21R0006 Cost Estimate Form.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Repair Bowling Center, Bldg B311 Federal contract opportunity
- Solicitation number
- FA557521R0006
About this file
This document package contains a cost estimate form and related federal contract opportunity notice. The cost estimate form provides pricing details for the repair of a bowling center at Moron Air Base in Spain, including architectural, mechanical, electrical, and miscellaneous work items. The estimated total cost is between 250,000-500,000 USD. The form includes line items for materials, labor, overhead and profit.
The related federal contract opportunity is a solicitation from the U.S. Air Force to issue a firm-fixed-price contract for the bowling center repair project. The period of performance is estimated at 375 calendar days. Offerors must be authorized to conduct construction business in Spain per local laws. The solicitation is only open to local Spanish sources consistent with FAR 5.202(a)(12).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUUG 10-1045 Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| QUUG 10-1045 Attch C Architectural Compatibility Plan-Dec19.pdf | ||
| Set 3 of 3 Drawings 14-1015.pdf | ||
| Set 2 of 3 Architectural Record Drawings.pdf | ||
| Set 1 of 3 Concept Drawings.pdf | ||
| Solicitation - FA557521R0006.pdf | ||
| QUUG 10-1045 Statement of Work English.pdf | ||
| QUUG 10-1045 Attch E - List of Kitchen-Food Preparation Area Equipment.pdf | ||
| QUUG 10-1045 Attch D Roof Structural Analysis Building 311.pdf | ||
| QUUG 10-1045 Attch B - Final Governing Standards for Spain May 2014.pdf | ||
| QUUG 10-1045 Attch A Integrated Natural Resources Management Plan.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DSN (KTR)
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR BOWLING CENTER, B311 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1045 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| DESIGN SERVICES | ||||||||||
| SERVICIOS DE REDACCIÓN DE PROYECTO | ||||||||||
| 1 | 35% Design Submission | |||||||||
| Presentación del Diseño al 35% | Ea | |||||||||
| 2 | 65% Design Submission | |||||||||
| Presentación del Diseño al 65% | Ea | |||||||||
| 3 | 95% Design Submission | |||||||||
| Presentación del Diseño al 95% | Ea | |||||||||
| 4 | 100% Design Submission | |||||||||
| Presentación del Diseño al 100% | Ea | |||||||||
| DESIGN SERVICES TOTAL | ||||||||||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS (DESING SERVICES)
DATE: FIRM NAME:
| TITLE: |
| BY: |
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"Page &P of &N
BASIC PACKAGE (KTR)
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR BOWLING CENTER, B311 (BASIC PACKAGE) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1045 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BLDG #311 | ||||||||||
| EDIF #311 | ||||||||||
| ARCHITECTURAL REPAIR WORKS | ||||||||||
| TRABAJOS DE REPARACIÓN DE ARQUITECTURA | ||||||||||
| B10 SUPERSTRUCTURE | ||||||||||
| B10 SUPERESTRUCTURA | ||||||||||
| B1020 ROOF CONSTRUCTION | ||||||||||
| B1020 CONSTRUCCIÓN DE CUBIERTA | ||||||||||
| 1 | B102001 Repair roof concrete beams and eaves. | |||||||||
| B102001 Repara vigas de hormigón de cubierta y aleros | JOB | |||||||||
| TOTAL B1020 ROOF CONSTRUCTION | ||||||||||
| TOTAL B1020 CONSTRUCCIÓN DE CUBIERTA | ||||||||||
| B10 SUPERSTRUCTURE | ||||||||||
| B10 SUPERESTRUCTURA |
| TOTAL B20 EXTERIOR CLOSURE | ||
| TOTAL B20 ENVOLVENTE EXTERIOR | ||
| 2 | B201001 Exterior Skin. Areas afected by roof repair/replacement | |
| B201001 Revestimientos exteriores. Afectados por reparaciones | JOB | |
| 3 | B201002 Exterior Louvers and Screens | |
| B201002 Rejillas y pantallas exteriores | Ea | |
| 4 | B201099 Exterior wall surface paint | |
| B201099 Pintura de paramentos exteriores | sm | |
| TOTAL B20 EXTERIOR CLOSURE | ||
| TOTAL B20 ENVOLVENTE EXTERIOR |
| B30 ROOFING | ||
| B30 CUBIERTAS | ||
| 5 | B3010001 Roof Covering Self protected membrane | |
| B301001 Sistema de Cubrición de membrana autoprotegida | sm | |
| 6 | B3010021 Roof Covering walkable Low Slope Roof | |
| B301021 Sistema de Cubrición transitable de baja pendiente | sm | |
| 7 | B301002 Roof Insulation and Fill | |
| B301002 Aislamiento y formación de pendiente | sm | |
| 8 | B301004 Flashing and Trim | |
| B301004 Rematería | lm | |
| 9 | B301005 Roof Opening and Supports | |
| B301005 Huecos en cubierta | JOB | |
| 10 | B301006 Gutters and Downspouts | |
| B301006 Canalones y bajantes | lm | |
| 11 | B301099 Other Roofing (Fall Arresting System) | |
| B301099 Otros elementos Cubierta (Sistema anticaidas) | ea | |
| TOTAL B30 ROOFING | ||
| TOTAL B30 CUBIERTAS |
| C30 INTERIOR FINISHES | ||
| C30 ACABADOS INTERIORES | ||
| C3010 WALL FINISHES | ||
| C3010 ACABADOS EN PARAMENTOS | ||
| 12 | C301002 Plaster Wall Finishes | |
| C301002 Enlucidos en paredes | sm | |
| 13 | C301004 Tile & Terrazzo Wall Finishes | |
| C301004 Alicatados y aplacados en paramentos | sm | |
| 14 | C301005 Painting to Wall | |
| C301005 Pintura en paramentos | sm | |
| 15 | C3020 FLOORING AND FLOOR FINISHES | |
| C3020 SOLADOS Y ACABADOS DE SUELOS | ||
| 16 | C302001 Tile Floor Finishes | |
| C302001 Acabado enlosado en suelos | sm | |
| 17 | C303006 Painted & Stained Ceiling | |
| C303006 Techos pintados y teñidos | sm | |
| TOTAL C30 INTERIOR FINISHES | ||
| TOTAL C30 ACABADOS INTERIORES |
| F20 SELECTIVE BUILDING DEMOLITION | ||
| F20 DEMOLICION SELECTIVA DE EDIFICIO | ||
| F2010 NON-HAZARDOUS SELECTIVE BULIDING DEMOLITION | ||
| F2010 DEMOLICION SELECTIVA EDIF NO PELIGROSA | ||
| 18 | F2021003 Roofing, Built-up and selfprotected system. | |
| F2021003 Cubiertas. Cubierta plana y autoprotegida | JOB | |
| 19 | F201004 Interior Construction & Finishes (flooring and tiles) | |
| F201004 Construcciones interiores y Acabados (suelos y reves) | JOB | |
| 20 | F201006 Mechanical System | |
| F201006 Sistemas Mecánicos | JOB | |
| 21 | F201007 Electrical System | |
| F201007 Sistemas eléctricos | JOB | |
| TOTAL F20 SELECTIVE BUILDING DEMOLITION | ||
| TOTAL F20 DEMOLICION SELECTIVA DE EDIFICIO |
| SUMMARY ARCHITECTURAL REPAIR WORKS |
| RESUMEN TRABAJOS DE REPARACIÓN DE ARQUITECTURA |
| B10 SUPERSTRUCTURE |
| B10 SUPERESTRUCTURA |
| TOTAL B20 EXTERIOR CLOSURE |
| TOTAL B20 ENVOLVENTE EXTERIOR |
| TOTAL B30 ROOFING |
| TOTAL B30 CUBIERTAS |
| TOTAL C30 INTERIOR FINISHES |
| TOTAL C30 ACABADOS INTERIORES |
| TOTAL F20 SELECTIVE BUILDING DEMOLITION |
| TOTAL F20 DEMOLICION SELECTIVA DE EDIFICIO |
| TOTAL ARCHITECTURAL REPAIR WORKS |
| TOTAL TRABAJOS DE REPARACIÓN DE ARQUITECTURA |
| MECHANICAL REPAIR WORKS | ||
| TRABAJOS DE REPARACIÓN MECÁNICOS | ||
| 22 | D30 Replace wall exhaust fan in food preparation area | |
| D30 Reemplazar extractor de pared en area preparación comida | JOB | |
| 23 | D2010 Replace kitchen sink, faucet, drain and accessories | |
| D2010 Reemplazar fregadero, grifo, drenaje y accesorios | JOB | |
| TOTAL MECHANICAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN MECÁNICOS |
| ELECTRICAL REPAIR WORKS | ||
| TRABAJOS DE REPARACIÓN ELECTRICOS | ||
| 24 | D5010 Electrical Service & Distribution | |
| D5010 Acometida y Distribución Eléctricas | JOB | |
| 25 | D5020 Lighting & Branch Wiring | |
| D5020 Cableado de Derivación e Iluminación | JOB | |
| 26 | D5030 Communication, Security & Alarm Systems | |
| D5030 Sistemas de Comunicaciiones, Seguridad y Alarma | JOB | |
| 27 | D5090 Special Electrical Systems | |
| D5090 Sistemas Eléctrcicos Especiales | JOB | |
| TOTAL ELECTRICAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN ELÉCTRICOS |
| MISCELLANEOUS | ||
| VARIOS | ||
| 28 | Repair Elements Affected by the Project Execution | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| TOTAL MISCELLANEOUS | ||
| TOTAL VARIOS |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| TOTAL ARCHITECTURAL REPAIR WORKS |
| TOTAL TRABAJOS DE REPARACIÓN DE ARQUITECTURA |
| TOTAL MECHANICAL REPAIR WORKS |
| TOTAL TRABAJOS DE REPARACIÓN MECÁNICOS |
| TOTAL ELECTRICAL REPAIR WORKS |
| TOTAL TRABAJOS DE REPARACIÓN ELÉCTRICOS |
| Miscellaneous |
| Varios |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS (BASIC PACKAGE)
DATE: FIRM NAME:
| TITLE: |
| BY: |
These costs and overhead and profit percentages will be applied in any possible future modifications
ADD ITEM#01 (KTR)
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR BOWLING CENTER, B311 (ADDITIVE ITEM #1) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1045 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BLDG #311 | ||||||||||
| EDIF #311 | ||||||||||
| ARCHITECTURAL REPAIR WORKS | ||||||||||
| TRABAJOS DE REPARACIÓN DE ARQUITECTURA |
| C30 INTERIOR FINISHES | ||
| C30 ACABADOS INTERIORES | ||
| C3010 WALL FINISHES | ||
| C3010 ACABADOS EN PARAMENTOS | ||
| 1 | C301005 Painting to Wall | |
| C301005 Pintura en paramentos | sm | |
| 2 | C301099 Provide and Install vynil graphic desing on walls | |
| C301099 Proveer e instalar gráficos de vinilo en paredes | JOB | |
| 3 | C3020 FLOORING AND FLOOR FINISHES | |
| C3020 SOLADOS Y ACABADOS DE SUELOS | ||
| 4 | C302001 Vynil Floor Finishes | |
| C302001 Acabado vinílico en suelos | sm | |
| 5 | C303099 Install venetian-louver blinds in north window | |
| C303099 Instalar veneciana de lamas verticales ventana norte | Ea | |
| 6 | C303006 Painted & Stained Ceiling | |
| C303006 Techos pintados y teñidos | sm | |
| TOTAL C30 INTERIOR FINISHES | ||
| TOTAL C30 ACABADOS INTERIORES |
| F20 SELECTIVE BUILDING DEMOLITION | ||
| F20 DEMOLICION SELECTIVA DE EDIFICIO | ||
| F2010 NON-HAZARDOUS SELECTIVE BULIDING DEMOLITION | ||
| F2010 DEMOLICION SELECTIVA EDIF NO PELIGROSA | ||
| 7 | F201004 Interior Construction & Finishes (carpets) | |
| F201004 Construcciones interiores y Acabados (smoquetas) | JOB | |
| 8 | F201006 Mechanical System | |
| F201006 Sistemas Mecánicos | JOB | |
| TOTAL F20 SELECTIVE BUILDING DEMOLITION | ||
| TOTAL F20 DEMOLICION SELECTIVA DE EDIFICIO |
| SUMMARY ARCHITECTURAL REPAIR WORKS |
| RESUMEN TRABAJOS DE REPARACIÓN DE ARQUITECTURA |
| TOTAL C30 INTERIOR FINISHES |
| TOTAL C30 ACABADOS INTERIORES |
| TOTAL F20 SELECTIVE BUILDING DEMOLITION |
| TOTAL F20 DEMOLICION SELECTIVA DE EDIFICIO |
| TOTAL ARCHITECTURAL REPAIR WORKS |
| TOTAL TRABAJOS DE REPARACIÓN DE ARQUITECTURA |
| MECHANICAL REPAIR WORKS | ||
| TRABAJOS DE REPARACIÓN MECÁNICOS | ||
| 9 | D30 Install heat pump system | |
| D30 Instalar sistema bomba de calor | JOB | |
| 10 | D30 Replace air curtain | |
| D30 Reemplazar cortina de aire | JOB | |
| 11 | D30 Install exhaust fan and air intake in machinery room | |
| D30 Instalar extractor y toma de aire en cuarto de maquinaria | JOB | |
| TOTAL MECHANICAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN MECÁNICOS |
| ELECTRICAL REPAIR WORKS | ||
| TRABAJOS DE REPARACIÓN ELECTRICOS | ||
| 12 | D5020 Lighting & Branch Wiring | |
| D5020 Cableado de Derivación e Iluminación | JOB | |
| 13 | D5090 Special Electrical Systems | |
| D5090 Sistemas Eléctrcicos Especiales | JOB | |
| TOTAL ELECTRICAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN ELÉCTRICOS |
| MISCELLANEOUS | ||
| VARIOS | ||
| 14 | Repair Elements Affected by the Project Execution | |
| Reparar elementos afectados por la ejecución del proyecto | JOB | |
| TOTAL MISCELLANEOUS | ||
| TOTAL VARIOS |
| WORK SUMMARY | ||
| RESUMEN TRABAJOS | ||
| TOTAL ARCHITECTURAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN DE ARQUITECTURA | 0 | 0 |
| TOTAL MECHANICAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN MECÁNICOS | ||
| TOTAL ELECTRICAL REPAIR WORKS | ||
| TOTAL TRABAJOS DE REPARACIÓN ELÉCTRICOS | ||
| Miscellaneous | ||
| Varios | ||
| GRAND TOTAL | ||
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS (ADDITIVE ITEM #1)
DATE: FIRM NAME:
| TITLE: |
| BY: |
These costs and overhead and profit percentages will be applied in any possible future modifications
SUMMARY (KTR)
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR BOWLING CENTER, B311 (SUMMARY) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1045 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SUMMARY | ||||||||||
| RESUMEN | ||||||||||
| 1 | DESIGN SERVICES TOTAL | |||||||||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO | ||||||||||
| 2 | BASIC PACKAGE TOTAL | |||||||||
| TOTAL PAQUETE BASICO | ||||||||||
| 3 | ADDITIVE ITEM #1 | |||||||||
| PARTIDA ADICIONAL #1 | ||||||||||
| SUMMARY TOTAL | ||||||||||
| TOTAL RESUMEN |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS (SUMMARY))
DATE: FIRM NAME:
| TITLE: |
| BY: |
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Bold"FOR OFFICIAL USE ONLY &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .