QALI KC-135 Fire Cart MJ92 MJ15.pdf

PDF 896 KB Posted

Attached to
KC-135 & C-17 Fire Cartridges Federal contract opportunity
Solicitation number
FA8213-23-R-5004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and federal contract opportunity solicitation for fire cartridges used on KC-135 and C-17 aircraft. The quality assurance letter outlines inspection requirements for the contractor, including mandatory stamp and signature verification on documentation, witnessing of testing, verification of leak tests and x-ray results, random selection of lots for testing, and verification of packaging and marking. The related federal contract opportunity solicitation seeks bids for fire cartridge first articles, production units, test plans, and inspection reports. Key details include national stock numbers, part numbers, quantities required for various end users and purposes such as foreign military sales to Denmark and Taiwan, pricing split between first article and production requirements, and involvement of the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files for this federal contract opportunity

Other files attached to KC-135 & C-17 Fire Cartridges, newest first.
File Type Posted
CDRLs for FAT FD2020-22-50040 - 22-50041 Oct 2022 Corrected.pdf PDF
CADPAD Item Marking Instruction - Ver 1.5 - 20190501.pdf PDF
REPSHIP.pdf PDF
SPI Combined.pdf PDF
ADC SOW Jan 2018.pdf PDF
Rework_and_Repair_ES7034.pdf PDF
Air Spec_FD2020-22-50040 and 50041.pdf PDF
SOW - February 2022.pdf PDF
Item Descriptions_FD2020-22-50040 and 50041.pdf PDF
CDRLS FD2020-22-50040 AND 50041 Oct 22 Corrected.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 08AUG2021
2021-08-09T14:24:04-0600
KELLY.ZACHARY.ANDREW.1596765501
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 878493-2/200330-4, 878492-2/200330-3
DODIC: MJ92/MJ15
Text20: 61423, 57597
Text19:
Part Number Line 2:
Contract No: 22-50040/50041
Date Contract Awarded:
Final Delivery Date FDD:
Program Name:

File details come from the government source that posted it. Updated .