Amendment_003_(2).pdf
PDF 36 MB Posted
- Attached to
- NGWSP, Reach 22a Federal contract opportunity
- Solicitation number
- R15PS00857
About this file
Amendment 003 information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Reach_22a_Specification_Revisions__6-19-15.docx | DOCX document | |
| Contractor_Question_Responses_6-19-15.docx | DOCX document | |
| Aquifer_Testing_Reach_22A_-_File_Verison_-_03-09-2015.pdf | ||
| Sol_R15PS00857_Amd_000006.pdf | ||
| Sol_R15PS00857_Amd_000005.pdf | ||
| Amendment_004_Detail_specifications.pdf | ||
| Sol_R15PS00857_Amd_000004.pdf | ||
| Sol_R15PS00857_Amd_000003.pdf | ||
| R15PS00857_Solicitation_Amendment_2.docx | DOCX document | |
| Sol_R15PS00857_Amd_000002.pdf | ||
| Sol_R15PS00857_Amd_000001.pdf | ||
| R15PS00857_Solicitation.docx | DOCX document | |
| Sol_R15PS00857.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reach 22a R15PS00857
Amendment 003 Posting Date 6/3/2015
The purpose of Amendment 003 is as follows:
Changes are depicted by a line directly left of the text
1. Update Section 01 35 20 Safety and Health:
1.02 Reference Standards
A. changed from RSHS-09 to RSHS B. 1. 29 CFR 1910.126 changed to 29 CFR Part 1910 and Standard title added
2. 29 CFR 1910.146 changed to 29 CFR Part 1926 and Standard title added
1.03 Project conditions were removed and replaced entirely by Submittals
1.04 Safety and Health - entirely new section
2. Update Section 01 35 30 Contractors Onsite Safety Personnel:
1.02 Inserted Reference standards
1.03 Submittals
B. Changed the Submittal title from Resume to Qualifications
1.04 Qualifications - section completely re-written
1.05 Application -
A. section re-written B. section re-written
1.06 Quality assurance
Titles of safety personnel have been changed
3. Update Section 01 33 00 Submittals The following submittals have been added:
01 35 20-1 Safety and Health - Emergency Action Plans Written Program and Training Records 01 35 20-2 Safety and Health - Job Hazard Analyses (JHA) 01 35 20-3 Safety and Health - Exposer Assessment Form (if applicable) 01 35 20-4 Safety and Health - Monthly Accident Summary Report 01 35 20-5 Safety and Health - Respirator User Documentation 01 35 20-6 Safety and Health - Crane Training Certificates 01 35 20-7 Safety and Health - Other Training Certificates, As Applicable
4. Updated Section 53 20 00 Records of Geologic and Subsurface Investigations
Added a new drawing under 1.05 Cone Penetration Test Logs.
G101. CPT-HDD-14-1
5. Post the Geological logs and Drawings
6. Post the Cutter Dam – River Outlet Works Intake – Under water Exam
7. Post Navajo Gallup Water Supply Project Plan of Development
8. Post site tour attendees
9. Post Question and Answers from the site tour held May 20, 2015
10. Post site tour minutes
If Amendment 003 attachments do not post to fbo.gov, please check fedconnect.net. If attachments do not post on either fbo.gov or fedconnect.net, please send an email to Ms. Leslie Corpening lcorpening@usbr.gov for attachments.
Please acknowledge all amendments at Solicitation submission which is currently June 17, 2015 at 1700 hours local time (MST).
Navajo Gallup Water Supply Project Cutter Lateral- Reach 22A Solicitation No. R15PS00857
Safety and Health
01 35 20 - 1
SECTION 01 35 20
SAFETY AND HEALTH
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in the prices offered in the price schedules for other items of work
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/rsh s.html
B. Code of Federal Regulations (CFR)
1. 29 CFR Part 1910 Occupational Safety and Health Standards
2. 29 CFR Part 1926 Safety and Health Regulations for Construction posted at: www.osha.gov
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. Safety Program:
1. Written safety program in accordance with of RSHS.
2. Cover all aspects of onsite and applicable off site operations and activities associated with this contract.
3. Follow the outline in Appendix B of RSHS
4. Will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B, a narrative for each applicable item in the outline.
5. Generic company safety programs are not acceptable. [The Safety Program must be site specific for this contract.]
6. Shall be submitted and accepted prior to commencing onsite work, including mobilization.
http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.osha.gov/
Cutter Lateral- Reach 22A Solicitation No. R15PS00857
01 35 20 - 2
7. The Safety Program Statement of Responsibility must state that “the contractor is responsible for ensuring that all work will be in compliance with Reclamation Safety and Health Standards and these specifications.”
C. Submit the following supplements to, Safety Program in accordance with Section
01 33 00 - Submittals:
1. RSN 01 35 20-1, Emergency Action Plans Written Program and Training Records.
2. RSN 01 35 20-2, Job Hazard Analyses (JHA).
a. For each distinct phase of work under the contract.
3. RSN 01 35 20-3, Exposer Assessment Form (if applicable)
a. Completed by a Certified Industrial Hygienist (CIH) or Certified Safety Professional (CSP).
b. Available at http://www.usbr.gov/pn/forms/ro-351.pdf.]
D RSN 01 35 20-4, Monthly Accident Summary Report:
1. Form 7-2218 or other acceptable form in accordance with RSHS.
E RSN 01 35 20-5 Respirator User Documentation
1. Submit documentation of medical qualifications less than 12 months old for all respirator users at the site.
2. Submit results of fit tests less than 12 months old for all users of tight fitting negative pressure respirators at the site.]
F. RSN 01 35 20-6, Crane Training Certificates
1. Qualifications for all riggers and signalpersons.
2. Crane Operator Qualifications:
a. Certifications for all crane and hoist operators.
b. Medical Qualifications to operate a crane in accordance with RSHS ]
G. RSN 01 35 20-7, Other Training Certificates, as applicable
1. First Aid/CPR certifications for onsite foremen and/or safety personnel.
2. Proof of fall protection and prevention training for employees who work in elevated areas.
3. Proof of training for all contractor employees involved with confined space entry work.
4. Rope-Supported Work training certificates for Contractor rope team. Training shall be in accordance with RSHS Section 16.
5. Training certifications and experience for scaffolding competent person.
http://www.usbr.gov/pn/forms/ro-351.pdf
Cutter Lateral- Reach 22A Solicitation No. R15PS00857
01 35 20 - 3
6. Training certifications and experience for excavation competent person.
1.04 SAFETY AND HEALTH
A. The Contractor shall not require persons employed in the performance of this contract, including subcontracts, to work under conditions that are unsanitary, hazardous, or dangerous to the employee’s health or safety.
B. Provide and maintain a work environment and procedures that:
1. Safeguard the public and Government's personnel, and Contractor employees exposed to Contractor operations and activities.
2. Avoid interruptions of site operations and delays in project completion dates.
3. Control costs in contract performance.
C. Do not begin on site work, including mobilization, until the COR accepts the Safety Program.
D. Participate in Contractor Safety Program Review meeting prior to mobilization.
E. Minimum work crew shall consist of no less than two (2) people.
F. Develop Job Hazard Analyses for each distinct phase of work under the contract.
1. Do not begin a phase of work until a JHA is acceptable to COR and shared with construction employees.
2. Activities involving hazardous materials shall have the appropriate Safety Data Sheet(s) attached to the JHA.
G. Comply with RSHS and [29 CFR 1926].
H. Correct safety and health violations identified by the CO or the COR.
I. When the Contractor fails or refuses to correct a compliance directive, the CO or COR may issue an order to stop all or part of the work.
1. When satisfactory corrective action is taken, an order to resume work will be issued.
2. The Contractor shall not be entitled to extension of time or to claim for damage or to additional compensation by reason of either the directive or stop order.
3. Failure of the CO or the COR to order discontinuance of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.
J. Maintain accurate record of and report to the CO the following occurrences during performance of this contract:
Cutter Lateral- Reach 22A Solicitation No. R15PS00857
01 35 20 - 4
1. Death.
2. Occupational disease.
3. Traumatic injury to employees or the public.
4. Property damage in excess of $2,500.
K. The rights and remedies of the Government provided in this section are in addition to any other rights and remedies provided by law or under this contract.
1. In the event there is a conflict between requirements contained in RSHS, specification paragraphs, Contractor’s approved Safety Program, referenced safety and health codes, and standards, or the U.S. Department of Labor Construction Safety and Health Standards, promulgated under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327 et seq.), as amended, the more stringent requirement shall prevail.
L. Provide appropriate safety barricades, signs, and signal lights.
M. Perform all training as required by federal, state, and local regulations prior to any activity that requires it.
1. Training records must be submitted to the COR upon request.
2. In no case shall an employee perform work until all required training is complete.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Cutter Lateral-Reach 22A SolicitationNo.R15PS00857
Contractor’s Onsite Safety Personnel
01 35 30 - 1
SECTION 01 35 30
CONTRACTOR’S ONSITE SAFETY PERSONNEL
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. (RSHS) Reclamation Safety and Health Standards, including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/rshs.html
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals
B. RSN-01 35 30-1, Qualifications:
1. Contractor’s Onsite Safety and Health Professional
C. RSN 01 35 30-2, Safety Inspection Reports:
2. List noted deficiencies, their abatement dates, and follow-up action for jobsite activities.
3. Base inspection report on findings of jobsite walk-through with Government personnel.
1.04 QUALIFICATIONS
A. Contractor’s Onsite Safety and Health Professional:
1. The Contractor shall identify an individual meeting the requirements training and experience requirements of Article 1.04A and:
a. Possessing at least a 4-year Bachelor’s Degree from an accredited college or university in:
1) Safety Engineering,
2) Safety and Occupational Health, or
3) Industrial Hygiene (IH)
Cutter Lateral-Reach 22A SolicitationNo.R15PS00857
01 35 30 - 2
b. Registered Professional Safety Engineer, Certified Safety Professional (CSP), or CIH certified by the Board of Certified Safety Professionals /American Board of Industrial.
c. Knowledgeable of current safety trends, industry practices, and can exercise technical expertise.
2. Include resume with current telephone numbers of references, description of safety representative responsibilities, and copies of applicable training certifications, degree, and/or registration.
3. The individual shall be qualified by virtue of education, training, certification, and experience in which professional status in the construction safety field has been established.
1.05 APPLICATION
A. Employ a full-time onsite Safety Professional as the Contractor’s Onsite Safety Representative prior to start of construction.
1. Safety Professional shall devote full time to on site safety and shall not perform other Contractor work under this contract.
