R16PS00263_-_Cover_Page_thru_Section_B_(1).pdf
PDF 157 KB Posted
- Attached to
- R16PS00263 - Folsom UHA Switchgear Replacement Federal contract opportunity
- Solicitation number
- R16PS00263
About this file
Solicitation No. R16PS00263 - Cover Page through Section B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._004.pdf | ||
| R16PS00263_-_Amendment_No._003.pdf | ||
| R16PS00263_-_Amendment_No._002.pdf | ||
| R16PS00263_-_Amendment_No._001.pdf | ||
| R16PS00263_-_Section_D_-_M.pdf | ||
| Section_C_Part_2_of_3.pdf | ||
| Section_C_Part_3_of_3.pdf | ||
| Section_C_Part_1_of_3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Technical Service Center Denver, Colorado FEBRUARY 2016
Solicitation No. R16PS00263 Specifications No. 20-C0838
Folsom UHA Switchgear Replacement
American River Division – Folsom Unit Central Valley Project, California
R16PS00263 – Folsom UHA Switchgear Replacement Specifications. No. 20-C0838
TABLE OF CONTENTS
SECTION A - Solicitation, Offer and Award Form (SF 1442)
SECTION B - Pricing Schedule
SECTION C - Specifications/Appendices
SECTION D - Packaging and Marking
SECTION E - Inspection and Acceptance
SECTION F - Deliveries or Performance
SECTION G - Contract Administration Data
SECTION H - Special Contract Requirements
SECTION I - Contract Clauses
SECTION J - List of Documents, Exhibits, and Other Attachments
SECTION K - Representations, Certifications and Other Statements of Offerors
SECTION L - Instructions, Conditions and Notices to Offerors
SECTION M - Evaluation Factors for Award
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Bureau of Reclamation
Mid-Pacific Region
Regional Office Division of Acquisition Services
R20
2800 Cottage Way, Room E-1815
Sacramento CA 95825-1898
Bureau of Reclamation - MP Regional Office
Attn: Matthew T. Byrne, Contracting Officer 2800 Cottage Way, Rm. E-1815, Federal Bldg.
Sacramento, California 95825-1898
Matthew Byrne 916-978-5126
1x
R16PS00263
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
A. Title: Folsom Powerplant UHA Switchgear Replacement
B. Work Site Location: Work site is located at the Western Area Power Administration
(WAPA) 230 kilovolt switchyard on the American River approximately 2 miles north of
Folsom, California, in Sacramento County.
C. Site Visit Information: See Section L, FAR 52.236-27, Site Visit (Construction) -
Alt. 1
D. Estimated Price Range: The estimated cost of construction is between
$1,000,000.00 and $5,000,000.00
E. Set-Aside Information: This requirement is restricted to Total Small Business concerns under NAICS 237130 with the applicable size standard of $36.50 million. FAR
Clause 52.219-06, "Notice of Total Small Business Set-Aside" applies to this requirement.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
7 300 calendar days and complete it within ________________ ________________ calendar days after receiving
03/30/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Mid-Pacific Region
Regional Office Division of Acquisition Services
R20
2800 Cottage Way, Room E-1815
Sacramento CA 95825-1898
Matthew T. Byrne
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R16PS00263
FOB: Destination
Section B - Supplies or Services and Prices
"AU" - Activity Unit is used solely for the purposes of allowing progress payments under
Department of Interior's Financial & Business
Management System (FBMS).
00010 R16PS00263 - Folsom Powerplant UHA Switchgear 1 AU
Replacement
Price Schedule - CLINs 1 - 18
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
Folsom UHA Switchgear Replacement
American River Division – Folsom Unit Central Valley Project, California
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number.
PRICE SCHEDULE
Item Section Work or Material Quantity and unit
Unit Price
Amount
WBR
1452.232-81 Mobilization and Preparatory Work For the lump sum of $
01 31 30 Contract Document Management
System For the lump sum of $
01 33 26 Electrical Drawings and Data For the lump sum of $
02 41 07 Removal and Disposal of Existing Features For the lump sum of $
B - 2
PRICE SCHEDULE
Item Section Work or Material Quantity and unit
Unit Price
02 83 33 Removal and Disposal of Material Containing Heavy Metals For the lump sum of $
03 30 00 Cast-In-Place Concrete For the lump sum of $
03 81 10 Concrete Removal For the lump sum of $
05 50 00 Metal Fabrications For the lump sum of $
26 05 04 Removal of Existing Electrical
Equipment and Cable For the lump sum of $
26 05 13
Medium-Voltage Power Cable - 5kV, Shielded, Insulated, Single Conductor, 750 MCM Power Cable
1,200 lin ft $ $
26 05 13
Medium-Voltage Power Cable - 5kV, Shielded, Insulated, Single Conductor, No. 4/0 AWG Power Cable
800 lin ft $ $
26 05 13 Testing of Existing 5-Kilovolt Power
Cable For the lump sum of $
26 05 33 Electrical Conduit and Raceways For the lump sum of $
26 05 36 Cable Tray System For the lump sum of $
26 13 10
Medium-Voltage Metal-Clad Switchgear and Fabricated Control Building
For the lump sum of $
26 13 10
Medium-Voltage Metal-Clad Switchgear and Fabricated Control Building Spare Parts
For the lump sum of $
B - 3
PRICE SCHEDULE
Item Section Work or Material Quantity and unit
Unit Price
26 25 10 5-Kilovolt Segregated Phase Bus For the lump sum of $
31 23 11 Earthwork for Structures For the lump sum of $
TOTAL FOR SCHEDULE: $_________________
END OF SUPPLIES OR SERVICES AND PRICES/COSTS
B - 4
This page intentionally left blank.
File details come from the government source that posted it. Updated .