Rancho Los Alamitos Transmission Main Abandonment Project
This specification document from the Long Beach Public Utilities Department (LBUD) Board of Public Utilities Commissioners details contract requirements for the Rancho Los Alamitos Transmission Main Abandonment Project in Long Beach, California. The work consists of abandoning approximately 2,050 linear feet of existing 24-inch steel cylinder concrete (SCC) transmission main located within the Rancho Los Alamitos area. The abandonment scope includes dewatering the pipe interior, placing controlled low-strength material (slurry) fill, sealing open ends with watertight caps or blind flanges, removing and salvaging existing valve lids, abandoning asbestos cement pipe (ACP) connections in place, and restoring all excavated areas to pre-construction conditions with pavement meeting City standards. Electronic bids are due August 31, 2026 at 2:00 PM through the City's Long Beach Buys online procurement system. A pre-bid conference is scheduled for August 19, 2026 at 2:00 PM virtually via Microsoft Teams. Work must be completed within 90 calendar days following issuance of the Notice to Proceed. The project includes 34 bid items encompassing mobilization, coordination, survey staking, traffic control, hazardous materials handling, storm water control, pavement removal and restoration, trenching and backfilling (800 linear feet), CLSM abandonment (6,600 cubic feet), valve operations, dewatering, and line stop operations.
Bidders must possess a valid California Class "A" General Engineering Contractor license and be registered with the California Department of Industrial Relations. Bid security of 10 percent of the total bid amount is required, with a certified check, bank draft, or satisfactory bond submitted electronically and the original hard copy delivered by bid opening. Performance and payment bonds, each equal to 100 percent of the contract price, are required upon award. The project is subject to prevailing wage requirements under California Labor Code sections 1720 et seq., with the 2026-1 prevailing wage rate applicable. Contractors must comply with apprenticeship employment requirements and certified payroll submission to the Department of Industrial Relations. The Equal Benefits Ordinance applies to contracts exceeding $100,000. Bid prices must remain open for 120 calendar days after opening. The contract award will be made to the lowest responsible bidder. Bid items include fixed stipulated allowances for field orders ($20,000), utility potholing ($15,000), permits ($5,000), contaminated soil disposal ($25,000), and livestock boarding ($12,500).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
WD-07-26
Approved this _______ day of _______________, 20___
Thomas Bekele
Senior Director of Engineering
Authorized this _______ day of _______________, 20___
B. Anatole Falagán General Manager
Approved as to Form this _________ day of _________________, 20___
Dawn McIntosh City Attorney
By: _________________________________________ Marsha Yasuda
Deputy City Attorney
4th August 26
6th August 26 wadepew Image wadepew Text Box 4th wadepew Text Box wadepew Text Box August wadepew Text Box
Long Beach Public Utilities Department
RANCHO LOS ALAMITOS TRANSMISSION MAIN
ABANDONMENT PROJECT
Contract Documents and Specifications WD-07-26
DRAWING NO. MC-5264
July 2026
Board of Public Utilities Commissioners
Long Beach, California
PLANS AND SPECIFICATIONS
LONG BEACH PUBLIC UTILITIES DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION MAIN
ABANDONMENT PROJECT
CONTRACT DOCUMENTS AND SPECIFICATIONS WD-07-26
DRAWING NO. MC-5264
BIDDING REQUIREMENTS, CONTRACT FORMS,
CONDITIONS OF THE CONTRACT, AND
TECHNICAL SPECIFICATIONS
Prepared by:
AtkinsRéalis
801 S. Grand Ave., Suite 275
Los Angeles, CA 90071
Board of Public Utilities Commissioners
Long Beach, California
This information is available in an alternative format
By request to Leela Stevens at (562) 570-2333
Board of Public Utilities Commissioners Table of Contents Contract Documents Page i
CONTRACT DOCUMENTS
TABLE OF CONTENTS
Page
PART 1 – BIDDING REQUIREMENTS
Notice Inviting Bids .............................................................................................................1-5 Instructions to Bidders ........................................................................................................1-7 Bid ................................................................................................................................... 1-13 Bidder’s Bond ....................................................................................................................1-1 Equal Benefits Ordinance Disclosure Form ........................................................................1-2 Iran Contracting Act Compliance Affidavit ..........................................................................1-1
PART 2 – CONTRACT FORMS
Bond for Faithful Performance ............................................................................................1-1 Labor and Material Bond ....................................................................................................1-1 Information to Comply with Labor Code Section 2810 ........................................................1-1 Workers’ Compensation Certificate ....................................................................................1-1
PART 3 – CONDITIONS OF THE CONTRACT
General Conditions .......................................................................................................... 1-72 Supplementary General Conditions ....................................................................................1-3 Supplementary General Conditions (Other) ........................................................................1-1
PART 4 – TECHNICAL SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS
01 10 01 Summary of Work and Sequence of Construction ...............................................1-5 01 10 03 Coordination ........................................................................................................1-9 01 22 00 Unit Prices ......................................................................................................... 1-12 01 29 73 Schedule of Values ..............................................................................................1-5 01 31 19 Project Meetings ..................................................................................................1-4 01 32 00 Construction Progress Documentation ................................................................1-8 01 32 23 Construction Survey Staking ...............................................................................1-4 01 32 33 Construction Photographic and Video Documentation .........................................1-6 01 33 00 Submittal Procedures ........................................................................................ 1-12 01 35 26 Governmental Safety Requirements .................................................................. 1-10 01 35 44 Environmental Procedures for Hazardous Materials ............................................1-6 01 40 00 Quality Requirements ........................................................................................ 1-10 01 41 26 Permits ................................................................................................................1-4 01 50 00 Construction Facilities and Temporary Controls...................................................1-8 01 55 26 Traffic Control and Temporary Restriping ............................................................1-9 01 57 23 Temporary Storm Water Pollution Control ...........................................................1-4 01 66 00 Product Shipment, Storage, and Handling Requirements ....................................1-2 01 71 13 Mobilization and Demobilization ..........................................................................1-2 01 73 33 Mechanical Identification .....................................................................................1-6 01 74 00 Cleaning and Waste Management .......................................................................1-4 01 77 00 Closeout Procedures ...........................................................................................1-2 01 78 39 Project Record Documents ..................................................................................1-4
Board of Public Utilities Commissioners Table of Contents Contract Documents Page ii
DIVISION 2 – EXISTING CONDITIONS
02 41 13 Selective Site Demolition .....................................................................................1-8 02 41 14 Paving Removal and Resurfacing ...................................................................... 1-10 02 41 15 Utility Pipeline Removal or Abandonment ............................................................1-6
DIVISION 3 - CONCRETE
03 30 00 Cast-in-Place Concrete Conforming to Greenbook Specifications ..................... 1-16
DIVISION 9 - FINISHES
09 96 56 Epoxy Linings and Coatings ................................................................................1-8
DIVISION 31 - EARTHWORK
31 05 16 Aggregate and Rock Products for Earthwork .......................................................1-6 31 05 50 Protecting Existing Utilities ..................................................................................1-6 31 23 19 Dewatering ..........................................................................................................1-6 31 23 24 Flowable Fill Controlled Low-Strength Material (CLSM) .......................................1-8 31 23 33 Trenching and Backfilling .....................................................................................1-8
DIVISION 33 – UTILITIES
33 01 10 Water Service Bypassing .....................................................................................1-4 33 01 19 Connecting to Existing Pressure Pipelines...........................................................1-4 33 01 37 Adjusting Utility Maintenance Hole and Vault Frames and Covers .......................1-4 33 05 26 Utility Identification ...............................................................................................1-6 33 05 31 Piping Joint Materials ..........................................................................................1-8 33 05 32 Flange Insulating Kits and Threaded Insulating Bushings ....................................1-4 33 05 33 Couplings, Tie Rods, Flange Connectors, and Unions ....................................... 1-12 33 05 39 Manual Valve Operators ......................................................................................1-8 33 08 11 Hydrostatic Pressure Testing and Flushing of Water Utilities ...............................1-4 33 11 11 Ductile Iron Pipe and Fittings ...............................................................................1-8 33 11 18 Cement-Mortar Lining and Coating of Steel Pipe .................................................1-9 33 11 19 Coating, Mastic and Tape-Wrap Systems for Metal Pipe .....................................1-3 33 11 20 Polyethylene Encasement of Iron Pipe, Fittings, Couplings, and Valves ..............1-4 33 12 10 Line Stops and Insertion Valves ..........................................................................1-4 33 13 00 Disinfecting of Water Utility Distribution .. …………………………………………….1-7
PART 5 – DRAWINGS (BOUND SEPARATELY)
PART 6 – STANDARD DETAILS
PART 7 – APPENDICES
Appendix A Bid Protest Procedures Appendix B Memorandum of Understanding Between LBUD and Public Works Appendix C Sample Contract Appendix D Pothole Report Appendix E General Requirements When Working Around LBUD Gas Facilities
PART 1
BIDDING
REQUIREMENTS
Board of Public Utilities Commissioners Notice Inviting Bids of the City of Long Beach Page 1 of 5
NOTICE INVITING BIDS
WD-07-26
LONG BEACH PUBLIC UTILITIES DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION MAIN
ABANDONMENT PROJECT
RECEIPT OF BIDS: Bids will be accepted on behalf of the Board of Public Utilities Commissioners of the City of Long Beach, California, Owner of the Work, until 2:00 PM AUGUST 31, 2026 for Rancho Transmission Main Abandonment Project (MC-5264) (WD-07-26) through the City of Long Beach’s online procurement system website (Long Beach Buys):
https://longbeachbuys.buyspeed.com/bso
The bids must be submitted electronically. Each electronic bid must be accompanied with a scanned copy of the full Bid, Bidder’s Bond, a notarized Non-collusion Affidavit, and a completed Equal Benefits Ordinance disclosure form.
A hard copy of the original Bidder’s Bond must also be received by the time of the Bid Opening to:
Long Beach Utilities Department Attn: Engineering Office Administrator 1800 E Wardlow Road Long Beach, CA 90807
In the event of a discrepancy between the line item bid schedule input in the Long Beach Buys portal and the scanned bid schedule in the specifications, the bid schedule with the lower total amount shall take precedence.
DESCRIPTION OF WORK: The work consists of the abandonment of approximately 2,050 linear feet of existing 24-inch steel cylinder concrete (SCC) transmission main located within the Rancho Los Alamitos area. Abandonment shall include dewatering the interior of the pipe, placing controlled low-strength material (slurry) fill at locations to be determined, and sealing all open ends with watertight caps or blind flanges as shown on the plans. Existing valve lids shall be removed and salvaged as directed by the Engineer and in accordance with WDS-127. All connections to asbestos cement pipe (ACP) shall be abandoned in place without disturbance to the ACP. All excavated areas shall be backfilled, compacted and restored to pre-construction conditions, with pavement restoration meeting City standards.
WORK SITE: The Work Site is located in the City of Long Beach, California, within the Rancho Los Alamitos Area. The pipeline alignment generally follows the corridor bounded by East Bixby Hill Road to the north, East Campus Road to the west, Los Cerritos Channel to the east, and E. 7th Street to the south. The Historic Rancho Los
Alamitos property is located at:
https://longbeachbuys.buyspeed.com/bso of the City of Long Beach Page 2 of 5
• 6400 East Bixby Hill Road, Long Beach, CA 90815
PRE-BID CONFERENCE: Prospective bidders are recommended to attend a pre-bid conference with the Long Beach Public Utilities Department (LBUD) and LBUD’s representatives at 2:00 PM AUGUST 19, 2026, virtually via Microsoft Teams. The purpose will be to discuss the scope of work to be performed under these specifications.
COMPLETION OF WORK: The Work, including final restoration, cleanup, punch list items, and closeout documentation, shall be completed within ninety (90) calendar days following the commencement date established in the Notice to Proceed.
A portion of the Work associated with the 24-inch line stop operation and associated traffic control activities shall be subject to additional schedule restrictions and liquidated damages as specified in the Supplementary General Conditions.
OPENING OF BIDS: All Bids received in a timely manner will be subject to further evaluation with respect to:
• The responsiveness of the Bid
• Determination that Bidder is responsible
CONTRACT DOCUMENTS: Plans and specifications are available for free download through Long Beach Buys at https://longbeachbuys.buyspeed.com/bso/. However, you must be registered and logged in to submit a bid. Registration is free and may be accomplished at the same URL.
BID SECURITY: Bidders must scan and upload with their bid documents a certified check or bank draft payable to the Long Beach Public Utilities Department, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the Bid, to Long Beach Buys. The original of the document shall be submitted to the Long Beach Public Utilities Department in a sealed envelope and must be received and time/date stamped by the Long Beach Public Utilities Department by the time and date stated for receipt of bids. DO NOT OPEN WITH REGULAR MAIL.” The Long Beach Public Utilities Department is located at 1800 East Wardlow Road, Long Beach, CA 90807.
BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 120 calendar days after the date of Bid opening.
CONTRACTOR’S LICENSE: The Contractor shall possess a valid California Class “A” General Engineering Contractor license at the time the Contract is awarded.
Failure to possess the specified license may render the Bid as non-responsive.
https://longbeachbuys.buyspeed.com/bso/ of the City of Long Beach Page 3 of 5
CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the Work. Copies of prevailing rate of per diem wages are on file in the office, and shall be made available upon request. Copies may also be obtained on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr.
This project will be subject the 2026-1 prevailing wage rate, as determined by the Director of the Department of Industrial Relations for the State of California. The Contractor to whom the Contract is awarded, and its subcontractors is directed to pay not less than the general rate of per diem wages for each craft, classification, or type of worker needed to execute the contract. Contractor is required to post a copy of the determination of the director of the prevailing rate of per diem wages at each job site.
Contractors are required to pay at least the California minimum wage for the basic hourly rate in all cases where the published prevailing wage rate is below the California minimum wage. Any and all employer payments required by the prevailing wage determinations must also be paid. If the California minimum wage is increased in the future to an amount above that shown in the prevailing wage determination, the basic hourly rate in that determination automatically increases to the new minimum wage.
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is a public work and subject to the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractors are further cautioned that certified payrolls shall be submitted electronically directly to the Department of Industrial Relations.
CERTIFIED PAYROLL SUBMISSION: Pursuant to the provisions of Labor Code Section 1776, Contractor shall keep and shall cause each subcontractor performing any portion of the work under this Contract to keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or subcontractor in connection with the work. Such payroll records for Contractor and all subcontractors shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor pursuant to the provisions of Section 1776 of the Labor Code. Contractor's failure to furnish such records to the Long Beach Public Utilities Department or the Long Beach Public Utilities Department’s authorized http://www.dir.ca.gov/dlsr of the City of Long Beach Page 4 of 5
Labor Compliance representative in the manner provided herein for notices shall entitle the Long Beach Public Utilities Department to withhold the penalty prescribed by law from progress payments due to Contractor.
APPRENTICESHIP EMPLOYMENT: The Contractor shall comply with Section
1777.5 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall so comply. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
EQUAL BENEFITS ORDINANCE: Bidders are advised that any contract awarded pursuant to this procurement process that exceeds $100,000 shall be subject to the applicable provisions of Long Beach Municipal Code Section 2.73 et seq, the Equal Benefits Ordinance.
NONDISCRIMINATION: The Awarded Contractor and any of its subcontractor must agree that they will not discriminate against any person in the performance of the contract and will comply with applicable federal, State and City of Long Beach, Equal Opportunity Laws, Rules and Regulations. Awarded Contractor and any of its subcontractors must agree to refrain from discriminating in employment and discriminating with respect to performance under the contract or purchase order on the basis of race, color, religion, national origin, sex, sexual orientation, gender identity, AIDS, HIV status, age, disability, or handicap, subject to federal and State laws, rules and regulations
IRAN CONTRACTING ACT: In accordance with California Public Contracting Code Section 2200-2208, all bidders submitting proposals for, entering into, or renewing contracts with the LBPUD and estimated at $1,000,000 or more are required to complete, sign and submit the “Iran Contracting Act of 2010 Compliance Affidavit” contained in Part 1 of Bidding Requirements.
PENALTIES: Contractor and subcontractors are subject to penalties, including, but not limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with Sections 13.28 through 13.31 and/or Labor Code § 1720 et seq.
NOTICE OF INTENT TO AWARD: The notice of intent to award a contract will be posted electronically on Long Beach Buys after all bids have been reviewed and evaluated for responsiveness. Actual posting time may vary.
RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the terms of the Contract Documents without retention of any portion of the payment by the LBUD by depositing securities of equivalent or greater value with the LBUD in accordance with the provisions of Section 22300 of the Public of the City of Long Beach Page 5 of 5
Contract Code. Such securities, if deposited by the Contractor, shall be valued by the LBUD, whose decision on valuation of the securities shall be final. Eligible securities shall be limited to those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the
LBUD.
CONTACT: All communications relative to this Work shall be directed to the LBUD prior to opening of the bids:
Board of Public Utilities Commissioners of the City of Long Beach 1800 East Wardlow Road Long Beach, CA 90807-4931 Attention: Ms. Leela Stevens Telephone: (562) 570-2333 E-mail: Leela.Stevens@lbwater.org
OWNER’S RIGHTS RESERVED: The LBUD reserves the right to reject any or all bids and to waive any informality in a bid.
DATE: _________________________
OWNER: Board of Public Utilities Commissioners of the City of Long Beach
By: __________________________ B. Anatole Falagán, General Manager
-END OF NOTICE INVITING BIDS-
DATE: _________________________
OWNER: Board of Public Utilities Commissioners of the City of Long Beach
By: __________________________ B. Anatole Falagán, General Manager
August 6, 2026 mailto:Leela.Stevens@lbwater.org
Board of Public Utilities Commissioners Instructions to Bidders of the City of Long Beach Page 1 of 7
INSTRUCTIONS TO BIDDERS
REQUIREMENTS AND CONDITIONS
CONTRACT DOCUMENTS
The documents that comprise the Contract Documents are set forth in the Contract, located in the Appendices, and the definition of “Contract Documents” in Article 1 of the General Conditions.
CONTRACTOR’S LICENSE
No bid will be accepted from a Bidder who is not a properly licensed contractor in the State of California. Bidders shall possess the appropriate licenses at the time the bid is submitted. Each Bidder shall record on the bid, the number and termination dates of all necessary licenses. A valid state license sufficient to qualify as the prime contractor is a pre-requisite for bidding. Necessary City licenses may be secured after the bids are opened but must be obtained prior to execution of the Contract.
BUSINESS LICENSE
The Long Beach Municipal Code (LBMC) requires all businesses operating in the City of Long Beach to pay a business license tax. In some cases the City may require a regulatory permit and/or evidence of a State or Federal license. Prior to issuing a business license, certain business types will require the business license application and/or business location to be reviewed by the Development Services, Fire, Health, and/or Police Departments. For more information, go to www.longbeach.gov/finance/business_license.
In accordance with Municipal Code (Section 3.80.210) a business license is required under the following conditions:
(a) If you are providing a service in Long Beach, CA
(b) If you are providing and delivering a product in Long Beach, CA
For more information, contact the Business License Section at 562-570-6211 or by e-mail to lbbiz@longbeach.gov.
BIDS
Bids shall be submitted online through the City of Long Beach’s procurement system, Long Beach Buys, at https://longbeachbuys.buyspeed.com/bso/.
The Contract Documents are free to download through Long Beach Buys. Bids must be submitted electronically. Bidders must be registered with Long Beach Buys.
https://longbeachbuys.buyspeed.com/bso/ of the City of Long Beach Page 2 of 7
All documents to be submitted with the bid are contained in Part 1 of this Specification;
these documents shall be scanned and uploaded with the bid, and shall include a scanned copy of the full Bid document, original Bidder’s Bond, notarized Noncollusion Declaration, a completed Iran Contracting Act of 2010 Compliance Affidavit, and a completed Equal Benefits Ordinance form.
A hard copy of the original Bidder’s Bond must be received by the time of the Bid Opening to the address shown in the Notice Inviting Bids.
Bids shall not contain any additional description or summaries of the Work to be done, and shall not be modified in any way by bidders. Alternates will not be considered, except as called for. Bids and any requests for modifications will only be accepted via Long Beach Buys.
Bidders are cautioned that the electronic bidding system will cease allowing entry at the time stated for bid opening, regardless of when entry was begun. Bidders are reminded to begin bid submission with sufficient time to complete the entries.
Bidders shall sign the bid properly, in longhand, or by providing electronic signatures.
LBUD will not consider any bid that does not meet these requirements.
Bidders shall include with their Bids in the manner described above the security described in the Notice Inviting Bids. LBUD will reject any Bid not accompanied by such Bid Security.
VENDORS CODE OF CONDUCT
Each Bidder must adhere to the City’s Vendor Code of Conduct, including, but not limited to, disclose any existing or potential conflict of interest relative to the performance of the contractual services resulting from this Invitation to Bid. Any such relationship that might be perceived or represented as a conflict should be disclosed.
The LBUD reserves the right to disqualify any Bidder on the grounds of actual or apparent conflict of interest. The Vendor Code of Conduct can be found at https://longbeach.gov/globalassets/finance/media-library/documents/business-info/purchasing-division/final-vendor-code-of-conduct-2023
WITHDRAWAL OF BID
A Bidder may withdraw their bids electronically, through the Long Beach Buys portal anytime before Bid opening.
STATEMENTS MADE AFTER BID OPENING BUT PRIOR TO AWARD OF
CONTRACT
https://longbeach.gov/globalassets/finance/media-library/documents/business-info/purchasing-division/final-vendor-code-of-conduct-2023 https://longbeach.gov/globalassets/finance/media-library/documents/business-info/purchasing-division/final-vendor-code-of-conduct-2023 of the City of Long Beach Page 3 of 7
Bidders are cautioned that comments and statements, whether oral or written, made by LBUD employees regarding the validity of bids, the waiver of deviations from Specifications, the possibility or probability of an award being made to a particular Bidder, and other similar matters are NOT binding by the LBUD. Bidders should not order materials, obtain financing or take other actions based on such comments and statements. Only authorization of a contract by the LBUD is conclusive and binding on the LBUD with respect to this bid and its resulting contract.
BIDDERS INTERESTED IN SUBMITTING MORE THAN ONE BID
No person, partnership or corporation shall be allowed to make or file or be interested in more than one bid for the Work, unless alternative bids are called for. If multiple bids are received from the same Bidder, only the most recent bid will be accepted. A person, partnership, or corporation submitting a price to a Bidder, or who has quoted prices on material to a Bidder, is not disqualified from quoting prices to other Bidders.
INTERPRETATION OF PLANS AND OTHER DOCUMENTS
If any prospective Bidder is in doubt as to the true meaning of any part of the plans, specifications, or other Contract Documents, or finds discrepancies in, or omissions from the Plans and Specifications or other Contract Documents, the Bidder may submit to LBUD a written request for an interpretation or correction. An interpretation or correction of the documents will be made solely by LBUD by Addendum. LBUD and LBUD’s employees, agents or consultants will not be responsible for any other explanation or interpretation of the documents.
ENGINEER’S ESTIMATE OF QUANTITIES OR WORK
The quantities of work to be done and materials to be furnished are approximate as shown in the Contract Documents and are given as a basis for comparison of bid only.
LBUD does not expressly or by implication agree or represent that the actual amount of work will correspond with the Engineer’s estimates.
ADDENDA
Addenda issued in writing before the time in which to submit bids expires shall be covered in the bid and shall form a part of the Contract Documents.
NOTICE TO BIDDERS REGARDING THE PUBLIC RECORDS ACT
Responses to this Invitation to Bid will become public record upon opening of the bid(s) unless the bid or specific parts of the bid can be shown to be exempt by law.
Each Bidder may clearly label all or part of a bid as “TRADE SECRETS”, "CONFIDENTIAL", or “PROPRIETARY” provided that the Bidder thereby agrees to indemnify and defend the City for honoring such a designation. The failure to so of the City of Long Beach Page 4 of 7 label any information that is released by the City shall constitute a complete waiver of any and all claims for damages caused by any release of the information.
LBUD shall not be liable or responsible in any way for disclosure of any records not marked as “Trade Secrets”, “Confidential” or “Proprietary”. LBUD shall not be liable or responsible in any way for disclosure of any records so marked if disclosure is deemed to be required by law or by a court order.
EXISTING CONDITIONS AND EXAMINATION OF CONTRACT DOCUMENTS
GENERAL
Each Bidder shall visit the sites of construction so that the facilities, difficulties, and restrictions attending the execution of the Work are fully understood. Bidders shall thoroughly examine and be familiar with the drawings and specifications. Bidders shall carefully correlate observations with requirements of the Contract Documents and otherwise satisfy themselves of the expense and difficulties attending performance of the work. The failure or omission of any Bidder to receive or examine any Contract Document, form, instrument, addendum, or other document or to visit the sites and become acquainted with conditions there existing shall not relieve any Bidder from obligations with respect to the bid or to the Contract. The submission of a bid shall be taken as prima facie evidence of compliance with this section. Bidders shall not, at any time after submission of the bid, dispute or assert that there were any misunderstandings in regard to the nature or amount of work.
SITES
Contractor shall be responsible for identifying and setting up an area for temporary storage of materials and equipment during construction. Upon completion and acceptance of the Work, all equipment, unused materials, temporary facilities, and other miscellaneous items resulting from or used in the operations shall be removed.
The sites shall be restored to their original ground configuration by filling any pits or trenches and leveling soil piles or ruts. All stored materials and equipment shall be removed from the sites as part of demobilization upon completion of the Work.
At all times during the Work, Contractor shall keep the premises clean and orderly, and upon completion of the Work, repair all damage caused by equipment and leave the sites clear of rubbish or excess materials of any kind.
SITE INVESTIGATION AND REPRESENTATION
By submitting a Bid, the Bidder acknowledges satisfaction as to the nature and location of the Work, the general and local conditions, particularly those bearing upon availability of transportation, access to the sites, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and uncertainties of weather, river stages, or similar physical conditions at the sites, the conformation and of the City of Long Beach Page 5 of 7 conditions of the ground, the character of equipment and facilities needed preliminary to and during the Work, and all other matters which can in any way affect the Work or the cost thereof.
By submitting a Bid, the Bidder further acknowledges satisfaction as to character, quality, and quantity of surface and subsurface materials to be encountered from its inspection of the sites and from reviewing any available records of other exploratory work. Failure by the Bidder to become acquainted with the physical conditions of the sites and all the available information will not relieve the Bidder from responsibility for properly estimating the difficulty or cost of successfully performing the Work.
The Bidder warrants by submitting a bid that, as a result of examination and investigation of all the aforesaid data, the Bidder can perform the Work in a good and workmanlike manner and to the satisfaction of the LBUD. The LBUD assumes no responsibility for any representations made by any of its employees, officers or agents during or prior to the execution of a Contract, unless (1) such representations are expressly stated in the Contract, and (2) the Contract expressly provides that the responsibility therefor is assumed by the LBUD.
AWARD OF CONTRACT OR REJECTION OF BIDS
AWARD
The award will be to the lowest responsible Bidder complying with the Contract Documents. Determination of low Bidder shall be based on the Total Bid Amount for the Project. The LBUD, however, reserves the right to reject any and all bids, and to waive any informality in bids received. The LBUD reserves the right to request clarification of any proposal term from a bidder. If, in the judgment of LBUD, a bid is unbalanced, it shall be considered sufficient grounds for rejection of the entire bid.
RESPONSIBILITY
Each Bidder must include in its bid a complete disclosure of any alleged significant prior or ongoing contract failures, any civil or criminal litigation or investigation pending which involves the Bidder or in which the Bidder has been judged guilty or liable.
Failure to comply with the terms of this provision will disqualify any bid. The LBUD reserves the right to reject any bid based upon the Bidder’s prior history with the LBUD, City or with any other party, which documents, without limitation, unsatisfactory performance, adversarial or contentious demeanor, significant failure(s) to meet contract milestones or other contractual failures.
Before award of the Contract, any Bidder, upon request from the LBUD, shall furnish a recent statement of the Bidder’s financial condition or such other evidence of qualifications as may be requested by LBUD. Failure to do so shall constitute grounds for rejection of the bid.
of the City of Long Beach Page 6 of 7
BONDS
The form of bonds that the Bidder, as Contractor, shall be required to execute are included in the Contract Documents and should be carefully examined by the Bidder.
The Contractor, simultaneously with the execution of the Contract, will be required to furnish a payment bond and a performance bond, each in an amount equal to one hundred (100) percent of the Contract Price. Said bonds shall be secured from a surety satisfactory to LBUD and who is authorized to transact business in California.
Said bonds shall continue in full force and effect for the guarantee period.
EXECUTION OF CONTRACT
The Contractor shall sign the Contract and return it to LBUD, together with the bonds and certificates of insurance and endorsements, within ten (10) calendar days after the mailing date of the Notice of Award. The date of commencement stated in the Notice of Award will constitute the beginning of the Contract Time. The Contract, bonds, certificates of insurance and endorsements and other documents to be executed by Contractor shall be executed and submitted in duplicate, one of which shall be filed with the LBUD and one returned to the Contractor. LBUD will issue a Notice to Proceed. The receipt of the Notice to Proceed will be authorization for Contractor to begin Work in the field and to start ordering equipment and material.
FAILURE TO EXECUTE CONTRACT OR SUBMIT INSURANCE
Failure by a Bidder to whom the Work is awarded to execute the Contract and file acceptable bonds and certificates of insurance coverage and endorsements as provided herein shall be just cause for the cancellation of the award and the forfeiture of the bid security, and shall make the Bidder liable to LBUD for all damages resulting from the failure, including reasonable attorney’s fees. The value of the bid security shall not be a limitation of damages.
The insurance certificates and endorsements included in the Contract Documents shall be completed, without alteration, to the satisfaction of LBUD, and delivered to LBUD by Contractor or Contractor’s insurance company within ten (10) days after the date of the Notice of Award. The insurance certificates and endorsements shall reflect coverage that complies with all insurance requirements in the Contract Documents.
MISCELLANEOUS
BID BREAKDOWN
Lump-sum and unit-price bid items shall be broken down as indicated on the bid form.
Contractor may be directed to provide greater detail of the items making up the Contract Price prior to submission of the first Progress Payment Request as indicated in the General Conditions.
of the City of Long Beach Page 7 of 7
CONTRACT TIME
The Contract Time shall be as set forth in the Notice Inviting Bids.
MEMORANDUM OF UNDERSTANDING BETWEEN LBUD AND PUBLIC WORKS
The City of Long Beach Department of Public Works (LBPW) issues interdepartmental permits for excavation and/or temporary street occupancy associated with in-house or contracted construction, operation and maintenance, paving, and improvement activities for facilities located within the City of Long Beach right-of-way. However, pursuant to the Memorandum of Understanding (MOU) between LBUD and LBPW (included in Appendix B of these Specifications), LBUD is exempt from the requirement to obtain these permits as part of their projects. Thus, the Contractor shall not need to pull permits with LBPW during the Project, but shall comply with all applicable terms and conditions set forth in the MOU, at any time when performing work within City of Long Beach streets, right-of-way, and easements.
LIQUIDATED DAMAGES
Liquidated damages, if any, shall be as set forth in Article 17.5 of the General Conditions of the Contract Documents.