2. Safety Professional requirements may be met by retaining appropriate level of services of an acceptable safety consultant.]
B. Contractor’s Onsite Safety Professional authorities, duties, and responsibilities:
1. The Onsite Safety and Health Professional’s job shall be hazard recognition, control and accident prevention.
2. Shall NOT be supervised by the onsite superintendent, but shall report directly to the corporate manager/owner.
3. The Onsite Safety and Health Professional shall be at the worksite at all times during work activities.
4. Duties include, but are not limited to the following:
a. Before start of construction, identify existing and predictable unsanitary, hazardous, or dangerous conditions.
b. Approve the site-specific Contractor safety and health program. The Onsite Safety and Health Professional will be responsible for coordinating all elements contained in the Contractor safety and health program and these specifications.
c. Lead weekly safety meetings at the jobsite.
d. May act as the qualified person for designing fall protection, excavation and scaffolding systems in accordance with the regulatory standards.
e. Assemble, review and sign each Job Hazard Analysis (JHA).
Cutter Lateral-Reach 22A SolicitationNo.R15PS00857
01 35 30 - 3
f. Prepare detailed weekly safety inspection reports in accordance with RSN 01 35 30-2:
g. Full authorization to correct unsafe acts on the spot, including the authority to stop work to correct safety and health problems.
h. Review and finalize all incident reviews, near-misses and accident reports in accordance with RSHS Section 3.
i. Attend the Safety Program Review Meeting and Conduct the monthly Joint Safety Policy Meetings in accordance with the RSHS section 3.
1.06 QUALITY ASSURANCE
A. Contractor’s Onsite Safety and Health Professional:
1. The effectiveness of the Contractor’s Onsite Safety and Health Professional in prosecuting the safety program will be subject to continued review and approval by the Contracting Officer.
2. Should the Contractor’s safety effort be considered inadequate, the Contracting Officer has the option to require the Contractor to replace the full-time qualified Safety Professional, at no additional cost to the Government.
Safety Program:
1. The effectiveness of the Contractor’s Safety Program will be subject to continued review and approval by the CO.
PART 2 PRODUCTS
PART 3 EXECUTION
END OF SECTION
Cutter Lateral-Reach 22A SolicitationNo.R15PS00857
01 35 30 - 4
This page intentionally left blank.
Cutter Lateral-Reach 22A SolicitationNo.R15PS00857
Submittals 01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the schedules for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-05(2010) Decimal-inch Drawing Sheet Size and Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-11 United States National CAD Standards, Version 5
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittal Types, as listed in Table 01 33 00A - List of Submittals:
1. A - Action:
a. Government will respond as to adequacy of submittal.
b. Action Submittals: Considered “shop drawings” within terms of the clause at FAR 52.236-21 - Specifications and Drawings for Construction.
2. I - Informational:
a. Government will acknowledge receipt of Informational submittals.
b. Government may reject an Informational submittal when submittal does not comply with contract. Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.
c. Informational Submittals: Considered “shop drawings” within terms of the clause at FAR 52.236-21 - Specifications and Drawings for Construction, except that approval by Government is not required.
01 33 00 - 2
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement units: US Customary Units.
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Reserve 3- by 3-inch space next to title block for review stamps.
3. Print Size: D size (22-inches by 34-inches).
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.
a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.
5. Government Format drawings:
a. Prepare drawings designated as “Government Format” in specifications as follows:
1) Title block and sheet format:
a) As shown on Drawing 40-D-7102.
b) Government will provide specific title block information to be used.
2) Drawing format:
a) AUTOCAD, Version 2007 or later.
b) In accordance with NIBS NCS.
3) Size: D-size (22-inch by 34-inch) as defined by ASME Y14.1.
4) Government will provide an electronic AutoCAD template.
6. Final drawings:
a. Drawing format: AUTOCAD, Version 2007 or later.
01 33 00 - 3
b. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
c. Electronic files: On CD or DVD discs.
d. Original plots: D size (22-inches by 34-inches).
e. Government will provide electronic AutoCAD template.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
F. Manuals:
1. Copies:
a. Printed copies: Bound and indexed.
b. Electronic copies: Adobe pdf on CD or DVD discs.
1) Bookmark longer files to assist in navigating file.
2. Contents:
a. Parts identification lists, lists of special tools, and accessories.
b. Schematics and wiring diagrams.
c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.
d. As-built drawings, photographs, and test records or reports by specifications.
G. Photographs:
1. Include negatives, or digital files on CD or DVD in .jpeg or similar format.
01 33 00 - 4
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.
1. Submittals identified with “CDMS” in “Sets to be sent” column shall be submitted electronically in accordance with Section 01 31 30 - Contract Document Management System.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 28 days after receiving comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. CO may extend contract completion date to allow additional time for completing work affected by excess review time.
01 33 00 - 5
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of 2 or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under the contract, and,
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work, however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Return of Submittals:
1. Return of submittals will be by CDMS response or hard copy, as applicable.
2. Action Submittals: 1 set of submittals required for action will be returned either approved, approved subject to identified changes, or not approved.
a. Revise and resubmit submittals not approved.
b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.
3. Informational Submittals: Government will acknowledge Informational submittals.
a. Informational submittals will not be returned when they comply with specifications.
b. Informational submittals that do not comply with specifications may be returned for resubmittal or additional information may be requested.
