Anson TX ARSR Building Refurbishment Federal contract opportunity
Solicitation number
6973GH-23-Q-00195
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This solicitation is for building refurbishment services at the Anson TX ARSR facility. Key requirements include lead abatement and removal work, building renovations, roof replacements, HVAC and electrical upgrades, and site improvements. The work will involve multiple trades and is governed by EPA, OSHA and FAA regulations regarding lead and hazardous materials. The response due date is May 23, 2023. The selected contractor must be licensed for lead abatement in Texas and will be responsible for all lead notifications, permitting and disposal requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Anson TX ARSR Building Refurbishment, newest first.
File Type Posted
FAA-QOO HAZMAT Report 01172023.2.pdf PDF
Payment Bond.pdf PDF
Wage Determination.pdf PDF
QOO ATCBI Division 1 General Requirements Specification.pdf PDF
Experience Information Form.pdf PDF
6973GH-23-Q-00195.pdf PDF
Contractor Release Form.pdf PDF
QOO ATCBI 100P_Drawings.pdf PDF
Performance Bond.pdf PDF
QOO Anson_TX Summary Scope 02252023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK RELEASE: AWP-3866 JCN: 1603186

Long Range Radar Sustainment Project QOO ATCBI Building and Radome Tower

Anson, Texas

FINAL SUBMITTAL

MAY 23, 2023

U.S. Department of Transportation

Federal Aviation Administration

Western Pacific Regional Office

777 South Aviation Boulevard, Suite 150

El Segundo, CA 90245

Prepared by:

PTSI Managed Services, Inc.

100 W. Walnut Street

Pasadena, CA 91124

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 553

AWP 3866 FOR OFFICIAL USE ONLY

Federal Aviation Administration SEALS PAGE

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 07 - 1

DOCUMENT 00 01 07

SEALS PAGES

1.01 DESIGN PROFESSIONALS OF RECORD

A. Architect:

1. Rolando de la Rosa.

2. License No.15131.

3. Responsible for the following Sections.

05 50 00 - METAL FABRICATIONS

06 10 53 - MISCELLANEOUS ROUGH CARPENTRY

07 55 56 - FLUID-APPLIED PROTECTED MEMBRANE ROOFING

07 62 00 - SHEET METAL FLASHING AND TRIM

07 92 00 - JOINT SEALANTS

08 11 13 - HOLLOW METAL DOORS AND FRAMES

08 14 16 - FLUSH WOOD DOORS

08 71 00 - DOOR HARDWARE

09 65 13 - RESILIENT BASE AND ACCESSORIES

09 65 36 - STATIC-CONTROL RESILIENT FLOORING

09 91 13 - EXTERIOR PAINTING

09 91 23 - INTERIOR PAINTING

09 96 00 - HIGH-PERFORMANCE COATINGS

10 28 00 - TOILET, BATH, AND LAUNDRY ACESSORIES

13 34 23 - FABRICATED METAL BUILDINGS

B. Civil Engineer:

1. Kevin Needham.

2. License No..

3. Responsible for the following Sections.

02 41 19 - SELECTIVE DEMOLITION

131 10 00 - SITE CLEARING

31 20 00 - EARTH MOVING

31 37 16.13 - RUBBLE-STONE RIPRAP

32 05 16 - AGGREGATES FOR EXTERIOR IMPROVEMENTS

32 11 23 - AGGREGATE BASE COURSES

32 13 13 - CONCRETE PAVING

32 31 13.53 - HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 19 - SEEDING

James Esquivel Untitled-2

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 07 - 2

33 14 15 - SITE WATER DISTRIBUTION PIPING

33 31 00 - SANITARY SEWERAGE PIPING

C. Structural Engineer:

1. Richard A. Jones.

2. License No.134686.

3. Responsible for the following Sections.

03 10 00 - CONCRETE FORMING AND ACCESSORIES

03 20 00 - CONCRETE REINFORCING

03 30 00 - CAST-IN-PLACE CONCRETE

05 50 00 - METAL FABRICATIONS

05 51 19 - METAL GRATING STAIRS

05 53 13 - BAR GRATINGS

D. Fire-Protection Engineer:

1. Frank Ataiyan.

2. License No.127216.

3. Responsible for the following Sections.

10 44 16 - FIRE EXTINGUISHERS

28 46 21.11 - ADDRESSABLE FIRE-ALARM SYSTEMS

E. Mechanical Engineer:

1. Michael McDonald.

2. License No.142496.

3. Responsible for the following Sections.

22 05 17 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 23.12 - BALL VALVES FOR PLUMBING PIPING

22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 07 19 - PLUMBING PIPING INSULATION

22 08 00 - COMMISSIONING OF PLUMBING

22 11 16 - DOMESTIC WATER PIPING

22 13 16 - SANITARY WASTE AND VENT PIPING

22 13 19 - SANITARY WASTE PIPING SPECIALTIES

22 33 00 - ELECTRIC DOMESTIC-WATER HEATERS

22 42 16.13 - COMMERCIAL LAVATORIES

23 05 17 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

James Esquivel Untitled-2

James Esquivel Untitled-2

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 07 - 3

23 05 18 - ESCUTCHEONS FOR HVAC PIPING

23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 46 - COATINGS FOR HVAC

23 05 48 - VIBRATION AND SEISMIC CONTROLS FOR HVAC

23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 08 00 - COMMISSIONING OF HVAC

23 09 23.27 - TEMPERATURE INSTRUMENTS

23 23 00 - REFRIGERANT PIPING

23 34 16 - CENTRIFUGAL HVAC FANS

23 37 13.23 - REGISTERS AND GRILLES

23 74 16.13 - PACKAGED, WALL MOUNT HEAT PUMP AIR-CONDITIONING UNITS

23 82 39.19 - WALL AND CEILING UNIT HEATERS

F. Electrical Engineer:

1. Enrique Chahin.

2. License No.133924.

3. Responsible for the following Sections.

26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL

26 05 00.10 - BASIC ELECTRICAL MATERIALS AND METHODS

26 05 05 - SELECTIVE DEMOLITION FOR ELECTRICAL

26 05 19 - LOW VOLTAGE CABLES

26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 33.10 - UNDERGROUND CONDUITS FOR ELECTRICAL SYSTEMS

26 05 53 - IDENTIFICATION OF ELECTRICAL SYSTEMS

26 08 00.13 - TESTING AND INSPECTING ELECTRICAL EQUIPMENT

26 22 13 - LOW VOLTAGE DISTRIBUTION TRANSFORMERS

26 24 16 - PANELBOARDS

26 27 26 - LOW VOLTAGE WIRING DEVICES

26 28 13 - FUSES

26 41 00 - FACILITY LIGHTNING PROTECTION

26 51 00 - INTERIOR LIGHTING

END OF DOCUMENT 00 01 07

Federal Aviation Administration 00 01 10 - TABLE OF CONTENTS

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 1

DOCUMENT 00 01 10

TABLE OF CONTENTS

PROJECT FILES

NOT USED

COVER & TABLE OF CONTENTS

PROJECT MANUAL COVER

DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 07 - SEALS PAGE

00 01 10 - TABLE OF CONTENTS

00 01 15 - LIST OF DRAWINGS

00 01 20 - WORK COVERED BY CONTRACT DOCUMENTS

DIVISION 01 — GENERAL REQUIREMENTS

GENERAL REQUIREMENTS BY FAA UNDER SEPARATE COVER

DIVISION 02 — EXISTING CONDITIONS

02 41 19 - SELECTIVE DEMOLITION

02 83 19.13 - LEAD-BASED PAINT ABATEMENT

DIVISION 03 — CONCRETE

03 10 00 - CONCRETE FORMING AND ACCESSORIES

03 20 00 - CONCRETE REINFORCING

03 30 00 - CAST-IN-PLACE CONCRETE

DIVISION 04 — MASONRY

NOT USED

DIVISION 05 — METALS

05 12 00 - STRUCTURAL STEEL FRAMING

05 50 00 - METAL FABRICATIONS

05 51 19 - METAL GRATING STAIRS

05 52 13 - PIPE AND TUBE RAILINGS

05 53 13 - BAR GRATINGS

DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES

06 10 53 - MISCELLANEOUS ROUGH CARPENTRY

DIVISION 07 — THERMAL AND MOISTURE PROTECTION

07 55 56 - FLUID-APPLIED PROTECTED MEMBRANE ROOFING

07 62 00 - SHEET METAL FLASHING AND TRIM

07 92 00 - JOINT SEALANTS

DIVISION 08 — OPENINGS

08 11 13 - HOLLOW METAL DOORS AND FRAMES

08 14 16 - FLUSH WOOD DOORS

08 71 00 - DOOR HARDWARE

DIVISION 09 — FINISHES

09 65 13 - RESILIENT BASE AND ACCESSORIES

09 65 36 - STATIC-CONTROL RESILIENT FLOORING

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 2

09 67 23 - RESINOUS FLOORING

09 91 13 - EXTERIOR PAINTING

09 91 23 - INTERIOR PAINTING

09 96 00 - HIGH-PERFORMANCE COATINGS

DIVISION 10 — SPECIALTIES

10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES

10 44 16 - FIRE EXTINGUISHERS

DIVISION 11 — EQUIPMENT

NOT USED

DIVISION 12 — FURNISHINGS

NOT USED

DIVISION 13 — SPECIAL CONSTRUCTION

13 34 23 - FABRICATED METAL BUILDINGS

DIVISION 14 — CONVEYING EQUIPMENT

NOT USED

DIVISION 21 — FIRE SUPPRESSION

NOT USED

DIVISION 22 — PLUMBING

22 05 17 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 23.12 - BALL VALVES FOR PLUMBING PIPING

22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 07 19 - PLUMBING PIPING INSULATION

22 08 00 - COMMISSIONING OF PLUMBING

22 11 16 - DOMESTIC WATER PIPING

22 13 16 - SANITARY WASTE AND VENT PIPING

22 13 19 - SANITARY WASTE PIPING SPECIALTIES

22 33 00 - ELECTRIC DOMESTIC-WATER HEATERS

22 42 16.13 - COMMERCIAL LAVATORIES

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING

23 05 17 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

23 05 18 - ESCUTCHEONS FOR HVAC PIPING

23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 46 - COATINGS FOR HVAC

23 05 48 - VIBRATION AND SEISMIC CONTROLS FOR HVAC

23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 08 00 - COMMISSIONING OF HVAC

23 09 23.27 - TEMPERATURE INSTRUMENTS

23 23 00 - REFRIGERANT PIPING

23 34 16 - CENTRIFUGAL HVAC FANS

23 37 13.23 - REGISTERS AND GRILLES

23 74 16.13 - PACKAGED,WALL MOUNT HEAT PUMP AIR-CONDITIONING UNITS

23 82 39.19 - WALL AND CEILING UNIT HEATERS

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 3

DIVISION 25 — INTEGRATED AUTOMATION

NOT USED

DIVISION 26 — ELECTRICAL

26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL

26 05 00.10 - BASIC ELECTRICAL MATERIALS AND METHODS

26 05 05 - SELECTIVE DEMOLITION FOR ELECTRICAL

26 05 19 - LOW VOLTAGE CABLES

26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 33.10 - UNDERGROUND CONDUITS FOR ELECTRICAL SYSTEMS

26 05 53 - IDENTIFICATION OF ELECTRICAL SYSTEMS

26 08 00.13 - TESTING AND INSPECTING ELECTRICAL EQUIPMENT

26 22 13 - LOW VOLTAGE DISTRIBUTION TRANSFORMERS

26 24 16 - PANELBOARDS

26 27 26 - LOW VOLTAGE WIRING DEVICES

26 28 13 - FUSES

26 28 16 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 41 00 - FACILITY LIGHTNING PROTECTION

26 51 00 - INTERIOR LIGHTING

DIVISION 27 — COMMUNICATIONS

NOT USED

DIVISION 28 — ELECTRONIC SAFETY AND SECURITY

28 46 21.11 - ADDRESSABLE FIRE-ALARM SYSTEMS

DIVISION 31 — EARTHWORK

31 05 19.13 - GEOTEXTILES FOR EARTHWORK

31 10 00 - SITE CLEARING

31 20 00 - EARTH MOVING

31 37 16.13 - RUBBLE-STONE RIPRAP

DIVISION 32 — EXTERIOR IMPROVEMENTS

32 05 16 - AGGREGATES FOR EXTERIOR IMPROVEMENTS

32 13 13 - CONCRETE PAVING

32 92 19 - SEEDING

DIVISION 33 — UTILITIES

33 14 15 - SITE WATER DISTRIBUTION PIPING

33 31 00 - SANITARY SEWERAGE PIPING

DIVISION 34 — TRANSPORTATION

NOT USED

DIVISION 35 — WATERWAY AND MARINE

NOT USED

DIVISION 40 — PROCESS INTERCONNECTIONS

NOT USED

DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 10 - 4

NOT USED

DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

NOT USED

DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT

NOT USED

DIVISION 44 — POLLUTION AND WASTE CONTROL EQUIPMENT

NOT USED

DIVISION 45 — INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT

NOT USED

DIVISION 46 — WATER AND WASTEWATER EQUIPMENT

NOT USED

DIVISION 48 — ELECTRICAL POWER GENERATION

NOT USED

Federal Aviation Administration LIST OF DRAWINGS

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 1

DOCUMENT 00 01 15

LIST OF DRAWINGS

1.01 SUMMARY

A. This document lists the drawings for the project pursuant to FAA AMS Contract Clause "3.2.2.3-60, Specifications, Drawings, and Material Offers Alternate I" . Contract clauses are found at the follow-ing link:

1. https://fast.faa.gov/contractclauses.cfm

1.02 REFERENCES

A. Throughout the specification sections of the Project for this Contract with a REFERENCES paragraph, the publications listed form a part of this Project Specifications to the extent referenced. The publications are referred to within the text by the basic designation only.

1.03 CONTRACT DRAWINGS

A. Contract drawings are as follows:

1. QOO ARSR BUILDING design drawings, dated MARCH 8, 2023

GENERAL

QOO - 1603186 - G001 COVER SHEET

QOO - 1603186 - G002 DRAWING INDEX

CIVIL

QOO - 1603186 - C0001 GENERAL NOTES, ABBREVIATIONS, AND LEGEND

QOO - 1603186 - CD101 DEMOLITION PLAN - 1

QOO - 1603186 - CD102 DEMOLITION PLAN – 2

QOO - 1603186 - CD901 DEMOLITION ELECTRICAL SITE PLAN

QOO - 1603186 - CS101 SITE PLAN - 1

QOO - 1603186 - CS102 SITE PLAN - 2

QOO - 1603186 - CG101 GRADING PLAN - 1

QOO - 1603186 - CG102 GRADING PLAN - 2

QOO - 1603186 - CU101 UTILITY PLAN - 1

QOO - 1603186 - CU102 UTILITY PLAN – 2

QOO - 1603186 - C901 ELECTRICAL SITE PLAN

ARCHITECTURE

QOO - 1603186 - A001 GENERAL NOTES

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 2

QOO - 1603186 - A002 ABBREVIATIONS, LEGEND, MATERIAL SYMBOLS

QOO - 1603186 - A101 PROPOSED ARCHITECTURAL SITE PLAN

QOO - 1603186 - A112 EXISTING EQUIPMENT BUILDING FLOOR PLAN & EXTERIOR ELEVATIONS

QOO - 1603186 - A113 EXISTING ENGINE GENERATOR BUILDING FLOOR PLAN & ELEVATIONS

QOO - 1603186 - A114 NEW PREFAB COMM/UPS BUILDING FLOOR PLAN & ELEVATIONS

QOO - 1603186 - A115 NEW CONEX STORAGE BUILDING FLOOR PLAN & ELEVATIONS

QOO - 1603186 - A130 COMM/UPS BLDG, EQUIPMENT BLDG, E/G BLDG ROOF PLANS

QOO - 1603186 - A401 ENLARGED FLOOR PLAN AND TOILET ROOM FIXTURES

QOO - 1603186 - A600 STAIR DETAILS

QOO - 1603186 - A602 STAIR DETAILS

STRUCTURAL

QOO - 1603186 - S001 GENERAL STRUCTURAL NOTES

QOO - 1603186 - S002 GENERAL STRUCTURAL NOTES

QOO - 1603186 - S003 SPECIAL INSPECTION SCHEDULE

QOO - 1603186 - S004 GENERAL STRUCTURAL NOTES

QOO - 1603186 - S101 OVERALL SITE PLAN

QOO - 1603186 - S102 COMM/UPS BUILDING FLOOR PLAN

QOO - 1603186 - S601 STANDARD CONCRETE DETAILS

QOO - 1603186 - S602 SECTIONS AND DETAILS

QOO - 1603186 - S603 TYPICAL STAIR DETAILS

QOO - 1603186 - S701 3D VIEW

MECHANICAL

QOO - 1603186 - M001 LEGEND, SYMBOLS AND NOTES

QOO - 1603186 - MD111 MECHANICAL DEMOLITION ENLARGED FLOOR PLANS

QOO - 1603186 - MD112 MECHANICAL DEMOLITION ENLARGED FLOOR PLANS

QOO - 1603186 - M101 MECHANICAL SITE PLAN

QOO - 1603186 - M111 MECHANICAL ENLARGED FLOOR PLANS

QOO - 1603186 - M112 MECHANICAL ENLARGED FLOOR PLAN AND SECTIONS

QOO - 1603186 - M113 MECHANICAL ENLARGED FLOOR PLAN AND SECTIONS

QOO - 1603186 - M500 EQUIPMENT SCHEDULES

QOO - 1603186 - M600 DETAILS

QOO - 1603186 - M601 DETAILS

QOO - 1603186 - M801 AIRFLOW DIAGRAM

PLUMBING

QOO - 1603186 - P001 LEGEND, SYMBOLS AND NOTES

QOO - 1603186 - PD111 PLUMBING DEMOLITION FLOOR PLANS

QOO - 1603186 - P111 PLUMBING ENLARGED FLOOR PLANS

QOO - 1603186 - P112 PLUMBING ENLARGED FLOOR PLANS

QOO - 1603186 - P113 PLUMBING ENLARGED FLOOR PLAN

QOO - 1603186 - P301 RADOME SECTION

QOO - 1603186 - P500 EQUIPMENT SCHEDULES

QOO - 1603186 - P600 DETAILS

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 3

ELECTRICAL

QOO - 1603186 - E001 LEGEND, SYMBOLS, NOTES AND ABBREVIATIONS

QOO - 1603186 - ED101 ELECTRICAL DEMOLITION - LIGHTING PLAN OVERALL

QOO - 1603186 - ED121 ELECTRICAL DEMOLITION - POWER PLAN OVERALL

QOO - 1603186 - ED122 ELECTRICAL DEMOLITION PLAN OVERALL

QOO - 1603186 - ED161 ELECTRICAL DEMOLITION - GROUNDING AND LIGHTNING PROTECTION PLAN -

OVERALL

QOO - 1603186 - ED401 ELECTRICAL DEMOLITION - ENLARGED LIGHTING PLANS

QOO - 1603186 - ED411 ELECTRICAL DEMOLITION - ENLARGED POWER PLANS

QOO - 1603186 - ED801 ELECTRICAL DEMOLITION - SINGLE LINE DIAGRAM

QOO - 1603186 - E101 ELECTRICAL LIGHTING PLAN - OVERALL & LIGHTING FIXTURE SCHEDULE

QOO - 1603186 - E121 ELECTRICAL POWER PLAN – OVERALL

QOO - 1603186 - E150 ENLARGE CABLE TRAY PLAN - COMM/ UPS BUILDING

QOO - 1603186 - E160 ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN - OVERALL

QOO - 1603186 - E161 ELECTRICAL GROUNDING - RADOME TOWER

QOO - 1603186 - E401 ENLARGED LIGHTING PLANS

QOO - 1603186 - E402 RADOME TOWER LIGHTING AND POWER

QOO - 1603186 - E403 PHOTOMETRICS - EQUIPMENT BUILDING

QOO - 1603186 - E411 ENLARGED POWER PLANS

QOO - 1603186 - E501 PANELBOARD SCHEDULE

QOO - 1603186 - E502 PANELBOARD SCHEDULE

QOO - 1603186 - E503 PANELBOARD SCHEDULE

QOO - 1603186 - E601 DETAILS – GROUNDING - FENCE

QOO - 1603186 - E602 STANDARD & MISCELLANEOUS DETAILS

QOO - 1603186 - E603 STANDARD & MISCELLANEOUS DETAILS

QOO - 1603186 - E604 STANDARD & MISCELLANEOUS DETAILS

QOO - 1603186 - E605 STANDARD & MISCELLANEOUS DETAILS

QOO - 1603186 - E801 SINGLE LINE DIAGRAM

FIRE PROTECTION

QOO - 1603186 - F001 LEGEND, SYMBOLS AND NOTES

QOO - 1603186 - FD101 FIRE PROTECTION DEMOLITION SITE PLAN

QOO - 1603186 - FD102 FIRE PROTECTION DEMOLITION FLOOR PLANS

QOO - 1603186 - F101 FIRE PROTECTION OVERALL SITE PLAN

QOO - 1603186 - F102 FIRE LIFE SAFETY FLOOR PLANS

QOO - 1603186 - F501 FIRE ALARM FLOOR PLANS

QOO - 1603186 - F541 FIRE ALARM RISER DIAGRAM

QOO - 1603186 - F551 FIRE ALARM DETAILS

QOO - 1603186 - F552 FIRE ALARM DETAILS

QOO - 1603186 - F571 FIRE ALARM CALCULATIONS

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 15 - 4

PART 2 - PRODUCTS

NOT USED.

PART 3 - EXECUTION

3.01 AVAILABILITY OF CADD DRAWING FILES

A. After award and upon request, the electronic "Computer-Aided Drafting and Design (CADD)" drawing files will be made available to the subcontractor for use in preparation of construction drawings and data related to the referenced contract subject to the following terms and conditions.

B. Electronic CADD drawing files are not construction documents. Differences may exist between the

CADD files and the corresponding construction documents. The subcontractor makes no representa-tion regarding the accuracy or completeness of the electronic CADD files, nor does it make represen-tation to the compatibility of these files with the subcontractors hardware or software. In the event a conflict arises between the signed and sealed construction documents prepared by the contractor and the furnished CADD files, the construction contract documents provided by the Contracting Of-ficer shall govern. Use of these CADD files does not relieve the subcontractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordi-nate the work of all subcontractors for the project.

C. Data contained on these electronic files shall not be used for any purpose other than as a conven-ience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the subcontractor and without liability or legal exposure to the contractor. The subcontractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the contractor, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The subcontractor shall, to the fullest extent permitted by law, indemnify and hold the contractor harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.

D. If the subcontractor uses, duplicates and/or modifies these electronic CADD files for use in produc-ing construction data related to this contract, all previous indicia of ownership (seals, logos, signa-tures, initials and dates) shall be removed. Subcontractor use includes producing As-built drawings required by the contract.

END OF DOCUMENT

Federal Aviation Administration WORK COVERED BY CONTRACT DOCUMENTS

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 20 - 1

SECTION 00 01 20

WORK COVERED BY CONTRACT DOCUMENTS

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Work covered by the Subcontract Documents.

1.02 WORK COVERED BY THE CONTRACT DOCUMENTS

A. Project Location: QOO ARSR, Anson, TX

B. The work consists of the following (not all-inclusive):

1. Civil/Site:

a. Civil demolition will include clearing of vegetation and trees around the perimeter fence, removing existing water line and removal of existing buildings. Existing buildings, sidewalks and utilities to remain will be protected in place. The existing gate at the county road will be removed.

b. Site improvements include new concrete pads for buildings and new sidewalks for the new Connex storage building. New fences will be constructed along both sides of the access road as well as a new gate at the county road. The access road and site area will be resurfaced with aggregate material. An expanded turn around will be constructed for fire truck access.

c. Drainage improvements include construction of drainage ditches along both sides of the access road. Berms will be constructed around existing equipment pads. A new culvert will be constructed under the access road at the county road.

d. Utility improvements will include construction of a new water supply line and sewer line for the new Comm/UPS Building. New electric and fiber optic lines will be constructed for the new buildings.

2. Structural:

a. New concrete pads for pre-fabricated buildings.

3. Architecture:

a. RADOME - Existing torn bird netting shall be replaced with new “K-Net HT” Bird Netting

Systems from Nixalite.

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 20 - 2

b. RADOME – Existing stairway landing guardrail heights do not comply with code, current guardrail height is 36”, and shall be extended to 42” and provide 4” toe kickplate.

c. RADOME - Tower steel structure paint has faded, the entire steel tower structure shall be refinished and regalvanized.

d. New Prefab COMM/UPS Building - The existing FTI/COM building is over 40 years old, shall be replaced by a new steel prefab building. The new prefab metal building will be

40’(L)X10’-6”(W)X9’6”H), with a unisex restroom and a storage room inside the building.

e. New Prefab COMM/UPS Building – Provide wall/floor/ceiling finishes, and toilet room fixtures and accessories.

f. Existing Equipment Building – Interior wall shall be refinished and repainted, existing carpet shall be refinished with ESD vinyl composition tiles.

g. Existing Equipment Building – Exterior wall infill material at previously removed duct penetrations at the east wall shall be refinished with new paint and finish material to match adjacent surface of the exterior wall.

h. Existing Equipment Building – Existing concrete roof shall be resurfaced with

"KEMPEROL" reflect 2k-FR cold fluid-applied roofing membrane over DenseDek roof board and rigid insulation.

i. Existing Equipment Building – Existing door bottom seal and door closer shall be replaced with new bottom seal and automatic closer.

j. Existing E/G Room – Interior wall shall be refinished and repainted, existing VCT flooring shall be replaced with ESD epoxy coating and integral wall base.

k. Existing E/G Building – Existing concrete roof shall be resurfaced with "KEMPEROL" reflect 2k-FR cold fluid-applied roofing membrane over DenseDek roof board and rigid insulation.

l. Existing E/G Building – Existing door bottom seal and door closer shall be replaced with new bottom seal and automatic closer.

4. Mechanical and Plumbing:

a. Demolish the whole COMM & UPS building, including the HVAC and plumbing systems.

b. Demolish the packed two units that served the existing COMM & UPS building, including the ductwork, ceiling air diffusers, wall registers, thermostats, and associated electrical/control cables.

c. Demolish and remove the existing Storage building, including the ventilation system.

d. Remove the two split Dakin units FCU/CU that serve the current equipment building and deliver it to the SSC Manager.

e. The new Comm/UPS building, including a Unisex toilet, Storage and relocating per the site designs, should be delivered. Three new Marvair packaged external wall-mounted units will be provided to serve the new Comm& Ups building.

f. The new exhaust fan in the Comm& UPS building are provided to service the restroom.

g. The plumbing fixtures for the unisex restroom have been provided. New lines paths connect the new water supply and sanitary sewer routes. Plumbing, civil, and site plans all specify the point of connection.

h. A new Conex Storage facility, comprising the ventilation system, as well as mechanical designs and a new unit heater, should be provided.

i. Replaced the electrical strips unit heater and upgraded the existing ventilation system inside the E/G building.

LRR - QOO ATCBI, Anson, TX May 23, 2023 00 01 20 - 3

j. Provide steel bars to protect the wall opening in accordance with FAA and municipal security code regulations.

5. Electrical upgrades:

a. Demolish and replace existing power panel “MAIN” and “ELECTRONICS” in FTI-COMM building. New panel “MAIN” and new panel “ELECTRONICS” are to be installed in new

COMM/UPS building.

b. Demolish power panel “STORAGE ROOM” in FTI-COMM building. Reconnect existing loads to new panel “ELECTRONICS” in COMM/UPS building.

c. Demolish and replace power panel “PP1 UTILITY” in Engine Generator Building.

d. Demolish and replace power panel “EQP” in Radar building

e. Demolish and replace power panel “LOAD CENTER” in Storage building.

f. Provide new power and lighting for new Storage building.

g. Demolish and replace all existing interior and exterior lighting fixtures site-wide.

h. All existing loads on demolished panelboards shall be transferred to a non-demolished panelboard. Refer to panelboard schedules.

i. Existing FTI-COMM building circuitry and associated electrical devices shall be demolished. Provide new Power and Lighting for new COMM/UPS building.

6. Fire Protection:

a. Installation of a new addressable fire alarm detection and notification system with central station reporting.

b. Removal of existing fire detection.

c. Replacement of existing fire extinguishers with Dry Chemical and Clean Agent portable extinguishers.

d. Replacement of existing emergency lighting systems with combination area light fixtures.

e. Replacement of existing egress signage.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION

Federal Aviation Administration GENERAL REQUIREMENTS BY FAA UNDER SEPARATE COVER

LRR - QOO ATCBI Anson, TX May 23, 2023 <SectionNumber> - 1

GENERAL REQUIREMENTS BY FAA UNDER SEPARATE COVER

Federal Aviation Administration SELECTIVE DEMOLITION

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 1

SECTION 02 41 19

SELECTIVE DEMOLITION

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

1.02 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.

D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

1.03 MATERIALS OWNERSHIP

A. Unless otherwise indicated, take ownership of demolition waste.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 2

1.04 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

B. Engineering Survey: Submit engineering survey of condition of building.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, and for dust control.

Indicate proposed locations and construction of barriers.

D. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Use of elevator and stairs.

5. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.

E. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

1.05 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

1.06 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.

1.07 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 3

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is in the Project Planning Document for review and use.

Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified in Section 02 83 19.13.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified in Section 02 83 19.13.

3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.08 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.01 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 4

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Engage a professional engineer to perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.

1. Inventory and record the condition of items to be removed and salvaged.

2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

3.02 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to

40 CFR 82 and regulations of authorities having jurisdiction.

3.03 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated services/systems when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 5

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment.

d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

3.04 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Division 01.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

C. Remove temporary barricades and protections where hazards no longer exist.

3.05 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 6

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.

Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least 8 hours after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

10. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area designated by Owner.

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition, cleaned, and reinstalled in their original locations after selective demolition operations are complete.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 41 19 - 7

3.06 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least

3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete.

Neatly trim openings to dimensions indicated.

B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.

C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.

E. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in

RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."

F. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight.

1. Remove existing roof membrane, flashings, copings, and roof accessories.

2. Remove existing roofing system down to substrate.

3.07 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

4. Comply with requirements specified in Division 01.

B. Burning: Do not burn demolished materials.

3.08 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 02 41 19

Federal Aviation Administration LEAD-BASED PAINT ABATEMENT-Revised 1

LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 1

SECTION 02 83 19.13

LEAD-BASED PAINT REMEDIATION

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Applicable provisions of Division 1 - General Requirements, drawings, and other conditions and requirements of the Contract Documents apply to the work of this Section. This specification is included as part of the bid package for removing lead-based paint that will be disturbed during the project.

a. The Facility Improvement project will include lead paint abatement related to the buildings and Radome tower renovations.

b. This Section includes the removal, control, and disposal of lead paint encountered during the work at the LRR – QOO ARSR facility in Anson, Texas. The work includes constructing temporary enclosures to isolate the work area, establishing negative-air pressure within the isolated work areas, and removing lead paint from the isolated work area. In addition, packaging and legal disposal of the removed Lead paint debris from FAA property.

1) Observe all existing conditions before submitting a bid. The bid must include the impact on existing conditions, particularly on the cost of the health and safety of occupants and the proper function and operation of the facility. Be aware of work performed by others. Failure to visit the site shall in no way relieve the necessity of providing materials or performing any work required to complete the work per the Contract Documents without additional cost to the

FAA. All site visits must be scheduled with the RE and FAA.

c. The quantities, locations, and extent of work indicated are only best estimates, which are limited by the physical constraints imposed by the facility's occupancy.

d. Lead-Based Paint (LBP) locations - Refer to the contract drawings (QOO -1603186 -

H101) and the LBT report for identification of areas and places of materials to be abated. Coordinate abatement work with all areas of work scheduled for the project.

e. Refer to the LBP report (Limited Asbestos and Lead-Containing Paint Survey Letter

Report, dated January 17, 2023) in the Project Planning Document for the types and locations of Lead-based paint identified. Visual or analytical data verification in the report was performed. The information provided is current.

LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 2

1.02 RADOM TOWER STEEL STRUCTURE

A. Lead Paint Removal: This project will require lead paint spot abatement or lead paint removal on the

Radome tower structural steel components, architectural components, electrical components, and shall be included as part of the demolition pricing. Refer to the hazmat report in the Project Planning

Document and drawing QOO -1603186 -H101 for details.

1.03 REFERENCE DOCUMENTS

A. The following documents are included for general reference and are not inclusive of all standards applicable to this project. The current issue of the following documents forms a part of this specification and applies to the extent specified. Work shall conform to federal, state, and local government regulations and the requirements specified in these Contract Documents. Whenever inconsistencies occur between the referenced materials, the more stringent shall apply. The document intends to verify the work is conducted at the highest level of safety.

American National Standards Institute (ANSI)

ANSI Z87.1 Occupational and Educational Eye and Face Protection

ANSI Z88.2 Respiratory Protection

ANSI Z89.1 Hard Hats

ANSI Z9.2 Fundamentals Governing the Design and Operation of Local Exhaust Systems

American Society for Testing and Materials (ASTM)

ASTM C 732 Aging Effects of Artificial Weathering on Latex Sealants

ASTM D 522 Mandrel Bend Test of Attached Organic Coatings

ASTM D 1331 Surface and Interfacial Tension of Solutions of Surface-Active Agents

ASTM D 2794 Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)

ASTM D 4397

Polyethylene Sheeting for Construction, Industrial, and Agricultural

Applications

ASTM E 84 Surface Burning Characteristics of Building Materials

ASTM E 96 Water Vapor Transmission of Materials

ASTM E 119 Fire Tests of Building Construction and Materials

ASTM E 736

Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural

Members

ASTM D 2986

Evaluation of Air Assay Media by the Monodisperse DOP (Dioctyl Phthalate)

Smoke Test

LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 3

ASTM D 4884-96

Standard Test Method for Strength of Sewn or Thermally Bonded Seams of

Geotextiles

Code of Federal Regulations (CFR)

29 CFR Part 1910 Occupational Safety and Health Standards

Subpart I Personal Protective Equipment

1910.132 General Requirements

1910.134 Respiratory Protection

Subpart J General Environmental Controls

1910.145 Specifications for Accident

Prevention Signs and Tags

Subpart Z Toxic and Hazardous Substances

1910.1000 Air Contaminants

1910.1025 Lead

1910.1028 Benzene

1910.1052 Methylene Chloride

1910.1200 Hazard Communication

29 CFR Part 1926 Safety and Health Regulations for the Construction Industry

Subpart D Occupational Health and

Environmental Controls

1926.51 Sanitation

1926.52 Occupational Noise Control

1926.56 Illumination

1926.62 Lead

Subpart E Personal Protective & Life Saving

Equipment

1926.100 Head Protection

1926.101 Hearing Protection

1926.102 Eye and Face Protection

1926.103 Respiratory Protection

1926.104 Safety Belts, Lifelines, and lanyards

LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 4

Subpart F Fire Protection and Prevention

1926.150 Fire Protection

1926.151 Fire Prevention

1926.154 Temporary Heating Devices

Subpart J Welding and Cutting

1926.350 Gas Welding and Cutting

1926.352 Fire Prevention

1926.353 Ventilation and Protection in Welding, Cutting, and Heating

Subpart L Scaffolds

1926.450 Scope, Application, and Definitions

Applicable to this Subpart

1926.451 General Requirements

1926.452 Additional Requirements Applicable

to Specific Types of Scaffolds

1926.453 Aerial Lifts

1926.454 Training Requirements

Appendix A Scaffold Specifications

Subpart M Fall Protection

1926.500 Scope, Applicability, and Definitions

Applicable to this Subpart

1926.501 Duty to Have Fall Protection

1926.502 Fall Protection Systems Criteria and

Practices

1926.503 Training Requirements

Subpart N Cranes, Derricks, Hoists, Elevators, &

Conveyors

1926.552 Material Hoists, Personnel Hoists, and Elevators

Subpart Z Toxic & Hazardous Substances

Appendix A Methods of Sample Analysis

Appendix B Medical Surveillance Guidelines

40 CFR Part 61 Environmental Protection Agency

Part 261 Identification and Listing of

Hazardous Waste https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153AppB https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153AppB

LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 5

49 CFR Part 173 Department of Transportation

Shippers General Requirements for Shipments and Packaging

National Institute for Occupational Safety and Health (NIOSH). Department of Health and Human

Services

Method 7400 Fibers

Method 7082 Atomic Absorption; Flame

Method 7105 Atomic Absorption; Graphite Furnace

National Fire Protection Association (NFPA)

70 National Electrical Code

241 Construction and Renovations

701 Standard Method of Fire Tests for Flame-Resistant Textiles and Films.

Compressed Gas Association (CGA)

CGA G-7 Compressed Air for Human Respirators

CGA G-7 Commodity Specifications for Air

Underwriters Laboratories (UL)

UL 586 High-Efficiency Particulate Air Filter Units

Additional Standards

NSF 49 National Sanitation Foundation Class II (Laminar Flow) Biohazard Cabinetry

Federal Aviation Administration (FAA) Orders

Article 77 Agreement between DOT/FAA and the National Air Traffic Controllers

Association (NATCA)

Article 52 Agreement between DOT/FAA and the Professional Airways System Specialists

(PASS)

Order 3900.19B FAA Occupational Safety and Health Program

LRR - QOO ARSR, Anson, TX May 23, 2023 02 83 19.13 - 6

1.04 DEFINITIONS

A. The following terms used in the text shall be defined as follows:

1. CIH: An Industrial Hygienist certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.

2. Competent Person: On all construction work sites the contractor shall designate a competent person having the qualifications and authority for verifying worker safety and health as required by 29 CFR 1926.20. The duties of the competent person include, but are not limited to, the following: establishing the negative pressure enclosure, verifying its integrity, controlling entry into and exit from the enclosure, inspecting the work site for consistent use of engineering control, verifying workers wear required personal protective equipment and are trained in the use of hygiene facilities, work practices, and decontamination procedures specified in this specification and applicable regulations.

3. COR: Contracting Officer's Representative

4. Critical Barrier: 2 Layers of 6-mil polyethylene sheeting sealed over the openings in the work area (or other similarly placed physical barrier) sufficient to prevent airborne fibers in the work area from migrating to an adjacent area.

5. Demarcated Area: An area that has been isolated from the remaining portions of the building by installing critical barriers and/or flapped barriers on the doorways/entrances/and other openings to the area, posting the area with OSHA approved warning signage to prevent unauthorized entry, and providing HEPA equipped ventilation equipment to filter the air and provide directed airflow out of the area.

6. HEPA (High Efficiency Particulate Air) Filter: A filter capable of trapping and retaining at least

99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.

7. Immediately: When the contractor is on-site, immediately refers actions required to take place within 15 minutes of being notified. When the contractor is off-site, immediately refers to actions required to take place within 2 hours of being notified.

8. MC (Monitoring Contractor): contracted as a third party to the FAA, to perform inspections and air monitoring.

1.05 PRE-BID CONTRACTOR QUALIFICATION SELECTION SUBMITTALS

A. Provide the following pre-bid contractor qualification selection submittals:

B. Contractor Identification: The Abatement Contractor shall be licensed by the State of Texas for the purpose of removal, encapsulation, enclosure, or demolition of lead, where required.

1. Company name and address (street and mailing if different).

2.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .