Raytheon_CDRL_A002_FA8540-21-D-0002.pdf
PDF 76 KB Posted
- Attached to
- Low Altitude Navigation and Targeting Infrared for Night (LANTIRN) USAF Sustaining Engineering Services
- Solicitation number
- FA8540-21-R-0005
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
AAQ-13 LANTIRN
E. CONTRACT/PR NO.
FA8540-21-D-0002
F. CONTRACTOR
RAYTHEON COMPANY
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Engineer Change Proposal
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80639C/T
5. CONTRACT REFERENCE
PWS para 4.0.5, 4.0.7
6. REQUIRING OFFICE
Timothy Blacknik
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 Draft
Final
Reg Repro
16. REMARKS
BLOCK 4: The ECP shall provide an assessment on the impact of the total life cycle cost.
Each ECP shall include a narrative concerning its impact upon safety with any hazards listed, their risk assessment, and impact on the present or proposed system. If no potential hazards exist, the basis for such determination and supporting evidence must be included.
Include a narrative concerning the impact on reliability, supportability, maintainability, and reproducibility. Also, include a factor titled "critical single point failure item". This factor will be used to indicate direct or indirect effect of the ECP on critical single point items.
BLOCK 9: Distribution statement D- "Distribution authorized to the Department of Defense and U.S. DOD contractors only for administrative and operational use, " 31 AUG 2000.
Other request for this document shall be referred to: AFLCMC/WNYBA, 460 Richard Ray Blvd., STE 200, Robins AFB GA 310-98-1813
BLOCK 10, 11, 12 & 13: Submit for any changes to the currently approved configuration documentation or as required. Revisions, as necessary, until approved by the procuring agency.
BLOCK 14: ELECTRONIC MEDIA IS REQUIRED BY AFLCMC/WNYBA.
DOCUMENTS SHALL BE GENERATED USING MICROSOFT OFFICE OR ADOBE
PRODUCTS. Classified portions of this CDRL will be forwarded IAW the
DD-254.
AFLCMC/WNYBA (Program Manager) - Travern.Poole.2@us.af.mil AFLCMC/WNYEDC (System Engineer) - Timothy.Blacknik@us.af.mil
See Blk 16 1
See Blk 16 1
See Blk 16 1
15. TOTAL 0 3 0
G. PREPARED BY
carithers.diane.m.1075543472 Diane Carithers
H. DATE
2021/01/11
I. APPROVED BY
poole.travern.l.1083279598
J. DATE
2021/01/12
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
File details come from the government source that posted it. Updated .