QOO ATCBI Specifications.pdf
PDF 7 MB Posted
- Attached to
- Anson TX ARSR Building Refurbishment Federal contract opportunity
- Solicitation number
- 6973GH-23-Q-00195
About this file
This solicitation is for building refurbishment services at the Anson TX ARSR facility. Key requirements include lead abatement and removal work, building renovations, roof replacements, HVAC and electrical upgrades, and site improvements. The work will involve multiple trades and is governed by EPA, OSHA and FAA regulations regarding lead and hazardous materials. The response due date is May 23, 2023. The selected contractor must be licensed for lead abatement in Texas and will be responsible for all lead notifications, permitting and disposal requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FAA-QOO HAZMAT Report 01172023.2.pdf | ||
| Payment Bond.pdf | ||
| Wage Determination.pdf | ||
| QOO ATCBI Division 1 General Requirements Specification.pdf | ||
| Experience Information Form.pdf | ||
| 6973GH-23-Q-00195.pdf | ||
| Contractor Release Form.pdf | ||
| QOO ATCBI 100P_Drawings.pdf | ||
| Performance Bond.pdf | ||
| QOO Anson_TX Summary Scope 02252023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK RELEASE: AWP-3866 JCN: 1603186
Long Range Radar Sustainment Project QOO ATCBI Building and Radome Tower
Anson, Texas
FINAL SUBMITTAL
MAY 23, 2023
U.S. Department of Transportation
Federal Aviation Administration
Western Pacific Regional Office
777 South Aviation Boulevard, Suite 150
El Segundo, CA 90245
Prepared by:
PTSI Managed Services, Inc.
100 W. Walnut Street
Pasadena, CA 91124
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 553
AWP 3866 FOR OFFICIAL USE ONLY
Federal Aviation Administration SEALS PAGE
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 07 - 1
DOCUMENT 00 01 07
SEALS PAGES
1.01 DESIGN PROFESSIONALS OF RECORD
A. Architect:
1. Rolando de la Rosa.
2. License No.15131.
3. Responsible for the following Sections.
05 50 00 - METAL FABRICATIONS
06 10 53 - MISCELLANEOUS ROUGH CARPENTRY
07 55 56 - FLUID-APPLIED PROTECTED MEMBRANE ROOFING
07 62 00 - SHEET METAL FLASHING AND TRIM
07 92 00 - JOINT SEALANTS
08 11 13 - HOLLOW METAL DOORS AND FRAMES
08 14 16 - FLUSH WOOD DOORS
08 71 00 - DOOR HARDWARE
09 65 13 - RESILIENT BASE AND ACCESSORIES
09 65 36 - STATIC-CONTROL RESILIENT FLOORING
09 91 13 - EXTERIOR PAINTING
09 91 23 - INTERIOR PAINTING
09 96 00 - HIGH-PERFORMANCE COATINGS
10 28 00 - TOILET, BATH, AND LAUNDRY ACESSORIES
13 34 23 - FABRICATED METAL BUILDINGS
B. Civil Engineer:
1. Kevin Needham.
2. License No..
3. Responsible for the following Sections.
02 41 19 - SELECTIVE DEMOLITION
131 10 00 - SITE CLEARING
31 20 00 - EARTH MOVING
31 37 16.13 - RUBBLE-STONE RIPRAP
32 05 16 - AGGREGATES FOR EXTERIOR IMPROVEMENTS
32 11 23 - AGGREGATE BASE COURSES
32 13 13 - CONCRETE PAVING
32 31 13.53 - HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 - SEEDING
James Esquivel Untitled-2
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 07 - 2
33 14 15 - SITE WATER DISTRIBUTION PIPING
33 31 00 - SANITARY SEWERAGE PIPING
C. Structural Engineer:
1. Richard A. Jones.
2. License No.134686.
3. Responsible for the following Sections.
03 10 00 - CONCRETE FORMING AND ACCESSORIES
03 20 00 - CONCRETE REINFORCING
03 30 00 - CAST-IN-PLACE CONCRETE
05 50 00 - METAL FABRICATIONS
05 51 19 - METAL GRATING STAIRS
05 53 13 - BAR GRATINGS
D. Fire-Protection Engineer:
1. Frank Ataiyan.
2. License No.127216.
3. Responsible for the following Sections.
10 44 16 - FIRE EXTINGUISHERS
28 46 21.11 - ADDRESSABLE FIRE-ALARM SYSTEMS
E. Mechanical Engineer:
1. Michael McDonald.
2. License No.142496.
3. Responsible for the following Sections.
22 05 17 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22 05 23.12 - BALL VALVES FOR PLUMBING PIPING
22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 - PLUMBING PIPING INSULATION
22 08 00 - COMMISSIONING OF PLUMBING
22 11 16 - DOMESTIC WATER PIPING
22 13 16 - SANITARY WASTE AND VENT PIPING
22 13 19 - SANITARY WASTE PIPING SPECIALTIES
22 33 00 - ELECTRIC DOMESTIC-WATER HEATERS
22 42 16.13 - COMMERCIAL LAVATORIES
23 05 17 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
James Esquivel Untitled-2
James Esquivel Untitled-2
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 07 - 3
23 05 18 - ESCUTCHEONS FOR HVAC PIPING
23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 46 - COATINGS FOR HVAC
23 05 48 - VIBRATION AND SEISMIC CONTROLS FOR HVAC
23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 08 00 - COMMISSIONING OF HVAC
23 09 23.27 - TEMPERATURE INSTRUMENTS
23 23 00 - REFRIGERANT PIPING
23 34 16 - CENTRIFUGAL HVAC FANS
23 37 13.23 - REGISTERS AND GRILLES
23 74 16.13 - PACKAGED, WALL MOUNT HEAT PUMP AIR-CONDITIONING UNITS
23 82 39.19 - WALL AND CEILING UNIT HEATERS
F. Electrical Engineer:
1. Enrique Chahin.
2. License No.133924.
3. Responsible for the following Sections.
26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
26 05 00.10 - BASIC ELECTRICAL MATERIALS AND METHODS
26 05 05 - SELECTIVE DEMOLITION FOR ELECTRICAL
26 05 19 - LOW VOLTAGE CABLES
26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 33.10 - UNDERGROUND CONDUITS FOR ELECTRICAL SYSTEMS
26 05 53 - IDENTIFICATION OF ELECTRICAL SYSTEMS
26 08 00.13 - TESTING AND INSPECTING ELECTRICAL EQUIPMENT
26 22 13 - LOW VOLTAGE DISTRIBUTION TRANSFORMERS
26 24 16 - PANELBOARDS
26 27 26 - LOW VOLTAGE WIRING DEVICES
26 28 13 - FUSES
26 41 00 - FACILITY LIGHTNING PROTECTION
26 51 00 - INTERIOR LIGHTING
END OF DOCUMENT 00 01 07
Federal Aviation Administration 00 01 10 - TABLE OF CONTENTS
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
PROJECT FILES
NOT USED
COVER & TABLE OF CONTENTS
PROJECT MANUAL COVER
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 - SEALS PAGE
00 01 10 - TABLE OF CONTENTS
00 01 15 - LIST OF DRAWINGS
00 01 20 - WORK COVERED BY CONTRACT DOCUMENTS
DIVISION 01 — GENERAL REQUIREMENTS
GENERAL REQUIREMENTS BY FAA UNDER SEPARATE COVER
DIVISION 02 — EXISTING CONDITIONS
02 41 19 - SELECTIVE DEMOLITION
02 83 19.13 - LEAD-BASED PAINT ABATEMENT
DIVISION 03 — CONCRETE
03 10 00 - CONCRETE FORMING AND ACCESSORIES
03 20 00 - CONCRETE REINFORCING
03 30 00 - CAST-IN-PLACE CONCRETE
DIVISION 04 — MASONRY
NOT USED
DIVISION 05 — METALS
05 12 00 - STRUCTURAL STEEL FRAMING
05 50 00 - METAL FABRICATIONS
05 51 19 - METAL GRATING STAIRS
05 52 13 - PIPE AND TUBE RAILINGS
05 53 13 - BAR GRATINGS
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 10 53 - MISCELLANEOUS ROUGH CARPENTRY
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 55 56 - FLUID-APPLIED PROTECTED MEMBRANE ROOFING
07 62 00 - SHEET METAL FLASHING AND TRIM
07 92 00 - JOINT SEALANTS
DIVISION 08 — OPENINGS
08 11 13 - HOLLOW METAL DOORS AND FRAMES
08 14 16 - FLUSH WOOD DOORS
08 71 00 - DOOR HARDWARE
DIVISION 09 — FINISHES
09 65 13 - RESILIENT BASE AND ACCESSORIES
09 65 36 - STATIC-CONTROL RESILIENT FLOORING
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 2
09 67 23 - RESINOUS FLOORING
09 91 13 - EXTERIOR PAINTING
09 91 23 - INTERIOR PAINTING
09 96 00 - HIGH-PERFORMANCE COATINGS
DIVISION 10 — SPECIALTIES
10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 16 - FIRE EXTINGUISHERS
DIVISION 11 — EQUIPMENT
NOT USED
DIVISION 12 — FURNISHINGS
NOT USED
DIVISION 13 — SPECIAL CONSTRUCTION
13 34 23 - FABRICATED METAL BUILDINGS
DIVISION 14 — CONVEYING EQUIPMENT
NOT USED
DIVISION 21 — FIRE SUPPRESSION
NOT USED
DIVISION 22 — PLUMBING
22 05 17 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22 05 23.12 - BALL VALVES FOR PLUMBING PIPING
22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 - PLUMBING PIPING INSULATION
22 08 00 - COMMISSIONING OF PLUMBING
22 11 16 - DOMESTIC WATER PIPING
22 13 16 - SANITARY WASTE AND VENT PIPING
22 13 19 - SANITARY WASTE PIPING SPECIALTIES
22 33 00 - ELECTRIC DOMESTIC-WATER HEATERS
22 42 16.13 - COMMERCIAL LAVATORIES
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 05 17 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
23 05 18 - ESCUTCHEONS FOR HVAC PIPING
23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 46 - COATINGS FOR HVAC
23 05 48 - VIBRATION AND SEISMIC CONTROLS FOR HVAC
23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 08 00 - COMMISSIONING OF HVAC
23 09 23.27 - TEMPERATURE INSTRUMENTS
23 23 00 - REFRIGERANT PIPING
23 34 16 - CENTRIFUGAL HVAC FANS
23 37 13.23 - REGISTERS AND GRILLES
23 74 16.13 - PACKAGED,WALL MOUNT HEAT PUMP AIR-CONDITIONING UNITS
23 82 39.19 - WALL AND CEILING UNIT HEATERS
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 3
DIVISION 25 — INTEGRATED AUTOMATION
NOT USED
DIVISION 26 — ELECTRICAL
26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
26 05 00.10 - BASIC ELECTRICAL MATERIALS AND METHODS
26 05 05 - SELECTIVE DEMOLITION FOR ELECTRICAL
26 05 19 - LOW VOLTAGE CABLES
26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 33.10 - UNDERGROUND CONDUITS FOR ELECTRICAL SYSTEMS
26 05 53 - IDENTIFICATION OF ELECTRICAL SYSTEMS
26 08 00.13 - TESTING AND INSPECTING ELECTRICAL EQUIPMENT
26 22 13 - LOW VOLTAGE DISTRIBUTION TRANSFORMERS
26 24 16 - PANELBOARDS
26 27 26 - LOW VOLTAGE WIRING DEVICES
26 28 13 - FUSES
26 28 16 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 41 00 - FACILITY LIGHTNING PROTECTION
26 51 00 - INTERIOR LIGHTING
DIVISION 27 — COMMUNICATIONS
NOT USED
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 46 21.11 - ADDRESSABLE FIRE-ALARM SYSTEMS
DIVISION 31 — EARTHWORK
31 05 19.13 - GEOTEXTILES FOR EARTHWORK
31 10 00 - SITE CLEARING
31 20 00 - EARTH MOVING
31 37 16.13 - RUBBLE-STONE RIPRAP
DIVISION 32 — EXTERIOR IMPROVEMENTS
32 05 16 - AGGREGATES FOR EXTERIOR IMPROVEMENTS
32 13 13 - CONCRETE PAVING
32 92 19 - SEEDING
DIVISION 33 — UTILITIES
33 14 15 - SITE WATER DISTRIBUTION PIPING
33 31 00 - SANITARY SEWERAGE PIPING
DIVISION 34 — TRANSPORTATION
NOT USED
DIVISION 35 — WATERWAY AND MARINE
NOT USED
DIVISION 40 — PROCESS INTERCONNECTIONS
NOT USED
DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 4
NOT USED
DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
NOT USED
DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
NOT USED
DIVISION 44 — POLLUTION AND WASTE CONTROL EQUIPMENT
NOT USED
DIVISION 45 — INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
NOT USED
DIVISION 46 — WATER AND WASTEWATER EQUIPMENT
NOT USED
DIVISION 48 — ELECTRICAL POWER GENERATION
NOT USED
Federal Aviation Administration LIST OF DRAWINGS
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 1
DOCUMENT 00 01 15
LIST OF DRAWINGS
1.01 SUMMARY
A. This document lists the drawings for the project pursuant to FAA AMS Contract Clause "3.2.2.3-60, Specifications, Drawings, and Material Offers Alternate I" . Contract clauses are found at the follow-ing link:
1. https://fast.faa.gov/contractclauses.cfm
1.02 REFERENCES
A. Throughout the specification sections of the Project for this Contract with a REFERENCES paragraph, the publications listed form a part of this Project Specifications to the extent referenced. The publications are referred to within the text by the basic designation only.
1.03 CONTRACT DRAWINGS
A. Contract drawings are as follows:
1. QOO ARSR BUILDING design drawings, dated MARCH 8, 2023
GENERAL
QOO - 1603186 - G001 COVER SHEET
QOO - 1603186 - G002 DRAWING INDEX
CIVIL
QOO - 1603186 - C0001 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
QOO - 1603186 - CD101 DEMOLITION PLAN - 1
QOO - 1603186 - CD102 DEMOLITION PLAN – 2
QOO - 1603186 - CD901 DEMOLITION ELECTRICAL SITE PLAN
QOO - 1603186 - CS101 SITE PLAN - 1
QOO - 1603186 - CS102 SITE PLAN - 2
QOO - 1603186 - CG101 GRADING PLAN - 1
QOO - 1603186 - CG102 GRADING PLAN - 2
QOO - 1603186 - CU101 UTILITY PLAN - 1
QOO - 1603186 - CU102 UTILITY PLAN – 2
QOO - 1603186 - C901 ELECTRICAL SITE PLAN
ARCHITECTURE
QOO - 1603186 - A001 GENERAL NOTES
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 2
QOO - 1603186 - A002 ABBREVIATIONS, LEGEND, MATERIAL SYMBOLS
QOO - 1603186 - A101 PROPOSED ARCHITECTURAL SITE PLAN
QOO - 1603186 - A112 EXISTING EQUIPMENT BUILDING FLOOR PLAN & EXTERIOR ELEVATIONS
QOO - 1603186 - A113 EXISTING ENGINE GENERATOR BUILDING FLOOR PLAN & ELEVATIONS
QOO - 1603186 - A114 NEW PREFAB COMM/UPS BUILDING FLOOR PLAN & ELEVATIONS
QOO - 1603186 - A115 NEW CONEX STORAGE BUILDING FLOOR PLAN & ELEVATIONS
QOO - 1603186 - A130 COMM/UPS BLDG, EQUIPMENT BLDG, E/G BLDG ROOF PLANS
QOO - 1603186 - A401 ENLARGED FLOOR PLAN AND TOILET ROOM FIXTURES
QOO - 1603186 - A600 STAIR DETAILS
QOO - 1603186 - A602 STAIR DETAILS
STRUCTURAL
QOO - 1603186 - S001 GENERAL STRUCTURAL NOTES
QOO - 1603186 - S002 GENERAL STRUCTURAL NOTES
QOO - 1603186 - S003 SPECIAL INSPECTION SCHEDULE
QOO - 1603186 - S004 GENERAL STRUCTURAL NOTES
QOO - 1603186 - S101 OVERALL SITE PLAN
QOO - 1603186 - S102 COMM/UPS BUILDING FLOOR PLAN
QOO - 1603186 - S601 STANDARD CONCRETE DETAILS
QOO - 1603186 - S602 SECTIONS AND DETAILS
QOO - 1603186 - S603 TYPICAL STAIR DETAILS
QOO - 1603186 - S701 3D VIEW
MECHANICAL
QOO - 1603186 - M001 LEGEND, SYMBOLS AND NOTES
QOO - 1603186 - MD111 MECHANICAL DEMOLITION ENLARGED FLOOR PLANS
QOO - 1603186 - MD112 MECHANICAL DEMOLITION ENLARGED FLOOR PLANS
QOO - 1603186 - M101 MECHANICAL SITE PLAN
QOO - 1603186 - M111 MECHANICAL ENLARGED FLOOR PLANS
QOO - 1603186 - M112 MECHANICAL ENLARGED FLOOR PLAN AND SECTIONS
QOO - 1603186 - M113 MECHANICAL ENLARGED FLOOR PLAN AND SECTIONS
QOO - 1603186 - M500 EQUIPMENT SCHEDULES
QOO - 1603186 - M600 DETAILS
QOO - 1603186 - M601 DETAILS
QOO - 1603186 - M801 AIRFLOW DIAGRAM
PLUMBING
QOO - 1603186 - P001 LEGEND, SYMBOLS AND NOTES
QOO - 1603186 - PD111 PLUMBING DEMOLITION FLOOR PLANS
QOO - 1603186 - P111 PLUMBING ENLARGED FLOOR PLANS
QOO - 1603186 - P112 PLUMBING ENLARGED FLOOR PLANS
QOO - 1603186 - P113 PLUMBING ENLARGED FLOOR PLAN
QOO - 1603186 - P301 RADOME SECTION
QOO - 1603186 - P500 EQUIPMENT SCHEDULES
QOO - 1603186 - P600 DETAILS
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 3
ELECTRICAL
QOO - 1603186 - E001 LEGEND, SYMBOLS, NOTES AND ABBREVIATIONS
QOO - 1603186 - ED101 ELECTRICAL DEMOLITION - LIGHTING PLAN OVERALL
QOO - 1603186 - ED121 ELECTRICAL DEMOLITION - POWER PLAN OVERALL
QOO - 1603186 - ED122 ELECTRICAL DEMOLITION PLAN OVERALL
QOO - 1603186 - ED161 ELECTRICAL DEMOLITION - GROUNDING AND LIGHTNING PROTECTION PLAN -
OVERALL
QOO - 1603186 - ED401 ELECTRICAL DEMOLITION - ENLARGED LIGHTING PLANS
QOO - 1603186 - ED411 ELECTRICAL DEMOLITION - ENLARGED POWER PLANS
QOO - 1603186 - ED801 ELECTRICAL DEMOLITION - SINGLE LINE DIAGRAM
QOO - 1603186 - E101 ELECTRICAL LIGHTING PLAN - OVERALL & LIGHTING FIXTURE SCHEDULE
QOO - 1603186 - E121 ELECTRICAL POWER PLAN – OVERALL
QOO - 1603186 - E150 ENLARGE CABLE TRAY PLAN - COMM/ UPS BUILDING
QOO - 1603186 - E160 ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN - OVERALL
QOO - 1603186 - E161 ELECTRICAL GROUNDING - RADOME TOWER
QOO - 1603186 - E401 ENLARGED LIGHTING PLANS
QOO - 1603186 - E402 RADOME TOWER LIGHTING AND POWER
QOO - 1603186 - E403 PHOTOMETRICS - EQUIPMENT BUILDING
QOO - 1603186 - E411 ENLARGED POWER PLANS
QOO - 1603186 - E501 PANELBOARD SCHEDULE
QOO - 1603186 - E502 PANELBOARD SCHEDULE
QOO - 1603186 - E503 PANELBOARD SCHEDULE
QOO - 1603186 - E601 DETAILS – GROUNDING - FENCE
QOO - 1603186 - E602 STANDARD & MISCELLANEOUS DETAILS
QOO - 1603186 - E603 STANDARD & MISCELLANEOUS DETAILS
QOO - 1603186 - E604 STANDARD & MISCELLANEOUS DETAILS
QOO - 1603186 - E605 STANDARD & MISCELLANEOUS DETAILS
QOO - 1603186 - E801 SINGLE LINE DIAGRAM
FIRE PROTECTION
QOO - 1603186 - F001 LEGEND, SYMBOLS AND NOTES
QOO - 1603186 - FD101 FIRE PROTECTION DEMOLITION SITE PLAN
QOO - 1603186 - FD102 FIRE PROTECTION DEMOLITION FLOOR PLANS
QOO - 1603186 - F101 FIRE PROTECTION OVERALL SITE PLAN
QOO - 1603186 - F102 FIRE LIFE SAFETY FLOOR PLANS
QOO - 1603186 - F501 FIRE ALARM FLOOR PLANS
QOO - 1603186 - F541 FIRE ALARM RISER DIAGRAM
QOO - 1603186 - F551 FIRE ALARM DETAILS
QOO - 1603186 - F552 FIRE ALARM DETAILS
QOO - 1603186 - F571 FIRE ALARM CALCULATIONS
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 4
PART 2 - PRODUCTS
NOT USED.
PART 3 - EXECUTION
3.01 AVAILABILITY OF CADD DRAWING FILES
A. After award and upon request, the electronic "Computer-Aided Drafting and Design (CADD)" drawing files will be made available to the subcontractor for use in preparation of construction drawings and data related to the referenced contract subject to the following terms and conditions.
B. Electronic CADD drawing files are not construction documents. Differences may exist between the
CADD files and the corresponding construction documents. The subcontractor makes no representa-tion regarding the accuracy or completeness of the electronic CADD files, nor does it make represen-tation to the compatibility of these files with the subcontractors hardware or software. In the event a conflict arises between the signed and sealed construction documents prepared by the contractor and the furnished CADD files, the construction contract documents provided by the Contracting Of-ficer shall govern. Use of these CADD files does not relieve the subcontractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordi-nate the work of all subcontractors for the project.
C. Data contained on these electronic files shall not be used for any purpose other than as a conven-ience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the subcontractor and without liability or legal exposure to the contractor. The subcontractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the contractor, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The subcontractor shall, to the fullest extent permitted by law, indemnify and hold the contractor harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
D. If the subcontractor uses, duplicates and/or modifies these electronic CADD files for use in produc-ing construction data related to this contract, all previous indicia of ownership (seals, logos, signa-tures, initials and dates) shall be removed. Subcontractor use includes producing As-built drawings required by the contract.
END OF DOCUMENT
Federal Aviation Administration WORK COVERED BY CONTRACT DOCUMENTS
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 20 - 1
SECTION 00 01 20
WORK COVERED BY CONTRACT DOCUMENTS
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Work covered by the Subcontract Documents.
1.02 WORK COVERED BY THE CONTRACT DOCUMENTS
A. Project Location: QOO ARSR, Anson, TX
B. The work consists of the following (not all-inclusive):
1. Civil/Site:
a. Civil demolition will include clearing of vegetation and trees around the perimeter fence, removing existing water line and removal of existing buildings. Existing buildings, sidewalks and utilities to remain will be protected in place. The existing gate at the county road will be removed.
b. Site improvements include new concrete pads for buildings and new sidewalks for the new Connex storage building. New fences will be constructed along both sides of the access road as well as a new gate at the county road. The access road and site area will be resurfaced with aggregate material. An expanded turn around will be constructed for fire truck access.
c. Drainage improvements include construction of drainage ditches along both sides of the access road. Berms will be constructed around existing equipment pads. A new culvert will be constructed under the access road at the county road.
d. Utility improvements will include construction of a new water supply line and sewer line for the new Comm/UPS Building. New electric and fiber optic lines will be constructed for the new buildings.
2. Structural:
a. New concrete pads for pre-fabricated buildings.
3. Architecture:
a. RADOME - Existing torn bird netting shall be replaced with new “K-Net HT” Bird Netting
Systems from Nixalite.
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 20 - 2
b. RADOME – Existing stairway landing guardrail heights do not comply with code, current guardrail height is 36”, and shall be extended to 42” and provide 4” toe kickplate.
c. RADOME - Tower steel structure paint has faded, the entire steel tower structure shall be refinished and regalvanized.
d. New Prefab COMM/UPS Building - The existing FTI/COM building is over 40 years old, shall be replaced by a new steel prefab building. The new prefab metal building will be
40’(L)X10’-6”(W)X9’6”H), with a unisex restroom and a storage room inside the building.
e. New Prefab COMM/UPS Building – Provide wall/floor/ceiling finishes, and toilet room fixtures and accessories.
f. Existing Equipment Building – Interior wall shall be refinished and repainted, existing carpet shall be refinished with ESD vinyl composition tiles.
g. Existing Equipment Building – Exterior wall infill material at previously removed duct penetrations at the east wall shall be refinished with new paint and finish material to match adjacent surface of the exterior wall.
h. Existing Equipment Building – Existing concrete roof shall be resurfaced with
"KEMPEROL" reflect 2k-FR cold fluid-applied roofing membrane over DenseDek roof board and rigid insulation.
i. Existing Equipment Building – Existing door bottom seal and door closer shall be replaced with new bottom seal and automatic closer.
j. Existing E/G Room – Interior wall shall be refinished and repainted, existing VCT flooring shall be replaced with ESD epoxy coating and integral wall base.
k. Existing E/G Building – Existing concrete roof shall be resurfaced with "KEMPEROL" reflect 2k-FR cold fluid-applied roofing membrane over DenseDek roof board and rigid insulation.
l. Existing E/G Building – Existing door bottom seal and door closer shall be replaced with new bottom seal and automatic closer.
4. Mechanical and Plumbing:
a. Demolish the whole COMM & UPS building, including the HVAC and plumbing systems.
b. Demolish the packed two units that served the existing COMM & UPS building, including the ductwork, ceiling air diffusers, wall registers, thermostats, and associated electrical/control cables.
c. Demolish and remove the existing Storage building, including the ventilation system.
d. Remove the two split Dakin units FCU/CU that serve the current equipment building and deliver it to the SSC Manager.
e. The new Comm/UPS building, including a Unisex toilet, Storage and relocating per the site designs, should be delivered. Three new Marvair packaged external wall-mounted units will be provided to serve the new Comm& Ups building.
f. The new exhaust fan in the Comm& UPS building are provided to service the restroom.
g. The plumbing fixtures for the unisex restroom have been provided. New lines paths connect the new water supply and sanitary sewer routes. Plumbing, civil, and site plans all specify the point of connection.
h. A new Conex Storage facility, comprising the ventilation system, as well as mechanical designs and a new unit heater, should be provided.
i. Replaced the electrical strips unit heater and upgraded the existing ventilation system inside the E/G building.
LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 20 - 3
j. Provide steel bars to protect the wall opening in accordance with FAA and municipal security code regulations.
5. Electrical upgrades:
a. Demolish and replace existing power panel “MAIN” and “ELECTRONICS” in FTI-COMM building. New panel “MAIN” and new panel “ELECTRONICS” are to be installed in new
COMM/UPS building.
b. Demolish power panel “STORAGE ROOM” in FTI-COMM building. Reconnect existing loads to new panel “ELECTRONICS” in COMM/UPS building.
c. Demolish and replace power panel “PP1 UTILITY” in Engine Generator Building.
d. Demolish and replace power panel “EQP” in Radar building
e. Demolish and replace power panel “LOAD CENTER” in Storage building.
f. Provide new power and lighting for new Storage building.
g. Demolish and replace all existing interior and exterior lighting fixtures site-wide.
h. All existing loads on demolished panelboards shall be transferred to a non-demolished panelboard. Refer to panelboard schedules.
i. Existing FTI-COMM building circuitry and associated electrical devices shall be demolished. Provide new Power and Lighting for new COMM/UPS building.
6. Fire Protection:
a. Installation of a new addressable fire alarm detection and notification system with central station reporting.
b. Removal of existing fire detection.
c. Replacement of existing fire extinguishers with Dry Chemical and Clean Agent portable extinguishers.
d. Replacement of existing emergency lighting systems with combination area light fixtures.
e. Replacement of existing egress signage.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION
Federal Aviation Administration GENERAL REQUIREMENTS BY FAA UNDER SEPARATE COVER
LRR - QOO ATCBI Anson, TX May 23, 2023 <SectionNumber> - 1
GENERAL REQUIREMENTS BY FAA UNDER SEPARATE COVER
Federal Aviation Administration SELECTIVE DEMOLITION
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 1
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
1.02 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.03 MATERIALS OWNERSHIP
A. Unless otherwise indicated, take ownership of demolition waste.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 2
1.04 INFORMATIONAL SUBMITTALS
A. Qualification Data: For refrigerant recovery technician.
B. Engineering Survey: Submit engineering survey of condition of building.
C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, and for dust control.
Indicate proposed locations and construction of barriers.
D. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.
E. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations.
F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.05 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.06 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.07 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 3
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is in the Project Planning Document for review and use.
Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified in Section 02 83 19.13.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified in Section 02 83 19.13.
3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.08 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.01 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 4
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Engage a professional engineer to perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.
1. Inventory and record the condition of items to be removed and salvaged.
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
3.02 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to
40 CFR 82 and regulations of authorities having jurisdiction.
3.03 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. Arrange to shut off utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 5
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.04 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Division 01.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Remove temporary barricades and protections where hazards no longer exist.
3.05 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 6
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.
Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 8 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition, cleaned, and reinstalled in their original locations after selective demolition operations are complete.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 7
3.06 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least
3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete.
Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
E. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in
RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."
F. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight.
1. Remove existing roof membrane, flashings, copings, and roof accessories.
2. Remove existing roofing system down to substrate.
3.07 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Division 01.
B. Burning: Do not burn demolished materials.
3.08 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
Federal Aviation Administration LEAD-BASED PAINT ABATEMENT-Revised 1
LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 1
SECTION 02 83 19.13
LEAD-BASED PAINT REMEDIATION
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Applicable provisions of Division 1 - General Requirements, drawings, and other conditions and requirements of the Contract Documents apply to the work of this Section. This specification is included as part of the bid package for removing lead-based paint that will be disturbed during the project.
a. The Facility Improvement project will include lead paint abatement related to the buildings and Radome tower renovations.
b. This Section includes the removal, control, and disposal of lead paint encountered during the work at the LRR – QOO ARSR facility in Anson, Texas. The work includes constructing temporary enclosures to isolate the work area, establishing negative-air pressure within the isolated work areas, and removing lead paint from the isolated work area. In addition, packaging and legal disposal of the removed Lead paint debris from FAA property.
1) Observe all existing conditions before submitting a bid. The bid must include the impact on existing conditions, particularly on the cost of the health and safety of occupants and the proper function and operation of the facility. Be aware of work performed by others. Failure to visit the site shall in no way relieve the necessity of providing materials or performing any work required to complete the work per the Contract Documents without additional cost to the
FAA. All site visits must be scheduled with the RE and FAA.
c. The quantities, locations, and extent of work indicated are only best estimates, which are limited by the physical constraints imposed by the facility's occupancy.
d. Lead-Based Paint (LBP) locations - Refer to the contract drawings (QOO -1603186 -
H101) and the LBT report for identification of areas and places of materials to be abated. Coordinate abatement work with all areas of work scheduled for the project.
e. Refer to the LBP report (Limited Asbestos and Lead-Containing Paint Survey Letter
Report, dated January 17, 2023) in the Project Planning Document for the types and locations of Lead-based paint identified. Visual or analytical data verification in the report was performed. The information provided is current.
LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 2
1.02 RADOM TOWER STEEL STRUCTURE
A. Lead Paint Removal: This project will require lead paint spot abatement or lead paint removal on the
Radome tower structural steel components, architectural components, electrical components, and shall be included as part of the demolition pricing. Refer to the hazmat report in the Project Planning
Document and drawing QOO -1603186 -H101 for details.
1.03 REFERENCE DOCUMENTS
A. The following documents are included for general reference and are not inclusive of all standards applicable to this project. The current issue of the following documents forms a part of this specification and applies to the extent specified. Work shall conform to federal, state, and local government regulations and the requirements specified in these Contract Documents. Whenever inconsistencies occur between the referenced materials, the more stringent shall apply. The document intends to verify the work is conducted at the highest level of safety.
American National Standards Institute (ANSI)
ANSI Z87.1 Occupational and Educational Eye and Face Protection
ANSI Z88.2 Respiratory Protection
ANSI Z89.1 Hard Hats
ANSI Z9.2 Fundamentals Governing the Design and Operation of Local Exhaust Systems
American Society for Testing and Materials (ASTM)
ASTM C 732 Aging Effects of Artificial Weathering on Latex Sealants
ASTM D 522 Mandrel Bend Test of Attached Organic Coatings
ASTM D 1331 Surface and Interfacial Tension of Solutions of Surface-Active Agents
ASTM D 2794 Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D 4397
Polyethylene Sheeting for Construction, Industrial, and Agricultural
Applications
ASTM E 84 Surface Burning Characteristics of Building Materials
ASTM E 96 Water Vapor Transmission of Materials
ASTM E 119 Fire Tests of Building Construction and Materials
ASTM E 736
Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural
Members
ASTM D 2986
Evaluation of Air Assay Media by the Monodisperse DOP (Dioctyl Phthalate)
Smoke Test
LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 3
ASTM D 4884-96
Standard Test Method for Strength of Sewn or Thermally Bonded Seams of
Geotextiles
Code of Federal Regulations (CFR)
29 CFR Part 1910 Occupational Safety and Health Standards
Subpart I Personal Protective Equipment
1910.132 General Requirements
1910.134 Respiratory Protection
Subpart J General Environmental Controls
1910.145 Specifications for Accident
Prevention Signs and Tags
Subpart Z Toxic and Hazardous Substances
1910.1000 Air Contaminants
1910.1025 Lead
1910.1028 Benzene
1910.1052 Methylene Chloride
1910.1200 Hazard Communication
29 CFR Part 1926 Safety and Health Regulations for the Construction Industry
Subpart D Occupational Health and
Environmental Controls
1926.51 Sanitation
1926.52 Occupational Noise Control
1926.56 Illumination
1926.62 Lead
Subpart E Personal Protective & Life Saving
Equipment
1926.100 Head Protection
1926.101 Hearing Protection
1926.102 Eye and Face Protection
1926.103 Respiratory Protection
1926.104 Safety Belts, Lifelines, and lanyards
LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 4
Subpart F Fire Protection and Prevention
1926.150 Fire Protection
1926.151 Fire Prevention
1926.154 Temporary Heating Devices
Subpart J Welding and Cutting
1926.350 Gas Welding and Cutting
1926.352 Fire Prevention
1926.353 Ventilation and Protection in Welding, Cutting, and Heating
Subpart L Scaffolds
1926.450 Scope, Application, and Definitions
Applicable to this Subpart
1926.451 General Requirements
1926.452 Additional Requirements Applicable
to Specific Types of Scaffolds
1926.453 Aerial Lifts
1926.454 Training Requirements
Appendix A Scaffold Specifications
Subpart M Fall Protection
1926.500 Scope, Applicability, and Definitions
Applicable to this Subpart
1926.501 Duty to Have Fall Protection
1926.502 Fall Protection Systems Criteria and
Practices
1926.503 Training Requirements
Subpart N Cranes, Derricks, Hoists, Elevators, &
Conveyors
1926.552 Material Hoists, Personnel Hoists, and Elevators
Subpart Z Toxic & Hazardous Substances
Appendix A Methods of Sample Analysis
Appendix B Medical Surveillance Guidelines
40 CFR Part 61 Environmental Protection Agency
Part 261 Identification and Listing of
Hazardous Waste https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153AppB https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153AppB
LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 5
49 CFR Part 173 Department of Transportation
Shippers General Requirements for Shipments and Packaging
National Institute for Occupational Safety and Health (NIOSH). Department of Health and Human
Services
Method 7400 Fibers
Method 7082 Atomic Absorption; Flame
Method 7105 Atomic Absorption; Graphite Furnace
National Fire Protection Association (NFPA)
70 National Electrical Code
241 Construction and Renovations
701 Standard Method of Fire Tests for Flame-Resistant Textiles and Films.
Compressed Gas Association (CGA)
CGA G-7 Compressed Air for Human Respirators
CGA G-7 Commodity Specifications for Air
Underwriters Laboratories (UL)
UL 586 High-Efficiency Particulate Air Filter Units
Additional Standards
NSF 49 National Sanitation Foundation Class II (Laminar Flow) Biohazard Cabinetry
Federal Aviation Administration (FAA) Orders
Article 77 Agreement between DOT/FAA and the National Air Traffic Controllers
Association (NATCA)
Article 52 Agreement between DOT/FAA and the Professional Airways System Specialists
(PASS)
Order 3900.19B FAA Occupational Safety and Health Program
LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 6
1.04 DEFINITIONS
A. The following terms used in the text shall be defined as follows:
1. CIH: An Industrial Hygienist certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.
2. Competent Person: On all construction work sites the contractor shall designate a competent person having the qualifications and authority for verifying worker safety and health as required by 29 CFR 1926.20. The duties of the competent person include, but are not limited to, the following: establishing the negative pressure enclosure, verifying its integrity, controlling entry into and exit from the enclosure, inspecting the work site for consistent use of engineering control, verifying workers wear required personal protective equipment and are trained in the use of hygiene facilities, work practices, and decontamination procedures specified in this specification and applicable regulations.
3. COR: Contracting Officer's Representative
4. Critical Barrier: 2 Layers of 6-mil polyethylene sheeting sealed over the openings in the work area (or other similarly placed physical barrier) sufficient to prevent airborne fibers in the work area from migrating to an adjacent area.
5. Demarcated Area: An area that has been isolated from the remaining portions of the building by installing critical barriers and/or flapped barriers on the doorways/entrances/and other openings to the area, posting the area with OSHA approved warning signage to prevent unauthorized entry, and providing HEPA equipped ventilation equipment to filter the air and provide directed airflow out of the area.
6. HEPA (High Efficiency Particulate Air) Filter: A filter capable of trapping and retaining at least
99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
7. Immediately: When the contractor is on-site, immediately refers actions required to take place within 15 minutes of being notified. When the contractor is off-site, immediately refers to actions required to take place within 2 hours of being notified.
8. MC (Monitoring Contractor): contracted as a third party to the FAA, to perform inspections and air monitoring.
1.05 PRE-BID CONTRACTOR QUALIFICATION SELECTION SUBMITTALS
A. Provide the following pre-bid contractor qualification selection submittals:
B. Contractor Identification: The Abatement Contractor shall be licensed by the State of Texas for the purpose of removal, encapsulation, enclosure, or demolition of lead, where required.
1. Company name and address (street and mailing if different).
2.…
This is the start of the file's text. The full file is on GovTribe.