QMAE-BD-140001-D_Amendment_001.docx
DOCX document 51 KB Posted
- Attached to
- Medium and Heavy Duty Truck Program Federal contract opportunity
- Solicitation number
- QMAE-BD-140001-D
- Issued by
- GSA Federal Acquisition Service
About this file
QMAE-BD-140001-D Amendment 0001
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation QMAE-BD-140001-D Amendment 001 – Continuation of Standard Form 30
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 6 |
2. AMENDMENT/MODIFICATION NO.
AMENDMENT 001
3. EFFECTIVE DATE
SEPTEMBER 15, 2014
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (IF APPLICABLE)
| 6. Issued By |
| Code |
| 7. ADMINISTERED BY (If other than Item 6) |
| Code |
GSA/FAS/QMAAA
1800 F STREET NW
WASHINGTON, DC 20405
| 8. Name and Address of Contractor (No., street, county, State and ZIP Code |
| (x) |
| 9A. AMENDMENT OF SOLICITATION NO. |
QMAE-BD-140001-D
| X |
| 9B. DATED (SEE ITEM 11) |
August 27, 2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X |
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |
| X |
| is extended |
is not extended.
Offer's must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ___ONE_____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| [ ] | |
| A. | THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
| [ ] | |
| B. | THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF : |
| [ ] | |
| C. | THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF : |
| [ ] | |
| D. | OTHER (Specify type of modification and authority) |
E. IMPORTANT: Contractor
| is not, |
| X |
| is required to sign this document and return _ONE_ copies to the issuing office. |
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The above referenced solicitation QMAE-BD-140001-D is amended as follows:
1) Update the AutoBid close date and proposal due date.
2) Provide questions and answers as submitted in response to the RFP.
3) Remove Wreckers and Carriers item numbers from Section D.8.
4) Remove Tab I from Volume I submission requirements
5) Provide revised Federal Standards for Ford Schedule of Items
The solicitation citations are amended in accordance with the attached pages.
All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
CONTRACTING OFFICER
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY ______________________________________________
(Signature of person authorized to sign)
(Signature of Contracting Officer)
| NSN 7540-01-152-8070 | |
| 30-105 | |
| STANDARD FORM 30 (REV. 10-83) |
PREVIOUS EDITION UNUSABLE
Prescribed by GSA, FAR (48 CFR) 53.243
This modification is issued to:
1) Update the AutoBid close date and Proposal due date.
a. AutoBid close date has been updated From: Friday, September 26, 2014, at 3:00pm Eastern To: Friday, October 3, 2014, at 3:00pm Eastern
b. Proposal due date has been updated From: Monday, September 29, 2014, at 2:30pm Eastern To: Monday, October 6, 2014, at 2:30pm Eastern
c. Changes apply to the following sections of the RFP
i. A.1 – Additional Information for Standard Form 1449
ii. F.1 – Addendum to 52.212-1 Instructions to Offerors – Commercial Items
iii. Attachment B - Proposal Checklist
2) Provide questions and answers as submitted in response to the RFP.
Question 1 CONUS/OCONUS Delivery Requirements:
Per Page 41: D.21 F-FSS-200-B DELIVERY--F.O.B. DESTINATION (MAY 1991) Prices offered must cover delivery F.O.B. destination (FAR 52.247-34) to locations in the continental United States (CONUS). Yet in multiple locations in the solicitation reference is made to OCONUS delivery: Page 12, Page 17, Page 38, and Page 71. Request confirmation that these references are related to the options, (DDRH designates Hawaii, DDRG designates Guam, DDRA designates Alaska). If vendors chooses to indicate that these options are Not Available then would it be accurate to say that all items in this contract for are for CONUS delivery ONLY?
Answer Hawaii, Guam and Alaska are optional OCONUS delivery locations. If the vendor indicates that delivery to Hawaii, Guam and Alaska options are not available then the only available delivery for any awarded contract would be the continental United States (CONUS).
Question 2
INSPECTION AT SOURCE OR DESTINATION:
Page 37: D.16 552.246-71 SOURCE INSPECTION BY GOVERNMENT (JUNE 2009)
(a) Inspection by Government Personnel Supplies to be furnished under this contract will be inspected at source by the Government …….
| Page 40: D.20 | E-FSS-522 | INSPECTION AT DESTINATION (MAR 1996) |
| (a) | Inspection by the Government. It is anticipated that the supplies purchased under this contract will be inspected at destination by the Government |
Please clarify whether inspection is going to be at Source as presented in TAB H under Volume 1 or if inspection could be required at Destination?
Inspection will be required at both the source and the destination. Inspection at the source would be to determine that the products compliance to Federal Standards and the specifications of the order. While Inspection at the destination would be to ensure no damage was caused to the product during shipping.
Question 3 The Solicitation Number for Medium and Heavy Duty Trucks is QMAE-BD-140001-D. The Solicitation Number for Wreckers and Carriers is QMAE-BD-140002-D. Yet the items numbers for the Wreckers and Carriers are included in the item listing on page 33, D.8 Time of Shipment for this solicitation on Medium and Heavy Duty Trucks. Are the Wreckers and Carriers a part of this solicitation response or will there be a separate solicitation?
Answer This solicitation is for Medium and Heavy Duty Trucks only. Wreckers and Carriers requirements are being solicited under a separate Request for Proposal (QMAE-BD-140002-D).
The RFP is amended to remove the Wreckers and Carriers items from Section D.8.
Question 4 Under Volume 1 on page 67, there is a TAB I – P.L. 94-163. Please clarify what should be submitted here. Vendor looked up Public Law 94-163 Energy Policy and Conservation Act but does not know what GSA requires for this submission at TAB I. Page 69 in the solicitation describes TAB H but there is no I, it just goes into the second volume.
No information is required under Tab I. The RFP is amended to remove Tab I from Volume I submission requirements.
Question 5 The solicitation states, “AutoBid will close Friday, September 26, 2014, at 3:00pm Eastern”, however, the proposal checklist states, “AutoBid Pricing Completed and submitted by 3:00pm September 24, 2014”. Please confirm when pricing must be completed and submitted in AutoBid.
The submission due date in AutoBid has been amended. AutoBid will close Friday, October 6, 2014, at 3:00pm Eastern. The RFP is amended to reflect this change.
Question 6 The proposal checklist includes the following in Volume 1, “TAB I – Public Law 94-163 Data”, but the Solicitation “SUBMISSION CONTENT AND FORMAT OF PROPOSALS” section does not. Is Public Law 94-163 Data required?
No information is required under Tab I. The RFP is amended to remove Tab I from Volume I submission requirements.
Question 7 After viewing several of the Federal Standards I have noticed much of my information that I spent weeks inputting into Auto Vendor is incorrect or not there. I was explained because other Ford dealers (about 3 other dealers) were also bidding and do to the GSA system unable to merge all the information, GSA was only able to use one dealers information (not sure who’s it is). This is going to be a big problem with Ford not meeting or complying with the Federal Standards.
To give you an example on the attached Item 471, page 2 under components for “Rear Axle” GSA Min Std is “11,500 to 13,900 lbs.” and Ford is supplying “17,500 lbs.”….That means Ford is not complying with GSA Federal Standards. Another example is page 1 under “Gross Vehicle Weight Rating” GSA Min Std is 19,501 to max 21,999 lbs.” and Ford is supplying you with “20,940 lbs.”…It’s incorrect it should be “20,780 lbs.”. Again these are just a couple of examples. There are many more.
I can bid the Ford truck to meet the Federal Standards but it’s not going to match what is in the Federal Standards. This then could lead to other problems. One is my pricing vs. other Ford dealers. I’m pricing the unit to meet spec’s (I could lose the bid for not being low on price) and if by chance I was awarded the item it would not meet the Federal Standard as they are written today
Answer The Government has determined that the Federal Minimum Standards as reflected in amendment 001, Attachment G2 - Ford Schedule of Items, represent the Government’s requirement. It is incumbent upon each offeror to propose a vehicle that meets or exceeds the Government’s stated requirements. Vendors should utilize the Technical Exceptions Worksheet (Attachment E to the solicitation) to note any exceptions to the Government’s stated requirement.
3) Remove Wreckers and Carriers item numbers from Section D.8.
Section D.8 552.211-81 Time of Shipment (Feb 1996) (Alternate I—Feb 1996) of the RFP has been revised
FROM:
D.8 552.211-81 TIME OF SHIPMENT (FEB 1996) (ALTERNATE I—FEB 1996)
**For purposes of this clause, for North American production shipment is defined as the moment a vehicle leaves the manufacturer’s production facility. For vehicles which require oceanic transport, the ship date is defined as the moment a vehicle leaves the port of debarkation.
(a) Shipment is required within 150-210 calendar days after receipt of order (ARO), as defined below.
(b) Each delivery order will specify that shipment is required no later than the number of days shown above. If such order also states that "Early Shipment is Precluded," the Contractor agrees to make shipment no sooner than 150-210 calendar days after receipt of order, as defined below. Earlier shipments may result in non-acceptance of the supplies at the delivery point at the time of arrival.
**For items 410, 414, 511, 511C, 513,513C, 514, 520, 524, 614, 615, 619, 622B, 624H, 624S, 624V, 625H, 625S, 625V, 712, 714, 715, 815, 824V, and 825V, shipment is required within 150 days ARO. For items 430, 434, 471, 474, 481, 484, 524G, 531, 531C, 533, 533C, 561, 563, 564, 571, 571C, 573, 573C, 578G, 575, 581, 581C, 583, 583C, 585, 619G, 622G, 633B, 634, 766, 833A, 971, 972, 973, 974, 978, 979, 980, 981, 982, and 983, shipment is required within 180 days ARO. For items 441, 444, 541, 543, 544, 644, 645, 648, 732, 734, 742, 744, 745, 844, 845, 975, 975R, 976, 976R and 977R shipment is required within 210 days ARO.
TO:
D.8 552.211-81 TIME OF SHIPMENT (FEB 1996) (ALTERNATE I—FEB 1996)
**For purposes of this clause, for North American production shipment is defined as the moment a vehicle leaves the manufacturer’s production facility. For vehicles which require oceanic transport, the ship date is defined as the moment a vehicle leaves the port of debarkation.
(a) Shipment is required within 150-210 calendar days after receipt of order (ARO), as defined below.
(b) Each delivery order will specify that shipment is required no later than the number of days shown above. If such order also states that "Early Shipment is Precluded," the Contractor agrees to make shipment no sooner than 150-210 calendar days after receipt of order, as defined below. Earlier shipments may result in non-acceptance of the supplies at the delivery point at the time of arrival.
**For items 410, 414, 511, 511C, 513,513C, 514, 520, 524, 614, 615, 619, 622B, 624H, 624S, 624V, 625H, 625S, 625V, 712, 714, 715, 815, 824V, and 825V, shipment is required within 150 days ARO. For items 430, 434, 471, 474, 481, 484, 524G, 531, 531C, 533, 533C, 561, 563, 564, 571, 571C, 573, 573C, 578G, 575, 581, 581C, 583, 583C, 585, 619G, 622G, 633B, 634, 766, and 833A shipment is required within 180 days ARO. For items 441, 444, 541, 543, 544, 644, 645, 648, 732, 734, 742, 744, 745, 844, and 845 shipment is required within 210 days ARO.
4) Remove Tab I from Volume I submission requirements
Section F.1 Addendum to 52.212-1 Instuctions to Offerors – Commercial Items, 3. Proposal Preparation, (g). 1) Volume 1 – Administrative Requirements – insert Offeror of the RFP has been revised
FROM:
1) “Volume 1 – Administrative Requirements – insert Offeror”
| “Proposal Checklist – insert Offeror” |
| “Tab A – SF1449 – insert Offeror” |
| “Tab B – Vendor Response Document – insert Offeror” |
| “Tab C – Financials – insert Offeror” |
| “Tab D – SAM information – insert Offeror” |
| “Tab E – VETS 100A – insert Offeror” |
| “Tab F – SubK Plan – insert Offeror” |
| “Tab G – Letter of Supply – insert Offeror” |
| “Tab H – Inspection Point(s) / Place(s) of Performance – insert Offeror” |
| “Tab I – P.L. 94-163 – insert Offeror” |
TO:
1) “Volume 1 – Administrative Requirements – insert Offeror”
| “Proposal Checklist – insert Offeror” |
| “Tab A – SF1449 – insert Offeror” |
| “Tab B – Vendor Response Document – insert Offeror” |
| “Tab C – Financials – insert Offeror” |
| “Tab D – SAM information – insert Offeror” |
| “Tab E – VETS 100A – insert Offeror” |
| “Tab F – SubK Plan – insert Offeror” |
| “Tab G – Letter of Supply – insert Offeror” |
| “Tab H – Inspection Point(s) / Place(s) of Performance – insert Offeror” |
5) Provide revised Federal Standards for Ford Schedule of Items
a. See Attachment G2 – Ford Schedule of Items for updated Federal Standards.