QASP-Teleradiology signed.pdf

PDF 286 KB Posted

Attached to
Teleradiology Services
Solicitation number
36C24522Q0225
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

Page 1 of 10 Version 0007 Dated 02/18/2018

The contractor will be evaluated in accordance with the following:

For: Hershel “Woody” Williams VA Medical Center Teleradiology Services

Contract Description: Provision Teleradiology Services to the Hershel “Woody” Williams VA Medical Centers Imaging Department.

The contractor will be evaluated in accordance of the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Crystal Hinton

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: James D. Ward Organization or Agency: VA

Page 2 of 10 Version 0007 Dated 02/18/2018

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

Primary: James D. Ward:

X

James D. Ward

Page 3 of 10 Version 0007 Dated 02/18/2018

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. Direct observation by VA personnel during visits to warehouse facilities as well as Veteran homes

b. PERIODIC INSPECTION. Inspections will be conducted both scheduled and unscheduled.

c. VALIDATED USER/CUSTOMER COMPLAINT: Complaints received from customers reported to contractor and VA will be logged and submitted to the contractor for immediate resolution/corrective action. Contract will monitor complaints monthly and report to the COR on a quarterly basis.

d. RANDOM SAMPLING: Option to be used in reviewing vendor employee and Veteran folders to ensure proper documentation is being maintained.

e. VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR: Receipt/evaluation of reports required in Performance Work Statement, Attachment D.

f. Other: Patient home inspection, patient satisfaction/complaints, monthly review of invoices for accuracy, timeliness of equipment delivery, accuracy of required documentation submitted, and adherence to Joint Commission Standards.

Page 4 of 10 Version 0007 Dated 02/18/2018

6.SAMPLE QASP PERFORMANCE REPORT DATE: August 22, 2018

Measures PWS Reference

Performance Requirement

Standard Acceptable Quality Level

Surveillance Method

Met AQL/DID

NOT MEET

AQL-

CPAR

RATING/ADD

COMMENTS

Prompt delivery of interpretations and return of films.

1.c., 1.f., and 1.d..

Reports are to be completed and verified within 48 hours of exam registration. Stat reports must be faxed to requesting clinician within 45 minutes of when the contractor receives request. All critical/emergent exam results must be called to requesting clinician and this documented in the final report (clinician name, date, and time).

100% of reports are delivered per the requirements of the PWS

98% Monthly Turn Around time reports

Availability of Radiologist.

1.a. Contract physician(s) shall be available as needed to properly

All (100%) contract physician(s)

Contract physician(s) are on-time

Periodic Inspection or

Page 5 of 10 Version 0007 Dated 02/18/2018 perform tasks as specified.

are on time and available to perform services.

and available to perform services 98 % of the time

Random Sampling

Privacy, Confidentiality and HIPAA

Special Contract Requirements

Contractor is aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards Zero breaches of privacy or confidentiality

All (100%) contractor physician(s) comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA

100% compliance;

no deviations.

Periodic Inspection or Random Sampling.

Contractor shall provide evidence of annual training required by VAMC, reports violations per VA Handbook 6500.6.

Maintains licensing, registration, and certification

Special Contract Requirements

Updated Licensing, registration and certification shall be provided as they are renewed. Licensing and registration information kept current.

All (100%) licensing, registration(s) and certification(s) for contract physician(s) shall be provided as they are renewed.

Licensing and registration information kept current.

All (100%) licensing, registration(s) and certification(s) for contract physician(s) shall be provided as they are renewed.

Licensing and registration information kept current.

Periodic Inspection or Random Sampling

Page 6 of 10 Version 0007 Dated 02/18/2018

No acceptable deviation.

Page 7 of 10 Version 0007 Dated 02/18/2018

7. CPAR RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p. A2-1):

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.

SATISFACTORY:

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTO

RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

https://www.cpars.gov/pdfs/CPARS-Guidance.pdf

Page 8 of 10 Version 0004 Dated 6/19/2017

8. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR

PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare an action plan to document how the contractor shall correct the identified issue and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this action plan to the CO. The Government shall review the contractor's action plan. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

See Sample CR on following page.

9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

X James D. Ward Imaging Manager

COR NAME/TITLE

SIGNED:

CONTRACTOR NAME/TITLE DATE

Page 9 of 10 Version 0004 Dated 6/19/2017

CONTRACT REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS ISSUE

3. TO: (Contracting Officer) 4. FROM: (Name of COR)

5. DATES

a. CR PREPARED

b. RETURNED BY

CONTRACTOR:

c. ACTION COMPLETE

6. Issue Identified: (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR Date:

8. SIGNATURE OF CONTRACTING OFFICER Date:

9a. TO (Contracting Officer) 9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE.

(Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

COR

Page 10 of 10 Version 0004 Dated 6/19/2017

CONTRACTING

OFFICER

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. Direct observation by VA personnel during visits to warehouse facilities as well as Veteran homes
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).

File details come from the government source that posted it. Updated .