FINAL_-_R15PS00154.pdf

PDF 2 MB Posted

Attached to
Palisades Power Line Reroute, Palisades Project, Idaho
Solicitation number
r15PS00154
Issued by

About this file

Solicitation R15PS00154

View the file

Other files

File Type Posted
Amendment_003.pdf PDF
R15PS00154_Amendment_002.pdf PDF
R15PS00154_Drawings_(non-sensitive).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R15PS00154

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

03/18/2015000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/13/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation entry on March 13, 2015 did not include the entire solicitation. This amendment is necessary to provide the solicitation package and selected drawings (see the notice on the Foreword page in the solicitation regarding availability of other drawings).

The solicitation response date is extended to 3:00 p.m., April 23, 2015. The site visit is at 1:00 p.m., April 1, 2015 - see details in Section L.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan E. Kramer

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Region March 2015

Solicitation No. R15PS00154

Palisades Power Line Reroute

Palisades Project, Idaho

This solicitation issued by Regional Director

Pacific Northwest Region Bureau of Reclamation

1150 North Curtis Road, Suite 100 Boise ID 83706-1234

Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer

Telephone Number: (208) 378-5364

Foreword - 1

PALISADES POWER LINE REROUTE

PALISADES PROJECT

PALISADES, IDAHO

FOREWORD

Work is located at the Palisades Powerplant, approximately 54 miles Southeast of Idaho Falls, Idaho, in Bonneville County.

Work consists of the furnishing and installation of all necessary conductors and all associated structures and hardware to properly replace the aging conductors run on deteriorated overhead power poles from the powerhouse to the upstream intake structures. The conductors will be placed in underground and surface mounted conduit to facilitate access and maintenance.

PRE-BID SITE VISIT: SEE SECTION L FOR PRE-BID SITE VISIT INFORMATION.

ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD HATS,

SAFETY VESTS.

FOR DATE AND PLACE OF BID OPENING, SEE "SOLICITATION, OFFER, AND

AWARD," STANDARD FORM 1442.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" (2009 EDITION) WHICH IS

APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT "WBR

1452.223-81 SAFETY AND HEALTH."

Some of the drawings for this solicitation are not included in this solicitation as they contain sensitive information. In order to receive a copy of these particular drawings, you must submit the Federal Non-Disclosure Agreement (Form 7-2577) attached to this solicitation. E-mail the completed form to Chris Waters at cwaters@usbr.gov, or by regular mail to Bureau of Reclamation, Attn: Chris Waters, PN-3705, 1150 N. Curtis Road, Boise, ID 83706-1234. After your request is approved, the drawings will be furnished to you.

i

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM ..................................................................... A-1

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 30 Outages 01 29 00 Payment Procedures 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Material Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal From Work 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 43 10 Quality Control Testing for Earthwork and Cast-In-Place Concrete 01 43 20 Contractor Quality Control for Materials Used in the Work 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 71 20 Surveying 01 74 10 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 22 00 Demolition

DIVISION 03 - CONCRETE

03 30 00 Cast-In-Place Concrete ii

DIVISIONS 04 THROUGH 9 - NOT USED

DIVISION 10 - SPECIALTIES

10 75 00 Fiberglass Pole

DIVISIONS 11 THROUGH 25 - NOT USED

DIVISIONS 26 - ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 20 Grounding and Bonding 26 05 33 Electrical Conduit

DIVISION 27 - NOT USED

DIVISION 28 - ELECTRICAL SAFETY AND SECURITY

28 20 00 Security Surveillance

DIVISIONS 29 THROUGH 30 - NOT USED

DIVISION 31 - EARTHWORK

31 02 10 Water for Dust Abatement 31 23 22 Conduit Trench Earthwork 31 23 90 Disposal of Excavated Materials 31 63 00 Directional Drilling

DIVISIONS 32 THROUGH 50 - NOT USED

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors

DIVISION 52 - DRAWINGS

52 00 00 Drawings

SECTION D PACKAGING AND MARKING ................................................................................. D-1 iii

SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1

E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I

APR 1984) ....................................................................................................................... E-3

SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1

F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.242-14 SUSPENSION OF WORK (APR 1984) ........................................................ F-1

SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1

G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN

REGION (OCT 2010) ..................................................................................................... G-1

