Question 47 - Reflected Ceiling Plans.pdf
PDF 279 KB Posted
- Attached to
- Expand and Upgrade Building 42 for Laboratory
- Solicitation number
- 36C25520R0073-0006
About this file
This document contains five reflected ceiling plans and details for a project to expand and upgrade Building 42 for laboratory use. The plans show lighting fixtures, speakers, smoke detectors, access panels, and other features for various rooms in the building. Occupancy sensors are noted throughout. Room names, dimensions and other technical details are provided on the plans. The solicitation seeks to expand and upgrade Building 42 at a Veterans Affairs medical center for laboratory use. The solicitation was issued by the Veterans Health Administration VISN 15 and is identified as number 36C25520R0073-0006, an amendment to the original solicitation. The agency involved is the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS AND ANSWERS 657-502.docx | DOCX document | |
| Design-Aire VA Medical Laboratory-Geotech Report.pdf | ||
| 36C25520R0073 0006.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
E
F
G
H
I
J
K
LIGHTING FIXTURE
SMOKE/HEAT DETECTOR
LEGEND: REFLECTED CEILING PLAN
SP SPEAKER
OS OCCUPANCY SENSOR
FA FIRE ALARM
A ACCESS PANEL
MECHANICAL - SUPPLY
MECHANICAL - RETURN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VAPAHCS PLANNING AND ENGINEERING
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
A-2.01 AuthorChecker6/6/14
MARION, IL
657A5-13-111REAL TIME LOCATOR SERVICE (RTLS) DRAWINGS0L-B CEILING PLAN
1/8" = 1'-0"1 0L-B CEILING PLAN
LIGHTING FIXTURE
SMOKE/HEAT DETECTOR
LEGEND: REFLECTED CEILING PLAN
SP SPEAKER
OS OCCUPANCY SENSOR
FA FIRE ALARM
A ACCESS PANEL
MECHANICAL - SUPPLY
MECHANICAL - RETURN
CHEMOTHERAPY
STORAGE
038A
BDG EXAM
STAIRS
SB5-01
EXAM
RESTROOM
038B
DR OFFICE
036A
RESTROOM
EXAM
EXAM
042WORK ROOM
EXAM
035F
EXAM
043A
RECEPTION
035E
WAITING
HEMATOLOGY/ONCOLOGY
035D
H.A.C.
ELECTRICAL
CLOSET
RESP. PFT.
RESP. OFFICE
046A
PATIENT
EDUCATION
046B
RESP. STORAGE
046C
EMS
RESTROOM
STAIRS
SB4-01
EXAM
RESTROOM
EXAM
DOCTOR OFFICE
MECH ELEV
CORRIDOR
CB9-01
ELEVATOR
P-7
EMS STORAGE
MECHANICAL
030STAIRS
SB1-01
CORRIDOR
CB1-01
ELEV 1
P-2
ELEV 2
P-1
R.R. WOMEN
AUTOPSY
033A
MORGUE
TOILET
033C
MORGUE
STORAGE
033BSTAIRS
SB6?-01?
ORTHO CLINIC
CORRIDOR
CB6-01
EXAM
035A
ORTHO CLINIC
EXAM
035B
EXAM
035C
CORRIDOR
CB5-01
8' - 10 1/4"
8' - 10 1/4"
8' - 6 1/4"
8' - 8 1/4"
8' - 0"
8' - 7 3/4"
8' - 8 1/4"
7' - 11 1/2"
7' - 11 1/2"
8' - 7 3/4"
8' - 7 1/2"
8' - 7 1/4"
7' - 7 3/4"
8' - 9"
8' - 8 3/4"
8' - 8 3/4"
7' - 8 3/4"
8' - 8"
8' - 8 3/4"
8' - 8 1/4"
8' - 8 1/2"
8' - 8 1/2" 8' - 9 3/4"
11' - 6"
11' - 6"
7' - 8 3/4"
9' - 8" 9' - 8 1/2"
8' - 10"
8' - 6"
7' - 8 3/4"
7' - 11 1/4"8' - 5"8' - 1 3/4" 8' - 0" 8' - 0 1/4"
8' - 0"
7' - 11 1/2"
7' - 7 1/2" 8' - 10 1/2"
9' - 10 1/4"
9' - 3 3/4"
8' - 2"
7' - 9 3/4"
10' - 6 1/2" 8' - 10 1/2"
9' - 9 3/4"
8' - 0"
8' - 7 1/4" 8' - 0 1/2"
9' - 0"9' - 7 27/32"
8' - 3 3/4"
8' - 3 3/4"
8' - 3"
8' - 0"
7' - 11 1/4"
8' - 2 1/2"
8' - 2 1/2"
8' - 0"
7' - 11 1/2"
7' - 11 3/4"
8' - 0 1/2"
8' - 5 1/2"
8' - 6"
8' - 2 1/2"
7' - 11 1/2"
RESTROOM
7' - 8 3/4"
8' - 2"
SP
SP
SP
SP
SP
OS
SP
OS OS
OS
OS
OS
OS SP SP OS SP OS
OS OS
SP SP
SP SP
SP
SP
OS
SP
OS
SP
OS
SP
SP
OS
SP
OS
SP
PULMONARY/
RESPIRATORY
AUDIOLOGY
REGISTRATION
001A
REGISTRATION
FILE
002 FILE
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VAPAHCS PLANNING AND ENGINEERING
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
A-2.02
SHHKG6/6/14
MARION, IL
657A5-13-111REAL TIME LOCATOR SERVICE (RTLS) DRAWINGS1L-G CEILING PLAN
9 20
NORTH
1/8" = 1'-0"1 1L-G CEILING PLAN
LIGHTING FIXTURE
SMOKE/HEAT DETECTOR
LEGEND: REFLECTED CEILING PLAN
SP SPEAKER
OS OCCUPANCY SENSOR
FA FIRE ALARM
A ACCESS PANEL
MECHANICAL - SUPPLY
MECHANICAL - RETURN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VAPAHCS PLANNING AND ENGINEERING
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
A2.01 AuthorChecker6/6/14
MARION
657A5-13-111REAL TIME LOCATOR SERVICE (RTLS) DRAWINGS0L-B CEILING PLAN
1/8" = 1'-0"1 0L-B CEILING PLAN
CLERK OFFICE
10B
WAITING ROOM
10A
EXTENDED
WAITING ROOM
ELECTRICAL
CLOSET
RETAIL STORE
RETAIL STORE
3A
STAIR
SB1-02
DINING
3E
OFFICE
3B
OFFICE
3D
WORK ROOM
3C
SERVING
3G
DINING
3FFOOD STORE
4A
KITCHEN
EYE GLASSES
CORRIDOR
CB2-02
VESTIBULE
SOILED LINEN
BIO-MED
SUPERVISOR
9D
DIET EQUIPMENT
ROOM
BIO-MED
REPAIR/TECH
OFFICES
9C
BIO-MED STAGING
9F
BIO-MED
REPAIR/TECH
OFFICES
9A
CLEAN LINEN
6A
MEN
WOMEN
CORRIDOR
CB1-02
ELEVATOR6
P4
ELEVATOR 5
P3
REAL EAR
EQUIPMENT
10C
STAYS AS IT IS
NOW
10D
REPAIR/TECH
OFFICES
10G
OFFICE
10E
HEARING AID
ISSUES
10F
BIO-MED
STORAGE
9E
BIO-MED
REPAIR/TECH
OFFICES
9B
8' - 9 1/2" 8' - 9 3/4" 9' - 3 1/2"
8' - 3"
8' - 3 1/2"
7' - 7 1/2"
8' - 3 1/2"
8' - 3 1/4" 8' - 0"
8' - 1 1/4"
7' - 6 1/2"7' - 6"
7' - 9 3/4"
7' - 10 1/2"
7' - 9 3/4"
7' - 10 3/4"
7' - 10 1/2" 7' - 10 1/2"
8' - 0 1/4" 7' - 11 1/4"
9' - 4 1/4"
11' - 6"
7' - 11 3/4"
8' - 0"
10' - 9 3/4"
7' - 10 3/4" 8' - 0 1/4"
7' - 11"
OS
OS
SP
SP
SP
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
SP
SP
SP
SP SP
SP
SP
SP
SPSP
SP
SP
OS
SP
SP
SP
LIGHTING FIXTURE
SMOKE/HEAT DETECTOR
LEGEND: REFLECTED CEILING PLAN
SP SPEAKER
OS OCCUPANCY SENSOR
FA FIRE ALARM
A ACCESS PANEL
MECHANICAL - SUPPLY
MECHANICAL - RETURN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VAPAHCS PLANNING AND ENGINEERING
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
A2.02
SHHKG6/6/14
MARION
657A5-13-111REAL TIME LOCATOR SERVICE (RTLS) DRAWINGS1L-G CEILING PLAN
1/8" = 1'-0"1 1L-G CEILING PLAN
6 11
IRM
BIOMED
VFW
AMER. LEGION
IRM OFFICE
IRM STORAGE
105A
IRM STORAGE
BIOMED OFF
BIOMED OFF
BIOMED OFF
BEHAVIOR
MEDICINE
111 T/C ELEC.
BEHAVIOR
MEDICINE
BEHAVIOR
MEDICINE
BEHAVIOR
MEDICINE
BEHAVIOR
MEDICINE
GYM
118B
VESTIBULE
H.A.C.
VESTIBULE
WOMENS TOILET
IRM OFFICE
COMPUTER ROOM
CHIEF ADP IRM
IRM TECHNICAL
STAFF
IRM OFFICE
IRM OFFICE
IRM OFFICE
129VAV
TELEPHONE
IRM
123A
CORRIDOR
C100
CORRIDOR
C101
CORRIDOR
C102
CORRIDOR
C103
MENS TOILET
CORRIDOR
C104
8' - 0" 8' - 0" 8' - 0" 7' - 10 3/4" 8' - 0" 8' - 0" 8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 0 1/4"
8' - 0 1/4"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
9' - 11 3/4"
9' - 11 3/4"
8' - 0" 8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0" 8' - 0"
8' - 0"8' - 0"
8' - 0"
8' - 0"
8' - 0"
SP OS
SP SPOS
SPSPOS
OS
SP
8' - 0"
8' - 0"SP
OS
SP
8' - 0"
SPOS
OS
SP
LIGHTING FIXTURE
SMOKE/HEAT DETECTOR
LEGEND: REFLECTED CEILING PLAN
SP SPEAKER
OS OCCUPANCY SENSOR
FA FIRE ALARM
A ACCESS PANEL
MECHANICAL - SUPPLY
MECHANICAL - RETURN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VAPAHCS PLANNING AND ENGINEERING
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
A2.01
SHHKG6/6/14
MARION, IL
657A5-13-111REAL TIME LOCATOR SERVICE (RTLS) DRAWINGSL-1 CEILING PLAN
1/8" = 1'-0"1 L-1 CEILING PLAN
3 4
| B1rvt - Sheet - A-2-01 - 0L-B CEILING PLAN.pdf |
| B1rvt - Sheet - A-2-02 - 1L-G CEILING PLAN.pdf |
| B2rvt - Sheet - A2-01 - 0L-B CEILING PLAN.pdf |
| B2rvt - Sheet - A2-02 - 1L-G CEILING PLAN.pdf |
| B37rvt - Sheet - A2-01 - L-1 CEILING PLAN.pdf |
File details come from the government source that posted it. Updated .