Quote_Price_Schedule.docx

DOCX document 17 KB Posted

Attached to
Theodore Roosevelt National Park Mobile Trailer
Solicitation number
140P6322Q0029
Issued by

View the file

Other files

File Type Posted
SOW_Trailer.docx DOCX document
Sol_140P6322Q0029.pdf PDF
SOW_Trailer_1.docx DOCX document
Experience_Questionnaire.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quote Price Schedule for: Theodore Roosevelt National Park Office Trailer.

Trailer/Office Details: (Provide Specification)

Setup time/ Trailer Preparation on site: (Provide time and procedure requirements)

Transportation both to and from site: (Provide description and procedure requirements)

Teardown/ Removal: (Provide description and procedure requirements)

Line ITEM 01:

1) Cost:

A. TransportationTotal : $ _______
B. Trailer preparation on siteTotal : $ _______
C. TeardownTotal : $ _______
D. RemovalTotal : $ _______
E. Removal transportationTotal : $ _______
F. Other:Total : $ _______

2) Rental price Monthly: $ ______ Total : $ _______

3) Total All items above: Grand Total : $ _______

Option year ITEM 02:

1) Rental price Monthly: $ ______ Total : $ _______

ITEM 03 Option Period if FAR 52.217-8 to extend is exercised

1) Monthly rental price (verify monthly rate) Monthly: $ ______

Required Attachments:

· Drawing of the Office Trailer

Contractor Name

Date

Signature

File details come from the government source that posted it. Updated .