G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE

INTERIOR (MAY 2010) ................................................................................................ G-1

G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1

H.1. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF

RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1

H.2. KEY PERSONNEL REQUIREMENTS--BUREAU OF RECLAMATION--PN

REGION (FEB 1995) ..................................................................................................... H-3

PART II CONTRACT CLAUSES

SECTION I CONTRACT CLAUSES ................................................................................................ I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1 I.2. 52.203-3 GRATUITIES (APR 1984) ............................................................................... I-1 I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)........................ I-2

I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) .......................................... I-2

I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4

I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014) .................................................................................................. I-5

I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6 iv

I.9. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (APR 2014) ...................................................................................................... I-10

I.10. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE

INTERIOR (JUL 1996) .................................................................................................. I-11

I.11. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER

FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-11

I.12. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ............................... I-11

I.13. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011) ............................................................................................. I-13

I.14. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (JUL 2013) ..................................................................... I-14

I.15. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

MAINTENANCE (DEC 2012)....................................................................................... I-17

I.16. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL

2013) ............................................................................................................................... I-18

I.17. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014) .......................................................................... I-20

I.18. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-20

I.19. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

OR PROPOSED FOR DEBARMENT (AUG 2013)...................................................... I-20

I.20. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (JUL 2013) ......................................... I-21

I.21. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (DEC 2014) ................................................................ I-22

I.22. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ............................. I-23

I.23. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT

(OCT 1997) ..................................................................................................................... I-25

I.24. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF

THE INTERIOR (AUG 1996) (DEVIATION) ............................................................... I-25 I.25. 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) ......... I-25 I.26. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-26 I.27. 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) ............................ I-28

I.28. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (JUL 2013) ............................................................................. I-28 I.29. 52.222-3 CONVICT LABOR (JUNE 2003) .................................................................. I-30

I.30. 52.222-4 CONTRACT WORK HOURS AND SAFETY

STANDARDS -OVERTIME COMPENSATION (MAY 2014) ................................... I-31

I.31. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) ............ I-32

I.32. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-34 v

I.33. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ..................................... I-35 I.34. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-36

I.35. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB

1988) ............................................................................................................................... I-38 I.36. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ....................... I-38 I.37. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-39

I.38. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-40

I.39. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-40 I.40. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................... I-40 I.41. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999) .................. I-40 I.42. 52.222-26 EQUAL OPPORTUNITY (MAR 2007) ....................................................... I-41

I.43. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION (FEB 1999) ...................................................................................... I-43 I.44. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014) ........................... I-48

I.45. 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES

(JUL 2014) ...................................................................................................................... I-48 I.46. 52.222-37 EMPLOYMENT REPORTS VETERANS (JUL 2014) ............................... I-49

I.47. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-50 I.48. 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ...................... I-51

I.49. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC

2014) ............................................................................................................................... I-58

I.50. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-62

I.51. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION (MAY 2011)....................................................................................... I-64 I.52. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-65

I.53. 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL

CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) ....................................... I-67

I.54. 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS

IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008) .......................... I-67

I.55. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-67

I.56. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF

RECLAMATION (OCT 1992) ....................................................................................... I-68

I.57. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION

(MAY 2010).................................................................................................................... I-69

I.58. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE

PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL

WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-69

I.59. 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014) ............ I-70

vi

I.60. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE

2008) ............................................................................................................................... I-73

I.61. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ...................................... I-73

I.62. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-74

I.63. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC

2007) ............................................................................................................................... I-74 I.64. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) ................................ I-74 I.65. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-76 I.66. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ........................................... I-77

I.67. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION

(JAN 1997)...................................................................................................................... I-77 I.68. 52.228-11 PLEDGE OF ASSETS (JAN 2012) .............................................................. I-77

I.69. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS

(MAY 2014).................................................................................................................... I-78 I.70. 52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999) ................................. I-78

I.71. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION

(OCT 2010) ..................................................................................................................... I-82

I.72. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-83

I.73. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR

CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) .................. I-83

I.74. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) .............................. I-84

I.75. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

-- BUREAU OF RECLAMATION (JUL 1998) ............................................................. I-85

I.76. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (MAY 2014) ........................................................................................... I-87 I.77. 52.232-17 INTEREST (MAY 2014) .............................................................................. I-90 I.78. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ................................................. I-91

I.79. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ....... I-92

I.80. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT (JUL 2013) ...................................................................... I-100

I.81. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUN 2013).................................................................................................................... I-102

I.82. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL

BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-103 I.83. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-103 I.84. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................... I-104

I.85. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT

2004) ............................................................................................................................. I-105 I.86. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ........................................... I-105 vii

I.87. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK (APR 1984) ...................................................................................................... I-106

I.88. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) ................. I-106 I.89. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-107 I.90. 52.236-8 OTHER CONTRACTS (APR 1984) ............................................................. I-107

I.91. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-107 I.92. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-107 I.93. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ......... I-108 I.94. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-108

I.95. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV

1991) ............................................................................................................................. I-108 I.96. 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984) ....... I-110

I.97. 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984) ........ I-110

I.98. 52.236-17 LAYOUT OF WORK (APR 1984) ............................................................. I-111

I.99. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997)- ALTERNATE I (APR 1984)............................................................................. I-111 I.100. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-112

I.101. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –

BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-112

I.102. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF

RECLAMATION (FEBRUARY 2011) ALTERNATE I (OCT 2006) ........................ I-114

I.103. PN REGION IMPLEMENTATION OF SECURITY REQUIREMENTS –

CONSTRUCTION CONTRACTS ............................................................................... I-124 I.104. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-125 I.105. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-125

I.106. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF

RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-126 I.107. 52.244-2 SUBCONTRACTS (OCT 2010) ................................................................... I-127 I.108. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAR 2015) ................ I-129

I.109. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2010) -

ALTERNATE I (APR 1984) ........................................................................................ I-131

I.110. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-134 I.111. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-138 I.112. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-139 I.113. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-139

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS ......................................................................................... J-1 viii

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS ....................................................................... K-1

K.1. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC

2014) ............................................................................................................................... K-1

K.2. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL

2013) ............................................................................................................................... K-4

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ............................................................................................................L-1

L.1. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING (NOV 2014) .............................................................................................. L-1

L.2. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (NOV 2014) ....................................................................................... L-2

L.3. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-3

L.4. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-3

L.5. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-3

L.6. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS

AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ............................... L-4

L.7. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE ACQUISITION

(JAN 2004)....................................................................................................................... L-5

L.8. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL

INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ......................... L-9

L.9. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION

PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) ................................ L-11

L.10. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-13

L.11. WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (APR 2001) ...................................................................................... L-14

L.12. WBR 1452.215-83 PRICE PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-16

L.13. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS

TO OFFERS, AND WITHDRAWALS OF OFFERS-BUREAU OF

RECLAMATION--PN REGION (APR 2007) .............................................................. L-16

L.14. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-17

L.15. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014) ............................................................................. L-17 ix

L.16. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)..................................................................................................................... L-18

L.17. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE

INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS --

BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ..................................... L-19

L.18. 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014) ........................................................... L-19

L.19. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR

(SEPT 2006) (DEVIATION) ......................................................................................... L-20

L.20. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995) .............................................................................................................................. L-20

L.21. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997) ....... L-21

L.22. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-21

SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1

M.1. WBR 1452.215-85 EVALUATION FACTORS FOR AWARD - QUALITY

PREDOMINANCE--BUREAU OF RECLAMATION (MAY 2005) ........................... M-1

M.2. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION

GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--

BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-2

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Bureau of Reclamation

Attn: Contracting Officer, PN-3726 1150 N. Curtis Road, Suite 100 Boise, ID 83706-1234

Susan Kramer 208-378-5156

1x 03/13/2015

R15PS00154

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO

THIS SOLICITATION IS SET-ASIDE FOR SMALL BUSINESS CONCERNS

THE ESTIMATED PRICE RANGE OF THE WORK IS $500,000-$1,000,000

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 120 calendar days and complete it within ________________ ________________ calendar days after receiving

Clause F.1.

04/16/2015

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Susan E. Kramer

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00154

SECTION B

(a) Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule.

(b) All offers are subject to the terms and conditions of this solicitation.

(c) Definitions:

(1) CLIN - Contract Line Item Number

(2) AU - Activity Unit (equals Lump Sum)

Delivery: 120 Days After Notice to Proceed

FOB: Destination

00010 Palisades Power Line Reroute, Palisades Project, 1 AU

Idaho

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

C-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Signature Sheet / Certification of Technical Specifications

Project Title:

Palisades Project, ID

Region:

Pacific Northwest Region – Boise, Idaho

Technical Specifications Palisades Power Line Reroute Title and Number: R15PS00154

Prepared by:

/s/ Cahl Gouker

Date:

12/22/2014

Technical Approval:

/s/ Steve Montague, PE

Date:

12/23/2014

1. The person signing the specifications package as “Prepared” shall have developed or assembled the written specifications.

2. The person signing the specifications package for “Technical Approval” shall have been in responsible charge of the overall design including developing or assembling the specifications. This person will typically be the design team leader. In cases where the designs described by the specifications meet the criteria for preparation by a registered engineer or architect, this person shall be registered with the applicable professional designation after their signature, such as P.E. for professional engineer or R.A. for registered architect. By this signature, this person is certifying the written specifications convey the design intent as portrayed on the drawings included therein.

For specifications package containing designs from multiple disciplines, it is the signing individual's responsibility to ensure (using procedures defined by his/her organization) that the technical information prepared by other professions and disciplines and depicted in the document is compatible with the overall design intent and that the documents used to depict that information (e.g., drawings) include signatures with appropriate professional registration designations.

DIVISION 01 – GENERAL REQUIREMENTS

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located at Palisades Dam, Idaho, approximately 45 miles southeast of Idaho Falls, Idaho, in Bonneville County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Demolition:

1. Removal and proper disposal of sawcut asphalt paving where conduit bank trench contacts parking lot or road surfaces.

B. Earthwork:

1. Trench excavation across powerplant parking lot and along access road to upstream left retaining wall.

2. Trench excavation from junction box at top of dam to seismic equipment and new fiberglass camera pole.

2. Excavation and Backfill for pull boxes

3. Excavation and backfill of hole for fiberglass camera pole.

4. Drilling from toe of dam to crest of dam.

C. Electrical Conduits and Basic Electrical Materials:

1. Rigid Galvanized Steel (RGS) conduits and fittings installed on exterior surface-mount areas (one 4” dia., two 2” dia.)

2. PVC coated RGS conduits and water tight fittings in all areas where conduits are buried or encased in concrete.

3. Liquid-tight flexible metal conduits and water tight fittings used in transition locations when components are mounted to separate surfaces; also in conduits crossing expansion joints.

4. Surface mounted galvanized steel pull boxes (retaining wall, underside of concrete pier platform)

D. Concrete:

1. Place concrete in conduit bank trench, surrounding conduits held in place by spacers placed every 5 feet. Rebar reinforcement located where conduit bank runs under or adjacent to roadways or parking lots.

01 11 00 - 2

2. Top of concrete surface will be at the same elevation as and even with all asphalt paved surfaces adjacent to or bordering the trench. Concrete surface will have a broomed finish.

D. Fiberglass Structures

1. Installation of 50 foot fiberglass pole for the mounting of the existing security camera

2. Installation of in-ground pull boxes at the base of the dam face, the top of the dam face, and at the transition between the conduit bank and the surface mounted conduits on the upstream left retaining wall.

3. Installation of junction box on pull box at the top of the dam face.

E. Electrical

1. One 3-conductor 2/0 AWG Power Cable with 2/0 AWG ground conductor.

2. One 12-conductor #10 AWG Control Cable.

3. 25 pair CAT cable (telephone).

4. Two Siamese Type Coax Cables with Integrated Power.

5. Two 12-fiber multi-mode Fiber Optic Cable.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

B. Quality Assurance: Inspection and tests performed by Government to ensure compliance with the terms of the contract.

C. Quality Control: Activities performed by Contractor to ensure work conforms to contract requirements.

D. Contractor Quality Testing: Specified tests to be performed by the Contractor.

1. The Government may use the test results for Quality Assurance.

2. The Contractor may use the test results as part of Contractor quality control.

01 11 00 - 3

a. The Government anticipates that these tests will be part of the Contractor’s quality control program, however the tests do not relieve the Contractor of providing adequate quality control measures in accordance with the clause at FAR 52.246-12, “Inspection of Construction.”

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 COST

A. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. USBR Cleaning Manual Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2010 Edition - Available online at:

http://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals:

1. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

a. For each Contractor use site on Government land.

1) Show use location and extent of impact. Uses include but are not limited to the following:

a) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

b) Parking areas, temporary roads, and haul routes.

c) Utilities including air, power, and water lines; fire hydrants;

and compressor station.

d) First-aid and medical facilities.

e) Areas for processing, storing, and disposing of waste materials from construction operations.

f) Temporary fences.

2) Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this http://www.usbr.gov/mussels/prevention

01 14 10 - 2 contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

3) Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

4) Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

b. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

1.04 PROJECT CONDITIONS

A. Government land as shown on drawings may be used for required construction facilities.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by the COR.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment: Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

B. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in USBR Cleaning Manual.

C. The COR will inspect construction equipment following procedures described in USBR Cleaning Manual before allowing the equipment onsite.

01 14 10 - 3

3.02 RESTORATION

A. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.

B. After completion of work, scarify and regrade Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate natural revegetation, provide proper drainage, and prevent erosion.

Outages

01 14 30 - 1

SECTION 01 14 30

OUTAGES

PART 1 GENERAL

1.01 COST

A. Include cost in prices offered in the schedule for items of work for which outages are required.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals:

1. RSN 01 14 30-1, Outage Request:

a. Area where work will be done (by number or other description).

b. Outline procedures for accomplishing work including:

1) Specific safety precautions to be taken.

2) Type and location of barricades.

3) Warning signs.

4) Protective grounds and devices to be used.

c. Commencement time of work.

d. Duration of work.

e. Number of personnel and their classification.

f. Description of equipment to be used.

g. Information indicating that required materials are on site or data indicating shipping dates of materials not on site.

1.03 PROJECT CONDITIONS

A. Coordinate and schedule outages with COR.

1. Outage scheduling will depend upon power demand requirements and related operating conditions.

2. Outages may be scheduled during off-peak periods, nights, or weekends.

3. No specific outage request will be considered unless:

a. COR has reasonable assurances that materials and equipment required for work will be onsite.

Outages

01 14 30 - 2

b. Contractor will be prepared to perform work on date and during period of time requested for specific outage.

4. Allowable time and available outage periods will govern outage requests, work scheduling, onsite delivery of materials, and required drawings and data submittals.

B. Coordinate work with Government operations.

C. No specific request for an outage will be considered unless COR has reasonable assurances that materials and equipment required for work will be on site and Contractor will be prepared to perform work on date and during period of time requested for specific outage. When work can not be performed during an approved outage period, notify COR that outage is not required.

D. Outage scheduling will depend upon power demand requirements and related operating conditions. Outages may be scheduled during off-peak periods, nights, or weekends.

Government reserves right to schedule outages for any period during 24-hour day, any day of week. Contractor will be informed of type of outages available and restrictions prior to start of construction. Contractor’s request for outages, scheduling of work, delivery of materials on site, and submittal of drawings and data as required, will be governed by allowable time and outage periods available.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Payment Procedures

01 29 00 - 1

SECTION 01 29 00

PAYMENT PROCEDURES

PART 1 GENERAL

1.01 SUBMITTALS

A. Submit in accordance with Section 01 33 00 - Submittals:

1. RSN 01 29 00-1, Schedule of Values.

1.02 SCHEDULE OF VALUES

A. Prepare a separate Schedule of Values for the items of work under the Contract.

B. Upon request of COR, provide documentation to support the accuracy of the Schedule of values.

C. Lump Sum Work:

1. Reflect specified allowances and alternates, as applicable.

2. List bonds and insurance premiums, mobilization, demobilization, preliminary and detailed progress schedule preparation, equipment testing, facility startup, and contract closeout separately.

D. An unbalanced or front-end loaded schedule will not be acceptable.

E. Summation of the complete Schedule of Values representing all the Work shall equal the Contract Price.

1.03 PAYMENT

A. Payment for all Lump Sum Work shown or specified in Contract Documents is included in the Contract Price. Payment will be based on a percentage complete basis for each line item of the accepted Schedule of Values.

B. Payment for Lump Sum Work covers all Work specified or shown within the limits or Specification sections as follows: All Work shown on Drawings and in Specification sections.

1.04 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS

A. Payment will not be made for following:

1. Loading, hauling, and disposing of rejected material.

2. Quantities of material wasted or disposed of in manner not called for under

Contract Documents.

Payment Procedures

01 29 00 - 2

3. Rejected loads of material, including material rejected after it has been placed by reason of failure of Contractor to conform to provisions of Contract Documents.

4. Material not unloaded from transporting vehicle.

5. Defective Work not accepted by COR.

6. Material remaining on hand after completion of Work.

PART 1 PRODUCTS

Not Used

PART 2 EXECUTION

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 COST

A. Include in prices offered in the schedule for other items of work.

1.02 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be…