SOW w/Drawings Electrical Service to Storage Garage (CRY)

View the file

Other files

File Type Posted
Sol_R15PS00648_Amd_000001.pdf PDF
Sol_R15PS00648.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Utility Service and Fixture Build-out for Crystal Equipment Building

Statement of Work

1.01 BACKGROUND

A. The Crystal Utility Building is located 5.6 miles from the Crystal Power Plant on the East Portal Road. Electricity was not available in the area when the building was constructed.

The purpose of this project is to furnish and install electrical service from Delta-Montrose Electrical Association (DMEA) junction box to the Crystal Equipment Building, and to install lighting, and electrical receptacles.

1.02 SCOPE

A. This is a turnkey project to supply electricity from the electrical provider to the Crystal Utility Building, and to provide the electrical build-out to the building as specified in section IV of this document (Task). The Contractor shall be responsible for all phases of the project including permitting, project management and coordinating the power connection with DMEA.

1.03 OBJECTIVE

A. The Crystal Equipment Building has never had electrical service provided to the building.

The objective of this project is to add a 400 amp electrical service to the building, install lights, electrical receptacles, and power to the door openers. The Contractor shall be responsible for all permitting and shall perform all work in accordance with DMEA guidelines located in the DMEA New Construction Handbook found at www.dmea.com (click on the member info tab, then electric service, then construction handbook) and the 2014 National Electrical Code (NEC).

B. All electrical wiring shall be installed in conduit piping in accordance with local codes.

Additional installation information can be obtained from the DMEA New Construction Handbook. The Contractor shall provide all of the labor and material to perform the work outlined in the Statement of Work and all attachments.

1.04 TASKS

A. Electrical service from DMEA junction box to building.

1. The Curecanti Field Division of the Bureau of Reclamation has paid DMEA for the initial electrical service design and estimate. DMEA has reviewed and approved the initial design. The Contractor shall confirm the power run, transformer location, and meter base location and will be responsible for any additional cost to DMEA. The scope includes coordinating the installation of DMEA equipment associated with this project. The electrical utility installation of this project is being tracked on DMEA’s work order #15146.

2. Provide all boring and trenching to provide 400 amp single phase electrical service to the equipment building. The boring required from the Crystal building under the road is approximately 40 feet of roadway - 20 feet of asphalt and another 20 feet of apron.

3. Provide detailed job specifications to supply 400A, 120/240V, single phase service from the DMEA junction box to the meter base. Specifications shall include trenching details and transformer base preparations.

B. Service Equipment – Meter socket and panelboard.

1. See attached drawings for location of Meter Socket (Combination Service Entrance All-In-One), and interior panelboard.

2. Provide and install a 400 amp – “Combination Service Entrance All-In-One” on exterior of building. The Combination Service Entrance All-In-One shall include a 400 amp meter socket with “manual lever bypass switch” in a NEMA 3R enclosure. The Contractor shall use factory installed 200 Amp circuit breaker and feed through lugs to feed the 200 amp panelboard inside the building. The Combination Service Entrance All-In-One and associated conduit shall be mounted on the building to avoid obstructing the use of the south-side storage and parking area. See attached drawings for location of Combination Service Entrance All-In-One. A 3” Schedule 80 PVC riser, expansion joint and connector is required for tie in at meter per DMEA regulations.

3. Furnish and install One (1) 30 space, 30 circuit, 200A Square D - NQ panel board (or equivalent) with 22,000 AIC rated QOB bolt in circuit breakers in a NEMA 1 enclosure, mounted approximately 28 feet from the south/east corner of the building along inside of south wall at a height of 6’ from floor to top of enclosure (see attached drawings). In order for the panel board to be considered equal it must be 22,000 AIC rated, QOB bolt in circuit breakers in a NEMA 1 enclosure.

Note: This panel board shall include a “Main Lugs Interior” (a Main Breaker is not required for this inside panelboard). Furnish and install the 200 amp panel with: One (1) - 2 pole 50 amp circuit breaker for the welder receptacle; Two (2) – 20 amp, 1-pole circuit breakers for the roll-up door openers; two (2) – 20 amp, 1-pole circuit breakers for lighting circuits; Six (6) – 20 amp, 1 – pole circuit breakers for GFCI receptacle outlets (receptacle circuits 1 – 7) and Four (4) -spare 20 amp single pole circuit breakers. Install panelboard with grounding electrode system per NEC and DMEA regulations. See attached drawings for location of panel board.

C. Interior receptacles.

1. Install twelve receptacles – four (4) on the south wall, four (4) on the north wall, one (1) on the east wall between the roll up doors, two (2) on the center post under the mezzanine, and one (1) on the west wall above the mezzanine. Each receptacle shall be located in accordance with the attached drawings. Install receptacles R1 – R4 and R7 – R11 along the bottom structural steel beam. Install receptacles R5 and R6 approximately 43” from the floor on the center support post under the mezzanine, directly adjacent to the ladder. Install receptacle R12 on the west wall above the mezzanine floor, approximately 32” above mezzanine surface, along the structural steel beam closest to the surface of the mezzanine.