1.07 HARD COPY OF TRANSMITTALS
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. Contracting Officer, Bureau of Reclamation, Attn UC-840, 125 South State St, Room 6107, Salt Lake City, UT 84138-1147.
2. Construction Engineer, Bureau of Reclamation, 1235 La Plata Hwy, Farmington, New Mexico, 87401.
01 33 00 - 6
3. Technical Service Center, Bureau of Reclamation, Attn 86-68170, PO Box 25007, Denver CO 80225-0007; Express Mail Sixth and Kipling, Building 67, Room 152.
B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A - List of Submittals.
1. Responsible codes starting with “86-6” are located in the Technical Service Center. Send these submittals to the TSC address shown above.
C. Send copy of transmittal letter with appropriate number of sets to offices that are not responsible code, but show “Sets to be sent” in Table 01 33 00A - List of Submittals.
D. When “Sets to be sent” is 0, send a copy of transmittal letter to that office.
E. Submittals required by specifications, but not listed in Table 01 33 00A - List of Submittals:
1. Submit in accordance with this section.
2. Submit to CE unless otherwise specified.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
01 33 00 - 7
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
I-1 Safety and Health (WBR 1452223-81)
Safety program Submitted and accepted before commencing onsite work See section 3 of RSHS
A CE CDMS
I-2 Safety and Health (WBR 1452223-81)
Monthly Accident Summary Report
First day of each month See paragraph 38 of
RSHS
I CE CDMS
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 28 days before use of Federal land
A CE CDMS
01 31 19-1 Project Management and Coordination
Written Summary Monthly once on-site construction begins
A CE CDMS
01 31 19-2 Project Management and Coordination
Off ROW Land Use Coordination
At least 4 months prior to use of land
A CE CDMS
01 31 30-1 Contract Document Management System
Approval Data Within 7 days of Award
A CE 0 1 0
01 31 30-2 Contract Document Management System
Final Data Within 14 days of completion of work
A CE 0 2 2
01 32 10-1 Construction Program
Representative Information
Within 7 days after receipt of Notice of Award
I CE CDMS
01 32 10-2 Construction Program
Baseline Schedule Within 21 days after receipt of Notice to Proceed
A CE CDMS
01 32 10-3 Construction Program
Updated Schedule Monthly or with Progress Payments
A CE CDMS
01 33 00 - 8
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
01 32 10-4 Construction Program
Time Impact Analysis
Within 28 days after CO directs a contract change, with any proposal for a future modification, with any value engineering proposal, or with any request or claim for an equitable adjustment to the contract
A CE CDMS
01 35 10-1 Safety Data Sheets
Complete LHM and SDS
At least 14 days before jobsite delivery of hazardous material
I CE CDMS
01 35 10-2 Safety Data Sheets
Updated LHM and SDS
At least 14 days before jobsite delivery of hazardous material not previously listed
I CE CDMS
01 35 20-1 Safety and Health
Emergency Action Plans Written Program and Training Records
At least 30 days before beginning onsite work
A CE CDMS
01 35 20-2 Safety and Health
Job Hazard Analyses (JHA)
At least 30 days before beginning onsite work
A CE CDMS
01 35 20-3 Safety and Health
Exposer Assessment Form (if applicable)
At least 30 days before beginning onsite work
A CE CDMS
01 35 20-4 Safety and Health
Monthly Accident Summary Report
First day of each month. See paragraph 3.8 of
RSHS.
A CE CDMS
01 35 20-5 Safety and Health
Respirator User Documentation
At least 30 days before beginning onsite work
A CE CDMS
01 35 20-6 Safety and Health
Crane Training Certificates
At least 30 days before beginning onsite work
01 33 00 - 9
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
01 35 20-7 Safety and Health
Other Training Certificates, As Applicable
At least 30 days before beginning onsite work
A CE CDMS
01 35 22-1 First-Aid Medical Facilities Plan
At least 28 days before beginning on-site construction
A CE CDMS
01 35 27-1 Underwater Work
Comprehensive Diving Plan
At least 28 days before beginning diving
A CE CDMS
01 35 27-2 Underwater Work
Daily Dive Plan Daily while diving A CE CDMS
01 35 27-3 Underwater Work
Video Recordings Immediately after making recording
A CE CDMS
01 35 30-1 Contractor‘s Onsite Safety Personnel
Qualifications At least 14 days before beginning on-site construction
I CE CDMS
01 35 30-2 Contractor’s Onsite Safety Personnel
Safety Inspection Reports
Once each week I CE CDMS
01 46 20-1 Testing Agency Services
Testing Agency Services Plan
At least 42 days before testing is required
A CE CDMS
01 55 20-1 Traffic Control Traffic Control Plan
At least 70 days before affecting public traffic
A CE CDMS
01 55 20-2 Traffic Control Permit Applications
At least 70 days before affecting public traffic
A CE CDMS
01 55 20-3 Traffic Control Permits At least 14 days before affecting public traffic
I CE CDMS
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 28 days before start of onsite construction work
A CE CDMS
01 56 15-1 Protection of Existing Utilities
Utility Owner Acknowledgment
At least 28 days before start of onsite construction work
A CE CDMS
01 56 15-2 Protection of Existing Utilities
Utility Investigation
At least 7 days after completing investigation
I CE CDMS
01 33 00 - 10
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 14 days before beginning on-site work
I CE CDMS
01 57 30-1 Water Pollution Control
Updated Stormwater Pollution Prevention Plan
At least 28 days before start of onsite construction work
A CE CDMS
01 57 30-2 Water Pollution Control
Spill Prevention Control and Countermeasure Plan (SPCC)
At least 28 days before delivery or storage of oil
A CE CDMS
01 57 50-1 Tree and Plant Protection
Protection Plan At least 28 days before beginning on-site work
A CE CDMS
01 71 20-1 Surveying Surveying Plan At least 28 days before beginning survey work
A CE CDMS
01 71 20-2 Surveying Resume At least 28 days before beginning survey work; At least 28 days before personnel change
I CE CDMS
01 71 20-3 Surveying Accuracy Check Results
At least 28 days before beginning survey work
I CE CDMS
01 71 20-4 Surveying Completed and Reduced Survey Notes
Within 2 days of completing and reducing notes
I CE CDMS
01 71 20-5 Surveying Original Field Survey Books
Weekly I CE CDMS
01 71 20-6 Surveying Quantity Survey Notes and Computations
Accompanying progress payment requests
I CE CDMS
01 71 20-7 Surveying Workday's Survey Notes
At conclusion of workday if requested by Government
I CE CDMS
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of waste disposal
I CE CDMS
01 74 00-2 Cleaning and Waste Management
Hazardous Wastes Manifest
Within 7 days of hazardous waste disposal
01 33 00 - 11
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume
At least 28 days before beginning environmental assessment
I CE CDMS
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment
Within 14 days of completion of work
I CE CDMS
01 78 30-1 Project Record Documents
Final As-built Drawings
Within 14 days of completion of work
A CE CDMS
0 1 1
02 82 20-1 Removal and Disposal of Asbestos Containing Material
Contractor Qualifications
At least 42 days before start of construction activities
A 86-68220 CDMS
02 82 20-2 Removal and Disposal of Asbestos Containing Material
Asbestos Hazard Containment Plan
At least 42 days before start of construction activities
A 86-68220 CDMS
02 82 20-3 Removal and Disposal of Asbestos Containing Material
Asbestos
NESHAP
Notification
At least 42 days before start of construction activities
A 86-68220 CDMS
02 82 20-4 Removal and Disposal of Asbestos Containing Material
Hazardous Waste Manifest
Within 7 days of waste disposal
A 86-68220 CDMS
02 83 30-1 Removal and Disposal of Coatings Containing Coal Tar Products
Written Compliance Program for Worker Protection from Coal Tar Coatings and Linings
At least 42 days before start of construction activities
A 86-68220 CDMS
02 83 30-2 Removal and Disposal of Coatings Containing Coal Tar Products
Plans At least 42 days before start of construction activities
A 86-68220 CDMS
01 33 00 - 12
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
02 83 30-3 Removal and Disposal of Coatings Containing Coal Tar Products
Test Results Within 7 days of testing
A 86-68220 CDMS
02 83 30-4 Removal and Disposal of Coatings Containing Coal Tar Products
Certificate of Disposal
Within 7 days of waste disposal
A 86-68220 CDMS
02 83 33-1 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Written Compliance Program for Worker Protection
At least 42 days before start of construction activities
A 86-68220 CDMS
02 83 33-2 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Plans At least 42 days before start of construction activities
A 86-68220 CDMS
02 83 33-3 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Clearance Testing Results
Within 7 days of receiving results
A 86-68220 CDMS
02 83 33-4 Removal and Disposal of Equipment with Coatings Containing Heavy Metals
Certificate of Disposal or Recycling Documentation
Within 7 days of waste disposal
A 86-68220 CDMS
03 01 31-1 Repair of Damaged Concrete During at Stoplog Guide Locations
Concrete Repair Plan
At least 42 days before start of construction activities
A 86-68180 CDMS
03 15 18-1 Hydrophilic Waterstops
Product Data At least 42 days before placing concrete
A 86-68180 CDMS
01 33 00 - 13
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
03 15 18-2 Hydrophilic Waterstops
Certification At least 42 days before placing concrete
A 86-68180 CDMS
03 15 18-3 Hydrophilic Waterstops
Instructions At least 42 days before placing concrete
A 86-68180 CDMS
03 15 18-4 Hydrophilic Waterstops
Samples At least 42 days before placing concrete
A 86-68180 0 0 1
03 20 00-1 Concrete Reinforcing
Reinforcement Diagrams and Lists
At least 28 days before placing concrete
A CE CDMS
03 20 30-1 Grouted Anchor Bars
Approval Data At least 42 days before placing concrete
A 86-68180 CDMS
03 20 30-2 Grouted Anchor Bars
Instructions At least 42 days before placing concrete