-END OF INSTRUCTIONS TO BIDDERS-
Board of Public Utilities Commissioners Bid of the City of Long Beach Page 1 of 13
BID TO THE BOARD OF PUBLIC UTILITIES COMMISSIONERS
OF THE CITY OF LONG BEACH FOR
RANCHO LOS ALAMITOS TRANSMISSION MAIN ABANDONMENT PROJECT
PER SPECIFICATION
Name of Bidder_________________________________________________________
Street Address_________________________________________________________ in the City of __________________________ County of________________________
State of ____________ Zip Code________________ Phone No.__________________
TO: BOARD OF PUBLIC UTILITIES COMMISSIONERS OF THE CITY OF LONG
BEACH
Pursuant to and in compliance with your Notice Inviting Bids and the other documents relating thereto, the undersigned bidder, having familiarized itself with the Contract Documents, local conditions affecting the performance of the Work, and the cost of the Work at the place where the Work is to be done, hereby bids and shall perform within the time stipulated in the Contract Documents, and shall provide and furnish any and all of the labor, material, tools, expendable equipment, and all utility and transportation services necessary to perform the Work and complete, in a workmanlike manner all of the Work required in the Contract Documents, including Addenda, for the prices hereinafter set forth.
The undersigned, as Bidder, declares that the only persons or parties interested in this bid as principals are those named herein; that this bid is made without collusion with any person, firm, or corporation; and bidder shall, if the bid is accepted, execute a Contract with the Board of Public Utilities Commissioners of the City of Long Beach, and that Bidder shall accept in full payment thereof the following prices, to wit:
of the City of Long Beach Page 2 of 13
BID
Furnish all labor, materials, equipment, applicable taxes, and incidentals necessary for the accomplishment of the following specific work items, each being the LUMP SUM
PRICE, LINEAR FOOT PRICE, CUBIC FOOT PRICE, STIPULATED DOLLAR AMOUNT,
OR EACH PRICE for the specific item:
Item No.
Description Size-Quantity Unit Unit Price Item Total
BASE BID ITEMS
1. Mobilization and Demobilization 1 LS
2. Coordination 1 LS
3.
Construction Survey Staking and Monumentation
1 LS
4.
Traffic Control and Temporary Restriping
1 LS
5.
Construction Information Signs, Temporary Facilities, and Controls
1 LS
6. Handling of Hazardous Materials (ACP) 1 LS
7.
Temporary Storm Water Pollution Control
1 LS
8.
Closeout Procedures and As-Built Documentation
1 LS
9.
Preservation of Existing Historic Ranch and Grounds
1 LS
10. Pavement Removal and Restoration 1 LS
11.
Excavation Safety Measures including Shoring and Sheeting
1 LS
12. Trenching, Backfilling, and Resurfacing 800 LF
13.
Concrete Sidewalk Panel Replacement and Removal of Existing Appurtenances
2 EA
14.
CCTV of Existing 24-inch Pipe to Be Abandoned
1 LS
15.
Abandonment of Existing 24-Inch SCC Transmission Main with Controlled Low-Strength Material (CLSM)
6600 CF
16. Manway Abandonment 2 EA
17.
Existing 24-inch Butterfly Valve Closure, Removal, and Disposal
1 EA
of the City of Long Beach Page 3 of 13
Item No.
Description Size-Quantity Unit Unit Price Item Total
18.
Existing 12-Inch Gate Valve Abandonment (Closure, Removal, and Disposal)
2 EA
19.
Blow-off Valve, Vault, and Riser Removal and Disposal
1 EA
20.
Plug and Abandon in Place Existing Unlocated Blowoff Assembly
1 EA
21.
Removal and Disposal of Miscellaneous Appurtenances and Piping
1 LS
22. Pipeline Dewatering 1 LS
23.
Line Stop Excavations and Backfill (Palo Verde Ave x E Bixby Hill Rd)
1 LS
24.
Valve Excavations and Backfill for Existing 24-inch Butterfly Valve with CLSM (Palo Verde x Bixby Hill)
1 LS
25.
Manway Abandonment Excavations and Backfill with CLSM (Bixby Terrace Dr)
1 LS
26.
Disinfecting and Testing of Water Utility System
1 LS
27.
Furnish, Install, and Remove 24-Inch Line Stop
1 EA
28. Install Miscellaneous Appurtenances 1 LS
SUBTOTAL (BID ITEMS 1-28) $
STIPULATED ITEMS
29. Allowance for Field Orders $20,000 Allowance $20,000
30. Allowance for Utility Potholing $15,000 Allowance $15,000
31. Allowance for Permits $5,000 Allowance $5,000
32.
Allowance to Dispose of Contaminated Soils and Materials
$25,000 Allowance $25,000
33. Allowance for Livestock Boarding $12,500 Allowance $12,500
34.
Repair or Replacement of Landscaped Median
1 LS
SUBTOTAL (BID ITEMS 29-34)
TOTAL AMOUNT BID (BID ITEMS 1 Through 34) of the City of Long Beach Page 4 of 13
Signature of Bidder
Name/Title
Date
It is understood that the foregoing quantities are estimated only and are solely for the purpose of facilitating the comparison of bids, and that the Contractor’s compensation will be computed upon the basis of the actual quantities in the completed Work.
Each individual bidder shall review the Plans and Specifications, and all other portions of the Contract Documents, and shall include all items necessary to complete the Work, including the assumption of all obligations, duties, and responsibilities necessary to the successful completion of the Contract, and the furnishing of all materials and equipment required to be incorporated in and form a permanent part of the Work: tools, equipment, supplies, transportation, facilities, labor, superintendence, and services required to perform and complete the Work; and bonds, insurance and submittals; all as per the requirements of the Contract Documents, whether or not expressly listed or designated.
of the City of Long Beach Page 5 of 13
STATEMENTS BY BIDDER
Bidder shall indicate opposite each item listed below the name of the manufacturer and product model number proposed to be used for the Work. An award to the Bidder will not imply approval by the Owner of a manufacturer or supplier listed by the bidder. However, if a manufacturer or supplier is acceptable to the Owner, the Bidder shall furnish the items from the manufacturer or supplier indicated. Any manufacturer or supplier listed in the Contract may be substituted, changed, or omitted by the successful bidder, subject to the approval of the Owner, without subjecting the Owner to any liability for the substitution, change or omission.
The listing of any manufacturer or supplier in the Contract does not, and is not intended to grant any right, title, or interest in the Contract for the benefit of the named manufacturer or supplier. Each Bidder shall inform in writing each named manufacturer or supplier that the named manufacturer or supplier is listed for information purposes only and that the manufacturer or supplier may be substituted, changed or omitted by the Bidder in accordance with the law and subject to the approval of the Owner, without subjecting the Owner to any liability for the substitution, change or omission. The Bidder shall reimburse the Owner for any expenses incurred by the Owner as a result of the Bidder’s failure to notify each named manufacturer or supplier.
The listing of lead times for delivery is for informational purposes only and will not affect the Contract Time(s) specified herein or entitle the Bidder, who becomes the Contractor, to extensions(s) of time. The Bidder is responsible for obtaining delivery of all items at times that will ensure completion within the Contract Time(s).
A. Lead time for delivery from date of signing the Contract shall be as follows:
Item Lead Time
24-inch Line Stop of the City of Long Beach Page 6 of 13
B. The Bidder intends to furnish materials supplied by the following manufacturers:
(Bidder shall list one manufacturer only for each item.)
Item Manufacturer
24-inch Line Stop
C. Person who inspected site of the Work for the Bidder:
Name__________________________ Date of Inspection:__________________
Name__________________________ Date of Inspection:__________________
D. It is agreed that, if requested by the Owner, the Bidder shall furnish a notarized financial statement, references, and other information, sufficiently comprehensive to permit an appraisal of Bidder’s current financial condition.
E. The Bidder shall furnish the following information. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.
Additional sheets may be attached if necessary.
1) Street Address ________________________________________________
2) Type of Firm: Individual _____________________________________
Partnership _____________________________________ Limited__________ General_________
Limited Liability Company__________ State___________
Joint Venture_____________________________________
Corporation _____________________________________
State of Incorporation or Partnership __________________
3) Telephone ________________________________________________ of the City of Long Beach Page 7 of 13
4) Contractor’s license: Primary Class______ Lic. No. ____________________
Supplemental classifications held, if any:_______________________________
5) DIR Public Works Contractor Registration No. ___________________________
6) Number of years as a contractor in construction work of this type:____________
7) Three projects of this complexity recently completed by the Bidder and/or the
Subcontractor(s):
a. Bidder or Subcontractors Name:
Type of Project:
Work Performed:
Contract Amount::
Date Completed:
Owners Name:
Contact Name and Phone No.:
b. Bidder or Subcontractors Name:
Work Performed:
Contract Amount::
Date Completed:
c. Bidder or Subcontractors Name:
Work Performed:
Contract Amount::
of the City of Long Beach Page 8 of 13
Date Completed:
8) List any alleged significant prior or ongoing contract failures, any civil or criminal litigation or investigation pending which involves the Bidder or in which the Bidder has been judged guilty or liable:
9) List any existing or potential conflict of interest relative to the performance of the contractual services resulting from this Invitation to Bid:
of the City of Long Beach Page 9 of 13
ADDENDA ACKNOWLEDGMENT
Bidder shall signify receipt of all addenda (if any) here:
Addenda Nos.
Respectfully submitted, Bidder’s Legal Name
By ________________________________________
Title _______________________________________
Street Address
Telephone Number
Contractor’s License Number
Dated:______________________________________
NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation, if Bidder is a partnership, the true name of the partnership shall be set forth above, together with the signature of the general partner or partners authorized to sign contracts on behalf of the partnership; if the Bidder is an individual, his/her signature shall be placed above; if the Bidder is a joint venture, the name of the joint venture shall be set forth above with the signature of an authorized representative of each venturer; if the Bidder is a limited liability company, the legal name of the company shall be set forth above with the signature of a principal authorized to bind the Company.
of the City of Long Beach Page 10 of 13
CERTIFICATION OF BIDDER’S QUALIFICATIONS
The undersigned Bidder certifies that Bidder is, at the times of bidding, and shall be throughout the period of the Contract, licensed by the State of California to do the type of work required under the terms of the Contract Documents. Bidder further certifies that Bidder is skilled and regularly engaged in the general class and type of work called for in the Contract Documents.
The Bidder represents that Bidder is competent, knowledgeable and has special skills regarding the nature, extent and inherent conditions of the Work to be…