This document is a Questions & Answers (Q&A) file for Project PS-24-004, a Roadway Improvement Project for the Town of Windsor, Colorado, dated March 26 and April 2, 2024. The Q&A addresses two primary inquiries from potential bidders regarding pavement marking specifications and project details. The first question clarifies the unit quantity for stop bar measurements, specifically correcting the bid schedule to use linear feet (LF) for 2' stop bars. The second set of questions seeks clarification on road closure locations, traffic restrictions, street-specific asphalt requirements (PG 64-28), and specific construction details for Highland Meadows, such as bottom lift thickness and removal amounts.
The document directs bidders to consult the Asphalt Construction Notes and project plans for most of the requested information, with the town providing specific corrections to potential ambiguities. For the Highland Meadows section, the town confirms a 3" bottom lift and 5" removal amount, contradicting earlier notes that suggested a 2" bottom lift. While the document does not provide comprehensive pricing or funding details, it demonstrates the town's commitment to precise communication and transparency in the bidding process for the roadway improvement project, which involves approximately 82,000 square yards of roadway overlay.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Schedule - Roadway Improvement Project - 2024 Rev 4-3-24.pdf | ||
| Project Manual - Roadway Improvement Project - 2024.pdf | ||
| Plan Set - Roadway Improvement Project - 2024 Rev 4-3-24.pdf | ||
| Plan Set - Roadway Improvement Project - 2024.pdf | ||
| Bid Schedule - Roadway Improvement Project - 2024.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers - 1
Project PS-24-004 - Roadway Improvement Project - 2024
Buying Organization Town of Windsor
No Question/Answer Question Date
Q1 Question: Pavement Marking
Pavement Marking and Striping - 1' Stop Bar is by the LF and you have Pavement Marking and Striping
- 2' Stop Bar as an EA. Is this correct?
Answer: The unit quantity for the 2' Stop Bar is incorrect, the unit quantity for this line item is Linear
Feet (LF); the corrected Bid Schedule is enclosed.
03/26/2024
Q2 Question: Bid Questions
1. Can you give us the locations where closures will be allowed.
2. Are there any other traffic restrictions.
3. Can you clarify which streets require PG 64-28?
4. On sheet 29, does Highland Meadows require a 3” or 2” bottom lift? The notes and bid schedule call for 3”, however the key on the right side of detail calls out 2” bottom and only 4” of removal.
Answer: 1. This information can be found in the Asphalt Construction Notes in the plans.
2. This information can be found in the Asphalt Construction Notes in the plans.
3. This information can be found in the Asphalt Construction Notes and Cross-section details on Sheet
29 in the plans.
4. The bottom lift will be 3" and the removal amount is 5"; the corrected sheet is enclosed.
04/02/2024
Questions & Answers - 1