A 86-68180 CDMS
03 30 00-1 Cast-In-Place Concrete
Approval Data At least 42 days before placing concrete
A 86-68180 CDMS
03 30 00-2 Cast-In-Place Concrete
Concrete Placement Drawings
At least 28 days before placing concrete
A CE CDMS
03 30 00-3 Cast-In-Place Concrete
Concrete Placement Schedule
At least 42 days before placing concrete
A CE CDMS
03 30 00-4 Cast-In-Place Concrete
Certifications 42 days before placing concrete
A 86-68180 CDMS
03 30 00-5 Cast-In-Place Concrete
Test Reports Within 7 days of completing tests
A 86-68180 CDMS
03 48 00-1 Precast Concrete Structures
Product Approval Drawings and Data
At least 42 days before casting first structure
A 86-68120 CDMS
03 48 00-2 Precast Concrete Structures
Mix Design At least 42 days before casting first vault
A 86-68180 CDMS
03 48 00-3 Precast Concrete Structures
Curing, Handling and Storage Requirements:
At least 42 days before casting first vault
A 86-68180 CDMS
03 62 20-1 Nonshrink Grout Packaged Nonshrink Grout Data
At least 42 days before placing grout
01 33 00 - 14
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
03 62 20-2 Nonshrink Grout Packaged Nonshrink Grout Sample
At least 42 days before placing grout
A 86-68180 0 0 1
03 62 20-3 Nonshrink Grout Grouting Plan At least 42 days before placing grout
A 86-68180 CDMS
03 63 00-1 Epoxy Grout Approval Data At least 42 days before placing grout
A 86-68180 CDMS
03 81 10-1 Concrete Removal
Concrete Removal Plan
At least 42 days before concrete removal
A 86-68180 CDMS
09 96 20-1 Coatings Approval Data At least 42 days before beginning coating work
A 86-68180 CDMS
09 96 20-2 Coatings Final Approval Data
At least 42 days before beginning coating work
A 86-68180 CDMS
09 96 20-3 Coatings Certifications At least 42 days before beginning coating work
A 86-68180 CDMS
09 96 20-4 Coatings Documentation At least 42 days before beginning coating work
A 86-68180 CDMS
09 96 20-5 Coatings Contractor Quality Testing Data for “Shop or Field Applied” Coatings
14 days of completing coating work
A 86-68180 CDMS
10 14 26-1 Utility Markers Utility Marker Plan
At least 42 days before start of construction activities
A CE CDMS
22 11 83-1 Duplex Strainer Approval Drawings and Data
Within 56 days after Notice to proceed
A 86-68410 CDMS
22 11 83-2 Duplex Strainer Final Drawings and Data
Within 14 days of final testing
I 86-68410 CDMS
22 13 16-1 Bifurcation Vault Drainage Piping
Approval Data Within 56 days after Notice to proceed
A 86-68410 CDMS
23 82 39-1 Electric Heat Units
Approval Data Within 56 days after Notice to proceed
A 86-68410 CDMS
23 82 39-2 Electric Heat Units
Final Data Within 14 days of final testing
I 86-68410 CDMS
01 33 00 - 15
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
26 05 20-1 Conductors and Cables
Approval Data Within 56 days after Notice to proceed
A 86-68430 CDMS
26 05 20-2 Conductors and Cables
Field Test Reports Within 14 days after tests are completed
I 86-68430 CDMS
26 05 26-1 Grounding and Bonding
Test Reports Within 14 days after tests are completed
I 86-68430 CDMS
26 24 16-1 Panelboard Approval Data Within 56 days after Notice to proceed
A 86-68430 CDMS
26 24 16-2 Panelboard Approval Drawings
Within 56 days after Notice to proceed
A 86-68430 CDMS
26 24 16-3 Panelboard Panelboard Schedule and Circuit Directory
Within 70 days after Notice to proceed
A 86-68430 CDMS
26 26 10-1 Transformer Load Center
Approval Data Within 91 days after Notice to proceed
A 86-68430 CDMS
26 26 10-2 Transformer Load Center
Approval Drawings
Within 91 days after Notice to proceed
A 86-68430 CDMS
26 26 10-3 Transformer Load Center
Panelboard Schedule and Circuit Directory
Within 70 days after Notice to proceed
A 86-68430 CDMS
26 27 26-1 Wiring Devices Approval Data Within 56 days after Notice to proceed
A 86-68430 CDMS
26 42 10-1 Buried Galvanic Cathodic Protection and Corrosion Monitoring System
Certification and Data
At least 42 days before procuring materials
A 86-68180 CDMS
26 42 10-2 Buried Galvanic Cathodic Protection and Corrosion Monitoring System
Final Data Within 7 days of final testing
A 86-68180 CDMS
26 42 11-1 Submerged Galvanic Anode Cathodic Protection System for Welded Tank
Certification and Data
At least 42 days before procuring materials
01 33 00 - 16
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
26 42 11-2 Submerged Galvanic Anode Cathodic Protection System for Welded Tank
Final Data Within 7 days of final testing
A 86-68180 CDMS
26 42 12-1 Submerged Galvanic Anode Cathodic Protection System for Bolted Tank
Certification, Design, and Manufacturer’s Data
At least 42 days before procuring materials
A 86-68180 CDMS
26 42 12-2 Submerged Galvanic Anode Cathodic Protection System for Bolted Tank
Final Data Within 7 days of final testing
A 86-68180 CDMS
26 56 10-1 Interior Lighting Approval Data Within 56 days after Notice to Proceed
A 86-68430 CDMS
31 02 10-1 Water for Dust Abatement
Meter Calibration At least 42 days before beginning on-site work
A CE CDMS
31 02 30-1 Dust Palliative Proposed Application Area for Dirt Glue
At least 42 days before beginning on-site work
A CE CDMS
31 03 10-1 Care of Flow During Construction
Dam Outlet Works Water Control Plan
At least 28 days before beginning on-site work
A CE CDMS
31 03 33-1 Removal of Water From Excavation
Removal of Water Plan
At least 28 days before beginning on-site work
A CE CDMS
31 23 02-1 Compacting Earth Materials
Test Results Within 7 days after completion of tests
I CE CDMS
31 23 23-1 Filter Sand Material
Certification and Laboratory Test Results
At least 42 days before beginning on-site work
A 86-68314 CDMS
31 23 25-1 Gravel Drain Material
Certification and Laboratory Test Results
At least 42 days before beginning on-site work
A 86-68314 CDMS
31 23 27-1 Miscellaneous Fill Material
Test Results Within 7 days after testing
01 33 00 - 17
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
31 23 44-1 Slope Protection Removal, Storage and Replacement Plan
At least 28 days before beginning on site work
A CE CDMS
31 23 51-1 Rigid Cellular Polystyrene Geofoam
Approval data At least 42 days before installing
A 86-68140 CDMS
31 23 51-2 Rigid Cellular Polystyrene Geofoam
Shop Drawings At least 42 days before installing
A 86-68140 CDMS
31 23 51-3 Rigid Cellular Polystyrene Geofoam
Temporary Siphon Crossing Plan
At least 42 days before placing
A 86-68140 CDMS
31 23 70-1 Controlled Low Strength Materials
(CLSM)
Approval Data for CLSM Produced Without Native Soil
At least 42 days before placing
A 86-68180 CDMS
31 23 70-2 Controlled Low Strength Materials
(CLSM)
Approval Data for CLSM Produced with Native Soil
At least 42 days before placing
A 86-68180 CDMS
31 23 70-3 Controlled Low Strength Materials
(CLSM)
Quality Control Test Results
Within 7 days of testing
A CE CDMS
32 15 10-1 Gravel Surfacing Gravel Certification
At least 28 days before placing gravel
A CE CDMS
32 15 10-2 Gravel Surfacing Geofabric Installation
At least 28 days before placing geofabric
A CE CDMS
32 15 10-3 Gravel Surfacing Geofabric Certification
At least 28 days before placing geofabric
A CE CDMS
32 91 60-1 Erosion Control Blanket
Manufacturer’s Information
At least 28 days before placing blanket
A CE CDMS
32 91 60-2 Erosion Control Blanket
Installation Plan At least 28 days before placing blanket
A CE CDMS
32 92 20-1 Seeding Seeding Plan At least 28 days before seeding
A CE CDMS
32 92 20-2 Seeding Certifications At least 28 days prior to beginning work
01 33 00 - 18
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
33 05 21-1 Bored Road Crossings
Placement Plan At least 28 days prior to beginning work
A CE CDMS
33 05 21-2 Bored Road Crossings
Material Certification
At least 28 days prior to beginning work
A CE CDMS
33 05 21-3 Bored Road Crossings
Copy of Application for Utility Permit
At least 28 days prior to beginning work
A CE CDMS
33 05 22-1 Horizontal Directional Drilling
Resumes of Key Personnel
Within 56 days after Notice to proceed
A CE CDMS
33 05 22-2 Horizontal Directional Drilling
Work Plan Within 56 days after Notice to proceed
A CE CDMS
33 05 22-3 Horizontal Directional Drilling
Drilling Plan Within 56 days after Notice to proceed
A CE CDMS
33 05 22-4 Horizontal Directional Drilling
Photo Documentation
Within 7 days of completion
A CE CDMS
33 05 22-5 Horizontal Directional Drilling
Pipe Retention Plan
Within 56 days after Notice to proceed
A CE CDMS
33 05 22-6 Horizontal Directional Drilling
Daily Reports Next day A CE CDMS
33 05 22-7 Horizontal Directional Drilling
Drilling Fluid Daily Report
Next day A CE CDMS
33 05 22-8 Horizontal Directional Drilling
Drill Fluid and Cuttings Disposal Plan
Within 28 days after Notice to proceed
A CE CDMS
33 05 22-9 Horizontal Directional Drilling
Disposal Report Within 7 days of disposal
A CE CDMS
33 05 22-
Horizontal Directional Drill
Contingency Containment Report
Within 7 days of a release
A CE CDMS
33 05 22-
Horizontal Directional Drill
Final Report Within 14 days of completion
01 33 00 - 19
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
33 09 12-1 Magnetic Flowmeter Systems
Approval Data At least 42 days before procurement
A 86-68410 CDMS
33 09 12-2 Magnetic Flowmeter Systems
Final Data Before shipment to site
I 86-68410 CDMS
33 09 12-3 Magnetic Flowmeter Systems
Simulated Test Report
Within 14 days of completion of tests
I 86-68410 CDMS
33 09 15-1 Flood Detection And Alarm System
Approval Data At least 42 days before procurement
A 86-68410 CDMS
33 09 15-2 Flood Detection And Alarm System
Final Drawings and Data
Within 14 days of completion of tests
I 86-68410 CDMS
33 11 10-1 Pipeline General Requirements
Qualifications At least 42 days before pipe fabrication or procurement
A CE CDMS
33 11 10-2 Pipeline General Requirements
Pipelaying Diagrams
At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 11 10-3 Pipeline General Requirements
Filling and Testing Plan
At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 11 10-4 Pipeline General Requirements
Floatation Prevention Plan
At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 11 16-1 PVC Pressure Pipe
Shop Drawings At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 11 16-2 PVC Pressure Pipe
Pipe Manufacture Certification
14 days before shipping
A CE CDMS
33 11 16-3 PVC Pressure Pipe
Test Results At least 42 days before pipe fabrication or procurement
01 33 00 - 20
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
33 11 18-1 HDPE Pressure Pipe
Heat Fusion Joint Operator Qualifications
At least 42 days before pipe fabrication or procurement
A CE CDMS
33 11 18-2 HDPE Pressure Pipe
Shop Drawings At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 11 18-3 HDPE Pressure Pipe
Pipe Manufacture Certification
14 days before shipping
A CE CDMS
33 11 18-4 HDPE Pressure Pipe
Fusion Procedures At least 42 days before pipe fabrication or procurement
A CE CDMS
33 11 50-1 Pipe Crossings at Existing Utility Pipelines
Rubber Gasket Data
At least 42 days before pipe fabrication or procurement
A CE CDMS
33 16 50-1 Steel Tanks Shop Drawings, Design Calculations and Design Data
At least 56 days before fabrication or procurement
A 86-68420 CDMS
33 16 50-2 Steel Tanks Qualifications At least 63 days before fabrication or procurement
A 86-68420 CDMS
33 16 50-3 Steel Tanks Nondestructive Weld Test Reports
Within 14 days after installation
I 86-68420 CDMS
33 16 50-4 Steel Tanks Commercial Products Data
At least 56 days before fabrication or procurement
A 86-68420 CDMS
33 16 50-5 Steel Tanks Final Drawings and Data
Within 14 days after installation
I 86-68420 CDMS
33 16 51-1 Forebay Tank Drain Pipe
Shop Drawings At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 16 51-2 Forebay Tank Drain Pipe
Catch Basin Drop Inlet Shop Drawings
At least 42 days before pipe fabrication or procurement
A 86-68140 CDMS
33 21 95-1 Metal Piping For Line Pipe Installations
Shop Drawings At least 56 days before fabrication or
A 86-68420 CDMS
01 33 00 - 21
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
33 21 95-2 Metal Piping For Line Pipe Installations
Commercial Products Data
Before fabrication or procurement
A 86-68420 CDMS
33 21 95-3 Metal Piping For Line Pipe Installations
Final Drawings Within 14 days after installation
A 86-68420 CDMS
33 22 15-1 Valves and Equipment for Line Pipe Installations
Commercial Product Data
At least 42 days before fabrication or procurement
A 86-68420 CDMS
33 22 15-2 Valves and Equipment for Line Pipe Installations
Service Manuals Within 14 days after installation
I 86-68420 CDMS
33 46 36-1 Embankment Pipe Drain
Shop Drawings At least 42 days before pipe fabrication or procurement
A 86-68314 CDMS
33 46 36-2 Embankment Pipe Drain
Certification At least 42 days before pipe fabrication or procurement
A CE CDMS
33 46 36-3 Embankment Pipe Drain
Fusion Procedures At least 42 days before pipe fabrication or procurement
A CE CDMS
33 46 36-4 Embankment Pipe Drain
HDPE to Asbestos Cement Tile Connection Plan
At least 42 days before pipe fabrication or procurement
A 86-68314 CDMS
33 46 36-5 Embankment Pipe Drain
Pipe Installation Plan
At least 42 days before pipe fabrication or procurement
A 86-68314 CDMS
33 46 36-6 Embankment Pipe Drain
Video Inspection Within 14 days of inspection completion
A CE CDMS
35 21 10-1 Trashracks Existing Trashrack Dimensions
Within 7 days of measurement
I 86-68410 CDMS
35 21 94-1 Steel Piping Shop Drawings At least 56 days before fabrication or
A 86-68420 CDMS
01 33 00 - 22
Table 01 33 00A - List of Submittals
* Submittal types A - Action, I - Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or delivery time
Type
Respon-sible code
No of sets to be sent to **
CO CE TSC
35 21 94-2 Steel Piping Removal Procedure
At least 56 days before installation, fabrication, or procurement
A 86-68420 CDMS
35 21 94-3 Steel Piping Installation Procedure
At least 56 days before fabrication or procurement
A 86-68420 CDMS
35 21 94-4 Steel Piping Commercial Products Data
At least 56 days before installation
A 86-68420 CDMS
35 21 94-5 Steel Piping Final Drawings At least 14 days after installation
A 86-68420 CDMS
35 22 10-1 Slide Gates Removal and Replacement
Slide Gate Approval Drawings and Data
At least 42 days prior to fabrication or procurement
A 86-68420 CDMS
35 22 10-2 Slide Gates Removal and Replacement
Lift and Stem Calculations
At least 42 days prior to fabrication or procurement
A 86-68420 CDMS
35 22 10-3 Slide Gates Removal and Replacement
Product Data At least 42 days prior to fabrication or procurement
A 86-68420 CDMS
35 22 10-4 Slide Gates Removal and Replacement
Existing Anchor Bolt Data
At least 14 days prior to gate installation
A 86-68420 CDMS
35 22 10-5 Slide Gates Removal and Replacement
Slide Gate Hydrostatic Test Plan
At least 42 days prior to installation
A 86-68420 CDMS
35 22 10-6 Slide Gates Removal and Replacement
Gate Test Reports Within 7 days of gate testing
I 86-68420 CDMS
35 22 10-7 Slide Gates Removal And Replacement
Final Drawings and Data
Within 14 days of installation
I 86-68420 CDMS
35 22 14-1 Valves and Equipment
Commercial Product…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .