT SUBMITTAL 8 JUL 22

95% CONSTRUCTION DOCUMENTS SUBMITTAL 22 AUG 22

100% CONSTRUCTION DOCUMENTS SUBMITTAL 26 SEP 22

100% CD BID DOCUMENTS SUBMITTAL 26 OCT 22

G sh or tc ut

-ta rg et s-by -id

\1 Am

4f gx

Kh 1N aH Sg

M M

-W y-

Q cI

T2 U

9e tIJ z\ W at so n En gi ne er in g\ 1-

W at so n

En gi ne er in g, P C

\2

1\ Th in kf or m

\T H

-2

R ep la ce

M ai n Ki tc he n Fr ee ze rs B ro nx

V

AM

C \W at so n D ra w in gs

\R ev it\ W at so n R ev it

Pr oj ec t.r vt

/2 5/

:0

0:

P M

MD101

GROUND LEVEL MECHANICAL

DEMOLITION PLAN

1/8" = 1'-0"1

GROUND LEVEL MECHANICAL

DEMOLITION PLAN

KEYED DEMOLITION NOTES

EXISTING COOLER EVAPORATOR TO BE REMOVED.

EXISTING FREEZER EVAPORATOR TO BE REMOVED.

EXISTING CONDENSATE DRAIN PIPING TO BE REMOVED.

EXISTING CONDENSATE DRAIN PIPING DOWN TO SUB-BASEMENT LEVEL TO BE REMOVED. REFER TO

SHEET MD100 FOR CONTINUATION.

EXISTING FLOOR DRAIN TO BE REMOVED FOR REPLACEMENT.

EXISTING REFRIGERANT PIPING UP TO GROUND FLOOR INTERSTITIAL LEVEL TO BE REMOVED. REFER

TO SHEET MD102 FOR CONTINUATION.

EXISTING REFRIGERANT PIPING DOWN TO SUB-BASEMENT FLOOR TO BE REMOVED. REFER TO SHEET

MD100 FOR CONTINUATION.

EXISTING REFRIGERANT PIPING RISER TO BE REMOVED. REFER TO SHEET MD100 FOR CONTINUATION

ON THE SUB-BASEMENT LEVEL, AND SHEET MD102 FOR CONTINUATION ON THE GROUND FLOOR

INTERSTITIAL LEVEL.

EXISTING FLOOR DRAIN TO REMAIN.

NO.

STA

IR

NO.

STA

IR

10111213141516171819

9.510.2 19.6

A

B

A2

A7

B3

1 1

1 11

PHASE 2 DEMOLITION

GENERAL MECHANICAL DEMOLITON NOTES

A. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK.

B. ALL AREAS OF THE BUILDING AFFECTED BY MECHANICAL DEMOLITION WORK SHALL BE PATCHED AND REPAIRED TO MATCH ADJACENT FINAL FINISHES AND REQUIRED FIRE RATING. THE REPAIR WORK SHALL BE DONE TO THE

OWNER'S SATISFACTION.

C. DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT REQUIRED TO

PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

D. REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

E. DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED. PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN PROGRESS, AND TIMELY

DISCONNECTION OF UTILITY SERVICES.

F. EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH SIMILAR EXISTING WORK.

STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL

WORK.

G. UNLESS SPECIFIED OTHERWISE, ALL PIPING, WIRING, CONDUIT, AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE OWNER'S PROPERTY. THIS INCLUDES ALL CONCRETE PADS, PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN

ROOF, WALLS, FLOORS, IN AN APPROVED MANNER. STRUCTURAL

H. REMOVAL AND DISPOSAL OF ALL EXISTING REFRIGERANT SHALL BE COMPLETED IN ACCORDANCE WITH SECTION 608 OF THE CLEAN AIR ACT (CAA), AND THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS LISTED

IN 40 CFR PART 82, SUBPARTS A AND F.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD BID DOCUMENTSCapital Assets

U.S. Department

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

REPLACE MAIN KITCHEN FREEZERS

130 W KINGSBRIDGE RD, BRONX, NY 10468

526-21-111

26 OCTOBER 2022 JWE MPL

Approved:

Project Director

Assoc Project Director

Section/ Engineering

Service Approved:

Approved:

Chief Engineer

Safety Manager

Approved:

Approved:

NAL

PCC/Service Director

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198 of Veterans Affairs

CONCEPT / PRELIMINARIES SUBMITTAL 18 MAR 22

35% SCHEMATIC DESIGN SUBMITTAL 2 MAY 22

65% DESIGN DEVELOPMENT SUBMITTAL 8 JUL 22

95% CONSTRUCTION DOCUMENTS SUBMITTAL 22 AUG 22

100% CONSTRUCTION DOCUMENTS SUBMITTAL 26 SEP 22

100% CD BID DOCUMENTS SUBMITTAL 26 OCT 22

G sh or tc ut

-ta rg et s-by -id

\1 Am

4f gx

Kh 1N aH Sg

M M

-W y-

Q cI

T2 U

9e tIJ z\ W at so n En gi ne er in g\ 1-

W at so n

En gi ne er in g, P C

\2

1\ Th in kf or m

\T H

-2

R ep la ce

M ai n Ki tc he n Fr ee ze rs B ro nx

V

AM

C \W at so n D ra w in gs

\R ev it\ W at so n R ev it

Pr oj ec t.r vt

/2 5/

:0

0:

P M

MD102

GROUND LEVEL INTERSTITIAL

MECHANCIAL DEMOLITION PLAN

1/8" = 1'-0"1

GROUND LEVEL INTERSTITIAL

DEMOLITION PLAN

KEYED DEMOLITION NOTES

EXISTING REFRIGERANT PIPING DOWN TO GROUND FLOOR TO BE REMOVED. REFER TO SHEET MD101

FOR CONTINUATION.

EXISTING REFRIGERANT PIPING RISER DOWN TO SUB-BASEMENT LEVEL TO BE REMOVED. REFER TO

SHEET MD100 AND MD101 FOR CONTINUATION ON THE SUB-BASEMENT AND GROUND FLOOR

LEVELS, RESPECTIVELY.

CON

C. S

TEP

S

NO.

PNE

UMA

TIC

MES

SEN

GER

STA

IR

NO.

STA

IR

SYS

TEM

EQ

UIPM

ENT

RM

SILV

ER

MAC

HINE

RM

REC

OVE

RY

RM

101112131415

9.5

10.2

19.6

A

B

A2

A7

B3

CU-GE-01a

CU-GE-05

CU-GE-06

CU-GE-07

CU-GE-09

CU-GE-01E.1

CU-GE-01E.3 CU-GE-01E.2

1/2"ø RL 1 1/8"ø RS

1/2"ø RL 1 3/8"ø RS

1/2"ø RL 1 1/8"ø RS

1/2"ø RL 1 1/8"ø RS

1 3/8"ø RS 1/2"ø RL

1 3/8"ø RS 1/2"ø RL

1/2"ø RL 1 3/8"ø RS

7/8"ø RS 3/8"ø RL

3/4"ø D

CU-GE-01E.4

1/2"ø RL 1 3/8"ø RS

PHASE 1 NEW WORK

PHASE 2 NEW WORK

M-100

GENERAL MECHANICAL NEW WORK NOTES

A. ALL MECHANICAL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS FOR THE

STATE OF NEW YORK.

B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK.

C. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF DUCTWORK AND DIFFUSERS WITH LIGHTS, EQUIPMENT, AND CEILING GRID.

D. DRAWINGS ARE DIAGRAMMATIC AND GENERALLY INDICATIVE OF THE WORK. ALL SYSTEMS SHALL FOLLOW ARRANGEMENT AS MUCH AS POSSIBLE, HOWEVER, ACTUAL FIELD CONDITIONS SHALL DICTATE. PROVIDE NECESSARY MODIFICATIONS TO MEET FIELD CONDITIONS AND AVOID CONFLICT WITH OTHER IF RESOLUTION CANNOT BE REACHED WITHOUT COMPROMISING THE DESIGN, THESE CONFLICTS SHALL BE PRESENTED TO THE ENGINEER FOR RESOLUTION. IN CONFLICT AREAS, COMPLETE ONLY WORK NOT AFFECTED BY THE CONFLICT

PRIOR TO RESOLUTION.

E. CONNECTIONS TO EQUIPMENT SHALL CONFORM TO MANUFACTURER'S SPECIFICATIONS.

F. ALL HANGER SYSTEMS FOR PIPING AND EQUIPMENT SHALL BE SECURED TO BUILDING STRUCTURAL SYSTEM.

G. PROVIDE ACCESS PANELS IN CEILINGS WHERE REQUIRED FOR OPERATION AND MAINTENANCE OF ALL FANS, VALVES, DAMPERS, AIR-DEFLECTING DEVICES, AND OTHER MECHANICAL EQUIPMENT.

H. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE HARD

CEILING, OR ACOUSTICAL CEILING.

I. FOR WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

J. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW

BETWEEN WATER AND AIR.

K. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

L. ALL CONTROLS AND MONITORING SHALL BE TIED INTO THE EXISTING BUILDING MANAGEMENT SYSTEM USING BACnet IP PROTOCOL IN ACCORDANCE WITH ASHRAE, ANSI, AND ISO16484-5 STANDARDS. CONTROLS CONTRACTOR SHALL PROVIDE CAT5 WIRING TO AN OPEN PORT IN THE NEAREST TELECOMMUNICATION CLOSET

FOR INTEGRATION.

M. ALL EXTERIOR CONDENSING UNITS SHALL BE INSTALLED ON GALVANIZED STEEL DUNNAGE MOUNTED TO EXTERIOR EQUIPMENT PAD. DUNNAGE SHALL BE INSTALLED TO RAISE THE CONDENSING UNITS TO A MINIMUM HEIGHT OF 24" ABOVE THE EQUIPMENT PAD LEVEL. REFER TO SPECIFICATION SECTION 05 12 00 -

STRUCTURAL STEEL FRAMING FOR ADDITIONAL INFORMATION.

7' - 3 1/4"

3'

8"

NOTES:

1. CONTRACTOR SHALL REMOVE AND REPLACE THE EXISTING

AREAWAY GRATE FOLLOWING THE INSTALLATION OF NEW

REFRIGERANT PIPING.

2. DIMENSIONS PROVIDED ARE APPROXIMATE, VERIFY FINAL

DIMENSIONS IN FIELD FOLLOWING INSTALLATION OF

REFRIGERANT PIPING.

3. REFER TO SPECIFICATION SECTION 05 50 00 - METAL

FABRICATIONS FOR MATERIAL AND INSTALLATION

REQUIREMENTS FOR METAL GRATING AND PERIMETER

SUPPORTS.

PROVIDE 2x2x1/8 ANGLE

IRON AT PERIMETER OF

NEW GRATE FOR SUPPORT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD BID DOCUMENTSCapital Assets

U.S. Department

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

REPLACE MAIN KITCHEN FREEZERS

130 W KINGSBRIDGE RD, BRONX, NY 10468

526-21-111

26 OCTOBER 2022 JWE MPL

Approved:

Project Director

Assoc Project Director

Section/ Engineering

Service Approved:

Approved:

Chief Engineer

Safety Manager

Approved:

Approved:

NAL

PCC/Service Director

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

T:888.696.1198 of Veterans Affairs

CONCEPT / PRELIMINARIES SUBMITTAL 18 MAR 22

35% SCHEMATIC DESIGN SUBMITTAL 2 MAY 22

65% DESIGN DEVELOPMENT SUBMITTAL 8 JUL 22

95% CONSTRUCTION DOCUMENTS SUBMITTAL 22 AUG 22

100% CONSTRUCTION DOCUMENTS SUBMITTAL 26 SEP 22

100% CD BID DOCUMENTS SUBMITTAL 26 OCT 22

G sh or tc ut

-ta rg et s-by -id

\1 Am

4f gx

Kh 1N aH Sg

M M

-W y-

Q cI

T2 U

9e tIJ z\ W at so n En gi ne er in g\ 1-

W at so n

En gi ne er in g, P C

\2

1\ Th in kf or m

\T H

-2

R ep la ce

M ai n Ki tc he n Fr ee ze rs B ro nx

V

AM

C \W at so n D ra w in gs

\R ev it\ W at so n R ev it

Pr oj ec t.r vt

/2 5/

:5

9:

P M

M-100

SUB-BASEMENT MECHANICAL

NEW WORK PLAN

1/8" = 1'-0"1

SUB-BASEMENT MECHANICAL NEW

WORK PLAN

KEYED NEW WORK NOTES

NEW REFRIGERANT LIQUID AND SUCTION LINES UP TO GROUND FLOOR INTERSTITIAL SPACE, TO BE INSTALLED WITHIN EXISTING PIPE CHASE. REFER TO SHEETS M-101 AND M-102 FOR CONTINUATION.

NEW REFRIGERANT LIQUID AND SUCTION LINES UP TO UC-GE-01a ON GROUND FLOOR. REFER TO

SHEET M-101 FOR CONTINUATION.

NEW CONDENSATE DRAIN UP TO GROUND FLOOR. REFER TO SHEET M-101 FOR CONTINUATION.

PROVIDE THRU WALL PENETRATION FOR REFRIGERANT PIPING.

1/2" = 1'-0"2 EXTERIOR AREAWAY GRATE DETAIL

POT WASHING

F.E.C.

FROZEN FOODS

GE-01E

PRE-FAB VEG. FRIG.

GE-05

PRE-FAB MEAT FRIG.

GE-06

FOOD BANK

GE-07

DAIRY REFRIGERATION

GE-09

INGREDIENT ROOM

GE-08

MEAT & VEGETABLE

GE-01C

NUTRITION STORAGE

GE-10A

SUBSISTENCE STORAGE

GE-10

NONFOOD STORAGE

GE-08A

GE-04

OFFICE PROGRAM DEVELOPMENT OFICE

DELIVERY

STERILE STORAGE

DUMB WAITER

GE-11

CORRIDOR

CG-25

FOOD PROCESSING

GD-40B

HOUSEKEEPING

3A

SOILED DISHES

GE-01

CLEAN DISHES

GE-02

TRAY ASSEMBLY AREA

GE-01

DIETETIC OFFICE

DIET COMMUNICATION

GE-01

REFRIGERATOR

CORRIDOR

CG-26

TELEPHONE

EQUIPMENT

GE-13

STAIR NO. 7

ELECTRICAL

CLOSET

G-E

TRANSFORMER

CLOSET

GD-40B

MANUAL CART WASH

GD-01

UP

UP

POT WASHING

F.E.C.

FROZEN FOODS

GE-01E

PRE-FAB VEG. FRIG.

GE-05

PRE-FAB MEAT FRIG.

GE-06

FOOD BANK

GE-07

DAIRY REFRIGERATION

GE-09

INGREDIENT ROOM

GE-08

MEAT & VEGETABLE

GE-01C

NUTRITION STORAGE

GE-10A

SUBSISTENCE STORAGE

GE-10

NONFOOD STORAGE

GE-08A

GE-04

OFFICE PROGRAM DEVELOPMENT OFICE

DELIVERY

STERILE STORAGE

DUMB WAITER

GE-11

CORRIDOR

CG-25

FOOD PROCESSING

GD-40B

HOUSEKEEPING

3A

SOILED DISHES

GE-01

CLEAN DISHES

GE-02

TRAY ASSEMBLY AREA

GE-01

DIETETIC OFFICE

DIET COMMUNICATION

GE-01

REFRIGERATOR

CORRIDOR

CG-26

TELEPHONE

EQUIPMENT

GE-13

STAIR NO. 7

ELECTRICAL

CLOSET

G-E

TRANSFORMER

CLOSET

GD-40B

MANUAL CART WASH

GD-01

UP

UP

10111213141516171819

9.510.2 19.6

A

B

A2

A7

B3

UC-GE-01E.1 UC-GE-01E.2 UC-GE-01E.3

UC-GE-01a

D

D

D1

1 1

6 6

M-101

UC-GE-01E.4

UC-GE-05 UC-GE-06

D

UC-GE-07

UC-GE-09

1 1

D

PHASE 1 NEW WORK PHASE 2 NEW WORK

GENERAL MECHANICAL NEW WORK NOTES

A. ALL MECHANICAL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS FOR THE

STATE OF NEW YORK.

B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK.

C. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF DUCTWORK AND DIFFUSERS WITH LIGHTS, EQUIPMENT, AND CEILING GRID.

D. DRAWINGS ARE DIAGRAMMATIC AND GENERALLY INDICATIVE OF THE WORK. ALL SYSTEMS SHALL FOLLOW ARRANGEMENT AS MUCH AS POSSIBLE, HOWEVER, ACTUAL FIELD CONDITIONS SHALL DICTATE. PROVIDE NECESSARY MODIFICATIONS TO MEET FIELD CONDITIONS AND AVOID CONFLICT WITH OTHER IF RESOLUTION CANNOT BE REACHED WITHOUT COMPROMISING THE DESIGN, THESE CONFLICTS SHALL BE PRESENTED TO THE ENGINEER FOR RESOLUTION.

This is the start of the file's text. The full file is on GovTribe.