Sol_R15PS00857_Amd_000003.pdf

PDF 88 KB Posted

Attached to
NGWSP, Reach 22a Federal contract opportunity
Solicitation number
R15PS00857
Issued by
Department of the Interior Bureau of Reclamation

About this file

R15PS00857

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP, Reach 22a, newest first.
File Type Posted
Reach_22a_Specification_Revisions__6-19-15.docx DOCX document
Contractor_Question_Responses_6-19-15.docx DOCX document
Aquifer_Testing_Reach_22A_-_File_Verison_-_03-09-2015.pdf PDF
Sol_R15PS00857_Amd_000006.pdf PDF
Sol_R15PS00857_Amd_000005.pdf PDF
Amendment_004_Detail_specifications.pdf PDF
Sol_R15PS00857_Amd_000004.pdf PDF
Amendment_003_(2).pdf PDF
R15PS00857_Solicitation_Amendment_2.docx DOCX document
Sol_R15PS00857_Amd_000002.pdf PDF
Sol_R15PS00857_Amd_000001.pdf PDF
R15PS00857_Solicitation.docx DOCX document
Sol_R15PS00857.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R15PS00857

x x

4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 6107 Regional Office Upper Colorado Region Bureau of Reclamation

05/01/2015000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/01/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 003 is as follows:

Changes are depicted by a line directly left of the text

1. Update Section 01 35 20 Safety and Health:

1.02 Reference Standards

A. changed from RSHS-09 to RSHS

B. 1. 29 CFR 1910.126 changed to 29 CFR Part 1910 and Standard title added

2. 29 CFR 1910.146 changed to 29 CFR Part 1926 and Standard title added

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Leslie Corpening

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

R15PS00857/000003

1.03 Project conditions were removed and replaced

entirely by Submittals

1.04 Safety and Health - entirely new section

2. Update Section 01 35 30 Contractors Onsite Safety Personnel:

1.02 Inserted Reference standards

1.03 Submittals

B. Changed the Submittal title from Resume to

Qualifications

1.04 Qualifications - section completely

re-written

1.05 Application -

A. section re-written

B. section re-written

1.06 Quality assurance

Titles of safety personnel have been changed

3. Update Section 01 33 00 Submittals The following submittals have been added:

01 35 20-1 Safety and Health - Emergency Action

Plans Written Program and Training Records

01 35 20-2 Safety and Health - Job Hazard

Analyses (JHA)

01 35 20-3 Safety and Health - Exposer Assessment

Form (if applicable)

01 35 20-4 Safety and Health - Monthly Accident

Summary Report

01 35 20-5 Safety and Health - Respirator User

Documentation

01 35 20-6 Safety and Health - Crane Training

Certificates

01 35 20-7 Safety and Health - Other Training

Certificates, As Applicable

4. Updated Section 53 20 00 Records of Geologic and Subsurface Investigations

Added a new drawing under 1.05 Cone Penetration

Test Logs.

G101. CPT-HDD-14-1

5. Post the Geological logs and Drawings Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

R15PS00857/000003

6. Post the Cutter Dam ¿ River Outlet Works Intake ¿ Under water Exam

7. Post Navajo Gallup Water Supply Project Plan of Development

8. Post site tour attendees

9. Post Question and Answers from the site tour held May 20, 2015

10. Post site tour minutes

If Amendment 003 attachments do not post to fbo.gov, please check fedconnect.net. If attachments do not post on either fbo.gov or fedconnect.net, please send an email to Ms.

Leslie Corpening lcorpening@usbr.gov for attachments.

Please acknowledge all amendments at Solicitation submission which is currently June 17, 2015 at

1700 hours local time (MST).

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .