This document contains a Quality Assurance Surveillance Plan (QASP) and related federal contract opportunity for MC-130J engineering support services. The Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is seeking these services from PCI Aviation, LLC on a sole source basis. The QASP establishes procedures for monitoring contractor performance against standards in areas such as timely delivery of reports, engineering and technical support services, contractor manpower reporting, and quality management systems. It identifies roles for government parties including contracting officers, contracting officer representatives, and a multi-functional team in conducting oversight. The related federal contract opportunity provides additional details on the scope of work covering sustaining engineering, modifications, and technical support for MC-130J aircraft. It describes a firm fixed price, cost plus fixed fee, and cost reimbursement contract structure over five years with an initial 12-month base period and four 12-month options.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA850920R00170001.pdf | ||
| RevisedPerformance-BasedWorkStatement.pdf | ||
| PWS.pdf | ||
| CDRLS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR: FD2060-20-31523 QASP REVISION: 0 1
Quality Assurance Surveillance Plan for
MC-130J Supermod Engineering Support Services
Purchase Request: FD2060-20-31523
15 May 2020
1.0 Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract.
The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the details associated with a continuous oversight process, to include:
What will be monitored
How monitoring will take place
Who will conduct the monitoring
How monitoring efforts and results will be documented
1.1 The contractor is responsible for implementing and delivering performance that meets contract standards using its own quality control plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to ensure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
1.2 The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance. Copies of the QASP and any revisions shall be provided to the contractor and the Contracting Officer's Representative (COR) to facilitate implementation of surveillance activities. In addition, the QASP should recognize and accommodate unforeseen or uncontrollable circumstances which might occur that are outside the control of the contractor.
1.3 Objective(s): This requirement is for MC-130J aircraft sustaining engineering services and technical support for systems on Air Force Special Operations Command (AFSOC) aircraft throughout their life cycles. This effort will require the contractor to define, assess, and resolve various engineering and technical support issues for the MC-130J aircraft (hereafter referred to as “the aircraft” or “MC-
130J”) systems and subsystems. The contractor shall provide an enhanced engineering design and analysis capability, support aircraft modifications, address operational capability improvements, analyze/recommend aircraft availability improvements, suggest reliability and maintainability actions, perform replacement system analysis, assist with resolving deficiency reports, and assist with aircraft troubleshooting/repair. The contractor shall provide engineering support for all MC-130J modifications to include, but not limited to, Increment 3, Defense System Upgrade (DSU), Electronic Warfare Bus, Cotton Mouth, Buffer Boards, and Auxiliary Flight Deck Station (AFDS) and develop implementation / installation integration plan and provide reach back support during kit installations as technical support.
The contractor shall also be required to perform logistical studies, develop Time Compliance Technical
Orders (TCTO), submit technical order (TO) change packages, determine parts obsolescence solutions, develop prototypes, address drawing deficiencies, and perform other sustaining engineering activities required for weapon system sustainment. The contractor will as required produce and install limited
PR: FD2060-20-31523 QASP REVISION: 0 2
kits for minor modifications in order to standardize fielded aircraft installations with the MC-130J consolidated modification line. This acquisition will benefit the government by assisting Multi-
Function Teams (MFT) with logistics and addressing technical and engineering matters relating to the overall sustainment of the aircraft platforms. When properly addressed/corrected, expediting resolution of these sustaining engineering issues will provide increased operational capability for the aircraft in the areas of operational safety, suitability, and effectiveness.
1.4 Result(s): This acquisition will benefit the USAF by providing timely system engineering activities, improved capability to the war-fighter, and by helping to reduce down-time of Low
Density/High Demand aircraft.
2.0 Assessment Management
2.1 Services Summary
Performance Objective PWS
Reference
Performance Threshold Method of Surveillance
Provide timely delivery of required data.
4.3.1
4.3.6
4.3.9
4.4.1.1.2
4.4.1.1.3
The contractor shall submit a status report by the 15the calendar day of the delivery month. The contractor’s report shall be complete and accurate, so that the number of report rejections shall not exceed one (1) per each six (6) month period. Rewritten reports shall be resubmitted to AFLCMC/WIU within five (5) business days of notification that a rewrite is required. Reports will be on schedule 95% of the time.
Contractor provides the remaining 5% within five (5) business days.
Surveillance will be conducted by the COR reviewing data
/documents.
Surveillance will be documented, at a minimum, quarterly by the COR in the PAR.
Perform complete, accurate, and timely system engineering and technical liaison services to support the aircraft system/subsystems and their integration into the aircraft
4.3- 4.4.3.6
Upon notification by AFLCMC/WIU of a technical report requirement, the contractor’s report shall be delivered by the specified due date and complete and accurate, so that the number of report rejections, due to omitted or inaccurate technical information shall not exceed one (1) per submittal. Rewritten reports shall be resubmitted to AFLCMC/WIU within five (5) business days of notification that a rewrite is required.
Surveillance will be conducted by the COR reviewing data and documentation against the technical report requirement.
documented, at a minimum, quarterly by the COR in the PAR.
PR: FD2060-20-31523 QASP REVISION: 0 3
Establish and maintain
Contractor Manpower
Reporting
5.5.5 Within 30 calendar days of
contract/order award, the Contractor shall establish a record for the contract/order in eCMRA including
Order Data, Contact Data and
Location Data and make the annual report no later than October 31 of the following fiscal year.
Surveillance will be conducted by the COR monitoring eCMRA and reporting
Contractor non-compliance to the
PCO.
documented annually by the COR in the
PAR.
Contractor Quality
Management System
(QMS)
5.6 The Contractor shall submit a Quality
Control Plan (QCP) addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur
Surveillance will be conducted by the COR monitoring submission of the OCP and submitting and changes to the contractor.
documented annually by the COR in the
PAR.
PR: FD2060-20-31523 QASP REVISION: 0 4
2.2 COR Online File Documentation
The COR will establish and maintain an online file containing training and surveillance documentation in the Procurement Integrated Enterprise Environment (PIEE) via the Joint
Appointment Module (JAM) and Surveillance and Performance Module (SPM). At a minimum, the following documentation will be maintained in JAM/SPM by the COR or PCO as applicable.
a. COR INFORMATION (COR Profile established in JAM):
Training and Appointment:
DAU CLC 222 Contracting Officers Representative (COR) Online Training
DAU CLM 003 Overview of Acquisition Ethics DoD Combatting Trafficking in Persons for Acquisition & Contracting Professionals
Wide Area Workflow Overview
QAPC-Led Training (Level C)
Contract-Specific Training
Refresher training
Confirmation of filing the Annual OGE 450
b. QASP
c. Designation of Contracting Officer’s Representative
d. Annual COR File Inspection Checklist(s)
e. COR ONLINE FILE:
i. COR Status Reports/Surveillance:
PAR(s)
CAR(s)
ii. COR Trip Reports
iii. COR Correspondence Reports:
Meeting Minutes
Contractor correspondence
iv. Miscellaneous Documents:
Contract, including modifications (if not in EDA)
PWS, including revisions (if not in EDA)
Amended QASP
DD Form 254 (if not in EDA)
CDRL(s) (if not in EDA)
CDRL/Deliverables (if not in WAWF)
Contractor Safety Plan
Applicable status report(s)
Master/Delivery Schedules
Customer Complaint Records
CAV-AF Repair Item Actions Report(s)
PR: FD2060-20-31523 QASP REVISION: 0 5
Documentation of Contractor payment (if not processed in WAWF)
2.3 Plan for Corrective Action
2.3.1 Unsatisfactory Contractor performance will result in the COR issuing a negative PAR to the
Contractor. The Contractor will be required to respond by the suspense date. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence.
2.3.2 If repetitive negative PARs or a single negative PAR identifying Contractor non- compliance are issued without satisfactory resolution, the COR will initiate the CAR process. However, the
MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR by the established suspense date with a corrective action plan to the PCO for acceptance by the MFT. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The COR will upload the CAR in SPM. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.
2.3.3 CORs shall establish a tracking system for corrective actions that includes date COR submitted CAR to PM/FSM, date reviewed by PM/FSM, date reviewed by CO, date issued by CO, contractor’s identified root cause, proposed corrective action, contractor follow-up actions, and get-well date.
2.4 Acceptance of Services
2.4.1 The Contractor shall submit/process payment requests and receipt/acceptance documents via
Wide Area Workflow (WAWF). Services will be accepted by the Program Manager.
2.4.2 CDRL deliverables shall be submitted using WAWF and directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.
3.0 Roles and Responsibilities of Multi-Functional Team (MFT)
3.1 General Responsibilities
3.1.1 The MFT is responsible for ensuring the acquisition utilizes Performance-Based Service(s)
Acquisition (PBSA) methods including establishment of performance thresholds, procedures to evaluate Contractor performance and positive/negative incentives to encourage the highest quality of services.
3.1.2 The MFT is responsible for conducting surveillance of Contractor performance to ensure
Government requirements including quality of services, cost and schedule are met. The MFT will
PR: FD2060-20-31523 QASP REVISION: 0 6
provide the results of their surveillance to the Contracting Officer’s Representative (COR) for input into the Performance Assessment Report (PAR) and to the MFT member updating the
Contractor Performance Assessment Reporting System (CPARS).
3.1.3 For contracts requiring higher-level quality requirements, the MFT is responsible for developing metrics in tracking the effectiveness of the contractors Quality Management System
(QMS) that tie to the SS, QASP, and CPARS. Ensure contracts requiring higher-level contract quality requirements include a SS performance objective that encompasses MFT goals related to quality directly relates to the CPARS category of “Quality”.
3.1.4 The MFT ensures contract oversight focuses on the adequacy and adherence of the contractor to their proposed QMS. The MFT shall focus on whether the COR or contractor is first in detecting defects and trends, who (COR or contractor) accomplishes more inspections, and, whether the contractor is proactively pursuing key QMS functions to ensure quality related problems or defects do not recur.
3.2 Contracting Officer’s Representative (COR)
3.2.1 Registers in PIEE as a COR. Self-nominates in JAM as the designated COR for the contract.
If required, files an Office of Government Ethics (OGE) Form 450, Confidential Financial
Disclosure Report. Establishes and maintains an online file containing training and surveillance documentation in JAM/SPM.
3.2.2 Registers for an Enterprise Contractor Manpower Reporting Application (eCMRA) account after designation as a COR. No later than 60 calendar days after contract/order award, verifies the
Contractor has established a record for the contract/order in eCMRA. Reviews and, if required, corrects the Contractor record (Order Data, Contact Data, Location Data, etc.). Enters the National
Defense Authorization Act (NDAA) Elements and the Fund Cite Data. Verifies the Contractor has reported all data for each fiscal year, including an annual count of contractor/subcontractor personnel performing services and the total of contractor/subcontractor labor hours, no later than
October 31 of the following fiscal year.
3.2.3 Works with the MFT in conducting and documenting surveillance on Contractor performance. Reports unethical conduct and instances of fraud, waste and/or abuse to the
Procuring Contracting Officer (PCO). Inspects and accepts/rejects deliverables during contract/order performance and at close-out to ensure contract/order terms and conditions are met.
Develop an inspection schedule that shall comprise of at least ten percent of non-services summary items, but no more than twenty percent. Monitors control and disposition of Government property.
Monitors Contractor payment and verifies it is commensurate with Contractor performance.
Documents Contractor performance via PARs, Corrective Action Report(s) (CAR), etc. Issues
PARs, at a minimum, quarterly, and negative PAR(s) or CAR(s) as required.
3.2.4 Ensure contractor’s accepted Quality Management System (QMS) complies with contract requirements. In post award, CORs need to place special emphasis in ensuring the contractor’s
QMS is being followed as written, plus is effective in bringing about the desired results – performance equal to or greater than the SS metrics, plus an inspection and corrective action program that identifies and fixes issues without having to be identified by the Government.
PR: FD2060-20-31523 QASP REVISION: 0 7
3.3 Contracting Officer’s Representative (COR) Supervisor
3.3.1 Upon PCO request for COR support, selects a qualified nominee. Confirms the COR nominee has no personal conflicts of interest with performing the responsibilities to be delegated by the PCO. Verifies the COR nominee has the appropriate clearance for the contract/order. If required, ensures the COR nominee files an OGE Form 450. Ensures the COR takes initial, annual and any additional training required by the contracting activity. Ensures the COR completes 16 hours of refresher training every three years after completion of the QAPC-Led Training.
3.3.2 Registers as Manager via SPM.
3.3.3 Ensures the COR registers in PIEE as a user via SPM. Ensures the COR self-nominates as the designated COR for the contract in JAM. Upon email notification of the COR self-nomination, approves the nomination via email link. Reviews the COR Profile and COR Online File, at a minimum, annually. Considers performance of COR duties in their appraisal.
3.4 Procuring Contracting Officer (PCO)
3.4.1 Only individual authorized to enter into contracts for supplies and/or services by obligating the Government. Determines if a COR is required to conduct/document surveillance of Contractor performance. If the requiring activity has not initiated a COR nomination in the JAM, submits a
Request for Contracting Officer’s Representative Support memorandum to the requiring activity.
Determines whether a COR is required to file an OGE Form 450. Provides Contract-Specific
Training to the COR.
3.4.2 Upon notification of COR Supervisor approval of the COR self-nomination, approves the nomination in JAM. Before contract/order award, generates a Designation of Contracting Officer’s
Representative memorandum to the COR and Contractor via JAM through use of the identified
Smart Form. The Designation memorandum ensures the Contractor is notified of the COR assigned to the contract/order and their areas of responsibility and limitation of authority. Upon transfer/termination of the COR, issues a Revocation (Termination) of Designation of Contracting
Officer’s Representative memorandum in JAM.
3.4.3 Reviews the COR reports on Contractor performance in SPM. Approves/Rejects PARS and any CAR(s). Reviews the COR Profile and COR Online File, at a minimum, annually. Documents the results of their review on the Annual COR File Inspection Checklist and uploads to SPM under
Surveillance Documents (Category “Miscellaneous”, Subcategory “Other”, Label the document
“Annual COR File Inspection Checklist”). Checklist must be signed by the PCO, COR, and COR
Supervisor prior to uploading to SPM.
3.5 Quality Assurance Program Coordinator (QAPC)
3.5.1 Supports the MFT in the development of the contract/order quality assurance requirements specifically ensuring the requirements are clearly stated and enforceable. Prior to contract/order award, provides training to CORs and COR management [e.g., FC/FD. COR supervisor, etc.]
PR: FD2060-20-31523 QASP REVISION: 0 8
3.5.2 Provides functional, not technical, support for JAM/SPM users including assistance with registration and role activation. Monitors records of COR and COR management training in
JAM/SPM.
3.6 Contractor
3.6.1 Participates as a member of the MFT upon approval of the Justification & Approval (J&A) or
Sole Source Justification (SSJ) if the acquisition is sole source and upon contract/order award if it is competitive.
3.6.2 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4)
Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.
3.6.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of
Defense Contract Security Classification Specification, and applicable Government regulations.
3.6.4 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.
3.6.5 Signs and returns a positive PAR within five business days. Signs and returns a negative
PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.
3.6.6 Establishes a record for the contract/order in eCMRA no later than 30 calendar days after contract/order award. Enters Order Data, Contact Data and Location Data. Provides an annual count of contractor/subcontractor personnel performing services for each fiscal year if the
Department of Defense (DoD) is the requiring activity and if the acquisition is in excess of
$3,000,000.00. Reports all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract/order for each fiscal year in eCMRA.
3.7 Functional Commander/Functional Director (FC/FD)
The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis. Reference PWS and QASP signature page.
PR: FD2060-20-31523 QASP REVISION: 0 9
4.0 Management Strategy
4.1 The MFT will meet and record minutes quarterly to review contractor’s performance. The
COR will issue PARs via SPM utilizing the identified Smart Form, documenting both satisfactory and unsatisfactory Contractor performance, at a minimum, quarterly.
4.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the PCO or Contract Specialist will issue a
CAR. However, the MFT reserves the right to issue a CAR at any time based on the severity of the
Contractor non-compliance. If the CAR process fails to resolve the unsatisfactory Contractor performance, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order
4.3 Incentives
4.3.1 If Contractor performance meets or exceeds contractual requirements, positive incentives may include, but are not limited to, decreased surveillance, favorable CPARs and exercising options.
4.3.2 If Contractor performance does not meet contractual requirements, negative incentives may include, but are not limited to, increased surveillance, unfavorable CPARs, not exercising options and Government recourse authorized by the Inspection of Supply/Services clause(s) identified in the contract/order.
5.0 Annual COR Online File Inspection: The COR, the COR Supervisor and the PCO will review the COR Profile and COR Online File, at a minimum, annually. The PCO will document the results of their review on the Annual COR File Inspection Checklist. The COR and COR
Supervisor will acknowledge the results of the Annual COR File Inspection Checklist via signature.
6.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.
6.1 The MFT will evaluate Contractor performance. The Program Manager will, at a minimum, review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.
6.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the Program Manager will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s response, the CPAR will be coordinated through management up to the Division level. Once approved, the
CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review. The
Contractor shall have the option to concur or non-concur, with comments, via CPARS.
PR: FD2060-20-31523 QASP REVISION: 0 10
6.3 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality of Service, Business Relations, Management, Cost Control (if applicable), and Schedule.
Performance
Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
7.0 Safety Requirements
7.1 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to
DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty
DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. The
Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the MFT (COR, if available, or another MFT member) by telephone within four business hours. The Contractor shall cooperate with Government safety investigations.
7.2 MFT Surveillance: MFT member(s) will report any potential safety hazards or actual mishaps to the COR. The COR will monitor Contractor reporting and review any mishap notifications.
The COR will address safety and/or health issues in the PAR or in a CAR as applicable.
8.0 Trafficking in Persons: The MFT must inform the PCO if the contractor/subcontractor fails to comply with the requirements of FAR 52.222.50, Combating Trafficking in Persons. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and
Support / Office of the Under Secretary of Defense (OUSD) Personnel and Readiness (P&R)
Defense Human Resources Activity (DHRA).
PR: FD2060-20-31523 QASP REVISION: 0 11
9.0 Signatures
By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.
The QAPC signature above signifies guidance was provided to the MFT in the development of contract quality assurance requirements in accordance with AFFARS MP5346.103.1c.(2).
Dylan Dalton Program Manager/COR Date
AFLCMC/WIU SOF/PR & Rotary Divisions
478-222-0659
Britney Jones, Program Manager/COR Date
AFLCMC/WIU SOF/PR & Rotary Division
478-222-0967
Jeffery Pruitt/PCO Date
AFLCMC/WIUKA SOF-Fixed Wing
478-222-9667
By signing below, you are identifying that these services are not mission-essential in accordance with DFARS 237.7602(a), DFARS 252.237-7023(a) (2) and AFI 10-403, paragraph 1.9.1.33.2.
John Sawyer/ FC/FD Date
AFLCMC/WIU SOF/PR & Rotary Division
478-926-6310
| 2020-05-28T12:34:56-0400 | |
| MIDDLEBROOKS.DEBORAH.A.1280272937 |
| Text2: 29 May 2020 | |
| Text3: 28 May 2020 | |
| Text4: 29 May 20 | |
| Text5: 3 June 2020 | |
| Text6: 3 June 20 | |
| 2020-05-28T13:07:38-0400 | |
| DALTON.DYLAN.C.1536376999 |
| 2020-05-29T08:45:39-0400 | |
| JONES.BRITNEY.J.1112739170 |
| 2020-06-03T11:10:24-0400 | |
| PRUITT.JEFFERY.W.1109154802 |
| 2020-06-03T09:08:33-0400 | |
| SAWYER.JOHN.W.1109215186 |