Receptacle outlets shall be Duplex type, 120V/20A, and GFCI protected.

2. Install One - 50A/240V welder receptacle on the south wall.

D. Interior lighting.

1. Provide and Install twelve (12) – 4’ Energy Star rated LED fixtures in the service bay area, to achieve a minimum 20 foot candles illuminance at a working level of 2.5’ from the floor.

2. Lighting fixtures L1 – L9 shall be controlled using a single pole switch, located adjacent to personnel door on south east corner of the building.

3. Lighting fixtures L10 – L12 shall be controlled using a single pole switch, located adjacent to personnel door on south west corner of building, under mezzanine.

4. Lighting fixtures L1 – L12 shall be mounted at locations identified on attached drawings.

a. Overhead fixtures L1-L3 between and on each side of roll-up doors shall be mounted 14’ above floor.

b. Overhead fixtures L4-L6 shall be mounted 16’ above the floor.

c. Overhead fixtures L7-L9 shall be mounted 7’6” above the top surface of the mezzanine.

d. Overhead fixtures L10-L12 shall be mounted 8’6” above the floor.

5. Install combination LED exit signs (fixture numbers L16 and L17) with frog eyes (emergency lights) above the 2 pedestrian doors.

6. Install One LED emergency light (fixture number L18)with 2 high output lamps centered on the west wall in the upper mezzanine area, and one LED emergency light (fixture number L19) with 2 high output lamps centered on the north wall on the structural steel beam approximately 12’ from floor.

E. Exterior lighting.

1. Install a 90W forward throw LED wall pack, bronze color (fixture number L13) on the front of the building. The light shall be centered at the peak of the building 18’ from grade and above the existing Bureau of Reclamation sign. The light shall be controlled by a photo cell and on from dusk till dawn.

2. Install 30W full cut-off LED wall pack fixtures, bronze color (fixture numbers L14, L15) above both pedestrian doors on the south east and south west corners of the building. The lights shall be centered in each door opening and mounted 2’ above top of door. Each light shall be operated by motion sensor.

F. Electric garage doors.

1. Install receptacles for both garage door operators, each on a dedicated 120V/20A circuit. Each receptacle shall be located within 3’ of the door opener which it feeds. Connect power cords of each existing opener to receptacle and terminate door controls (switches). The Contractor shall verify that existing controls are adequate, and make additions and/or alterations to make both doors operate correctly and independently.

1.05 DELIVERY

A. This project is located at the Crystal Equipment Building on East Portal Road 5.6 miles from the Crystal Power Plant or approximately one mile past the Black Canyon of the Gunnison National Park south entrance pay station. The Contractor shall be responsible for all deliveries and the storage of all equipment and supplies.

1.06 GOVERNMENT FURNISHED PROPERTY

A. No property or services will be furnished by the Government. This location does not have any water, restrooms or electric power. The building interior does not have any drywall.

1.07 SECURITY

A. Any contractor associated with this project who needs building access will be escorted by a Bureau of Reclamation employee. The Contractor is responsible for scheduling access to the interior of the building with Contracting Officer’s Representative.

1.08 PLACE OF PERFORMANCE

A. The entirety of this project is at the Crystal Equipment Building located 5.6 miles from the Crystal Power Plant on the East Portal Road. This facility is a storage building with no water or bathroom facility.

1.09 PERIOD OF PERFORMANCE

A. This project shall commence no later than 30 days from contract award date and be completed no later than 90 days from contract award date.

General Decision Number: CO150011 03/27/2015 CO11

Superseded General Decision Number: CO20140011

State: Colorado

Construction Type: Building

Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015 1 01/09/2015 2 03/27/2015

ASBE0028-004 10/01/2013

ALL COUNTIES EXCEPT ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND

MONTEZUMA

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems.....................$ 28.83 13.18

ASBE0076-002 07/01/2014

ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND MONTEZUMA

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)....................$ 31.26 11.38

BRCO0007-003 05/01/2014

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS,

COSTILLA, CROWLEY, CUSTER, DOLORES, ELBERT, FREMONT, HINSDALE,

HUERFANO, KIOWA, KIT CARSON, LA PLATA, LAS ANIMAS, LINCOLN,

MINERAL, MONTEZUMA, PARK, PROWERS, SAGUACHE, SAN JUAN & TELLER

COUNTIES

BRICKLAYER.......................$ 24.22 8.62

BRCO0007-009 05/01/2014

DELTA, GARFIELD, GRAND, GUNNISON, JACKSON, LAKE, LOGAN, MOFFAT,

MONTROSE, MORGAN, OTERO, OURAY, PHILLIPS, RIO BLANCO, RIO

GRANDE, SAN MIGUEL, SEDGWICK, WASHINGTON & YUMA COUNTIES

BRICKLAYER.......................$ 24.22 8.62

BRCO0007-010 01/01/2014

CLEAR CREEK, EAGLE, GILPIN, PITKIN, ROUTT & SUMMIT COUNTIES

Rates Fringes

BRICKLAYER.......................$ 24.03 8.63

CARP9901-006 05/01/2013

Baca, Bent, Chaffee, Cheyenne, Clear Creek, Crowley, Custer, Delta, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Huerfano, Jackson, Kiowa, Kit Carson, Lake, Las Animas, Lincoln, Logan, Moffat, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Routt, Saguache, Sedgwick, Summit, Teller, Washington and Yuma Counties, Colorado

Carpenters:

Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 25.00 5.39

CARP9901-007 05/01/2013

Alamosa, Archuleta, Conejos, Costilla, Dolores, Hinsdale, La Plata, Mineral, Montezuma, Rio Grande, San Juan and San Miguel Counties, Colorado

CARPENTER

Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 22.75 4.10

ELEC0012-001 09/01/2014

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,

OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES

Electricians:

Electrical contract over $1,000,000..................$ 27.30 10.80+3% Electrical contract under $1,000,000..................$ 24.75 11.84 (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0068-007 06/01/2014

CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,

MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES

ELECTRICIAN......................$ 32.65 12.70

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls

ELEC0113-003 06/01/2014

CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES

Rates Fringes

ELECTRICIAN (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)............$ 29.55 14.69

* ELEC0969-001 12/01/2014

DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,

MONTEZUMA, RIO BLANCO, AND ROUTT COUNTIES

ELECTRICIAN......................$ 24.00 7.32

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

* ELEC0969-005 12/01/2014

OURAY, PITKIN, SAN JUAN AND SAN MIGUEL COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.00 8.40

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

* ELEC0969-009 12/01/2014

DELTA AND MONTROSE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 24.00 7.32

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEV0025-002 01/01/2015

Rates Fringes

Elevator Constructor.............$ 40.68 28.385+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

IRON0024-002 11/01/2013

Rates Fringes

Ironworker, reinforcing and structural.......................$ 24.80 10.14

LABO0720-003 05/01/2014

LABORER

Concrete/Mason Tenders......$ 16.42 6.38

PAIN0930-001 07/01/2014

Rates Fringes

GLAZIER..........................$ 29.67 7.52

PLAS0577-001 05/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 24.00 10.23

PLUM0003-006 07/01/2014

CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF

ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES

PLUMBER

(Including HVAC Work).......$ 31.93 12.34

PLUM0058-009 07/01/2013

ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, ELBERT (Southern portion including the towns of Elbert, Matherson and Silma), FREMONT, HUERFANO, KIOWA, KIT CARSON (Including towns of Dfalgler, Seibert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PARK (Including towns of Fauplay, Hartsel and Lake George), PROWERS, RIO GRANDE, AND SAGUACHE COUNTIES

PLUMBER/PIPEFITTER

(Plumbers include HVAC work)

(Pipefitters exclude HVAC work).......................$ 28.55 13.15

PLUM0058-012 07/01/2013

TELLER COUNTY

Plumbers Include HVAC Work

Pipefitters Exclude HVAC Work........................$ 28.55 13.15

PLUM0145-001 08/01/2013

ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL

COUNTIES

PLUMBERS (Including HVAC work) & PIPEFITTERS (Excluding HVAC work).......$ 24.58 10.97

PLUM0208-005 07/01/2013

CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, YUMA. PARTS OF ELBERT,

EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES

PIPEFITTER

(Excluding HVAC work).......$ 33.35 12.27

ROOF0058-001 05/01/2014

Rates Fringes

ROOFER...........................$ 22.20 6.35

SHEE0009-001 07/01/2014

Rates Fringes

Sheet metal worker (Includes HVAC duct and installation of HVAC systems)....................$ 32.47 13.98

SUCO2001-008 12/20/2001

Rates Fringes

Carpenters:

Acoustical..................$ 15.69 3.15

All other Work..............$ 15.94 3.41

Drywall Finisher/Taper...........$ 14.44 2.19

Laborer, common..................$ 9.75

PAINTER..........................$ 15.19

(Excluding drywall finishing/taping) Brush, Roller, Spray

Power equipment operators:.......$ 13.41 Backhoe

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

03_Drawings Crystal Bldg Electrical Install.pdf
Crystal Electrical Installation - Main Floor Lighting Plan
Crystal Electrical Installation - Mezzanine Level Lighting Plan
Crystal Electrical Installation - East Elev and Mounting Height Detail
Crystal Electrical Installation - South Elev Lighting Plan

File details come from the government source that posted it. Updated .