QASP CONUS MHE Maint.docx

DOCX document 17 KB Posted

Attached to
CONUS MHE Preventative Maintenance and Remedial Services Federal contract opportunity
Solicitation number
SP451022Q1025
Issued by
Defense Logistics Agency

About this file

This solicitation requests proposals for material handling equipment preventative maintenance and remedial repair services for DLA Disposition Services sites in the continental United States. The requirement is set aside for small businesses under NAICS code 811310 with a size standard of $8 million. Offerors must submit pricing on the schedule of prices by January 7th, 2022 to be considered for the one-year firm-fixed price IDIQ base contract with a minimum and maximum value of $2 million. Evaluation will be based on past performance and price, with past performance significantly more important. The solicitation includes a quality assurance surveillance plan outlining preventative maintenance and repair acceptance levels to measure contractor performance.

View the file

Other files for this federal contract opportunity

Other files attached to CONUS MHE Preventative Maintenance and Remedial Services, newest first.
File Type Posted
Attachment 4 CAC Turn-In Receipt.pdf PDF
Appendix 5 - List of Manufacturers.xlsx XLSX spreadsheet
Appendix 1 - Northeast Region.xlsx XLSX spreadsheet
Appendix 2 - Southeast Region.xlsx XLSX spreadsheet
PWS CONUS MHE Maint_Final 11-16-2021.docx DOCX document
Appendix 4 - West Region.xlsx XLSX spreadsheet
Attachment 2 Bid Schedule CONUS MHE Maint v2.xlsx XLSX spreadsheet
Appendix 6 - Place of Performance.xlsx XLSX spreadsheet
Attachment 3 - Contractor Instructions.pdf PDF
MHE SOL Clauses and Provisions.docx DOCX document
Attachment 1 Past Performance Questionnaire.doc DOC document
Appendix 3 - Mid-America Region.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP for DLA Disposition Services Continental United States (CONUS) Performance-Based Material Handling Equipment (MHE) Maintenance

1. Purpose:

This document is to provide guidance on administering subject contracts such that the best possible quality in performance can be assured through appropriate surveillance and addressing of any performance failures as appropriate. The Acceptable Performance Level (APL) is the standard the U.S. Government (USG) expects the contractor to meet throughout the life of the contract. In general, the DLA Disposition Services MHE Maintenance contract will have two APLs that will be used to measure contractor performance though additional ones may be identified depending on the contract requirements. The standard APLs are timely preventive maintenance of all equipment and timely completion of minor repairs.

2. Acceptable Performance Levels:

a. Timely and Complete Preventive Maintenance (PM)
(i). “item” in the standard and APL column means a single piece of MHE.
(ii). The APL is measured per quarter.
b. Timely and Complete Corrective Maintenance (CM)
(i). “item” in the standard and APL column means a single piece of MHE.
(ii). The APL is measured throughout the contract performance period.

3. Surveillance:

a. The primary method of surveillance for evaluating compliance is by Contracting Officer’s Representative (COR) reporting. The COR is responsible for reporting preventive maintenance performance to the Contracting Officer (KO) promptly after the performance deadline has passed. The COR will provide when the action was required to be performed by the contractor and the date it occurred. The COR shall also include what the negative impact of the contractor’s failure to meet the APL was on the DLA Disposition Services site.
b. In instances where there are late completions of PM or CM, the COR shall determine if the late performance is caused by an occurrence beyond the reasonable control of the contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the USG either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. In such cases as there is an excusable delay, the contractor will be deemed to have made the APL for the period.

4. Reduction for Failed APL:

a. Throughout each performance period of the contract, including options, the contractor is allowed one failure of the preventive maintenance APL and one failure of exceeding the 3 late repairs. After the failures the KO may take consideration for each additional instance of the contractor not meeting the APL. As indicated in the APL matrix, the reduction for failure to meet APLs is the same in all performance areas. The 5 - 100% consideration available is broad to give the contracting officer full latitude to take consideration based on the effect of the non-compliance on site operations and frequency of not meeting the APLs.
b. If valid failure to meet an APL is identified and consideration is warranted considering the pertinent facts, consideration is taken against the value of the preventive maintenance or repair for the item. Consideration is taken against the individual value of the maintenance or repair which is late.
c. In addition to the consideration and past performance annotation remedies available to the KO under the APL Matrix, the government may use such measures as partial or full terminations under FAR 52.212-4, not exercising options, and ending a contract early without these measures as long as it is IDIQ and has met its minimum government obligation for the period and a plan for a timely replacement contract is secured.

Acceptable Performance Levels

Deliverable
Standard
Time Frame
Clause
Acceptable Performance Level
Reduction for failed APL
Method of Surveillance
Timely and Complete PM
PM of all items under the appropriate CLINs
Within 14 calendar days and/or as determined by site needs via call orders
PWS 11 e.
No more than 3 items maintained later per period. Failure to meet APL allowed once during performance period including options.
Payment may not be made until APL is achieved.
COR/

Customer

Preventive Maintenance Sheet
Record of items inspected, and word performed for each piece of equipment receiving a PM service
Within 5 business days of PM service completion
PWS 11 f.
No more than 3 record sheets delivered late during the period of performance.
Payment may not be made until APL is achieved.
Timely and complete CM
MHE Operational in a timely manner
Within 5 business days of COR approval of cost estimate and repair
PWS 12 e.
No more than 3 items repaired exceeding the required timeframe.
Payment may not be made until APL is achieved.
COR/