QUUG 10-1045 Schedule of Material Submittals.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Repair Bowling Center, Bldg B311 Federal contract opportunity
- Solicitation number
- FA557521R0006
About this file
This document contains a schedule of material submittals and description of a federal contract opportunity for repair of a bowling center at Moron Air Base in Spain. The schedule outlines 15 required submittals from contractors due between the contract notice to proceed and final inspection, including construction schedules, safety and environmental plans, as-built drawings, and key staff. The related solicitation is for a firm-fixed price contract valued between $250,000 and $500,000 with a 375-day period of performance to repair the bowling center. Local Spanish sources authorized for government works will be considered in accordance with defense agreements between Spain and the United States. The soliciting agency is the United States Air Force under United States Air Forces in Europe and Africa.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21R0006 Cost Estimate Form.xlsx | XLSX spreadsheet | |
| Set 3 of 3 Drawings 14-1015.pdf | ||
| Set 2 of 3 Architectural Record Drawings.pdf | ||
| Set 1 of 3 Concept Drawings.pdf | ||
| Solicitation - FA557521R0006.pdf | ||
| QUUG 10-1045 Attch C Architectural Compatibility Plan-Dec19.pdf | ||
| QUUG 10-1045 Statement of Work English.pdf | ||
| QUUG 10-1045 Attch E - List of Kitchen-Food Preparation Area Equipment.pdf | ||
| QUUG 10-1045 Attch D Roof Structural Analysis Building 311.pdf | ||
| QUUG 10-1045 Attch B - Final Governing Standards for Spain May 2014.pdf | ||
| QUUG 10-1045 Attch A Integrated Natural Resources Management Plan.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 10-1045 | PROJECT TITLE |
REPAIR BOWLING CENTER, B311
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| PART 11 -GENERAL CONDITIONS | |||
| 01 | Warranty letter | 4 | Acceptance+15 |
| 02 | Construction Schedule | CNTP+7 | |
| 03 | Progress Schedule | 4 | CNTP+10 |
| 04 | Work Plan | CNTP+7 | |
| 05 | Mobility Plan | 4 | CNTP+15 |
| 06 | Project Sign | CNTP+15 | |
| 07 | Quality Control Plan | 4 | CNTP+15 |
| 08 | Environmental Protection Plan | 4 | CNTP+15 |
| 09 | DD Form 1354 | 4 | FI+15 |
| 10 | Waste & construction debris management | 4 | Final Inspection |
| 11 | As-Built drawings | 4 | FI+15 |
| 12 | Key Staff | 4 | DNTP+15 |
| 13 | Health and safety Plan | 4 | CNTP +15 |
| PART 12 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES | |||
| 14 | Design-Build Schedule | 1 | DNTP+10 |
| 15 | Monthly Updates | 1 | Every 1st of month |
| DB Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW |